CN102567815B - 基于实际电网运行数据的事后理想计划分析方法 - Google Patents
基于实际电网运行数据的事后理想计划分析方法 Download PDFInfo
- Publication number
- CN102567815B CN102567815B CN201210038941.5A CN201210038941A CN102567815B CN 102567815 B CN102567815 B CN 102567815B CN 201210038941 A CN201210038941 A CN 201210038941A CN 102567815 B CN102567815 B CN 102567815B
- Authority
- CN
- China
- Prior art keywords
- unit
- ideal
- desirable
- afterwards
- optimization
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210038941.5A CN102567815B (zh) | 2012-02-20 | 2012-02-20 | 基于实际电网运行数据的事后理想计划分析方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210038941.5A CN102567815B (zh) | 2012-02-20 | 2012-02-20 | 基于实际电网运行数据的事后理想计划分析方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102567815A CN102567815A (zh) | 2012-07-11 |
CN102567815B true CN102567815B (zh) | 2014-12-10 |
Family
ID=46413182
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210038941.5A Active CN102567815B (zh) | 2012-02-20 | 2012-02-20 | 基于实际电网运行数据的事后理想计划分析方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102567815B (zh) |
Families Citing this family (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103065057B (zh) * | 2013-01-25 | 2015-09-16 | 武汉大学 | 一种电力系统差异化规划经济性评估方法 |
CN103116823A (zh) * | 2013-01-25 | 2013-05-22 | 中国电力科学研究院 | 一种用于多级电力市场的市场结构公共信息模型构建方法 |
CN103093287B (zh) * | 2013-01-29 | 2017-02-08 | 广东电网公司电力调度控制中心 | 电网指标预测误差评估方法和系统 |
CN103268570B (zh) * | 2013-04-28 | 2016-06-22 | 中国南方电网有限责任公司 | 一种电网经济调度预评估系统及方法 |
CN103632045B (zh) * | 2013-11-19 | 2017-07-07 | 中国南方电网有限责任公司 | 一种评估省级电网发电调度理想度的计算方法 |
CN104218569B (zh) * | 2014-08-15 | 2016-02-24 | 国家电网公司 | 一种大规模电网静态安全校核的评价分析方法 |
CN104299055B (zh) * | 2014-10-15 | 2017-08-29 | 国电南瑞科技股份有限公司 | 一种抑制电厂内机组反向调节的发电计划优化方法 |
CN107491867B (zh) * | 2017-08-07 | 2021-02-02 | 国电南瑞科技股份有限公司 | 一种用于多周期发输变检修计划的安全校核及评估方法 |
CN107464025B (zh) * | 2017-08-25 | 2021-06-11 | 智脑智能科技(苏州)有限公司 | 基于大数据的供应链需求预测与智能决策方法 |
CN109087122A (zh) * | 2018-06-26 | 2018-12-25 | 广东电网有限责任公司 | 一种发电侧全电量交易的方法、装置及系统 |
CN109359853B (zh) * | 2018-10-11 | 2021-10-22 | 国电南瑞科技股份有限公司 | 一种考虑电网安全约束的跨省调峰辅助服务交易出清方法 |
CN111539586B (zh) * | 2020-06-05 | 2022-04-26 | 中国电力科学研究院有限公司 | 一种电力调度中心及辅助决策方法 |
CN111525568B (zh) * | 2020-06-05 | 2021-08-27 | 中国电力科学研究院有限公司 | 一种适用于电力系统再调度的建模方法及系统 |
CN114924188A (zh) * | 2022-05-13 | 2022-08-19 | 上海擎测机电工程技术有限公司 | 一种火电机组启停机监测方法与系统 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101232182A (zh) * | 2008-01-18 | 2008-07-30 | 清华大学 | 三维协调的电网能量管理系统及对电网的评估及控制方法 |
CN102156815A (zh) * | 2011-04-07 | 2011-08-17 | 国电南瑞科技股份有限公司 | 年度电量进度跟踪调度模式下发电计划优化方法 |
CN102184468A (zh) * | 2011-04-27 | 2011-09-14 | 国电南瑞科技股份有限公司 | 间歇性能源发电有功调度方法 |
-
2012
- 2012-02-20 CN CN201210038941.5A patent/CN102567815B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101232182A (zh) * | 2008-01-18 | 2008-07-30 | 清华大学 | 三维协调的电网能量管理系统及对电网的评估及控制方法 |
CN102156815A (zh) * | 2011-04-07 | 2011-08-17 | 国电南瑞科技股份有限公司 | 年度电量进度跟踪调度模式下发电计划优化方法 |
CN102184468A (zh) * | 2011-04-27 | 2011-09-14 | 国电南瑞科技股份有限公司 | 间歇性能源发电有功调度方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102567815A (zh) | 2012-07-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102567815B (zh) | 基于实际电网运行数据的事后理想计划分析方法 | |
US10574087B2 (en) | Energy storage modeling and control | |
CN105046395B (zh) | 一种含多类型新能源的电力系统日内滚动计划编制方法 | |
CN110490363B (zh) | 一种多日机组组合优化方法及系统 | |
CA3030490A1 (en) | Intelligent energy management system for distributed energy resources and energy storage systems using machine learning | |
CN104951899A (zh) | 含大规模可再生能源的配电公司多时间尺度优化调度方法 | |
CN103617453A (zh) | 考虑风电和谐消纳的电力系统中长期交易运营计划获取方法 | |
CN104283234A (zh) | 基于大时间尺度机组检修的风电接纳能力评估方法 | |
CN112149842A (zh) | 一种电网的检修管理方法及装置 | |
KR20210100699A (ko) | 하이브리드 발전소 | |
CN110400056A (zh) | 基于风光时空特性的梯级水电日前优化调度方法及装置 | |
Lauby et al. | Balancing act | |
CN103633641A (zh) | 一种考虑风电接纳的中长期交易运营计划获取方法 | |
CN105226649B (zh) | 一种基于母线负荷预测改进的省级电网发电调度优化方法 | |
CN103337040A (zh) | 一种计及风电波动性的风电发电计划编制系统及编制方法 | |
JP7169144B2 (ja) | 蓄電設備管理装置および蓄電設備管理方法 | |
McGarrigle et al. | Cost savings from relaxation of operational constraints on a power system with high wind penetration | |
CN116934106A (zh) | 电源侧风光火储一体化项目的ccer方法学开发方法 | |
CN109871983B (zh) | 一种电力能源管理系统 | |
CN111478377A (zh) | 一种基于网源动态约束的新能源消纳能力评估方法及系统 | |
TWI815666B (zh) | 分散式虛擬電廠整合智慧淨零的混合系統及其方法 | |
Lim et al. | Cost-Effective Peak Shaving Strategy Based on Clustering and XGBoost Algorithm | |
Sajjadi et al. | Integration of Electric Vehicles into Multi‐energy Systems | |
CN118153912A (zh) | 一种基于智慧物联的电力能源管理系统 | |
Alharthi et al. | Renewable Energy Hybrid Grid-Connected System Sensitivity Analysis, Integration, and System Flexibility |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: STATE GRID ZHEJIANG ELECTRIC POWER COMPANY Effective date: 20140212 |
|
CB03 | Change of inventor or designer information |
Inventor after: Wu Bingxiang Inventor after: Guo Feng Inventor after: Liu Jun Inventor after: He Chunsheng Inventor after: Ding Qia Inventor after: Yang Zhenglin Inventor after: Yang Leyong Inventor after: Li Lili Inventor after: Zhu Bingquan Inventor after: Huang Jing Inventor after: Zhang Jun Inventor after: Wu Zhen Inventor before: Wu Bingxiang Inventor before: Ding Qia Inventor before: Yang Zhenglin Inventor before: Yang Leyong Inventor before: Li Lili |
|
CB03 | Change of inventor or designer information | ||
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: LI HUI ZHANG SHIJUN YIN ZHIFU WANG CHENGDA WANG XIANGZENG TO: LI HUI ZHANG SHIJUN YIN ZHIFU WANG CHENGDA WANG XIANGZENG ZHANG YONGQIANG LIU JIE HE FEI WANG XIANGZENG GAO RUIMIN LIU LI LI JIANDONG |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20140212 Address after: High road high tech Development Zone Nanjing city Jiangsu province 210061 No. 20 Applicant after: NARI Technology Development Co., Ltd. Applicant after: State Grid Zhejiang Electric Power Company Address before: High road high tech Development Zone Nanjing city Jiangsu province 210061 No. 20 Applicant before: NARI Technology Development Co., Ltd. |
|
TA01 | Transfer of patent application right | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |