CN102561590B - 管孔内填散沙的建筑物钢管梁、柱 - Google Patents
管孔内填散沙的建筑物钢管梁、柱 Download PDFInfo
- Publication number
- CN102561590B CN102561590B CN201210022796.1A CN201210022796A CN102561590B CN 102561590 B CN102561590 B CN 102561590B CN 201210022796 A CN201210022796 A CN 201210022796A CN 102561590 B CN102561590 B CN 102561590B
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- sand
- column
- pipe
- post
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 38
- 239000010959 steel Substances 0.000 title claims abstract description 38
- 239000004576 sand Substances 0.000 title claims abstract description 32
- 238000010276 construction Methods 0.000 title abstract description 5
- 238000003825 pressing Methods 0.000 claims abstract description 12
- 239000011148 porous material Substances 0.000 claims description 14
- 230000006835 compression Effects 0.000 claims description 4
- 238000007906 compression Methods 0.000 claims description 4
- 239000000463 material Substances 0.000 abstract description 4
- 230000006378 damage Effects 0.000 abstract description 3
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 230000000903 blocking effect Effects 0.000 abstract 1
- 230000003139 buffering effect Effects 0.000 abstract 1
- 239000000945 filler Substances 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 229920000742 Cotton Polymers 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 239000011083 cement mortar Substances 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Landscapes
- Rod-Shaped Construction Members (AREA)
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
管孔内填散沙的建筑物钢管梁、柱,属于建筑构件,用于钢结构建筑中,克服空心管因截面变形导致的承载力瞬间丧失和用混凝土填充管孔存在的成本高,填充物无流动性,建筑物破坏无缓冲的不足。由用作梁、柱的钢管、填充在管孔内的散沙形成的沙芯、固定在钢管一端防止漏沙的封堵、填沙钢管另一端管孔内可移动压砂板或柱、压沙板或柱朝向管端一侧管孔内推压沙板的压力弹簧、固定在钢管端部的弹簧支承座组成。本发明的有益效果是形成内部支撑,抵抗截面变形,产生纵向预应力,和纵向力的承载面积,加大承载能力。填充物有流动性、密度均匀,阻止横截面变形导致的瞬间降低承载力而导致建筑物的突然坍塌。易制作、易安装,建筑成本低。
Description
技术领域
本发明属于建筑物构件,具体涉及建筑物中的梁或柱。
背景技术
建筑物中的柱和梁是必不可少的构件,随着建筑业技术的进步和对抗震性能的关注,使得钢结构建筑物在逐渐被广泛应用。从材料力学上考虑,以管材作为梁、柱为通常的选择。但管状材料受力超限时,管截面会瞬间变扁,承载能力急剧下降,导致建筑物随即损毁。为防止前述现象发生,已经出现在管孔中浇灌混凝土或水泥砂浆的增强方式。在管形梁、柱的管孔中浇灌混凝土,虽然起到阻止梁、柱变扁,提升钢管梁柱的承载力,防止建筑物瞬时坍塌,但仍存在管孔内混凝土养生难于控制,制造、施工较复杂,建筑成本有明显增加,填充物无流动性,建筑物破坏无缓冲时间。
发明内容
本发明的目的是提供一种管孔内填散沙的建筑物钢管梁、柱,用于钢结构建筑中,抵抗钢管的横截面变扁,克服空心管因截面变形导致的承载力瞬间丧失和用混凝土填充管孔存在的制造、施工较复杂,建筑成本有明显增加,填充物无流动性,建筑物破坏无缓冲时间的不足。
本发明的梁、柱由用作梁、柱的钢管、填充在管孔内的散沙形成的沙芯、固定在钢管一端防止漏沙的封堵、钢管另一端管孔内可移动的压砂板或柱、压沙板或柱朝向管端一侧管孔内推压沙板或柱的压力弹簧、固定在钢管端部的弹簧支承座组成。以上为本发明基本方案。
其中的弹簧支撑座可以是固定在钢管端部的钢板或塞入管孔的柱,弹簧支撑座与钢管端部的连接方式可以采用焊接、铆接、螺栓等常规方式连接。
在封堵和压沙板和所填充的散沙之间有阻燃棉片。
本发明中弹簧施加到管内填充物的压力根据所需梁、柱的承载力及管壁的厚度综合计算选定。
本发明的制造方法是:在用作梁、柱的钢管的一端固定上封堵,封住管孔端口,使之不漏沙,向一端被封闭的钢管内填充河沙。河沙充填至设定量后,将钢管开口端向上竖立,在振动台上将管内散沙振实。然后在沙芯的上端面放置压沙板或柱,在压沙板上方的管内放置压力弹簧。在压力弹簧上端放置弹簧座,在弹簧座上施加压力使弹簧座触及或进入管端,并将弹簧座固定在在钢管端头上,移走向弹簧座加压装置,填沙钢管在振动台上二次振动,使弹簧的压力传递至全部沙芯,即得到填散沙的建筑物钢管梁、柱。
本发明的有益效果是形成内部支撑,抵抗截面变形,产生纵向预应力,和纵向力的承载面积,加大承载能力。填充物有流动性、密度均匀,阻止横截面变形导致的瞬间降低承载力而导致建筑物的突然坍塌。易制作、易安装,建筑成本低。
附图说明
图1为本发明中梁、柱的纵向剖面图。
图2为本发明中两端带有连接构件的梁、柱的纵向剖面图。
具体实施方式
参阅图1、图2,本发明包括用作梁、柱的钢管1、填充在管孔内的散沙形成的沙芯4、固定在钢管一端防止漏沙的封堵2或兼作封堵的梁、柱与相邻构件的接头8、钢管另一端管孔内可移动的压砂板或柱5、压沙板或柱朝向管端一侧管孔内推压沙板或柱的压力弹簧6、固定在钢管端部的板状弹簧的支承座5或兼作弹簧支座的梁、柱与相邻构件的接头9组成。在封堵2或兼作封堵的梁、柱与相邻构件的接头8和板状弹簧的支承座5或兼作弹簧支座的梁、柱与相邻构件的接头9朝向沙芯一侧附有阻燃棉片3。
Claims (1)
1.管孔内填散沙的建筑物钢管梁、柱,其特征是:由用作梁、柱的钢管、填充在钢管孔内的散沙形成的沙芯、固定在钢管一端防止漏沙的封堵、钢管另一端管孔内可移动的压砂板或柱、压沙板或柱朝向管端一侧管孔内推压沙板的压力弹簧以及固定在钢管端部的弹簧支承座组成。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210022796.1A CN102561590B (zh) | 2012-02-02 | 2012-02-02 | 管孔内填散沙的建筑物钢管梁、柱 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210022796.1A CN102561590B (zh) | 2012-02-02 | 2012-02-02 | 管孔内填散沙的建筑物钢管梁、柱 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102561590A CN102561590A (zh) | 2012-07-11 |
CN102561590B true CN102561590B (zh) | 2014-09-03 |
Family
ID=46408062
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210022796.1A Expired - Fee Related CN102561590B (zh) | 2012-02-02 | 2012-02-02 | 管孔内填散沙的建筑物钢管梁、柱 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102561590B (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104493989A (zh) * | 2014-12-22 | 2015-04-08 | 福建省南安市巨轮机械有限公司 | 一种灌砂导柱及制作工艺 |
CN104831866A (zh) * | 2015-03-10 | 2015-08-12 | 成都科创佳思科技有限公司 | 混凝土柱结构 |
CN105421587B (zh) * | 2015-12-14 | 2018-05-15 | 广州大学 | 充沙钢管复合构件及其制作方法 |
DE102018132485A1 (de) * | 2018-01-19 | 2019-07-25 | Karlsruher Institut für Technologie | Hybride Tragstrukturen und deren Verwendung |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0631721A (ja) * | 1992-07-16 | 1994-02-08 | Takenaka Komuten Co Ltd | 鋼管コンクリート柱の製造方法 |
CN2893271Y (zh) * | 2006-04-28 | 2007-04-25 | 广州丰鼎五金制品有限公司 | 自压紧支撑式伸缩杆 |
CN101177965A (zh) * | 2007-12-06 | 2008-05-14 | 合肥工业大学 | 一种钢管-frp管内填混凝土组合结构 |
CN201268917Y (zh) * | 2008-08-13 | 2009-07-08 | 中国科学院上海光学精密机械研究所 | 带约束加强筋的钢管混凝土梁柱 |
CN201460176U (zh) * | 2009-08-05 | 2010-05-12 | 周劲宇 | 装配式填料钢管支架结构体系 |
-
2012
- 2012-02-02 CN CN201210022796.1A patent/CN102561590B/zh not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0631721A (ja) * | 1992-07-16 | 1994-02-08 | Takenaka Komuten Co Ltd | 鋼管コンクリート柱の製造方法 |
CN2893271Y (zh) * | 2006-04-28 | 2007-04-25 | 广州丰鼎五金制品有限公司 | 自压紧支撑式伸缩杆 |
CN101177965A (zh) * | 2007-12-06 | 2008-05-14 | 合肥工业大学 | 一种钢管-frp管内填混凝土组合结构 |
CN201268917Y (zh) * | 2008-08-13 | 2009-07-08 | 中国科学院上海光学精密机械研究所 | 带约束加强筋的钢管混凝土梁柱 |
CN201460176U (zh) * | 2009-08-05 | 2010-05-12 | 周劲宇 | 装配式填料钢管支架结构体系 |
Also Published As
Publication number | Publication date |
---|---|
CN102561590A (zh) | 2012-07-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102561590B (zh) | 管孔内填散沙的建筑物钢管梁、柱 | |
CN101463634A (zh) | 端部带耗能铅盒的约束屈曲支撑及其制作方法 | |
CN108374489A (zh) | 一种装配式混凝土柱脚节点结构及其施工方法 | |
CN105649212A (zh) | 一种砌体填充墙与主体框架的柔性连接装置及其砌筑方法 | |
CN103510530A (zh) | 一种叠合墙板嵌入式基础及其实施方法 | |
CN104452578B (zh) | 桩顶埋设吸能材料的耐震型整体式桥台桥梁及其施工方法 | |
CN100558998C (zh) | 铅-约束屈曲支撑复合耗能器及制作方法 | |
CN110145053A (zh) | 一种消能减震墙体 | |
JP5805182B2 (ja) | 合成杭の製造方法 | |
CN100540818C (zh) | 建筑用空心砌块 | |
CN108316317B (zh) | 一种钢管混凝土拱架灌注模拟装置 | |
CN109653192A (zh) | 装配式地下连续墙及其施工方法 | |
CN205530724U (zh) | 超长混凝土结构间歇式膨胀加强带构造 | |
CN203905036U (zh) | 预应力混凝土管桩劲性填芯结构 | |
CN105298017B (zh) | 一种钢管阻尼橡胶连梁 | |
CN103821161B (zh) | 预应力混凝土管桩劲性填芯结构 | |
CN111794408A (zh) | 一种预制填充墙与预制框架柱之间的柔性连接结构 | |
CN103924728B (zh) | 端部无粘结不等强度钢筋混凝土梁 | |
CN106337512A (zh) | 底部加强型钢管混凝土边框高强混凝土组合剪力墙及制作方法 | |
CN206681208U (zh) | 一种组合约束双钢板混凝土剪力墙 | |
CN102182144B (zh) | 一种可复位桥台抗震挡块 | |
CN113374174B (zh) | 一种新型再生块体混凝土预制装配式构造柱及其施工方法 | |
CN100543250C (zh) | 一种复合隔震层 | |
JP2014125813A (ja) | 耐震型プレキャストボックスカルバート | |
CN114525781A (zh) | 预应力杆芯囊袋注浆组合抗浮构件及施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140903 Termination date: 20220202 |
|
CF01 | Termination of patent right due to non-payment of annual fee |