CN102561296B - 静力触探试验方法 - Google Patents

静力触探试验方法 Download PDF

Info

Publication number
CN102561296B
CN102561296B CN201210096828.2A CN201210096828A CN102561296B CN 102561296 B CN102561296 B CN 102561296B CN 201210096828 A CN201210096828 A CN 201210096828A CN 102561296 B CN102561296 B CN 102561296B
Authority
CN
China
Prior art keywords
cone
penetration test
soil
static
cone penetration
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210096828.2A
Other languages
English (en)
Other versions
CN102561296A (zh
Inventor
李鹏
李国和
许再良
陈新军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Design Corp
Original Assignee
Third Railway Survey and Design Institute Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Railway Survey and Design Institute Group Corp filed Critical Third Railway Survey and Design Institute Group Corp
Priority to CN201210096828.2A priority Critical patent/CN102561296B/zh
Publication of CN102561296A publication Critical patent/CN102561296A/zh
Application granted granted Critical
Publication of CN102561296B publication Critical patent/CN102561296B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

本发明公开了一种静力触探试验方法,其包括如下步骤,S1:利用双桥静力触探探头,开展静力触探试验,测试探头在匀速贯入土体过程中的锥尖阻力和侧摩阻力;S2:探头贯入到指定土层预定深度后暂停贯入,卸载并使探头锥尖部位土体孔隙水压力逐渐消散。此后,以一缓慢的恒定加载速率对探杆施加一从零开始逐渐增加的力,直至探头部位土体出现刺入破坏,测记此条件下探头与土体之间不同相对变形所对应的锥尖阻力和侧摩阻力;S3:依次重复步骤S1和步骤S2,直至静力触探试验达到最终预定深度。本发明所述静力触探试验方法不仅能测得随地层深度连续变化的锥尖阻力和侧摩阻力,还能测得具有实际物理意义的探头与土体之间不同相对变形所对应的锥尖阻力和侧摩阻力,从而能进行更多更准确的进一步分析。

Description

静力触探试验方法
技术领域
本发明涉及一种静力触探试验方法,属岩土工程原位测试研究领域。
背景技术
静力触探技术是工程勘察中一项勘探和原位测试方法,主要适用于粘性土、粉性土和砂性土层。静力触探技术以其测试连续、快捷、可靠、经济等优点,在世界上众多国家广泛应用。但是,现有静力触探试验方法均为以一恒定速率将探头匀速贯入地层中,测记在此过程中的锥尖阻力                                                
Figure 2012100968282100002DEST_PATH_IMAGE001
和侧摩阻力,测试结果较为单一,在一定程度上限制了静力触探的工程化应用。
发明内容
本发明为解决上述现有技术中的问题而提供了一种经改进的静力触探试验方法,利用该方法能够在进行常规静力触探试验过程中,通过改进试验工艺,测得地基各土层探头与土体之间不同相对变形所对应的锥尖阻力
Figure 559349DEST_PATH_IMAGE001
和侧摩阻力。测试所得探头与土体之间不同相对变形所对应的锥尖阻力和侧摩阻力
Figure 276769DEST_PATH_IMAGE002
测试机理与桩基承载机理相同,可将其应用于桩基设计。譬如应用测试所得探头与土体之间不同相对变形所对应的锥尖阻力
Figure 671978DEST_PATH_IMAGE001
和侧摩阻力能较为直观、准确地估算桩基承载力及沉降变形。
本发明所采取的技术方案是:
一种静力触探试验方法,包括如下步骤:
S1:利用双桥静力触探探头,开展静力触探试验,测试探头在匀速贯入土体过程中的锥尖阻力
Figure 246496DEST_PATH_IMAGE001
和侧摩阻力
Figure 513529DEST_PATH_IMAGE002
S2:探头贯入到指定土层预定深度后暂停贯入,卸载并使探头锥尖部位土体孔隙水压力消散30分钟;此后,以一缓慢的恒定加载速率对探杆施加一从零开始逐渐增加的力,直至探头部位土体出现刺入破坏,测记此条件下探头与土体之间不同相对变形所对应的锥尖阻力
Figure 712430DEST_PATH_IMAGE001
和侧摩阻力
Figure 381308DEST_PATH_IMAGE002
S3:重复S1继续开展静力触探试验,到下一土层预定深度后重复S2测试该土层探头与土体之间不同相对变形所对应的锥尖阻力
Figure 312355DEST_PATH_IMAGE001
和侧摩阻力
Figure 66685DEST_PATH_IMAGE002
,依次重复S1和S2,直至静力触探试验达到最终预定深度。
上述S1步骤中探头匀速贯入土体中的速度为20±5mm/s。
上述S2步骤中对探杆施加力的恒定加载速率介于10~200 N/s之间。
本发明具有的优点和积极效果是:
本发明提供的静力触探试验方法为在进行常规静力触探试验基础上,通过改进试验工艺,当探头贯入到指定土层预定深度后暂停贯入,卸载并使探头锥尖部位土体孔隙水压力消散30分钟,此后以一缓慢的恒定加载速率(10~200 N/s)对探杆施加一从零开始逐渐增加的力,直至探头部位土体出现刺入破坏,测记此条件下探头与土体之间不同相对变形所对应的锥尖阻力
Figure 803696DEST_PATH_IMAGE001
和侧摩阻力
Figure 780878DEST_PATH_IMAGE002
。测试所得探头与土体之间不同相对变形所对应的锥尖阻力
Figure 210722DEST_PATH_IMAGE001
和侧摩阻力
Figure 452348DEST_PATH_IMAGE002
,测试机理与桩基承载机理相同,可将其应用于桩基设计。
附图说明
图1是按本发明所述方法开展的静力触探试验成果示意图。
具体实施方式
以下结合附图和具体实施例对本发明的静力触探试验方法进行说明。
该实施例的静力触探试验方法,包括如下步骤:
S1:利用双桥静力触探探头,开展静力触探试验,测试探头在匀速贯入(20±5mm/s)土体过程中的锥尖阻力
Figure 727471DEST_PATH_IMAGE001
和侧摩阻力
Figure 308625DEST_PATH_IMAGE002
S2:探头贯入到指定土层预定深度后暂停贯入,卸载并使探头锥尖部位土体孔隙水压力消散30分钟。此后,以一缓慢的恒定加载速率(10~200 N/s)对探杆施加一从零开始逐渐增加的力,直至探头部位土体出现刺入破坏,测记此条件下探头与土体之间不同相对变形所对应的锥尖阻力
Figure 643792DEST_PATH_IMAGE001
和侧摩阻力
Figure 372713DEST_PATH_IMAGE002
S3:重复S1继续开展静力触探试验,到下一土层预定深度后重复S2测试该土层探头与土体之间不同相对变形所对应的锥尖阻力
Figure 451528DEST_PATH_IMAGE001
和侧摩阻力
Figure 887188DEST_PATH_IMAGE002
,依次重复S1和S2,直至静力触探试验达到最终预定深度。
在本实施例中,该方法是通过改进现有静力触探试验工艺来实现的。在进行常规静力触探试验过程中,当探头贯入到某一地层土体预定深度后暂停贯入,卸载并使探头锥尖部位土体孔隙水压力消散30分钟,此后以一缓慢的恒定加载速率(10~200 N/s)对探杆施加一从零开始逐渐增加的力,直至探头部位土体出现刺入破坏,测记此条件下探头与土体之间不同相对变形所对应的锥尖阻力
Figure 658835DEST_PATH_IMAGE001
和侧摩阻力
Figure 609474DEST_PATH_IMAGE002
。之后,继续开展常规静力触探试验。
这样,在进行常规静力触探试验测试随地层深度连续变化的锥尖阻力
Figure 491979DEST_PATH_IMAGE001
和侧摩阻力
Figure 2012100968282100002DEST_PATH_IMAGE003
的同时,通过改进静力触探试验工艺可以测得指定土层探头与土体之间不同相对变形所对应的锥尖阻力
Figure 782146DEST_PATH_IMAGE001
和侧摩阻力
Figure 724694DEST_PATH_IMAGE002
。图1是采用本发明所述方法开展的静力触探试验测试成果示意图,如图1所示,这种新的静力触探试验方法比原有静力触探试验测试成果更加丰富,为之后的分析应用提供了更加有利的依据;且在原有静力触探试验基础上所增测的探头与土体之间不同相对变形所对应的锥尖阻力
Figure 162629DEST_PATH_IMAGE001
和侧摩阻力
Figure 19464DEST_PATH_IMAGE002
,测试机理与桩基承载机理完全一致。桩基承载力与沉降变形均与桩—土不同相对变形所对应的桩尖阻力和侧摩阻力相关,通过多次测试及相关对比试验即可分别建立桩—土不同相对变形所对应的桩尖阻力和侧摩阻力与探头—土不同相对变形所对应的锥尖阻力和侧摩阻力
Figure 492034DEST_PATH_IMAGE002
之间经验关系,进而估算桩基承载力及沉降变形。

Claims (3)

1.一种静力触探试验方法,包括如下步骤:
S1:利用双桥静力触探探头,开展静力触探试验,测试探头在匀速贯入土体过程中的锥尖阻力                                               
Figure 2012100968282100001DEST_PATH_IMAGE002
和侧摩阻力
Figure 2012100968282100001DEST_PATH_IMAGE004
S2:探头贯入到指定土层预定深度后暂停贯入,卸载并使探头锥尖部位土体孔隙水压力消散30分钟;此后,以一缓慢的恒定加载速率对探杆施加一从零开始逐渐增加的力,直至探头部位土体出现刺入破坏,测记此条件下探头与土体之间不同相对变形所对应的锥尖阻力和侧摩阻力
Figure 718012DEST_PATH_IMAGE004
S3:重复S1继续开展静力触探试验,到下一土层预定深度后重复S2测试该土层探头与土体之间不同相对变形所对应的锥尖阻力
Figure 103863DEST_PATH_IMAGE002
和侧摩阻力
Figure 710425DEST_PATH_IMAGE004
,依次重复S1和S2,直至静力触探试验达到最终预定深度。
2.根据权利要求1所述的静力触探试验方法,其特征在于:S1步骤中探头匀速贯入土体中的速度为20±5mm/s。
3.根据权利要求1所述的静力触探试验方法,其特征在于:S2步骤中对探杆施加力的恒定加载速率介于10~200 N/s之间。
CN201210096828.2A 2012-04-05 2012-04-05 静力触探试验方法 Expired - Fee Related CN102561296B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210096828.2A CN102561296B (zh) 2012-04-05 2012-04-05 静力触探试验方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210096828.2A CN102561296B (zh) 2012-04-05 2012-04-05 静力触探试验方法

Publications (2)

Publication Number Publication Date
CN102561296A CN102561296A (zh) 2012-07-11
CN102561296B true CN102561296B (zh) 2014-07-09

Family

ID=46407780

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210096828.2A Expired - Fee Related CN102561296B (zh) 2012-04-05 2012-04-05 静力触探试验方法

Country Status (1)

Country Link
CN (1) CN102561296B (zh)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102864766B (zh) * 2012-08-22 2014-12-31 江苏省电力设计院 基于标准贯入和静力触探试验相关关系的液化判别方法
CN107504936A (zh) * 2017-09-25 2017-12-22 江苏省水利科学研究院 淤泥检测系统及淤泥检测方法
CN109839317B (zh) * 2019-03-13 2020-08-14 大连理工大学 一种微型室内静力触探测试系统及方法
CN110158568B (zh) * 2019-06-11 2021-02-19 中国海洋大学 一种触探探头系数动态标定方法
CN110361521A (zh) * 2019-07-23 2019-10-22 浙江大学 一种由双桥静力触探数据计算土层纵波速度的无线测试装置
CN112301994B (zh) * 2020-09-18 2022-03-29 广州中勘工程科技有限公司 一种多参量静力触探探头标定装置和方法
CN118624395A (zh) * 2024-08-06 2024-09-10 中国海洋大学 基于室内cptu贯入试验测定超固结土静止土压力系数的方法

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1094897A1 (ru) * 1981-04-08 1984-05-30 Северный Филиал Всесоюзного Научно-Исследовательского Института По Строительству Магистральных Трубопроводов Способ испытани грунта статической нагрузкой
SU1286676A1 (ru) * 1985-09-18 1987-01-30 Всесоюзный научно-исследовательский институт транспортного строительства Способ динамического испытани грунта
CN101705678A (zh) * 2009-11-04 2010-05-12 广东永基建筑基础有限公司 静力触探方法

Also Published As

Publication number Publication date
CN102561296A (zh) 2012-07-11

Similar Documents

Publication Publication Date Title
CN102561296B (zh) 静力触探试验方法
Qian et al. Cyclic degradation and non-coaxiality of soft clay subjected to pure rotation of principal stress directions
CN102587426B (zh) 基于触探技术估算桩基承载力的分析方法
CN103076245B (zh) 一种深埋硬岩力学参数变化规律与取值的测定方法
CN109060539A (zh) 一种岩石微米尺度弹性模量及屈服强度获取方法
CN109632510A (zh) 一种预测水化损伤页岩强度的方法
Li et al. Effects of loading direction on failure load test results for Brazilian tests on coal rock
Wang et al. Effects of frictional behavior and geometry of subduction fault on coseismic seafloor deformation
CN106483056B (zh) 一种基于纵波波速的页岩孔隙度测量方法及测量装置
CN106917623B (zh) 钻井井壁稳定性预测方法及装置
CN106290118A (zh) 三轴应力作用下超低渗岩石渗透率测量方法
Xu et al. Landslides in the transitional slopes between a loess platform and river terrace, Northwest China
CN108387470A (zh) 一种连续压痕法测量残余应力和金属材料弹塑性力学性能的方法
CN103616301A (zh) 一种土体剪切试验装置及试验方法
CN105628486A (zh) 测量页岩岩石力学性质的方法及装置
CN103698397A (zh) 一种定量接触压力超声波检测系统及其检测方法
CN104198313A (zh) 一种基于仪器化压入技术的残余应力检测方法
CN113626986A (zh) 一种沥青路面模量梯度确定方法、装置及电子设备
CN108918396A (zh) 一种用三轴应力测试致密储层岩石渗透率的方法
CN110045026A (zh) 利用声发射技术识别岩石裂缝起裂应力的方法
Ma et al. A new shear rheological model for a soft interlayer with varying water content
Qin et al. Numerical analysis of gravity coring using coupled Eulerian-Lagrangian method and a new corer
CN106703768A (zh) 一种模拟高低浓度聚合物驱交替注入时机的确定方法
Zheng et al. The effect of periodic intermittency on the cyclic behavior of marine sedimentary clay
CN112505298B (zh) 一种致密油气储产性能参数原位测试方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 300142 Hebei District, Zhongshan Road, No. 10,

Patentee after: China Railway Design Group Limited

Address before: 300142 Hebei District, Zhongshan Road, No. 10,

Patentee before: China Railway Third Survey and Design Institute Group Ltd.

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140709

Termination date: 20210405

CF01 Termination of patent right due to non-payment of annual fee