Leak-proof reinforced prefabricated part of flood control dam
(1) art
The present invention relates to a kind of reinforcing prefabricated component, particularly relate to a kind of leak-proof reinforced prefabricated part of flood control dam.
(2) background technology
For a long time China to spend huge sums at flood-fighting front repair flood control dam and leak-proof reinforced process on, but effect all can not get effective improvement; Dykes and dams are caused the phenomenons such as the permeable certainly dam of dykes and dams still often to occur by the plague of insects as ant Durchgangshohle.In the process of flood control dam leak-proof reinforced, China does not also have effective measures at present and implements very large difficulty, particularly, dykes and dams that dykes and dams just different longer at embankment is difficult to carry out especially.Such as Changjiang main dyke two sides total length greatly about about myriametre, dykes and dams height in two sides is different, also needs low lying areas at the bottom of dam to carry out adding the troublesome work such as pile when implementing the measure of leak-proof reinforced; And some places all to exceed at the bottom of existing ground or river to reinforce to flood control dam especially and bring difficulty.Thus current, China's urgent need a kind ofly effectively will overcome the processing method of improvement flood control dam antiseep reinforcing to effect a radical cure the generation that flood control dam leakproof causes the events such as the flood burst the dam.
(3) summary of the invention
The object of the invention is to provide a kind of leak-proof reinforced prefabricated part of flood control dam, it is characterized in that, described plate body two ends be provided with connect tiger's jaw head, tiger's jaw chamber and tiger's jaw, on plate body, joint face is provided with connection bump bar, and lower joint face is provided with connecting groove structure.All joint faces of described joint face tiger's jaw chamber, tiger's jaw, upper joint face raised item and lower joint face connecting groove structure are with the elastic cementing layer of one deck.Whole prefabricated component reinforced concrete is made.Prefabricated component center accompanies one deck leakproof central partition plate.Described prefabricated component tiger's jaw head is connected with another prefabricated component tiger's jaw head and adopts cast-in-place filling bicylindrical reinforced concrete to connect, the flood control leak-proof reinforced wall that described prefabricated component is formed, feature has that structure is simple, production and processing convenient and have leakproof of controlling flood preferably, antidetonation, Resisting fractre and anti-effect of expanding with heat and contract with cold.
The present invention implements like this: described leak-proof reinforced prefabricated part of flood control dam is formed primarily of leakproof intermediate interlayer, reinforcing bar, plate body and elasticity cementing layer, it is characterized in that: the two ends, left and right of plate body are provided with tiger's jaw head, be provided with in tiger's jaw head and adopt cast-in-place tiger's jaw chamber and the tiger's jaw of filling with connection.Described plate body top is provided with the connection bump for rabbeting, and plate body bottom is provided with the connecting groove structure embedded for connection bump.Described plate body center is provided with one piece of leakproof intermediate interlayer, and intermediate interlayer is provided with the circular hole for making reinforcing bar pass.Described U-shaped reinforcing bar is through two ends electric welding and reinforcement welding after circular hole.Plate body is that reinforced concrete cast is formed, and described left and right, up and down all joint face glue are with one deck band elasticity cementing layer.
(4) accompanying drawing explanation
Fig. 1, be that the present invention is connected main pseudosection.
Fig. 2, be that the present invention combines top plan view.
Fig. 2, be that the present invention combines top plan view.
Fig. 3, be tiger's jaw head of the present invention and reinforcement placement figure.
Fig. 4, be the connection diagram up and down of plate body of the present invention and plate body.
In figure: 1 connection bump, 2 leakproof intermediate interlayers, 3 bicylindrical pins, 4 circular holes, 5 reinforcing bars, 6 plate bodys, 7 tiger's jaw heads, 8 tiger's jaw chambeies, 9 tiger's jaws, 10 elasticity cementing layers, 11 electric welding, 12U steel bar, 13 connecting groove structures.
(5) detailed description of the invention
Below in conjunction with Figure of description, specific embodiments of the present invention is described in detail:
As shown in Figure 1, Figure 2, Figure 3, Figure 4, the present invention is formed primarily of leakproof intermediate interlayer, reinforcing bar, plate body and elasticity cementing layer, it is characterized in that: the two ends, left and right of plate body are provided with tiger's jaw 7, be provided with in tiger's jaw 7 to adopt and cast-in-placely fill with the tiger's jaw chamber 8 and tiger's jaw 9 that connect.Described plate body 6 top is provided with the connection bump 1 for rabbeting, and plate body bottom is provided with the connecting groove structure 13 embedded for connection bump 1.Described plate body center is provided with one piece of leakproof intermediate interlayer 2, and leakproof intermediate interlayer 2 is provided with the circular hole 4 for making reinforcing bar pass.Described reinforcing bar is U-shaped reinforcing bar 12, and U-shaped reinforcing bar 12 welds with reinforcing bar 5 through two ends electric welding 11 after circular hole 4.Plate body 6 is reinforced concrete cast formation, and described left and right, up and down all joint face glue are with one deck band elasticity cementing layer 10.Embodiment of the present invention job description is as follows:
1. first by U-shaped reinforcing bar 12 through in the circular hole 4 of leakproof intermediate interlayer 2, ajusted after weld with reinforcing bar 5.
2. the reinforcing bar after welding processing and leakproof intermediate interlayer are put in mould to put just and pour mixed earth again into, with shock club, mixed earth vibrations are stirred, wait after doing and remove mould.
3. with special binder by after on elasticity cementing layer 10 sticker to the joint face of prefabricated component, whole prefabricated component manufacturing process just completes.