CN102550353B - 猕猴桃高架宽距密植栽培修剪方法 - Google Patents
猕猴桃高架宽距密植栽培修剪方法 Download PDFInfo
- Publication number
- CN102550353B CN102550353B CN 201210001118 CN201210001118A CN102550353B CN 102550353 B CN102550353 B CN 102550353B CN 201210001118 CN201210001118 CN 201210001118 CN 201210001118 A CN201210001118 A CN 201210001118A CN 102550353 B CN102550353 B CN 102550353B
- Authority
- CN
- China
- Prior art keywords
- ridge
- meters
- grow
- kiwi fruit
- strain
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Cultivation Of Plants (AREA)
Abstract
本发明公开了一种猕猴桃高架宽距密植栽培修剪方法,包括步骤:平整土地,起垅;每隔约1米栽种1株猕猴桃苗;在垅上每隔约4米栽立柱,用钢丝绳搭建网格状棚架;猕猴桃苗生长到2.0-2.5米时进行摘心;顶上发芽后保留2个芽,其余抹除;使2个芽分别向垂直于垄的相反方向顺着钢丝绳生长成主蔓;将垅上相邻的猕猴桃株分为近垄株和远垄株,分别对其进行整形修剪:当近垄株的主蔓生长到约3.0米时控制其不再向前生长,主蔓每隔30-40厘米抽生结果母枝;当远垄株的主蔓生长到约4米时控制其不再向前生长,从垄上的分枝端到主蔓上约2.5米处,抹除全部抽生枝芽;从2.5米至主蔓末端使其抽生结果母枝。本发明可促进猕猴桃枝蔓合理分布,保证良好通风和光照。
Description
技术领域
本发明属于果树栽培技术领域,特别涉及一种高架宽距密植猕猴桃栽培修剪方法,可促进猕猴桃枝蔓合理分布,保证良好通风和光照,尤其适用于现代城市休闲观光型果园。
背景技术
猕猴桃原产我国,因其鲜果中维生素C的含量特别丰富而风靡世界各国,成为一种新兴果树。果实中除维生素C的含量比苹果、甜橙高几倍到十几倍外,还含有维生素P(即卢丁)和蛋白分解酶,有降低血压和帮助消化的作用,为一种保健营养食品。在药用价值方面,据现代医学临床试验,其鲜果及果汁对麻风病、消化道癌症、高血压及心血管病等疾病都具有一定的预防作用和辅助疗效。
猕猴桃是一种落叶藤本果树,长枝先端具有逆时针缠绕性,能攀附于其他植物或支架上生长,其蔓细长柔软,如任其自然生长,会发生攀缘和相互缠绕的现象,造成果园树形杂乱,枝条丛生,架面郁蔽,枝蔓交叉重叠,通风透光差。由于枝蔓过密光照不足,下部枝条生长衰弱,致使枝条枯死,营养不足,果实发育小,产量少,品质差。
猕猴桃修剪方法一般包括夏季修剪和冬季修剪,夏季修剪一般5-8月份进行,主要包括更新枝和结果母枝的选留、培养以及结果枝的修剪,维持蔓枝合理分布和保持树冠良好光照。冬季修剪一般在落叶后进行,主要包括结果母枝的更新、控制结果部位外移,剪留适当的枝量和冬芽数。
现有技术中对所有的猕猴桃植株采用的都是相同的修剪方法,虽然一定程度上可以解决猕猴桃枝蔓过密的问题,但是由于相邻猕猴桃植株的枝蔓生长到一定长度以后,仍然容易出现枝蔓交叉重叠的现象,不但影响猕猴桃正常生长和结果,而且给田间管理带来诸多不便。
发明内容
本发明的目的在于克服现有技术中存在的缺陷,提供一种猕猴桃栽培、修剪方法,可促进猕猴桃枝蔓合理分布,保证良好通风和光照,尤其适用于现代城市休闲观光型果园。
一种猕猴桃高架宽距密植栽培修剪方法,其特征在于包括以下步骤:
步骤一、平整土地,起垅,控制垅间距约8米;在1-2月份时,每隔约1米栽种1株猕猴桃苗;
步骤二、在垅上每隔约4米栽立柱,用钢丝绳搭建网格状棚架;
步骤三、猕猴桃苗生长到2.0-2.5米时进行摘心;顶上发芽后保留2个芽,其余抹除;使2个芽分别向垂直于垄的相反方向顺着钢丝绳生长成主蔓;
步骤四、将垅上相邻的猕猴桃株分为近垄株和远垄株,分别对其进行整形修剪:当近垄株的主蔓生长到约3.0米时控制其不再向前生长,主蔓每隔30-40厘米抽生结果母枝;当远垄株的主蔓生长到约4米时控制其不再向前生长,从垄上的分枝端到主蔓上约2.5米处,抹除全部抽生枝芽;从2.5米至主蔓末端使其抽生结果母枝。
进一步地,步骤一所述垅高约1米,宽约2米。采用高垅的栽培方法,猕猴桃苗的根系限于垅内,雨水通过垅沟排出,根部不会因积水而造成腐烂,进而提高猕猴桃苗的成活率。
步骤二所述立柱高3.5米,其中栽在垅内约1米,垅上高度约2.5米。立柱可用水泥杆或用泥青烧浇灌过的木柱。本发明的猕猴桃棚架高度达3.5米,可延伸形成天然长廊景观效果,尤其适用于现代城市休闲观光型果园。
本发明改变了传统的猕猴桃修剪方式,对相邻的猕猴桃株采用不同的修剪方法。当近垄株的主蔓生长到约3.0米时控制其不再向前生长,主蔓每隔30-40厘米抽生结果母枝;当远垄株的主蔓生长到约4米时控制其不再向前生长,从垄上的分枝端到主蔓上约2.5米处,抹除全部抽生枝芽;从2.5米至主蔓末端使其抽生结果母枝。
本发明具有以下优点:(1)能使相邻猕猴桃植株在棚架上的生长空间相对界限分明,不会出现株与株之间的枝蔓相互交叉缠绕,架面的有效覆盖面积大,架面利用率大幅提高,猕猴桃产量随着有效覆盖率的增大而提高。(2)由于本发明的修剪方法可维持猕猴桃枝蔓合理分布,因此能保持树冠良好光照,良好的光照可以加大叶面积,制造更多的养分,达到丰产优质。(3)保持树体合理的骨架,使枝梢分布均匀,改善通风条件。(4)形成天然长廊景观效果,特别适用于现代城市休闲观光型果园。
由于本发明的猕猴桃栽培、修剪方法改善了树体结构和通风透光条件,增大了有效着叶部位和结果面积,因此猕猴桃产量和品质得到大幅提高。
本发明的高垄宽距高架可进行其它复合种养,提高单位面积的经济效益。
附图说明
下面结合附图对本发明作进一步详细说明。
图1是本发明一种实施方式的栽培、修剪示意图。
图2是图1的侧面视图。
图3是大棚架面俯视图。
图中,1—垅;2—猕猴桃株;3—立柱;4—棚架。
具体实施方式
实施例1:
如果1-3所示,按以下步骤栽培和修剪猕猴桃苗木:
步骤一、平整土地,起垅,垅高1米,宽2米。控制垅间距8米;在1-2月份时,每隔1米栽种1株猕猴桃苗。
步骤二、在垅上每隔4米栽水泥立柱,立柱高3.5米,其中栽在垅内1米,垅上高度2.5米。用镀锌钢丝绳搭建网格状棚架,每隔1米拉一条。
步骤三、猕猴桃苗发芽后单杆顺着支撑杆生长,不让苗木缠绕支撑杆。猕猴桃苗生长到2.0-2.5米时进行摘心;顶上发芽后保留2个芽,其余抹除;使2个芽分别向垂直于垄的相反方向顺着钢丝绳生长成主蔓。
步骤四、将垅上相邻的猕猴桃株分为近垄株和远垄株,分别对其进行整形修剪:当近垄株的主蔓生长到约3.0米时控制其不再向前生长,主蔓每隔30-40厘米抽生结果母枝;以便将来在结果母枝上抽生结果枝结果,结果数量一般控制在60-70个果,果实大小一般90-120克左右。当远垄株的主蔓分别顺着钢丝绳生长到约4米时控制其不再向前生长,从垄上的分枝端到主蔓上2.5米处,抹除全部抽生枝芽;从2.5米至主蔓末端使其发芽抽枝,让来年变成结果母枝,在结果母枝上抽生结果枝结果,一般控制结果数量在30-40个果实之间,果实大小一般90-120克。
本发明修剪方法的‘金魁’品种猕猴桃树与对照树比较
如图3的大棚架面俯视图,相邻猕猴桃植株在棚架上的生长空间相对界限分明,不会出现株与株之间的枝蔓相互交叉缠绕,架面的有效覆盖面积大,架面利用率大幅提高,猕猴桃产量随着有效覆盖率的增大而提高。每亩(667平方米)种猕猴桃83株,栽后第4-5年后进入丰产期,每亩产量可达1500千克左右。由于采用本发明的修剪方法可维持猕猴桃枝蔓合理分布,因此能保持树冠良好光照,良好的光照可以加大叶面积,制造更多的养分,达到丰产优质;保持树体合理的骨架,使枝梢分布均匀,改善通风条件。另外,可形成天然长廊景观效果,特别适用于现代城市休闲观光型果园。
Claims (3)
1.一种猕猴桃高架宽距密植栽培修剪方法,其特征在于包括以下步骤:
步骤一、平整土地,起垅,控制垅间距约8米;在1-2月份时,每隔约1米栽种1株猕猴桃苗;
步骤二、在垅上每隔约4米栽立柱,用钢丝绳搭建网格状棚架;
步骤三、猕猴桃苗生长到2.0-2.5米时进行摘心;顶上发芽后保留2个芽,其余抹除;使2个芽分别向垂直于垄的相反方向顺着钢丝绳生长成主蔓;
步骤四、将垅上相邻的猕猴桃株分为近垄株和远垄株,分别对其进行整形修剪:当近垄株的主蔓生长到约3.0米时控制其不再向前生长,主蔓每隔30-40厘米抽生结果母枝;当远垄株的主蔓生长到约4米时控制其不再向前生长,从垄上的分枝端到主蔓上约2.5米处,抹除全部抽生枝芽;从2.5米至主蔓末端使其抽生结果母枝。
2.如权利要求1所述猕猴桃高架宽距密植栽培修剪方法,其特征在于,步骤一所述垅高约1米,宽约2米。
3.如权利要求1所述猕猴桃高架宽距密植栽培修剪方法,其特征在于,步骤二所述立柱高3.5米,其中栽在垅内约1米,垅上高度约2.5米。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201210001118 CN102550353B (zh) | 2012-01-05 | 2012-01-05 | 猕猴桃高架宽距密植栽培修剪方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201210001118 CN102550353B (zh) | 2012-01-05 | 2012-01-05 | 猕猴桃高架宽距密植栽培修剪方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102550353A CN102550353A (zh) | 2012-07-11 |
CN102550353B true CN102550353B (zh) | 2013-07-31 |
Family
ID=46398011
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201210001118 Expired - Fee Related CN102550353B (zh) | 2012-01-05 | 2012-01-05 | 猕猴桃高架宽距密植栽培修剪方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102550353B (zh) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105432419B (zh) * | 2014-09-28 | 2018-03-27 | 咸宁市信德现代农业科技有限公司 | 一种猕猴桃种植用棚架和喷灌综合系统 |
CN105519395A (zh) * | 2014-09-28 | 2016-04-27 | 咸宁市信德现代农业科技有限公司 | 一种猕猴桃鱼刺形简易修剪方法 |
CN104871920A (zh) * | 2015-06-25 | 2015-09-02 | 李春燕 | 一种猕猴桃种植的整形修剪方法 |
CN105325229A (zh) * | 2015-09-30 | 2016-02-17 | 广西亿东生态农林工程有限公司 | 红心猕猴桃树整形修剪方法 |
CN106688794A (zh) * | 2016-12-27 | 2017-05-24 | 何权 | 一种落叶干性果树的栽培方法 |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1605237A (zh) * | 2003-10-09 | 2005-04-13 | 蒯世英 | 一种优质猕猴桃树的栽培方法 |
-
2012
- 2012-01-05 CN CN 201210001118 patent/CN102550353B/zh not_active Expired - Fee Related
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1605237A (zh) * | 2003-10-09 | 2005-04-13 | 蒯世英 | 一种优质猕猴桃树的栽培方法 |
Non-Patent Citations (5)
Title |
---|
张冬梅.猕猴桃树修剪关键技术.《河南农业》.2011,(第2期), * |
张帆.猕猴桃T形架主蔓多枝上架整形修剪技术.《西北园艺》.2008, * |
张继明,等.宝鸡市猕猴桃无公害栽培技术规程.《落叶果树》.2007, * |
杜军强.猕猴桃树整形修剪技术.《西北园艺》.2011, * |
金芳伦.猕猴桃不同剪蔓量对产量品质影响.《江西果树》.1999,(第1期), * |
Also Published As
Publication number | Publication date |
---|---|
CN102550353A (zh) | 2012-07-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102657056B (zh) | 一种梨树倒“个”形树形及其整形方法 | |
CN103461050B (zh) | 一种枇杷矮化提早结果的栽培方法 | |
CN102326500B (zh) | 一种适合于枣树套袋栽培的树形及其修剪方法 | |
CN104160911B (zh) | 水晶葡萄坡地tu形整形修剪技术 | |
CN105684820A (zh) | 一种名优茶机采茶园的建立及管理方法 | |
CN104920090B (zh) | 基于双层水平臂形的果树形及树形整形方法 | |
CN106386379A (zh) | 一种北方设施葡萄一年两收高效栽培方法 | |
CN102823474A (zh) | 一种用于蛇龙珠葡萄品种的整形修剪方式 | |
CN105746290B (zh) | 一种桃树倒“个”形栽培技术 | |
CN104322344A (zh) | 一种树盆结合的设施葡萄一年两熟栽培方法 | |
CN105724165B (zh) | 一种适宜较寒冷地区保护地猕猴桃的设施栽培方法 | |
CN102550353B (zh) | 猕猴桃高架宽距密植栽培修剪方法 | |
CN103609441A (zh) | 一种蓝莓育苗方法 | |
CN102687650A (zh) | 一种梨树的盆栽方法 | |
CN108055969A (zh) | 一种葡萄的省力化整形修剪种植方法 | |
CN1602666A (zh) | 一种果树“一边倒”形栽培管理方法 | |
CN105557413B (zh) | 一种罗汉果的丰产栽培方法 | |
CN106386349A (zh) | 一种促进乔砧甜樱桃中心干多发枝的方法 | |
CN103988744B (zh) | 一种猕猴桃在非适生区的栽培方法 | |
CN106069569B (zh) | 一种方便采摘运输的葡萄种植方法 | |
CN105961107A (zh) | 一种桃树树形及修剪方法 | |
CN103650893B (zh) | 一种李树树冠的打顶修剪方法 | |
CN106982702B (zh) | 温室大棚葡萄一年两熟春节上市方法 | |
CN103477935A (zh) | 一种桃树拉枝修剪方法 | |
CN109548554A (zh) | 一种设施葡萄增大果粒的栽培方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Pruning method for kiwifruit in elevated wide-spacing close-planting cultivation Effective date of registration: 20140928 Granted publication date: 20130731 Pledgee: Bank of China Limited by Share Ltd. Shanghai Development Zone Pudong branch Pledgor: Zhang Youlian Registration number: 2014310000071 |
|
PLDC | Enforcement, change and cancellation of contracts on pledge of patent right or utility model | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130731 Termination date: 20220105 |
|
CF01 | Termination of patent right due to non-payment of annual fee |