CN102542364B - Method and system for balancing substitute materials in material requirement planning - Google Patents
Method and system for balancing substitute materials in material requirement planning Download PDFInfo
- Publication number
- CN102542364B CN102542364B CN201010578459.1A CN201010578459A CN102542364B CN 102542364 B CN102542364 B CN 102542364B CN 201010578459 A CN201010578459 A CN 201010578459A CN 102542364 B CN102542364 B CN 102542364B
- Authority
- CN
- China
- Prior art keywords
- demand
- supply
- substitution
- node
- balancing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- General Factory Administration (AREA)
Abstract
The invention relates to a method for balancing substitute materials in material requirement planning. The method for balancing the substitute materials in the material requirement planning comprises the following steps of: forming a material substitution tree according to a material substitution relationship such that each material is taken as a node of the material substitution tree, a substituted material is taken as a child node of the substitute material, and a substitute material is taken as a father node of the substituted material; computing a supply and demand condition of the nodes in each production sub-stage according to the material supply and demand information of a lowest layer of child node of the material substitution tree so as to obtain substitution demand data; and computing the supply and demand condition of the nodes according to the material supply and demand information of all levels of father nodes and the substitution demand of the corresponding child nodes so as to obtain the substitution demand data. In addition, the invention further relates to a system for balancing the substitute materials in the material requirement planning. According to the material substitution relationship and the supply and demand information of the materials with the substitution relationship, the method and the system can organize the materials with the substitution relationship into the material substitution tree to substitute and manage, and a layer-by-layer computation method is adopted, so that the substitutions of all materials can be computed and completed in one step to improve the management efficiency.
Description
[technical field]
The present invention relates to handling of goods and materials, especially relate to a kind of method and system of balancing substitute materials in material requirement planning.
[background technology]
Adopt area of computer aided enterprise production management, first computing machine will be enable to read product slate manufactured by enterprise and all materials that will relate to, for the ease of computer recognizing, the product structure of expressing by diagram must be changed into certain data layout, this file describing product structure is in data format exactly Bill of Material (BOM), namely be BOM (Bill Of Material, Bill of Material (BOM)).It is the technological document defining product structure, and therefore, it is also called product structure table or product tree.
Due to the requirement difference to product quality, adopting plastics on new materials or change in the work etc. to reduce costs, often needing the material of existing use to replace to new material.In original product structure, required material, for taking time, supplying requirement etc. to be all changeless, when managing material, can manage according to the program of setting in advance easily.
But when relating to material and replacing, material supply and demand originally certainly will change, need to recalculate to make the material equilibrium of supply and demand.In traditional replacement management, replace material B for material A, replace in the following way:
1. calculate the equilibrium of supply and demand of material A during certain;
2. the equilibrium of supply and demand of calculate material B phase at the same time, replace if there is material in this period, then can be inserted in material A by the substitutive demand of material B, cause the equilibrium of supply and demand of material A to be broken, material A needs to recalculate.
As can be seen from above, there is material replacement each time and the equilibrium of supply and demand of material A all can be caused to be destroyed, and need to recalculate.Namely material A needs the number of times of reruning to be exactly decided by the number of times of the substitutive demand of material B.This makes the efficiency of management greatly reduce, and especially when relating to various materials and replacing, calculates and will become very frequent.
[summary of the invention]
Based on this, be necessary to provide a kind of method improving the balancing substitute materials in material requirement planning of the efficiency of management.
A method for balancing substitute materials in material requirement planning, comprises the steps: the process of production to be divided into multiple production sub according to Production requirement; At each production sub, obtain the supply and demand information with the material of substitutional relation that described production sub relates to; The supply/demand of often kind of material is calculated according to described supply and demand information; Wherein, to every two connected production subs, the next son stage calculates after a upper sub.
Preferably, the described step calculating the supply/demand of often kind of material according to supply and demand information specifically comprises: form material substitution tree according to material substitution relation, make the node that each material is set as described material substitution, the child node of replaced material material as an alternative, substitute materials is as the father node of replaced material; According to the material supply and demand information of the bottom child node that described material substitution is set, the supply/demand of computing node, obtains substitutive demand data; According to the material supply and demand information of father node at different levels and the substitutive demand of corresponding child node, the supply/demand of step-by-step calculation node, obtains substitutive demand data.
In addition, a kind of system of balancing substitute materials in material requirement planning is also provided.
A kind of system of balancing substitute materials in material requirement planning, comprise server and be connected at least one client of carrying out data interaction with server, described server comprises receiver module and processing module, and described client comprises acquisition module: described acquisition module is used at each production sub collection material supply and demand document and material substitution relation and is sent to receiver module; Described receiver module receives described material supply and demand document and material substitution relation; Described processing module calculates the supply/demand of often kind of material according to described supply and demand information.
Preferably, described processing module specifically forms material substitution tree according to material substitution relation, makes the node that each material is set as described material substitution, the child node of replaced material material as an alternative, and substitute materials is as the father node of replaced material; According to the material supply and demand information of the bottom child node that described material substitution is set, the supply/demand of computing node, obtains substitutive demand data; According to the substitutive demand of father node material supply and demand information at different levels and corresponding child node, the supply/demand of step-by-step calculation node, obtains substitutive demand data.
Said method and this management method of system and system manage by production sub, carry out carrying out one-time calculation to material supply/demand at each sub, can reduce unpredictable substituting as far as possible.
Further, according to material substitution relation and the supply and demand information of material with substitutional relation, be organized into material substitution tree by there being the material of substitutional relation and carry out substituting management, and adopt the method successively calculated, substituting of all materials is once calculated, improves the efficiency of management.
[accompanying drawing explanation]
Fig. 1 is the process flow diagram of the balancing substitute materials in material requirement planning of an embodiment;
Fig. 2 is the material substitution tree schematic diagram of an embodiment;
Fig. 3 is the system construction drawing of the balancing substitute materials in material requirement planning of an embodiment.
[embodiment]
Be further described below in conjunction with the method and system of specific embodiment to balancing substitute materials in material requirement planning.
First the process of production is divided into multiple production sub according to Production requirement by the method for the balancing substitute materials in material requirement planning of the present embodiment.Produce some time periods that sub is the whole production run of product, multiple continuous print produces the whole production run that sub forms product jointly.Produce sub mainly to divide according to Production requirement, Production requirement is the various Regulatory requirements in process of producing product, such as divides according to operation.
Secondly, to each generation sub, all supply and demand information with the material of substitutional relation is obtained.At each generation sub, the material related to may be different, has again a lot of substitutional relation between various material.Obtain that this production sub relates to and there is the supply and demand information of the material of substitutional relation, for calculating the supply/demand of often kind of material.All materials with substitutional relation are organized together, and obtains material supply and demand information in advance, can disposable often kind of material supply/demand be calculated, there will not be because the interim alternative problem causing repeatedly calculating.And because the division of sub, the material supply/demand in each stage is easy to control, reduce the interim alternative possibility occurred.
Between each sub above-mentioned, generally there is obvious sequencing.Therefore account form is the supply/demand first calculating the inner often kind of material of each sub, is then that sub calculates one by one.Namely to every two connected production subs, the next son stage calculates after a upper sub.
Wherein, in the present embodiment, the step calculating the supply/demand of often kind of material according to described supply and demand information is concrete as shown in Figure 1, comprises the steps:
S10: form material substitution tree according to material substitution relation, make the node that each material is set as described material substitution, the child node of replaced material material as an alternative, substitute materials is as the father node of replaced material.
In the production run of a product, relate to the alternative use of material.Material substitution has a variety of causes and mode, as deficiencies of stores, uses the lower material of price, produces products etc. by different quality requirements.Be generally used for producing the main material of product and be called principal goods material, being used for the material of alternative principal goods material is called and substitutes material.According to production object and the difference in the period of production, alternative material may have a variety of, and according to priority forms substitutional relation step by step.Such as produce a sub, principal goods material is A, B, preferential spent material C substitute, material C so again can spent material D substitute.Therefore for embodying this substitutional relation, material is organized into material substitution tree.As shown in Figure 2, for the material substitution of the present embodiment is set.Wherein main material A, B all can be substituted by material C, and therefore main material A, B are the child nodes of material C, and material C is the father node of main material A, B, and in like manner, material C is the child node of material D, and material D is the father node of material C.
S20: at each production sub, get the bottom child node of described material substitution tree, according to material supply and demand information, the supply/demand of computing node, obtains substitutive demand data.Production sub is the some time periods in producing, and arranges according to Production requirement.General production run all comprises plural production sub.The material of material substitution tree bottom child node is the principal goods material in production run, and in the present embodiment, bottom child node is material A, B.
Production sub starts, and can list the demand for principal goods material, and namely the storage situation of each principal goods material is the supply of this material.Supply is deducted demand, obtains the supply/demand of material, when difference is not less than zero, represent in liberal supply, do not need to use substitute materials; When difference is less than zero, represent under-supply, need to use substitute materials, now the absolute value of this difference is exactly the substitutive demand data of principal goods material for substitute materials.The first stage of such as producing, main material A demand 1000, principal goods material B demand 800, if main material A, B respectively need 900, then the supply and demand difference of A is the supply and demand difference of 1000-900=100, B is 800-900=-100.For this reason, material B produces substitutive demand 100 at the father node place of its substitute materials C.
After bottom child node has calculated, just can the supply/demand of step-by-step calculation father node at different levels.
S30: father node at different levels is according to the substitutive demand of material supply and demand information and corresponding child node, and the supply/demand of computing node, obtains substitutive demand data.In the present embodiment, first the supply/demand of material C is calculated, now, except the demand of material C not only comprises projected demand to itself (if phase is at the same time as the principal goods material of other production phases), also have the substitutive demand of material B, if material C supply 800, projected demand is also 800, the substitutive demand of material B is 100, then the supply and demand difference of material C is 800-800-100=-100.Secondly, the supply/demand of the father node D of material C is calculated.Computing method are identical with the method for the supply/demand calculating material C.
As shown in Figure 3, be the system construction drawing of balancing substitute materials in material requirement planning of an embodiment.This system comprises server 10 and is connected at least one client 20 of carrying out data interaction with server 10.Server 10 comprises receiver module 12 and processing module 14, and client 20 comprises acquisition module 22.
Acquisition module 22 is for gathering material supply and demand document and material substitution relation and being sent to receiver module 12 at each production sub.Receiver module 12 receives described material supply and demand document and material substitution relation.
Processing module 14 is for calculating the supply/demand of often kind of material according to described supply and demand information.Be specially: form material substitution tree according to material substitution relation, make the node that each material is set as described material substitution, the child node of replaced material material as an alternative, substitute materials is as the father node of replaced material; According to the material supply and demand information of the bottom child node that described material substitution is set, the supply/demand of computing node, obtains substitutive demand data; According to the substitutive demand of father node material supply and demand information at different levels and corresponding child node, the supply/demand of computing node, obtains substitutive demand data.
The above embodiment only have expressed several embodiment of the present invention, and it describes comparatively concrete and detailed, but therefore can not be interpreted as the restriction to the scope of the claims of the present invention.It should be pointed out that for the person of ordinary skill of the art, without departing from the inventive concept of the premise, can also make some distortion and improvement, these all belong to protection scope of the present invention.Therefore, the protection domain of patent of the present invention should be as the criterion with claims.
Claims (4)
1. a method for balancing substitute materials in material requirement planning, is characterized in that, comprises the steps:
The process of production is divided into multiple production sub according to Production requirement;
At each production sub, obtain the supply and demand information with the material of substitutional relation that described production sub relates to;
The supply/demand of often kind of material is calculated according to described supply and demand information, comprise: form material substitution tree according to material substitution relation, make the node that each material is set as described material substitution, the child node of replaced material material as an alternative, substitute materials is as the father node of replaced material;
Wherein, to every two connected production subs, the next son stage calculates after a upper sub.
2. the method for balancing substitute materials in material requirement planning as claimed in claim 1, is characterized in that, the described step calculating the supply/demand of often kind of material according to supply and demand information specifically comprises:
According to the material supply and demand information of the bottom child node that described material substitution is set, the supply/demand of computing node, obtains substitutive demand data;
According to the material supply and demand information of father node at different levels and the substitutive demand of corresponding child node, the supply/demand of step-by-step calculation node, obtains substitutive demand data.
3. a system for balancing substitute materials in material requirement planning, comprise server and be connected at least one client of carrying out data interaction with server, described server comprises receiver module and processing module, and described client comprises acquisition module:
Described acquisition module is used at each production sub collection material supply and demand document and material substitution relation and is sent to receiver module;
Described receiver module receives described material supply and demand document and material substitution relation;
Described processing module calculates the supply/demand of often kind of material according to described supply and demand information; Wherein, described processing module forms material substitution tree according to material substitution relation, makes the node that each material is set as described material substitution, and the child node of replaced material material as an alternative, substitute materials is as the father node of replaced material.
4. the system of balancing substitute materials in material requirement planning as claimed in claim 3, it is characterized in that, the material supply and demand information of the bottom child node that described processing module is specifically set according to described material substitution, the supply/demand of computing node, obtains substitutive demand data; According to the substitutive demand of father node material supply and demand information at different levels and corresponding child node, the supply/demand of step-by-step calculation node, obtains substitutive demand data.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010578459.1A CN102542364B (en) | 2010-12-08 | 2010-12-08 | Method and system for balancing substitute materials in material requirement planning |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010578459.1A CN102542364B (en) | 2010-12-08 | 2010-12-08 | Method and system for balancing substitute materials in material requirement planning |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102542364A CN102542364A (en) | 2012-07-04 |
CN102542364B true CN102542364B (en) | 2015-05-20 |
Family
ID=46349209
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201010578459.1A Active CN102542364B (en) | 2010-12-08 | 2010-12-08 | Method and system for balancing substitute materials in material requirement planning |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102542364B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104766179A (en) * | 2015-04-23 | 2015-07-08 | 广州视源电子科技股份有限公司 | Maintenance method and system for substitute materials |
CN111209765B (en) * | 2018-11-21 | 2023-05-30 | Oppo(重庆)智能科技有限公司 | Method and device for identifying material bar code and terminal equipment |
CN111105134A (en) * | 2019-11-11 | 2020-05-05 | 华勤通讯技术有限公司 | Material demand plan calculation method and platform, electronic device and storage medium |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101650802A (en) * | 2009-08-17 | 2010-02-17 | 金蝶软件(中国)有限公司 | Material information modifying method and material information modifying device in material demand plan system |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FI109436B (en) * | 1999-04-16 | 2002-07-31 | Ericsson Telefon Ab L M | Data processing in an access node |
CN1444161A (en) * | 2002-03-11 | 2003-09-24 | 联想(北京)有限公司 | Resolution method of material detailed list (BOM) data |
CN100534042C (en) * | 2007-07-06 | 2009-08-26 | 中国人民解放军国防科学技术大学 | Two-stage distributed application layer multicasting method facing to MSVMT problem |
CN101458786A (en) * | 2007-12-14 | 2009-06-17 | 英业达股份有限公司 | Material bracket altering method and system of material manifest |
-
2010
- 2010-12-08 CN CN201010578459.1A patent/CN102542364B/en active Active
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101650802A (en) * | 2009-08-17 | 2010-02-17 | 金蝶软件(中国)有限公司 | Material information modifying method and material information modifying device in material demand plan system |
Also Published As
Publication number | Publication date |
---|---|
CN102542364A (en) | 2012-07-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103440364B (en) | Based on the method and system of BIM auto-building model WBS node | |
CN102446303B (en) | Distribution method and device of process route assembly | |
CN102289743A (en) | Computer simulation system and method in product production process | |
CN102542364B (en) | Method and system for balancing substitute materials in material requirement planning | |
CN103246549B (en) | A kind of method and system of data conversion storage | |
CN111736994B (en) | Resource arranging method, system, storage medium and electronic equipment | |
CN109359907A (en) | A kind of storekeeper bar code management system | |
CN104899257A (en) | Data updating method and device in distributed data warehouse | |
CN102024209A (en) | Method for automatically replacing materials by replacement tree technology | |
CN104199955B (en) | information management system and method | |
CN105279269A (en) | SQL generating method and system for supporting table free association | |
CN103257638B (en) | Reentrant process patch modeling method for complex manufacturing process | |
EP2881903A1 (en) | Managing design updates in a manufacturing execution system | |
CN102467697A (en) | Material demand generation method and system | |
CN103530134A (en) | Configurable software platform structure | |
CN105335813A (en) | Material kitting acquisition method and system | |
CN101145227A (en) | Operation data processing method and processor | |
CN105426601A (en) | Diversity design scheme reporting method and system based on BIM (Building Information Modeling) | |
CN116401325A (en) | Data processing method and device based on data warehouse model | |
CN102750353B (en) | Method for analyzing distributed data in key value library | |
CN115564204A (en) | Parallel processing method for demand resource allocation in supply chain | |
JP2012221124A (en) | Production plan creation system | |
JP6397657B2 (en) | Requirements calculation system, requirements calculation method and program | |
US9443215B2 (en) | Next generation sequencing management | |
US7624043B2 (en) | Inventory control system and method in recycle-oriented society |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |