CN102545092A - Base and installation rod used for electrified installation device on tower and installation method thereof - Google Patents

Base and installation rod used for electrified installation device on tower and installation method thereof Download PDF

Info

Publication number
CN102545092A
CN102545092A CN2012100174254A CN201210017425A CN102545092A CN 102545092 A CN102545092 A CN 102545092A CN 2012100174254 A CN2012100174254 A CN 2012100174254A CN 201210017425 A CN201210017425 A CN 201210017425A CN 102545092 A CN102545092 A CN 102545092A
Authority
CN
China
Prior art keywords
mounting bar
base
shaped pedestal
shaft tower
peristome
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012100174254A
Other languages
Chinese (zh)
Other versions
CN102545092B (en
Inventor
吴天钢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIAXING SHANNIU ELECTRONIC TECHNOLOGY CO LTD
Original Assignee
JIAXING SHANNIU ELECTRONIC TECHNOLOGY CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIAXING SHANNIU ELECTRONIC TECHNOLOGY CO LTD filed Critical JIAXING SHANNIU ELECTRONIC TECHNOLOGY CO LTD
Priority to CN201210017425.4A priority Critical patent/CN102545092B/en
Publication of CN102545092A publication Critical patent/CN102545092A/en
Application granted granted Critical
Publication of CN102545092B publication Critical patent/CN102545092B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The invention discloses a base and an installation method used for an electrified installation device on a tower and an installation method thereof. The base comprises a U-shaped seat body and a bayonet lock device arranged on the lower portion of the opening portion of the U-shaped seat body, a screw hole is arranged at the top of the U-shaped seat body, and a jack is arranged on one side of the U-shaped seat body. The installation rod can be a split installation rod, an integral type installation rod or a single installation rod. The method is that the electrified device is installed on the aerial tower through the base by adopting the split installation rod, the integral type installation rod or the single installation rod. The installation device can be installed with power on, the installation mode is simple, installation speed of various devices on the tower can be effectively improved, and working efficiency is improved.

Description

A kind of base and mounting bar and installation method that is used for charged erection unit on the shaft tower
Technical field
The present invention relates to install on a kind of overhead transmission line shaft tower the base and the installation method thereof of various kinds of equipment, particularly a kind of base and mounting bar and installation method that is used for charged erection unit on the shaft tower.
Background technology
At present; The built on stilts transmission and distribution line line pole tower One's name is legion of each electric pressure need install all kinds of operations, safeguard additional when the shaft tower later stage, in the time of like bird-scaring unit, line supervision appearance, anemometry appearance etc.; Can only take to have a power failure and install or the mode of artificial live line working is carried out; The reliability of influence power supply needs to drop into bigger human and material resources, and artificial live line working is dangerous high.Charged erection unit needs special equipment, instrument and installation method.
Summary of the invention
Technical problem to be solved by this invention provides a kind of base and mounting bar and installation method that is used for charged erection unit on the shaft tower, the installation that can have a power failure, and mounting means is simple, effectively improves the installation rate of various kinds of equipment on the shaft tower, increases work efficiency.
The technical scheme that technical solution problem of the present invention adopts is: first aspect; A kind of base that is used for charged erection unit on the shaft tower; Comprise U-shaped pedestal, bayonet lock device; Said bayonet lock device is arranged at the bottom of U-shaped pedestal peristome, and the top of said U-shaped pedestal is provided with screwed hole, and a side of said U-shaped pedestal is provided with jack.
As a kind of preferred, said bayonet lock device comprises circular bayonet lock, circular holder and spring, and the cross-arm plane of said circular bayonet lock and shaft tower or draw hole set on the iron plane to be complementary is connected by bolt between said circular holder and the U-shaped pedestal.
As further improvement, the top of said U-shaped pedestal peristome is provided with the installing frame that is used to install magnet.
Second aspect; A kind of base with above-mentioned charged erection unit is installed on employed mounting bar on the shaft tower; Comprise head and barred body, the top of said barred body is provided with external screw thread, and said head comprises the bottom that is provided with externally threaded top and is provided with internal thread; The hand of spiral of said upper and lower is opposite, and the jack that external screw thread that said top is set and U-shaped pedestal one side are provided with is complementary; The set external screw thread of internal thread that said bottom is set and barred body top is complementary, and this is split type mounting bar.
The 3rd aspect; A kind of base with above-mentioned charged erection unit is installed on employed mounting bar on the shaft tower, comprises peristome and barred body, and said peristome is provided with upper opening and the top screwed hole that runs through the opening both sides; And be provided with lower through-hole; The top of said barred body is provided with external screw thread, and the set external screw thread of said top screwed hole and barred body top is complementary, and diameter is corresponding in the relevant position dwindles for said barred body and lower through-hole; And the diameter after said lower through-hole is dwindled is slightly less than the barred body diameter, and this is the Contiuum type mounting bar.
The 4th aspect; A kind of base with above-mentioned charged erection unit is installed on employed mounting bar on the shaft tower, comprises barred body, and said barred body top is provided with one section through hole; The circular holder of the diameter of said through hole and bayonet lock device is complementary, and this is single formula mounting bar.
The 5th aspect a kind ofly adopts said split type mounting bar that described base is used for the installation method of charged erection unit on the shaft tower, may further comprise the steps, and the first step is screwed into the connecting bolt of equipment to be installed in the screwed hole at U-shaped pedestal top of base; Second step linked to each other the tapped bottom of barred body and head of mounting bar, and the externally threaded top of head band is connected with the set jack of U-shaped pedestal one side; The 3rd step moved to shaft tower place to be installed through mounting bar with equipment to be installed and base, and U-shaped pedestal peristome card to the cross-arm plane or draw the iron plane, is made the bayonet lock of bayonet lock device snap in the cross-arm plane or draws in the hole set on the iron plane; The 4th step, the mounting bar of slowly screwing, promptly the jack on externally threaded top of mounting bar head band and the U-shaped pedestal begins to unscrew, and separates with jack until the externally threaded top of mounting bar head band, promptly installs.
The 6th aspect; A kind ofly adopt said split type mounting bar that described base is used for the installation method of charged erection unit on the shaft tower, may further comprise the steps the first step; In the installing frame on the U-shaped pedestal peristome top of base, lay a magnet, the blended rubber band is fixed magnet and U-shaped pedestal; In second step, the connecting bolt of equipment to be installed is screwed in the screwed hole at U-shaped pedestal top; The 3rd step linked to each other the tapped bottom of barred body and head of mounting bar, and the externally threaded top of head band is connected with the set jack of U-shaped pedestal one side; The 4th step moved to shaft tower place to be installed through mounting bar with equipment to be installed and base, U-shaped pedestal peristome is snapped in the cross-arm plane or draws the iron plane, through magnet with the cross-arm plane of base and shaft tower or draw the iron plane to fix; The 5th step, the mounting bar of slowly screwing, promptly the jack on externally threaded top of mounting bar head band and the U-shaped pedestal begins to unscrew, and separates with jack until the externally threaded top of mounting bar head band, promptly installs.
The 7th aspect a kind ofly adopts said Contiuum type mounting bar that described base is used for the installation method of charged erection unit on the shaft tower, may further comprise the steps, and the first step is screwed into the connecting bolt of equipment to be installed in the screwed hole at U-shaped pedestal top of base; Second step, the opening of the peristome of mounting bar head is blocked the set jack of U-shaped pedestal one side, the turn barred body is threaded to barred body at the top of the peristome of head; The 3rd step moved to shaft tower place to be installed through mounting bar with equipment to be installed and base, and U-shaped pedestal peristome card to the cross-arm plane or draw the iron plane, is made the bayonet lock of bayonet lock device snap in the cross-arm plane or draws in the hole set on the iron plane; The 4th step slowly unscrewed the barred body of mounting bar, can separate with jack until the peristome of mounting bar head, promptly installed.
The 8th aspect; A kind ofly adopt said Contiuum type mounting bar that described base is used for the installation method of charged erection unit on the shaft tower, may further comprise the steps the first step; In the installing frame on the U-shaped pedestal peristome top of base, lay a magnet, the blended rubber band is fixed magnet and U-shaped pedestal; In second step, the connecting bolt of equipment to be installed is screwed in the screwed hole at U-shaped pedestal top of base; The 3rd step, the opening of the peristome of mounting bar head is blocked the set jack of U-shaped pedestal one side, the turn barred body is threaded to barred body at the top of the peristome of head; The 4th step moved to shaft tower place to be installed through mounting bar with equipment to be installed and base, with U-shaped pedestal peristome card to the cross-arm plane or draw the iron plane, through magnet with the cross-arm plane of base and shaft tower or draw the iron plane to fix; The 5th step slowly unscrewed the barred body of mounting bar, can separate with jack until the peristome of mounting bar head, promptly installed.
The 9th aspect a kind ofly adopts said single formula mounting bar that described base is used for the installation method of charged erection unit on the shaft tower, may further comprise the steps, and the first step is screwed into the connecting bolt of equipment to be installed in the screwed hole at U-shaped pedestal top of base; Second the step, with circular fixed seating in the through hole on mounting bar top; The 3rd step moved to shaft tower place to be installed through mounting bar with equipment to be installed and base, and U-shaped pedestal peristome card to the cross-arm plane or draw the iron plane, is made the bayonet lock of bayonet lock device snap in the cross-arm plane or draws in the hole set on the iron plane; The 4th step, slowly put down mounting bar, promptly install.
The tenth aspect; A kind ofly adopt said single formula mounting bar that described base is used for the installation method of charged erection unit on the shaft tower, may further comprise the steps the first step; In the installing frame on the U-shaped pedestal peristome top of base, lay a magnet, the blended rubber band is fixed magnet and U-shaped pedestal; In second step, the connecting bolt of equipment to be installed is screwed in the screwed hole at U-shaped pedestal top of base; The 3rd the step, with circular fixed seating in the through hole on mounting bar top; The 4th step moved to shaft tower place to be installed through mounting bar with equipment to be installed and base, with U-shaped pedestal peristome card to the cross-arm plane or draw the iron plane, through magnet with the cross-arm plane of base and shaft tower or draw the iron plane to fix; The 5th step, slowly put down mounting bar, promptly install.
The base that is used for charged erection unit on the shaft tower provided by the invention normally snaps in said circular bayonet lock the cross-arm plane of shaft tower or draws hole set on the iron plane, and said circular holder is connected with bolt with the U-shaped pedestal.But when the cross-arm plane of shaft tower or draw when the hole that is complementary not being installed on the iron plane with the bayonet lock device; The invention provides preferred version; Employing magnet is fixed; A magnet promptly is installed in the installing frame on said U-shaped pedestal peristome top, after U-shaped pedestal peristome snaps in the cross-arm plane or draws the iron plane, is adopted magnet with the cross-arm plane of base and shaft tower or draw the iron plane to fix.The invention provides three kinds of bases simultaneously and be installed on employed mounting bar on the shaft tower, promptly split type mounting bar, Contiuum type mounting bar and single formula mounting bar described charged erection unit; The present invention also provides to different bases, adopts the method for split type mounting bar, Contiuum type mounting bar and single formula mounting bar charged erection unit on built on stilts shaft tower.
The invention has the beneficial effects as follows: the understructure of charged erection unit is simple, can adopt two kinds of mounting bars to install, and can fix through bayonet lock device and/or magnet; Easy for installation, fixing reliable, effectively improved the installation rate of various kinds of equipment on the shaft tower; Shorten the set-up time; Reduce loss of outage, alleviate operating pressure, increase work efficiency.
Description of drawings
Fig. 1 looks sketch map for the master of the embodiment of the invention.
Fig. 2 is the stereogram of the embodiment of the invention.
Fig. 3 is the cross-sectional schematic of the split type mounting bar of the embodiment of the invention.
Fig. 4 is the cross-sectional schematic of embodiment of the invention Contiuum type mounting bar.
Fig. 5 is the cross-sectional schematic of the single formula mounting bar of the embodiment of the invention.
Below in conjunction with accompanying drawing the present invention is further specified.
Embodiment
Embodiment 1:
Like Fig. 1, shown in Figure 2, a kind of base of charged erection unit comprises U-shaped pedestal 1, bayonet lock device, and the bayonet lock device is arranged at the bottom of U-shaped pedestal 1 peristome, is provided with screwed hole 3 at the top of U-shaped pedestal 1, is provided with jack 4 in a side of U-shaped pedestal 1.The bayonet lock device comprises circular bayonet lock 2, circular holder 5 and spring; Bayonet lock 2 is arranged in the holder 5 with spring; The part that bayonet lock 2 exposes holder 5 is an inclined-plane; Highest point is 10mm, and the cross-arm plane of this bayonet lock 2 and shaft tower or draw hole set on the iron plane to be complementary is fixedly connected by bolt 9 between holder 5 and the U-shaped pedestal 1.
Embodiment 2:
Also be provided with the installing frame 8 that is used to install magnet on the top of U-shaped pedestal 1 peristome.All the other are identical with embodiment 1.
Embodiment 3:
The split type mounting bar that the base of above-mentioned charged erection unit is adopted in installation; As shown in Figure 3; Comprise head and barred body; Head comprises the bottom 7 that is provided with externally threaded top 6 and is provided with internal thread, and the hand of spiral of said top 6 and bottom 7 is opposite, is provided with externally threaded top 6 and is complementary with the jack 4 that U-shaped pedestal 1 one sides are provided with.The said bottom 7 set set external screw threads of internal thread and barred body top are complementary.
Embodiment 4:
The Contiuum type mounting bar that the base of above-mentioned charged erection unit is adopted in installation, as shown in Figure 4, comprise peristome and barred body; Said peristome is provided with upper opening and the top screwed hole 10 that runs through the opening both sides; And be provided with lower through-hole, and the top of said barred body is provided with external screw thread, and said top screwed hole 10 is complementary with the set external screw thread in barred body top; Diameter is corresponding in the relevant position dwindles for said barred body and lower through-hole, and the diameter of said lower through-hole after dwindling is slightly less than the barred body diameter.
Embodiment 5:
The single formula mounting bar that the base of above-mentioned charged erection unit is adopted in installation, as shown in Figure 5, comprise barred body, said barred body top is provided with one section through hole 11, and the circular holder 5 of the diameter of said through hole 11 and bayonet lock device is complementary.
Embodiment 6:
Adopt embodiment 3 described split type mounting bars that the base shown in the embodiment 1 is used for a kind of installation method of charged erection unit on the shaft tower, the first step is screwed into the connecting bolt of equipment to be installed in the screwed hole 3 at U-shaped pedestal 1 top; In second step, the external screw thread that mounting bar head top is set is connected with the jack 4 that U-shaped pedestal 1 one sides are provided with; The 3rd step moved to shaft tower place to be installed through mounting bar with equipment to be installed and base, and to the cross-arm plane or draw the iron plane, the bayonet lock of treating the bayonet lock device snaps in the cross-arm plane or draws in the hole set on the iron plane with U-shaped pedestal 1 peristome card; The 4th step, the mounting bar of slowly screwing, promptly the jack 4 of the head of mounting bar and U-shaped pedestal 1 begins to unscrew, and separates with jack 4 until the mounting bar head, promptly installs.
Embodiment 7:
Adopt embodiment 3 described split type mounting bars the base shown in the embodiment 2 to be used for a kind of installation method of charged erection unit on the shaft tower; May further comprise the steps; The first step; In the installing frame 8 on the U-shaped pedestal 1 peristome top of base, lay a magnet, the blended rubber band is fixing with magnet and U-shaped pedestal 1; In second step, the connecting bolt of equipment to be installed is screwed in the screwed hole 3 at U-shaped pedestal 1 top; The 3rd step linked to each other the tapped bottom 7 of the barred body and the head of mounting bar, and the externally threaded top 6 of head band is connected with the set jack 4 of U-shaped pedestal 1 one sides; The 4th step moved to shaft tower place to be installed through mounting bar with equipment to be installed and base, U-shaped pedestal 1 peristome is snapped in the cross-arm plane or draws the iron plane, through magnet with the cross-arm plane of base and shaft tower or draw the iron plane to fix; The 5th step, the mounting bar of slowly screwing, promptly the jack 4 on externally threaded top 6 of mounting bar head band and the U-shaped pedestal 1 begins to unscrew, and separates with jack until the externally threaded top 6 of mounting bar head band, promptly installs.
Embodiment 8:
Adopt embodiment 4 described Contiuum type mounting bars the base shown in the embodiment 1 to be used for a kind of installation method of charged erection unit on the shaft tower; May further comprise the steps; The first step is screwed into the connecting bolt of equipment to be installed in the screwed hole 3 at U-shaped pedestal 1 top of base; Second step, the opening of the peristome of mounting bar head is blocked the set jack 4 of U-shaped pedestal 1 one sides, the turn barred body is threaded to barred body at the top of the peristome of head; The 3rd step moved to shaft tower place to be installed through mounting bar with equipment to be installed and base, and U-shaped pedestal 1 peristome card to the cross-arm plane or draw the iron plane, is made the bayonet lock of bayonet lock device snap in the cross-arm plane or draws in the hole set on the iron plane; The 4th step slowly unscrewed the barred body of mounting bar, can separate with jack 4 until the peristome of mounting bar head, promptly installed.
Embodiment 9:
Adopt embodiment 4 described Contiuum type mounting bars the base shown in the embodiment 2 to be used for a kind of installation method of charged erection unit on the shaft tower; May further comprise the steps; The first step; In the installing frame 8 on the U-shaped pedestal 1 peristome top of base, lay a magnet, the blended rubber band is fixing with magnet and U-shaped pedestal 1; In second step, the connecting bolt of equipment to be installed is screwed in the screwed hole 3 at U-shaped pedestal 1 top of base; The 3rd step, the opening of the peristome of mounting bar head is blocked the set jack 4 of U-shaped pedestal 1 one sides, the turn barred body is threaded to barred body at the top of the peristome of head; The 4th step moved to shaft tower place to be installed through mounting bar with equipment to be installed and base, with U-shaped pedestal 1 peristome card to the cross-arm plane or draw the iron plane, through magnet with the cross-arm plane of base and shaft tower or draw the iron plane to fix; The 5th step slowly unscrewed the barred body of mounting bar, can separate with jack 4 until the peristome of mounting bar head, promptly installed.
Embodiment 10:
Adopt embodiment 4 described Contiuum type mounting bars the base shown in the embodiment 2 to be used for a kind of installation method of charged erection unit on the shaft tower; May further comprise the steps; The first step is screwed into the connecting bolt of equipment to be installed in the screwed hole 3 at U-shaped pedestal 1 top of base; In second step, circular holder 5 is placed in the through hole 11 on mounting bar top; The 3rd step moved to shaft tower place to be installed through mounting bar with equipment to be installed and base, and U-shaped pedestal 1 peristome card to the cross-arm plane or draw the iron plane, is made the bayonet lock of bayonet lock device snap in the cross-arm plane or draws in the hole set on the iron plane; The 4th step, slowly put down mounting bar, promptly install.
Embodiment 11:
Adopt embodiment 4 described Contiuum type mounting bars the base shown in the embodiment 2 to be used for a kind of installation method of charged erection unit on the shaft tower; May further comprise the steps; The first step; In the installing frame 8 on the U-shaped pedestal 1 peristome top of base, lay a magnet, the blended rubber band is fixing with magnet and U-shaped pedestal 1; In second step, the connecting bolt of equipment to be installed is screwed in the screwed hole 3 at U-shaped pedestal 1 top of base; In the 3rd step, circular holder 5 is placed in the through hole 11 on mounting bar top; The 4th step moved to shaft tower place to be installed through mounting bar with equipment to be installed and base, with U-shaped pedestal 1 peristome card to the cross-arm plane or draw the iron plane, through magnet with the cross-arm plane of base and shaft tower or draw the iron plane to fix; The 5th step, slowly put down mounting bar, promptly install.

Claims (12)

1. base that is used for charged erection unit on the shaft tower; It is characterized in that: comprise U-shaped pedestal (1), bayonet lock device; Said bayonet lock device is arranged at the bottom of U-shaped pedestal (1) peristome; The top of said U-shaped pedestal (1) is provided with screwed hole (3), and a side of said U-shaped pedestal (1) is provided with jack (4).
2. the base that is used for charged erection unit on the shaft tower as claimed in claim 1; It is characterized in that: said bayonet lock device comprises circular bayonet lock (2), circular holder (5) and spring; Be fixedly connected by bolt (9) between the cross-arm plane of said circular bayonet lock (2) and shaft tower or draw hole set on the iron plane to be complementary, said circular holder (5) and U-shaped pedestal (1).
3. the base that is used for charged erection unit on the shaft tower as claimed in claim 1 is characterized in that: the top of said U-shaped pedestal (1) peristome is provided with the installing frame (8) that is used to install magnet.
4. one kind will be installed on employed mounting bar on the shaft tower like the base of claim 1,2 or 3 described charged erection units; It is characterized in that: comprise head and barred body; The top of said barred body is provided with external screw thread; Said head comprises the bottom (7) that is provided with externally threaded top (6) and is provided with internal thread, and the hand of spiral of said top (6) and bottom (7) is opposite, and the jack (4) that external screw thread that said top (6) are set and U-shaped pedestal (1) one side are provided with is complementary; The set external screw thread of internal thread that said bottom (7) is set and barred body top is complementary, and this is split type mounting bar.
5. one kind will be installed on employed mounting bar on the shaft tower like the base of claim 1,2 or 3 described charged erection units; It is characterized in that: comprise peristome and barred body; Said peristome is provided with upper opening and runs through the top screwed hole (10) of opening both sides, and is provided with lower through-hole, and the top of said barred body is provided with external screw thread; Said top screwed hole (10) is complementary with the set external screw thread in barred body top; Diameter is corresponding in the relevant position dwindles for said barred body and lower through-hole, and the diameter of said lower through-hole after dwindling be slightly less than the barred body diameter, and this is the Contiuum type mounting bar.
6. one kind will be installed on employed mounting bar on the shaft tower like the base of claim 1,2 or 3 described charged erection units; It is characterized in that: comprise barred body; Said barred body top is provided with one section through hole (11); The circular holder (5) of the diameter of said through hole (11) and bayonet lock device is complementary, and this is single formula mounting bar.
7. installation method that adopts the described mounting bar of claim 4 will base according to claim 1 or claim 2 to be used for charged erection unit on the shaft tower; It is characterized in that: may further comprise the steps; The first step is screwed into the connecting bolt of equipment to be installed in the screwed hole (3) at U-shaped pedestal (1) top of base; Second step linked to each other the tapped bottom of barred body and head (7) of mounting bar, and the externally threaded top of head band (6) is connected with the set jack (4) of U-shaped pedestal (1) one side; The 3rd step moved to shaft tower place to be installed through mounting bar with equipment to be installed and base, and U-shaped pedestal (1) peristome card to the cross-arm plane or draw the iron plane, is made the bayonet lock of bayonet lock device snap in the cross-arm plane or draws in the hole set on the iron plane; The 4th step, the mounting bar of slowly screwing, promptly the jack (4) on the externally threaded top of mounting bar head band (6) and the U-shaped pedestal (1) begins to unscrew, and separates with jack (4) until the externally threaded top of mounting bar head band (6), promptly installs.
8. installation method that adopts the described mounting bar of claim 4 base as claimed in claim 3 to be used for charged erection unit on the shaft tower; It is characterized in that: may further comprise the steps; The first step; In the installing frame (8) on U-shaped pedestal (1) the peristome top of base, lay a magnet, the blended rubber band is fixing with magnet and U-shaped pedestal (1); In second step, the connecting bolt of equipment to be installed is screwed in the screwed hole (3) at U-shaped pedestal (1) top; The 3rd step linked to each other the tapped bottom of barred body and head (7) of mounting bar, and the externally threaded top of head band (6) is connected with the set jack (4) of U-shaped pedestal (1) one side; The 4th step moved to shaft tower place to be installed through mounting bar with equipment to be installed and base, U-shaped pedestal (1) peristome is snapped in the cross-arm plane or draws the iron plane, through magnet with the cross-arm plane of base and shaft tower or draw the iron plane to fix; The 5th step, the mounting bar of slowly screwing, promptly the jack (4) on the externally threaded top of mounting bar head band (6) and the U-shaped pedestal (1) begins to unscrew, and separates with jack until the externally threaded top of mounting bar head band (6), promptly installs.
9. installation method that adopts the described mounting bar of claim 5 will base according to claim 1 or claim 2 to be used for charged erection unit on the shaft tower; It is characterized in that: may further comprise the steps; The first step is screwed into the connecting bolt of equipment to be installed in the screwed hole (3) at U-shaped pedestal (1) top of base; Second step, the opening of the peristome of mounting bar head is blocked the set jack (4) of U-shaped pedestal (1) one side, the turn barred body is threaded to barred body at the top of the peristome of head; The 3rd step moved to shaft tower place to be installed through mounting bar with equipment to be installed and base, and U-shaped pedestal (1) peristome card to the cross-arm plane or draw the iron plane, is made the bayonet lock of bayonet lock device snap in the cross-arm plane or draws in the hole set on the iron plane; The 4th step slowly unscrewed the barred body of mounting bar, can separate with jack (4) until the peristome of mounting bar head, promptly installed.
10. installation method that adopts the described mounting bar of claim 5 base as claimed in claim 3 to be used for charged erection unit on the shaft tower; It is characterized in that: may further comprise the steps; The first step; In the installing frame (8) on U-shaped pedestal (1) the peristome top of base, lay a magnet, the blended rubber band is fixing with magnet and U-shaped pedestal (1); In second step, the connecting bolt of equipment to be installed is screwed in the screwed hole (3) at U-shaped pedestal (1) top of base; The 3rd step, the opening of the peristome of mounting bar head is blocked the set jack (4) of U-shaped pedestal (1) one side, the turn barred body is threaded to barred body at the top of the peristome of head; The 4th step moved to shaft tower place to be installed through mounting bar with equipment to be installed and base, with U-shaped pedestal (1) peristome card to the cross-arm plane or draw the iron plane, through magnet with the cross-arm plane of base and shaft tower or draw the iron plane to fix; The 5th step slowly unscrewed the barred body of mounting bar, can separate with jack (4) until the peristome of mounting bar head, promptly installed.
11. installation method that adopts the described mounting bar of claim 6 base according to claim 1 or claim 2 to be used for charged erection unit on the shaft tower; It is characterized in that: may further comprise the steps; The first step is screwed into the connecting bolt of equipment to be installed in the screwed hole (3) at U-shaped pedestal (1) top of base; In second step, circular holder (5) is placed in the through hole (11) on mounting bar top; The 3rd step moved to shaft tower place to be installed through mounting bar with equipment to be installed and base, and U-shaped pedestal (1) peristome card to the cross-arm plane or draw the iron plane, is made the bayonet lock of bayonet lock device snap in the cross-arm plane or draws in the hole set on the iron plane; The 4th step, slowly put down mounting bar, promptly install.
12. installation method that adopts the described mounting bar of claim 6 base as claimed in claim 3 to be used for charged erection unit on the shaft tower; It is characterized in that: may further comprise the steps; The first step; In the installing frame (8) on U-shaped pedestal (1) the peristome top of base, lay a magnet, the blended rubber band is fixing with magnet and U-shaped pedestal (1); In second step, the connecting bolt of equipment to be installed is screwed in the screwed hole (3) at U-shaped pedestal (1) top of base; In the 3rd step, circular holder (5) is placed in the through hole (11) on mounting bar top; The 4th step moved to shaft tower place to be installed through mounting bar with equipment to be installed and base, with U-shaped pedestal (1) peristome card to the cross-arm plane or draw the iron plane, through magnet with the cross-arm plane of base and shaft tower or draw the iron plane to fix; The 5th step, slowly put down mounting bar, promptly install.
CN201210017425.4A 2012-01-20 2012-01-20 Base and installation rod used for electrified installation device on tower and installation method thereof Expired - Fee Related CN102545092B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210017425.4A CN102545092B (en) 2012-01-20 2012-01-20 Base and installation rod used for electrified installation device on tower and installation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210017425.4A CN102545092B (en) 2012-01-20 2012-01-20 Base and installation rod used for electrified installation device on tower and installation method thereof

Publications (2)

Publication Number Publication Date
CN102545092A true CN102545092A (en) 2012-07-04
CN102545092B CN102545092B (en) 2014-09-03

Family

ID=46351328

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210017425.4A Expired - Fee Related CN102545092B (en) 2012-01-20 2012-01-20 Base and installation rod used for electrified installation device on tower and installation method thereof

Country Status (1)

Country Link
CN (1) CN102545092B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105490232A (en) * 2015-12-04 2016-04-13 国家电网公司 Bird repeller fixing installation structure
CN105633857A (en) * 2016-03-30 2016-06-01 国网山东省电力公司商河县供电公司 Special tool for replacing bird repelling device in electrified manner
CN107781281A (en) * 2016-08-31 2018-03-09 天津市津宝乐器有限公司 Traveling Tabor papoose carrier attachment means

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2932777Y (en) * 2006-05-22 2007-08-08 卢义福 An insulating rod with removable working head
CN201528140U (en) * 2009-11-04 2010-07-14 河南省电力公司平顶山供电公司 Operating stick for power distribution work
CN201562913U (en) * 2009-11-03 2010-08-25 华北电网有限公司廊坊供电公司 Tool for live-line installing of bird dispeller equipped with single-bolt seat
CN201590620U (en) * 2009-12-05 2010-09-22 山东电力集团公司临沂供电公司 Power transmission line wind deflection preventive fixing clip
CN201877757U (en) * 2010-09-08 2011-06-22 华北电网有限公司廊坊供电公司 Mounting device for installing bird expeller in electrified way

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2932777Y (en) * 2006-05-22 2007-08-08 卢义福 An insulating rod with removable working head
CN201562913U (en) * 2009-11-03 2010-08-25 华北电网有限公司廊坊供电公司 Tool for live-line installing of bird dispeller equipped with single-bolt seat
CN201528140U (en) * 2009-11-04 2010-07-14 河南省电力公司平顶山供电公司 Operating stick for power distribution work
CN201590620U (en) * 2009-12-05 2010-09-22 山东电力集团公司临沂供电公司 Power transmission line wind deflection preventive fixing clip
CN201877757U (en) * 2010-09-08 2011-06-22 华北电网有限公司廊坊供电公司 Mounting device for installing bird expeller in electrified way

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105490232A (en) * 2015-12-04 2016-04-13 国家电网公司 Bird repeller fixing installation structure
CN105633857A (en) * 2016-03-30 2016-06-01 国网山东省电力公司商河县供电公司 Special tool for replacing bird repelling device in electrified manner
CN107781281A (en) * 2016-08-31 2018-03-09 天津市津宝乐器有限公司 Traveling Tabor papoose carrier attachment means

Also Published As

Publication number Publication date
CN102545092B (en) 2014-09-03

Similar Documents

Publication Publication Date Title
CN102545092B (en) Base and installation rod used for electrified installation device on tower and installation method thereof
CN203932358U (en) A kind of electrical verification grounding apparatus that is applied to high-altitude controller switching equipment
CN205677341U (en) New-type cross-arm
CN204286796U (en) A kind of non-bolt assembled borescope finder
CN203631771U (en) Angle-adjustable ground wire device
CN202131831U (en) Insulator for electronic fence poles
CN205825734U (en) LF stove electric-pole horizontal arm lateral fixing device
CN202210624U (en) Movable power distribution cabinet installing plate
CN203251016U (en) Link bar
CN206020766U (en) A kind of power transmission line column draws lower securing member with OPGW insulation
CN208797473U (en) A kind of auxiliary device of live installation of bird repeller
CN211237965U (en) Detachable current transformer
CN208299219U (en) A kind of electric automatization power distribution cabinet
CN202616658U (en) Suspension string insulator replacement device of 220kV circuit
CN207690599U (en) Straight-through current transformer suspension fixed structure
CN201762577U (en) Entire tray of washing machine
CN205509038U (en) Ground wire apparatus
CN206421923U (en) Suspension type filtering compensation electricity container support
CN209419169U (en) A kind of ground wire vibration abatement component
CN205791271U (en) Fixing sleeve for wire stripper
CN202977751U (en) Electric-power line grounding apparatus
CN204651831U (en) A kind of novel electric power electric wire fastener
CN204179004U (en) A kind of vacuum circuit-breaker
CN210838692U (en) Temporary device for replacing insulating porcelain insulator in live-line manner
CN202423979U (en) Maintenance rack for overhead line

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140903

Termination date: 20190120

CF01 Termination of patent right due to non-payment of annual fee