CN102562092A - 一种隧道衬砌模型试验容器 - Google Patents

一种隧道衬砌模型试验容器 Download PDF

Info

Publication number
CN102562092A
CN102562092A CN201210021940XA CN201210021940A CN102562092A CN 102562092 A CN102562092 A CN 102562092A CN 201210021940X A CN201210021940X A CN 201210021940XA CN 201210021940 A CN201210021940 A CN 201210021940A CN 102562092 A CN102562092 A CN 102562092A
Authority
CN
China
Prior art keywords
door
rear wall
antetheca
tunnel lining
container
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201210021940XA
Other languages
English (en)
Other versions
CN102562092B (zh
Inventor
唐阳
王玉锁
冯鉴
罗世辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Jiaotong University
Original Assignee
Southwest Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Jiaotong University filed Critical Southwest Jiaotong University
Priority to CN201210021940XA priority Critical patent/CN102562092B/zh
Publication of CN102562092A publication Critical patent/CN102562092A/zh
Application granted granted Critical
Publication of CN102562092B publication Critical patent/CN102562092B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

本发明提供了一种隧道衬砌模型试验容器,本发明属于土木工程技术领域,特别涉及隧道衬砌模型试验研究用的试验容器。前后壁、侧壁、底座三者之间均为直角连接,围岩摩擦阻力大,前后壁补强槽钢型号小,槽钢设置多,因焊接变形引起壁板凹凸不平,增加了试验过程中的摩擦阻力,影响测试精度及试验效果;本发明容器前壁和后壁形成向内微倾梯形台结构,补强槽钢对称焊接在前壁和后壁的外面,前壁还设置了围岩和模型装卸口;侧壁采用厚钢板,两侧对称设计条形孔,底座为整体厚钢板;安全封门设有两扇大门板,每扇门的上部和底部均设有两付固定销套件,安全封门的压板采用玻璃钢,每扇门板上设有用观测孔。主要用于隧道衬砌模型试验研究用的试验。

Description

一种隧道衬砌模型试验容器
技术领域
本发明属于土木工程技术领域,特别涉及隧道衬砌模型试验研究用的试验容器。
背景技术
试验容器是隧道衬砌模型试验研究中用来盛围岩和模型的容器,也是试验台的主要受力结构,是得到可靠试验数据的关键结构。容器前侧须开设较大装卸口,便于装填、排放围岩及装拆衬砌模型,也须在开孔处设置安全封门并对其固定,防止施压过程中围岩和模型的外移,还需在安全封门上设置用于传感器线路布置的结构。
现有容器为对称长方体结构,长度和深度较宽度大许多,由前壁、后壁、两个端壁、底座及安全封门组成。前后壁结构一样,均为底板上焊接补强槽钢结构,只是前壁开设有围岩、试验模型等的装卸口及相应的安装固定用的安全封门。端壁及底座均由三根槽钢采用并排螺栓连接而成。端壁与前后壁采用螺栓连接,端壁和底座均在中间槽钢焊接角钢并在容器外侧将二者用螺栓连接起来。底座夹在前后壁间并置于底部承载座上。安全封门压板为木板,外侧采用竖向布置的六根槽钢和容器装卸口边缘穿销进行固定,中间开设圆孔,便于观测衬砌模型及安放测试装置。试验时,在试验容器内居中安放隧道衬砌模型,周边施以围岩,用木板封住装卸口,外侧布置六根加强槽钢压住木板,槽钢端部插上穿销与装卸口周边固定即完成了安全封门的安装。
采用现有试验容器的问题是:前后壁、侧壁、底座三者之间均为直角连接,围岩摩擦阻力大,影响测试精度及试验效果;前后壁补强槽钢型号小,槽钢设置多,壁板厚度小,焊接工作量大,易因焊接变形引起壁板凹凸不平,增加了试验过程中的摩擦阻力,影响测试精度;侧壁和底座各采用三根槽钢并排且用螺栓连接,须对槽钢连接处进行大量钻通孔工作,工作量大,制造成本高;侧壁与底座连接采用自制角钢加螺栓模式连接,须加工角钢及相应螺栓通孔,增加加工量和制造成本。安全封门压板为木板,围岩受垂向力后产生较大横向力向外侧挤压木板,即使外侧加上槽钢加强筋对木板进行压紧补强,但不足以抵抗横向力,造成木板变形,影响测试精度。安装槽钢加强筋时,须多人配合并预压木板,才能插上穿销,安装麻烦。安装穿销时易发生穿销掉落砸伤操作人员,拆卸槽钢时须敲掉穿销,造成穿销变形,不能重复使用,在大的作用力下槽钢和穿销可能发生外蹦,存在安全隐患。
发明内容
本发明的目的就是提供一种隧道衬砌模型试验容器,使用该容器的制造成本低,结构刚度大,安全可靠,拆装方便,可根据需要将壁体向内侧倾斜一定角度,以减小壁对围岩的摩擦阻力,从而提高测试精度和有效性。
本发明为解决原有结构上的问题,降低制造成本,减小壁体与围岩之间的摩擦阻力,所实施的具体技术方案是:该隧道衬砌模型试验容器,包括由两侧壁螺栓连接前壁和后壁的两端面,底座和安全封门,该容器前壁和后壁形成向内微倾梯形台结构,补强槽钢对称焊接在前壁和后壁的外面,前壁还设置了围岩和模型装卸口;侧壁采用厚钢板,两侧对称设计条形孔,底座为整体厚钢板;该容器底座位于前壁、后壁之间,侧壁位于前壁和后壁端部外侧,它们之间由高强度螺栓连接;安全封门设有两扇大门板,由门轴座和门轴固定在门框上,两扇小门板通过活动门轴座和活动门轴固定在大门板上,每扇门的上部和底部均设有两付固定销套件,背面还设有加强筋;安全封门的压板采用玻璃钢,每扇门板上还设有用观测孔。
前壁和后壁可根据试验需要在1∶50~100间调整内倾斜度。
前后壁板采用厚钢板,选择大型号补强槽钢对称焊接在前后壁上,前壁还设置了围岩、模型装卸口;侧壁采用厚钢板,两侧对称设计条形孔;底座采用整体厚钢板。该容器的前、后壁、底座及侧壁均置于加载机架基座上,底座位于前后壁之间,侧壁位于前后壁端部外侧并用高强度螺栓与前后壁连接起来。安全封门压板采用玻璃钢,装卸口四角布置固定门轴座,大门板和小门板可绕各自转动轴转动,也可用各自的固定销套件与固定销座将其压紧在玻璃钢板并固定在装卸口上。大小门板内侧均有槽型加强筋用于增加门板刚度及压紧玻璃钢板,门板上还设计有用于安装试验设备及观测的孔。
与现有技术相比,本发明的优点有:
厚钢板、大型号槽钢的选取,补强槽钢间距的适当增加,减少了槽钢数量,使得焊接量大大减少,焊接变形小,焊接工艺好,增强了整体刚度,降低了制造成本。
侧壁和底座采用厚钢板,保证了刚度,减小了原槽钢连接孔的加工量。
侧壁设计条形孔可适应试验需要的倾斜角度,降低摩擦力对试验的影响。
封门压板采用玻璃钢,刚度较大,不易变形;透明度高,便于观测;切割容易,加工成本低。
四扇折页门的设计,将原有的加强筋固定在折页门上,折页门为一整体,整体刚度大,不易变形;可适应单模型和双模型两种试验,即当进行单模型试验时,安装完玻璃钢压板后,将外侧折页门用固定销固定,仅开启中间折页门,当进行双模型试验时,将四扇折页门全打开。
折页门固定在装卸口四角固定门轴座内,每扇门上还设有四个L型固定销轴、八个固定销座及相应安全挡,可实现门的完全固定,不会出现松动及掉落现象;折页门内侧加强筋还兼有压力板作用,即将玻璃钢压板紧紧压在围岩上,防止松动。
安全封门操作简便,在装拆玻璃钢压板时,仅需1人将固定销轴从固定销座内插入或拔出,用手向内推门板或向外拉门板即可完成折页门的闭合或开启,不会出现销轴掉落甚至砸伤操作人员的情况。
附图说明
图1是本发明主视图。
图2是本发明侧壁条形孔示意图。
图3是本发明剖视图。
图4是本发明安全封门示意图。
具体实施方式
如图1、图2、图3、图4为本发明的一种具体实施方式。按照图纸将前后壁厚钢板加工后,在其上布置并焊接相应槽钢,加工好侧壁和底座,将底座置于加载机架基座上,固定前后壁,用螺栓连接侧壁和前后壁并调整至需要斜度即可完成组装。按照图纸将两组门板加工好后,将其安装在装卸口固定门轴座上,对齐装卸口上下边缘上固定销座配焊门板上的固定销及相应销座,则完成了整个安全封门折页门的安装。将玻璃钢封门装上装卸口,关闭四扇折页门,插上相应固定销即完成了安全封门的关闭工况。轻敲并拔出固定销,打开四扇折页门,取下玻璃钢封门即完成了整个安全封门的开启工况。

Claims (3)

1.一种隧道衬砌模型试验容器,包括由两侧壁(3)螺栓连接前壁(1)和后壁(2)的两端面,其特征在于:该容器前壁(1)和后壁(2)形成向内微倾梯形台结构,补强槽钢对称焊接在前壁(1)和后壁(2)的外面,前壁(1)还设置了围岩和模型装卸口;侧壁采用厚钢板,两侧对称设计条形孔(5),底座为整体厚钢板;该容器底座(4)位于前壁(1)、后壁(2)之间,侧壁(3)位于前壁(1)和后壁(1)端部外侧,它们之间由高强度螺栓连接;安全封门设有两扇大门板(6),由门轴座(7)和门轴(8)固定在门框上,两扇小门板(12)通过活动门轴座(10)和活动门轴(11)固定在大门板(6)上,每扇门的上部和底部均设有两付固定销套件(9),背面还设有加强筋(13);安全封门的压板采用玻璃钢(15),每扇门板上还设有用观测孔(14)。
2.根据权利要求1所述的一种隧道衬砌模型试验容器,其特征在于:前壁(1)和后壁(1)可根据试验需要在1∶50~100间调整内倾斜度。
3.根据权利要求1所述的一种隧道衬砌模型试验容器,其特征在于:整个容器置于加载机架基座上。
CN201210021940XA 2012-01-31 2012-01-31 一种隧道衬砌模型试验容器 Expired - Fee Related CN102562092B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210021940XA CN102562092B (zh) 2012-01-31 2012-01-31 一种隧道衬砌模型试验容器

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210021940XA CN102562092B (zh) 2012-01-31 2012-01-31 一种隧道衬砌模型试验容器

Publications (2)

Publication Number Publication Date
CN102562092A true CN102562092A (zh) 2012-07-11
CN102562092B CN102562092B (zh) 2013-11-20

Family

ID=46408526

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210021940XA Expired - Fee Related CN102562092B (zh) 2012-01-31 2012-01-31 一种隧道衬砌模型试验容器

Country Status (1)

Country Link
CN (1) CN102562092B (zh)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU1779970C (ru) * 1990-11-01 1992-12-07 Центральный научно-исследовательский институт машиностроения Рабоча часть трансзвуковой аэродинамической трубы с адаптивными стенками
JPH0835398A (ja) * 1994-07-22 1996-02-06 Three Bond Co Ltd シールドトンネル用二次覆工構造及びその施工方法
WO1999028595A1 (fr) * 1997-11-28 1999-06-10 Nagatomo, Shigeki Procede de construction a structure de type 'squelette de baleine' pour tunnel a section importante
ES2143921B1 (es) * 1997-07-16 2000-12-16 Orsta Staalindustri As Dispositivo para la fijacion y estanqueizacion de recubrimientos para tuneles
CN201297175Y (zh) * 2008-11-11 2009-08-26 西南交通大学 一种土压平衡式盾构施工过程模拟试验装置
JP2009236802A (ja) * 2008-03-28 2009-10-15 Railway Technical Res Inst 3次元トンネル載荷模擬実験装置
CN201650298U (zh) * 2009-11-27 2010-11-24 同济大学 模拟隧道全断面开挖的平面应变式模型试验装置
CN201915970U (zh) * 2010-12-23 2011-08-03 西南交通大学 一种泄水式管片衬砌模型试验箱
CN202520321U (zh) * 2012-01-31 2012-11-07 西南交通大学 隧道衬砌模型试验容器

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU1779970C (ru) * 1990-11-01 1992-12-07 Центральный научно-исследовательский институт машиностроения Рабоча часть трансзвуковой аэродинамической трубы с адаптивными стенками
JPH0835398A (ja) * 1994-07-22 1996-02-06 Three Bond Co Ltd シールドトンネル用二次覆工構造及びその施工方法
ES2143921B1 (es) * 1997-07-16 2000-12-16 Orsta Staalindustri As Dispositivo para la fijacion y estanqueizacion de recubrimientos para tuneles
WO1999028595A1 (fr) * 1997-11-28 1999-06-10 Nagatomo, Shigeki Procede de construction a structure de type 'squelette de baleine' pour tunnel a section importante
JP2009236802A (ja) * 2008-03-28 2009-10-15 Railway Technical Res Inst 3次元トンネル載荷模擬実験装置
CN201297175Y (zh) * 2008-11-11 2009-08-26 西南交通大学 一种土压平衡式盾构施工过程模拟试验装置
CN201650298U (zh) * 2009-11-27 2010-11-24 同济大学 模拟隧道全断面开挖的平面应变式模型试验装置
CN201915970U (zh) * 2010-12-23 2011-08-03 西南交通大学 一种泄水式管片衬砌模型试验箱
CN202520321U (zh) * 2012-01-31 2012-11-07 西南交通大学 隧道衬砌模型试验容器

Also Published As

Publication number Publication date
CN102562092B (zh) 2013-11-20

Similar Documents

Publication Publication Date Title
CN105651965B (zh) 一种可加载相似模拟试验装置及其使用方法
CN207004146U (zh) 一种用于高压输电角钢塔主柱角钢的加固装置
CN202520321U (zh) 隧道衬砌模型试验容器
ATE417258T1 (de) Anordnung zum testen von platten unter scherdruckbelastung
CN110470536A (zh) 一种砌体筒式构件压剪复合受力试验加载装置及加载方法
CN107178242A (zh) 一种用于高压输电角钢塔主柱角钢的加固装置
CN102562092B (zh) 一种隧道衬砌模型试验容器
CN207964174U (zh) 新型阀门试压装置
CN204649537U (zh) 巷道底鼓相似材料模拟试验模型槽
CN104458242B (zh) 类矩形盾构管片试验加载装置
CN204594988U (zh) 一种室内土工模型实验装置
CN207882264U (zh) 用于边坡开挖模拟的物理试验模型
CN209665264U (zh) 一种用于核电站自密封闸阀自密封填料压环取出工具
CN213210494U (zh) 一种高危移动放射源在线监控系统
CN207045782U (zh) 一种飞机维护口盖组件及具有其的飞机气密腔
CN204555688U (zh) 一种微波工业加热设备密封炉门
CN206356357U (zh) 电池铝箔生产线铸轧专用防尘装置
CN208131044U (zh) 一种高低温环试箱
CN203359274U (zh) 用于集装箱的地板以及集装箱
CN202614441U (zh) 一种立式蝶阀开关扭矩测试泵压试验台
CN207276132U (zh) 一种用于电器柜的安装放置平台
CN204881802U (zh) 一种汽车衡
CN205138356U (zh) 一种具有车门内外板匹配功能的车门外板冲压检具
CN204227888U (zh) 一种煅烧炉滚圈的双斜铁安装结构
CN201249972Y (zh) 折叠集装箱门框翻转铰链及密封结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131120

Termination date: 20170131

CF01 Termination of patent right due to non-payment of annual fee