CN102519324A - 一种临近高陡边坡的水孔预裂爆破方法 - Google Patents

一种临近高陡边坡的水孔预裂爆破方法 Download PDF

Info

Publication number
CN102519324A
CN102519324A CN2011104436209A CN201110443620A CN102519324A CN 102519324 A CN102519324 A CN 102519324A CN 2011104436209 A CN2011104436209 A CN 2011104436209A CN 201110443620 A CN201110443620 A CN 201110443620A CN 102519324 A CN102519324 A CN 102519324A
Authority
CN
China
Prior art keywords
hole
presplitting
water
water hole
blasting method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011104436209A
Other languages
English (en)
Other versions
CN102519324B (zh
Inventor
钟冬望
李琳娜
陈浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Xinhua Engineering Co., Ltd.
Original Assignee
Wuhan University of Science and Engineering WUSE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan University of Science and Engineering WUSE filed Critical Wuhan University of Science and Engineering WUSE
Priority to CN 201110443620 priority Critical patent/CN102519324B/zh
Publication of CN102519324A publication Critical patent/CN102519324A/zh
Application granted granted Critical
Publication of CN102519324B publication Critical patent/CN102519324B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

本发明具体涉及一种临近高陡边坡的水孔预裂爆破方法。该方法是先根据坡面的剖面图,采用换向孔布孔方式布孔,其技术参数是:水孔预裂孔(5)不耦合系数为1.5~4.5;水孔预裂孔(5)孔距为1.5~3m;水孔预裂孔(5)与缓冲孔(6)的排间距为2.5~3米;水孔预裂孔(5)线装药密度为1.5~3.5kg/m;主炮孔(7)孔网参数为4×4~6×5m2。再将炸药(4)装入水孔预裂孔(5)的底部,之后装入导爆索(2);然后按1~8次装药,每次装药的顺序是:先装入间隔器(3),再装入炸药(4),依此反复,直至装完。堵塞后,在水孔预裂孔(5)外将导爆索(2)与非电导爆管雷管(1)联接,准备起爆,水孔预裂孔(5)超前起爆时间为80~100ms。本发明具有能降低根底率、减少大块和高效低耗的特点。

Description

一种临近高陡边坡的水孔预裂爆破方法
技术领域
本发明属于水孔预裂爆破技术领域,尤其涉及一种临近高陡边坡的水孔预裂爆破方法。
背景技术
随着露天开采的进行,越来越多的大型露天矿从山坡露天转入深凹露天,而随着开采深度的增加和边坡的加陡,地下水也越来越多,爆破过程中产生的地震效应也对开挖边坡的稳定性影响越来越大。因此,高陡边坡下控制爆破技术具有重要的现实意义,得到了各发达国家的普遍重视。
虽然水中爆炸的研究历史悠久,预裂爆破技术的应用也很广泛,但是由于炸药爆炸“三高”特性和岩石的非均匀性,使得控制爆破很困难,至于水孔预裂爆破,由于其水域很小,炸药到岩石距离很短,其冲击波产生与传播和无限水域有很大的区别,对其进行测试也十分困难,以上所有这些特点使水孔爆破问题的研究变得相当复杂和困难。
在露天开采过程中,临近高陡边坡的控制爆破多采用预裂爆破和缓冲爆破技术。传统的预裂爆破一般是在干孔条件下进行的,但对深凹露天矿尤其是地下水发育地区,炮孔含水率达100%,如用传统的预裂爆破技术则普遍存在根底多、大块多、低效高耗以及边坡稳定性差等问题。
发明内容
本发明旨在克服现有技术缺陷,任务是提供一种能降低根底率、减少大块、高效低耗的临近高陡边坡的水孔预裂爆破方法。
为实现上述任务,本发明采用的技术方案是:该方法的步骤如下:
第一步、根据台阶布置要求,确定生产平台位置,测出待爆实际坡面的剖面图,确定不同位置的底盘抵抗线值。
第二步、根据坡面的剖面图,采用换向孔布孔方式布孔,具体技术参数是:
(1)水孔预裂孔不耦合系数为1.5~4.5;
(2)水孔预裂孔孔距为1.5~3m;
(3)水孔预裂孔与缓冲孔的排间距为2.5~3米;
(4)水孔预裂孔线装药密度为1.5~3.5kg/m;
(5)主炮孔孔网参数为4×4~6×5m2
第三步、水孔预裂爆破方法的装药结构为全导爆索装药结构,即首先将炸药装入水孔预裂孔的底部,再装入导爆索;然后按2~8次装药,每次装药的顺序是:先装入间隔器,再装入炸药,依此反复,直至装完。
第四步、堵塞后,在水孔预裂孔外将导爆索与非电导爆管雷管联接,准备起爆,水孔预裂孔超前起爆时间为80~100ms。
所述换向布孔方式是:水孔预裂孔和缓冲孔的倾向均与边坡倾向垂直,邻近缓冲孔的主炮孔的倾向交错布置,互相垂直,其它主炮孔倾向与边坡倾向相同。
所述水孔预裂孔为垂直孔、或为倾斜孔,水孔预裂孔的直径≥100mm;水孔预裂孔的起爆方式为非电导爆管起爆,起爆顺序为斜线起爆。
所述缓冲孔的装药量为140~150Kg。
所述主炮孔的直径≥150mm,主炮孔的孔深为10~15m,主炮孔的炮孔倾角为50~75°,主炮孔的装药量为200~250Kg。
由于采用上述技术方案,本发明较好地消除了根底,有利于下部台阶的生产开采;一次形成正常生产台阶,大块率低,爆后爆堆集中利于铲装运;通过实际矿山应用对比,本方法大块率和根底率分别从原来的5%下降为3.5%和4%,下降了30%和20%;水平爆破振动比原来下降了36.8%;垂直爆破振动比原来下降了29.1%。就经济效益而言,根据加拿大矿物和能源技术中心编的《边坡工程手册》(冶金工业出版社,1984年出版)介绍,临近边坡预裂爆破经济效益计算共有五项,如减少边坡维护费,降低剥采比,增加矿石回收量等,仅以某矿F9断层下开采为例,成功地回收了38万吨优质矿石,以每吨节约30元计,创造经济效益1124万元。
因此,本发明具有降低根底率、减少大块、高效低耗、无需新设备、施工简单、简便易行和成本低的特点;不仅适用于地下水发育地区的深凹露天矿临近边坡的控制爆破,还广泛应用于各种岩土工程、边坡开挖工程、金属非金属采矿和建筑交通等爆破领域中。
附图说明
图1是本发明的一种全导爆索装药结构示意图;
图2是本发明的换向孔布孔方式布孔示意图。
具体实施方式
下面结合具体实施方式对本发明做进一步描述,并非对其保护范围的限制:
实施例1
一种临近高陡边坡的水孔预裂爆破方法,该方法用于某矿的临近高陡边坡F9断层下的矿石开采,其步骤如下:
第一步、根据台阶布置要求,确定生产平台位置,测出待爆实际坡面的剖面图,确定不同位置的底盘抵抗线值。
第二步、根据坡面的剖面图,采用换向孔布孔方式布孔,具体技术参数是:
1、水孔预裂孔5不耦合系数为1.5~3.0;
2、水孔预裂孔5孔距为1.5~2.5m;
3、水孔预裂孔5与缓冲孔6的排间距为2.5~3米;
4、水孔预裂孔5线装药密度为1.5~2.5kg/m;
5、主炮孔7孔网参数为4×4~4×5m2
第三步、本实施例的装药结构如图2所示,为全导爆索装药结构:即首先将炸药4装入水孔预裂孔5的底部,再装入导爆索2;然后分2次装药,每次装药的顺序是:先装入间隔器3,再装入炸药4,依此反复,直至装完。
第四步、堵塞后,在水孔预裂孔5外将导爆索2与非电导爆管雷管1联接,准备起爆,水孔预裂孔5超前起爆时间为80~100ms。
所述换向布孔方式是:水孔预裂孔5和缓冲孔6的倾向均与边坡倾向8垂直,邻近缓冲孔6的主炮孔7的倾向交错布置,互相垂直,其它主炮孔7倾向与边坡倾向8相同。
所述水孔预裂孔5为倾斜孔;水孔预裂孔5的直径≥100mm;水孔预裂孔5的起爆方式为非电导爆管起爆,起爆顺序为斜线起爆。
所述缓冲孔6的装药量为140~150Kg。
所述主炮孔7的直径≥150mm,主炮孔7的孔深为10~15m,主炮孔7的炮孔倾角为50~65°,主炮孔7的装药量为200~250Kg。
实施例2
一种临近高陡边坡的水孔预裂爆破方法。该方法除下列步骤外,其余同实施例1。
第二步、根据坡面的剖面图,采用换向孔布孔方式布孔,具体技术参数是:
1、水孔预裂孔5不耦合系数为3.0~4.5;
3、水孔预裂孔5孔距为2.0~3.0m;
3、水孔预裂孔5与缓冲孔6的排间距为2.5~3米;
4、水孔预裂孔5线装药密度为2.0~3.0kg/m;
5、主炮孔7孔网参数为4×5~6×5m2
第三步、本实施例的装药结构为全导爆索装药结构:首先将炸药4装入水孔预裂孔5的底部,再装入导爆索2;然后分3~8次装药,装药的顺序是:先装入间隔器3,再装入炸药4,依此反复,直至装完。
本实施例中:水孔预裂孔5为垂直孔;主炮孔7的炮孔倾角为60~75°。
本具体实施方式较好地消除了根底,有利于下部台阶的生产开采;一次形成正常生产台阶,整形效果好,大块率低,爆后爆堆集中利于铲装运;通过实际矿山应用对比,本本具体实施方式大块率和根底率分别从原来的5%下降为3.5%和4%,下降了30%和20%;水平爆破振动比原来下降了36.8%;垂直爆破振动比原来下降了29.1%。就经济效益而言,根据加拿大矿物和能源技术中心编的《边坡工程手册》(冶金工业出版社,1984年出版)介绍,临近边坡预裂爆破经济效益计算共有五项,如减少边坡维护费,降低剥采比,增加矿石回收量等,仅以实施例1为例,成功地回收了38万吨优质矿石,以每吨节约30元计,创造经济效益1124万元。
本具体实施方式具有降低根底率、减少大块、高效低耗、无需新设备、施工简单、简便易行和成本低的特点。不仅适用于地下水发育地区的深凹露天矿临近边坡的控制爆破,还广泛应用于各种岩土工程、边坡开挖工程、金属非金属采矿和建筑交通等爆破领域中。

Claims (5)

1.一种临近高陡边坡的水孔预裂爆破方法,其特征在于该方法的步骤如下:
第一步、根据台阶布置要求,确定生产平台位置,测出待爆实际坡面的剖面图,确定不同位置的底盘抵抗线值;
第二步、根据坡面的剖面图,采用换向孔布孔方式布孔,具体技术参数是:
(1)水孔预裂孔(5)不耦合系数为1.5~4.5,
(2)水孔预裂孔(5)孔距为1.5~3m,
(3)水孔预裂孔(5)与缓冲孔(6)的排间距为2.5~3米,
(4)水孔预裂孔(5)线装药密度为1.5~3.5kg/m,
(5)主炮孔(7)孔网参数为4×4~6×5m2
第三步、水孔预裂爆破方法的装药结构为全导爆索装药结构,即首先将炸药(4)装入水孔预裂孔(5)的底部,再装入导爆索(2);然后按2~8次装药,每次装药的顺序是:先装入间隔器(3),再装入炸药(4),依此反复,直至装完;
第四步、堵塞后,在水孔预裂孔(5)外将导爆索(2)与非电导爆管雷管(1)联接,准备起爆,水孔预裂孔(5)超前起爆时间为80~100ms。
2.根据权利要求1所述的临近高陡边坡的水孔预裂爆破方法,其特征在于所述换向布孔方式是:水孔预裂孔(5)和缓冲孔(6)的倾向均与边坡倾向(8)垂直,邻近缓冲孔(6)的主炮孔(7)的倾向交错布置,互相垂直,其它主炮孔(7)倾向与边坡倾向(8)相同。
3.根据权利要求1所述的临近高陡边坡的水孔预裂爆破方法,其特征在于所述水孔预裂孔(5)为垂直孔、或为倾斜孔,水孔预裂孔(5)的直径≥100mm;水孔预裂孔(5)的起爆方式为非电导爆管起爆,起爆顺序为斜线起爆。
4.根据权利要求2所述的临近高陡边坡的水孔预裂爆破方法,其特征在于所述缓冲孔(6)的装药量为140~150Kg。
5.根据权利要求2所述的临近高陡边坡的水孔预裂爆破方法,其特征在于所述主炮孔(7)的直径≥150mm,主炮孔(7)的孔深为10~15m,主炮孔(7)的炮孔倾角为50~75°,主炮孔(7)的装药量为200~250Kg。
CN 201110443620 2011-12-27 2011-12-27 一种临近高陡边坡的水孔预裂爆破方法 Active CN102519324B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110443620 CN102519324B (zh) 2011-12-27 2011-12-27 一种临近高陡边坡的水孔预裂爆破方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110443620 CN102519324B (zh) 2011-12-27 2011-12-27 一种临近高陡边坡的水孔预裂爆破方法

Publications (2)

Publication Number Publication Date
CN102519324A true CN102519324A (zh) 2012-06-27
CN102519324B CN102519324B (zh) 2013-09-11

Family

ID=46290329

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110443620 Active CN102519324B (zh) 2011-12-27 2011-12-27 一种临近高陡边坡的水孔预裂爆破方法

Country Status (1)

Country Link
CN (1) CN102519324B (zh)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102788539A (zh) * 2012-08-14 2012-11-21 武汉大学 一种用于植绿的边坡轮廓爆破方法
CN103486910A (zh) * 2013-09-27 2014-01-01 安徽理工大学 一种协同爆破装药结构及其装药方法
CN103591860A (zh) * 2013-11-29 2014-02-19 武汉大学 一种提高堆石坝过渡料细颗粒径料含量的水耦合装药及其起爆方法
CN104654946A (zh) * 2013-11-15 2015-05-27 韩国布拉斯特株式会社 利用埋藏于水孔或干孔装药层内充填管体的爆破方法
CN104729370A (zh) * 2015-03-20 2015-06-24 葛洲坝易普力股份有限公司 一种高温炮孔降温方法
CN106055801A (zh) * 2016-06-03 2016-10-26 武汉科技大学 一种深基坑支撑梁爆破拆除顺序的确定方法
CN106288996A (zh) * 2016-08-24 2017-01-04 广西新港湾工程有限公司 一种水下沟槽预裂爆破施工方法
CN108801087A (zh) * 2018-05-07 2018-11-13 董武斌 一种边坡预裂爆破方法
CN109029172A (zh) * 2018-09-17 2018-12-18 福建省新华都工程有限责任公司 一种近边坡控制爆破方法
CN112097577A (zh) * 2020-06-04 2020-12-18 福建省新华都工程有限责任公司 一种临近终了边坡控制爆破方法
CN112648898A (zh) * 2020-12-18 2021-04-13 本钢板材股份有限公司 一种径向不耦合轴向连续装药的预裂爆破方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101644157A (zh) * 2009-07-29 2010-02-10 葛洲坝集团第五工程有限公司 临江高陡岩质边坡料场时空转换开采方法
CN102213574A (zh) * 2011-05-27 2011-10-12 中国人民解放军理工大学工程兵工程学院 一种短期性边坡爆破成型方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101644157A (zh) * 2009-07-29 2010-02-10 葛洲坝集团第五工程有限公司 临江高陡岩质边坡料场时空转换开采方法
CN102213574A (zh) * 2011-05-27 2011-10-12 中国人民解放军理工大学工程兵工程学院 一种短期性边坡爆破成型方法

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
侯煜: "露天矿邻近边坡的预裂爆破及其应用", 《中国钼业》 *
刘赞平等: "预裂爆破技术在露天大孔径深孔爆破中的应用", 《河北冶金》 *
张金飞等: "高边坡路堑爆破施工工艺控制研究", 《交通标准化》 *
高洪亮等: "南芬露天铁矿预裂爆破实践", 《矿业快报》 *

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102788539A (zh) * 2012-08-14 2012-11-21 武汉大学 一种用于植绿的边坡轮廓爆破方法
CN103486910A (zh) * 2013-09-27 2014-01-01 安徽理工大学 一种协同爆破装药结构及其装药方法
CN103486910B (zh) * 2013-09-27 2016-05-18 安徽理工大学 一种协同爆破装药结构及其装药方法
CN104654946A (zh) * 2013-11-15 2015-05-27 韩国布拉斯特株式会社 利用埋藏于水孔或干孔装药层内充填管体的爆破方法
CN103591860A (zh) * 2013-11-29 2014-02-19 武汉大学 一种提高堆石坝过渡料细颗粒径料含量的水耦合装药及其起爆方法
CN104729370A (zh) * 2015-03-20 2015-06-24 葛洲坝易普力股份有限公司 一种高温炮孔降温方法
CN106055801A (zh) * 2016-06-03 2016-10-26 武汉科技大学 一种深基坑支撑梁爆破拆除顺序的确定方法
CN106055801B (zh) * 2016-06-03 2018-12-14 武汉科技大学 一种深基坑支撑梁爆破拆除顺序的确定方法
CN106288996A (zh) * 2016-08-24 2017-01-04 广西新港湾工程有限公司 一种水下沟槽预裂爆破施工方法
CN106288996B (zh) * 2016-08-24 2018-05-25 广西新港湾工程有限公司 一种水下沟槽预裂爆破施工方法
CN108801087A (zh) * 2018-05-07 2018-11-13 董武斌 一种边坡预裂爆破方法
CN109029172A (zh) * 2018-09-17 2018-12-18 福建省新华都工程有限责任公司 一种近边坡控制爆破方法
CN112097577A (zh) * 2020-06-04 2020-12-18 福建省新华都工程有限责任公司 一种临近终了边坡控制爆破方法
CN112097577B (zh) * 2020-06-04 2023-01-03 福建省新华都工程有限责任公司 一种临近终了边坡控制爆破方法
CN112648898A (zh) * 2020-12-18 2021-04-13 本钢板材股份有限公司 一种径向不耦合轴向连续装药的预裂爆破方法

Also Published As

Publication number Publication date
CN102519324B (zh) 2013-09-11

Similar Documents

Publication Publication Date Title
CN102519324B (zh) 一种临近高陡边坡的水孔预裂爆破方法
CN108225137B (zh) 煤矿岩巷掘进聚能水压光面爆破结构及方法
CN101713290B (zh) 煤矿深部全煤巷道冲击地压解危方法
CN106223958A (zh) 倾斜中厚矿体分区凿岩阶段落矿嗣后充填协同采矿法
CN205825826U (zh) 一种矿山边坡预裂爆破炮孔结构
CN102720500A (zh) 一种急倾斜薄矿体机械化地下开采方法
CN106121652B (zh) 一种闭坑露天矿山矿石回采方法
CN110331978A (zh) 一种环境再造分段中深孔嗣后充填采矿法
CN104632221A (zh) 一种采用液态二氧化碳爆破诱导崩落采矿方法
CN102692164B (zh) 纵向结构面结构性强岩爆区应力卸载注水钻爆法
CN108625855B (zh) 一种充填体下的采矿方法
CN103244124A (zh) 一种煤矿巷道工作面强制放顶卸压过空巷的方法
CN104596375A (zh) 一种岩巷综掘施工方法
CN102080545B (zh) 高危矿柱露天深孔协同回采方法
CN104296609B (zh) 深孔梯段爆破中含不同坚硬程度岩层的控制爆破方法
CN103742146A (zh) 墩柱式充填法采煤工艺
CN107762511B (zh) 一种切顶充填临近采空区的类条带式采煤方法
CN108086979A (zh) 一种垂直深孔柱状药包落矿阶段矿房法采矿工艺
CN205225270U (zh) 一种地下充填采矿凿岩硐室结构
CN103437766A (zh) 一种原地碎裂采矿方法
CN102926753B (zh) 一种人工冻结采场顶板深孔崩矿嗣后充填采矿法
CN109186390B (zh) 露天深孔爆破水间隔-耦合装药爆破方法及专用水柱袋
CN110219650A (zh) 一种环境再造阶段深孔嗣后充填采矿法
CN102213574A (zh) 一种短期性边坡爆破成型方法
CN100437014C (zh) 一种原始缓边坡爆破整形处理方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160401

Address after: 361000, North Block 19ABCD, Pacific Plaza, 331 Jiahe Road, Xiamen, Fujian

Patentee after: Fujian Xinhua Engineering Co., Ltd.

Address before: 430081 construction of Qingshan District, Hubei, Wuhan

Patentee before: Wuhan University of Science and Technology

C56 Change in the name or address of the patentee
CP02 Change in the address of a patent holder

Address after: The old Longyan city Fujian County 364200 County of Shanghang Province Jing Mei Cun, Zijin Mountain

Patentee after: Fujian Xinhua Engineering Co., Ltd.

Address before: 361000, North Block 19ABCD, Pacific Plaza, 331 Jiahe Road, Xiamen, Fujian

Patentee before: Fujian Xinhua Engineering Co., Ltd.