A kind of new website appraisal procedure moving network optimization system
Technical field
The present invention relates to mobile network optimization system, specifically a kind of new website appraisal procedure moving network optimization system.
Background technology
In mobile communications, each province is in order to solve the network optimization, and prefectures and cities of each province can carry out the large-scale network optimization and engineering construction, wherein relates to a large amount of newly-built macro station, planning and design, the construction of room substation and opens examination. In large scale and intricate due to newly-built station, how realizing that the new website in prefectures and cities of the whole province arbitrary period is opened progress carries out control, operating mass after being opened by new website, utilization ratio and every index are assessed and compare, and lack effective automatization statistics and the means of verification at present.
Present method can count the new website networking rate of prefectures and cities easily, exceedes warning index rate, compliance rate, interim index rate and the value of each index some day.
Summary of the invention
It is an object of the invention to provide a kind of new website appraisal procedure moving network optimization system.
It is an object of the invention to realize in the following manner, appraisal procedure is as follows
1) create a new website management project, comprise new website title, demand class and new website Resource Properties;
2) for the new project created sets up evaluation index, warning index and evaluation index is included;
3) for new website management project imports the base station information of planning;
4), etc. after the actual networking of a certain new website, districts and cities user finds the corresponding layout data of our station, and clicking editor increases cell information;
5) network optimization user inquires about the networking rate of certain time in networking rate function;
6) network optimization user inquires about the departure distance of the planning address of certain concrete base station and actual address in site excursion function and exceedes all base station informations of a certain concrete distance;
7) network optimization user inquires about the warning index information of the base station information that networked now in warning function, comprises the data that exceed standard, the data that do not exceed standard and exceeding standard rate;
8) network optimization user inquires about the evaluation index information of the base station information that now networked in evaluation index function, comprises data up to standard, below standard data and compliance rate;
Establishment new website management project process in step 1), comprises project name, project demand class, base station acquiescence attribute and self-defined attribute;
Step 2) in create warning index and evaluation index, carry out selective goal by a tree structure;
In step 4) for planning base station information increase cell information time, need in existing little area resource table to inquire about the actual name of base station, actual longitude, actual latitude and network entry time, supplement these information in the attribute of base station, and calculate the distance between our station actual address and planning address, whether meet warning index and evaluation index;
Step 8) defines an interim evaluation index, inquires about the interim index compliance rate of this project;
Step 1) and step 5) also comprise: define a table, come the List name of stock item and corresponding table name.
Adopt the method for the invention, compared with prior art, it is possible to realize easily establishment of item, project data import, project data association, project control software. After conveniently referring to that province user sets up a project, then layout data is imported, districts and cities user is associated relation, then the evaluation index that user just can check prefectures and cities is economized, the every evaluation index of oneself just can be checked by prefectures and cities, which offers a saving the development time, reduce the complexity of exploitation, it is to increase development efficiency.
Accompanying drawing explanation
Fig. 1 is the overview flow chart of the present invention;
Fig. 2 is self-defined verification condition schema.
Embodiment
With reference to Figure of description, the method for the present invention is described in detail below.
Problem to be solved by this invention is to provide a kind of method and can assess networking rate, the early warning exceeding standard rate of new website easily, assess compliance rate and the indication information of a certain period, and the aspects such as the operation conditions of assessment newly-built station and the identical situation of assessment design and construction and network demand provide supporting method effectively. Specific embodiments is as follows:
1.1 establishment new website management projects, comprise new website title, demand class and new website Resource Properties;
1.2 is that the new project created sets up evaluation index, includes warning index and evaluation index;
The base station information that 1.3 is the importing planning of new website management project;
After the actual networkings of a certain new website such as 1.4, districts and cities user finds the corresponding layout data of our station, and clicking editor increases cell information;
1.5 network optimization users can inquire about the networking rate of certain time in networking rate function;
1.6 network optimization users can inquire about the departure distance of the planning address of certain concrete base station and actual address in site excursion function and exceed all base station informations of a certain concrete distance;
1.7 network optimization users can inquire about the warning index information of the base station information that networked now in warning function, comprises the data that exceed standard, the data that do not exceed standard and exceeding standard rate;
1.8 network optimization users can inquire about the evaluation index information of the base station information that now networked in evaluation index function, comprises data up to standard, below standard data and compliance rate.
Establishment new website management project process in step 1.1, comprises project name, project demand class, base station acquiescence attribute and self-defined attribute.
Step 1.2 creates warning index and evaluation index, carries out selective goal by a tree structure.
In step 1.4 for planning base station information increase cell information time, need in existing little area resource table to inquire about the actual name of base station, actual longitude, actual latitude and network entry time, supplement these information in the attribute of base station, and calculate the distance between our station actual address and planning address, whether meet warning index and evaluation index.
When step 1.8 is inquired about every index, define an interim evaluation index, inquire about the interim index compliance rate of this project.
In the present invention, define a repertory, come the List name of stock item and corresponding table name.
Embodiment
The establishment of new project and evaluation index is mainly discussed below, and all operations all completes on network optimization system foreground.
In order to increase extendability and compatibility, during the technology of specific implementation the present invention, java language and JDBC (JavaDataBaseConnection can be used, Java DataBase combining), accomplish cross-platform (windows/unix/linux), integration across database (sqlserver/mysql/oracle/db2 etc.), it is provided that WEB graphical interfaces, simple operations, convenient and practical.
It is described below in conjunction with accompanying drawing and idiographic flow.
Fig. 1 is the main flow process of the present invention.
In the present invention, the table name of new project and the naming rule of newly-increased field are as follows:
Table name: the project name that user inputs directly be converted Chinese pinyin or respective initial pinyin combinations;
Table increases field newly: field_add_* (No. * is numeral, represents which field).
The descriptor of literary name section is the field name that user inputs.
The project name that first establishment new website project inputs according to user is converted into whole Chinese phonetic alphabet, then judge that whether length is more than 30 characters, if it exceeds, so get the initial combination of other word of spelling of first word, judge that whether length is more than 30 again, if it exceeds, so get the initial pinyin combinations of each phonetic transcriptions of Chinese characters, judge that whether length is more than 30 again, if it exceeds, so intercept front 30 characters, then the project that whether there is identical items title in list is searched, so point out if identical and exist, user is allowed to re-enter, if table name is identical, user is so pointed out to there is the table of a * * by name, whether inquiry user changes name, if revised, then circulate a upper cloth, otherwise amendment last character of table name, it is revised as sequence number, it is individual which shows. then by project name and corresponding table name insertion project maintenance table, then under fixing user, create table and its field information.
Project configuration literary name section is as follows:
Field name |
Type |
Field describes |
PROJECT_ID |
Varchar2(32) |
Project major key |
PROJECT_NAME |
Varchar2(32) |
Project name |
RELATE_TABLE |
varchar2(64) |
The corresponding table name of project |
REG_TIME |
date |
The project registration time |
Casting sword data report flow is the template that user first downloads reported data, after then having filled in data according to corresponding form, uploads on WEB foreground, and optional when uploading is that increment covering is uploaded or completely newly uploaded.
After having uploaded layout data, districts and cities actual complete base station set up after, then layout data is found on WEB foreground according to base station planning title, then click editor association cell information, then background program can find cell information in resources bank and by information solicitation such as community networkings in table. The logic of this single amendment and batch modification has difference, is first upgraded by all cell informations during batch modification, then upgrades at bulk lookup inbound information.
Finally, user just can use WEB foreground, inquires about the statistics of every index.
Fig. 2 describes self-defined verification condition flow process. When user wants ratio or the achievement data in certain period adding up or inquiring about other index of this project, it is possible to self-defined selective goal. As can be seen from the figure, this process is very simple, only need to select the index of needs from tree, then select the time period. This kind of simple method embodies the advantage conveniently adding up and searching index, namely improves the handiness of system to a great extent.
Except the technology feature described in specification sheets, it is the known technology of those skilled in the art.