CN102518310B - Construction method of photoelectric curtain wall of glass film - Google Patents

Construction method of photoelectric curtain wall of glass film Download PDF

Info

Publication number
CN102518310B
CN102518310B CN 201110408439 CN201110408439A CN102518310B CN 102518310 B CN102518310 B CN 102518310B CN 201110408439 CN201110408439 CN 201110408439 CN 201110408439 A CN201110408439 A CN 201110408439A CN 102518310 B CN102518310 B CN 102518310B
Authority
CN
China
Prior art keywords
cable
wire
ground
cabinet
copper
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201110408439
Other languages
Chinese (zh)
Other versions
CN102518310A (en
Inventor
葛加君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG HANGZHOU BAY CONSTRUCTION GROUP CO Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201110408439 priority Critical patent/CN102518310B/en
Publication of CN102518310A publication Critical patent/CN102518310A/en
Application granted granted Critical
Publication of CN102518310B publication Critical patent/CN102518310B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Installation Of Indoor Wiring (AREA)

Abstract

The invention discloses a construction method of a photoelectric curtain wall of a glass film, which comprises mounting a support, laying a roof, mounting a cable tray, laying wires and cables, mounting a direct-current combiner box, wiring, mounting a low-voltage power distribution cabinet, wiring, mounting an inverter, mounting a grounding unit, mounting a monitoring system, mounting an adverse current prevention unit, and mounting a lightning protection facility. The invention combines the common conventional curtain wall (roof) with the photoelectric effect, makes the wall surface or roof have exterior protection functions, has rain-escaping, shading, wind proofing, sunstroke preventing and winter protection functions, simultaneously utilizes solar energy to generate power, and has obvious economic benefits.

Description

The job practices of glass film photoelectric curtain wall
Technical field
The present invention relates to a kind of job practices of glass film photoelectric curtain wall.
Background technology
The job practices of existing glass film photoelectric curtain wall, construction is complicated, and construction effect is undesirable.
Summary of the invention
The object of the present invention is to provide a kind of rational in infrastructure, the job practices of the glass film photoelectric curtain wall that construction effect is good.
Technical solution of the present invention is:
A kind of job practices of glass film photoelectric curtain wall is characterized in that: comprise the following steps:
(1) support is installed: at first carry out sign on agent structure, then the good line of bullet punches, gluing is fixed on the support location in the hole, then processes carrying out water-tight around the hole;
(2) roofing is laid
1. photovoltaic module by the design pitch marshalling and be fixed on support or connector on;
2. leave installing space between photovoltaic module and building coats and the gap of dispelling the heat, this gap must not be clogged by foreign material such as constructions;
3. the roofing photovoltaic square formation is arranged according to minimal channel width 500mm;
(3) cable testing bridge is installed
1) before cable testing bridge is installed, with the position that civil engineering water service pipe, the specialty of ventilating are coordinated, at first carry out unwrapping wire location, mounting suspension, the suspension and support spacing is chosen span by line of load and is supported, span is 1.5m~3m, and during at right angle setting, the fixed point spacing is not more than 2m;
2) after suspension bracket, support are installed and are finished, carrying out trailing arm installs, trailing arm and hang between support and to use brace to fix, vertical can the gravitate run-off the straight not sagging to guarantee between support and crane span structure body maintenance, erection bridge body again, the crane span structure body uses junction plate to be connected and fixed, and with set bolt, the body of a bridge is fixed on trailing arm, in case the crane span structure slippage;
Height off the ground when 3) cable bridge horizontal is installed is not less than 2.5m, during at right angle setting apart from ground 1.8m;
When 4) cable bridge horizontal is installed, choose best span by line of load and support fixing; Several groups of cable testing bridges arrange maintenance, maintenance distance between each adjacent cable crane span structure when the parallel installation of sustained height;
5) on cable testing bridge continuously apart from cabling, the filling rate in cable cross section in crane span structure, power cable is not more than 40%, control cables is not more than 50%;
6) cable testing bridge is parallel with various pipelines or when intersecting, its minimum low coverage meets following requirement:
The pipeline classification Parallel clear distance The intersection clear distance
The general technology pipeline 0.4m 0.3m
Have corrosive liquids or gas pipeline 0.5m 0.5m
The insulation layer heat distribution pipeline is arranged 0.5m 0.5m
Without the insulation layer heat distribution pipeline 1.0m 1.0m
7) the every road of cable testing bridge is adopted and is no less than 2 place's reliable grounds, and ground connection adopts the galvanizing band iron to be connected with natural grounding substance, ground resistance≤1 Ω;
(4) electric wire lays
1) wire connects
The crimping method is adopted in the connection of wire in case, box, uses wiring terminal and copper or aluminum casing, wire clamp to connect; The sub-thread aluminum core line adopts the wiring of insulation spiral to turn round connection; During being connected between wire and electric terminal, sub-thread copper or aluminium core and conductor cross-section are 25.mm 2And following multiply copper conductor directly connects, and the core of multiply copper conductor adopted connect after first tightening, ward off tin again; Multiply copper conductor and conductor cross-section surpass 2.5mm 2Many copper conductors crimp type terminal after be connected with the terminal of electric device again; Copper, aluminum conductor are connected and use copper-aluminum transition terminal, copper-aluminium transition sleeve pipe or copper-aluminium transition wire clip to connect, and copper, when aluminium terminal is connected, copper tip are done and are warded off tin and process; When using the crimping method to connect wire, the specification of wiring terminal copper or aluminum casing, pressing mold is consistent with the core cross section;
2) color mark of insulated electric conductor or bare conductor in circuit:
AC three-phase circuit: L1 is yellow mutually; L2 is green mutually; L3 is red mutually; The neutral conductor is light blue; The protection ground wire is yellowish green alternate color; Greenish-yellow Double-colour horn wire only is used for the mark protection grounding can not be used for other purposes; Light blue is used for neutrality or medium line;
3) calculate every cable length by design and Actual path before laying, arrange every dish cable, the minimizing cable connector;
4) minimum bending radius of cable meets: control cables and PVC insulated power cable are not less than 10D, and power cable with cross-linked polyethylene insulation is not less than 15D, and D is the outside diameter of cable here;
5) during cable laying, cable is drawn from the upper end of dish;
6) layout of power cable connector
1. the cable that lays side by side, stagger mutually in the position of its joint;
2. the joint during the cable surface, put fixing with the supporting plate holder;
3. there is the protection box of the mechanical damage of preventing direct-buried cable connector box outside; Be positioned at the protection box of frozen soil layer, annotate with pitch in box;
7) installing of sign board
In cable terminal, cable connector, corner, interlayer, in the two ends of tunnel and vertical shaft, people's well, install sign board on cable, indicate circuit number on sign board, when without numbering, write cable model, specification and origin exactly, the cable that uses in parallel has serial number;
8) cable that lays of vertical run or the inclination over 45 ° is in each support place; On crane span structure every the 2m place; The cable of horizontal laying is at the place, two ends of cable head and end and turning, cable connector; When the cable spacing is had requirement, every the 5-10m place; Single-core cable fixedly meet designing requirement;
9) fireproofing of cable is fire-retardant
Pass vertical shaft, wall, floor or enter the hole place of electrical panel, cabinet at cable, with the closely knit shutoff of fire prevention calking; In cable trench and tunnel, segmentation or answer the soft flame-proof material that fire resisting wall is set on request to the cable in important loop, in the special raceway groove that is laid in separately or in fire-resistant enclosed slot box, or applies fireproof paint, fire prevention band to it; In the power cable connector both sides and the long section of adjacent cable 2-3 apply fireproof paint or fire prevention band, adopt fire-resistant or flame retardant type cable;
(5) direct current conflux case install, wiring: by design and installation figure carry out frame, rack is installed screw and must be tightened; Frame, machine apart from install should with the inlet wire position alignment; During installation, should adjust level, verticality, deviation and be not more than 3mm; The installation drawing, the design arrangement figure that provide by the supplier carry out the distribution installation; The metal base of frame, rack, distributing frame is all carried out grounding connection; Before termination, the rack inner cable performs colligation, should leave the mobile surplus of 1 meter; Be ready to distributing frame termination table before termination, cable termination carries out according to the termination table; At first the cable that enters in rack from the scene will carry out the verification numbering, and the cable that enters in rack from the scene will be fixed; Enter cable in rack from the scene, should leave surplus; The cable that enters in rack from the scene does not admit of joint;
(6) low-voltage distribution cabinet installation, wiring
When 1) in a row the length of power distribution cabinet surpassed 6m, the channel setting after cabinet led to the outlet in this chamber or other rooms, and outlet is arranged in the both sides of passage, when the distance between two outlets surpasses 15m, also increased export therebetween;
2) designing requirement of construction drawing is pressed in the plan-position of low-voltage distribution cabinet, the locus unified standard size Control in the reference lamina vertical shaft;
3) independent low-voltage distribution cabinet, the verticality of only looking for cabinet face and side;
4) power distribution cabinet in column in place after, first look for the cabinet at two ends, little line is tightened in supreme 2/3 high position under the cabinet again, and is by the platform centering, as nonstandard in cabinet, be as the criterion with the cabinet face, adopt the 0.5mm iron plate to adjust during centering, every place pad can not surpass 3, the size of then pressing set bolt at most, use drilling of electric hand drill on the foundation trench steelframe, low-voltage distribution cabinet is fixed with the galvanized bolt of M12;
5) in a row power distribution cabinet is fixed with bolt between cabinet and cabinet, according to the difference of the height of cabinet, selects corresponding fixed point;
(7) inverter is installed
1) photovoltaic combining inverter requires installation ground smooth, and the rack surrounding has enough spaces, is convenient to heat radiation and safeguards, headroom is not less than 50cm, and the space, back is not less than 50cm, and rack the place ahead can not be less than 80cm;
By assembly access situation divide single group conspire to create, organize more conspire to create, centralized;
2) be connected with photovoltaic array: when designing the group serial type photovoltaic array that is connected with the 100KW Photovoltaic Inverter, photovoltaic array both positive and negative polarity open-circuit voltage is no more than 880V;
3) be connected with electrical network: as long as the three phase network electric voltage frequency meets the requirements, photovoltaic combining inverter can work, voltage range: 310V~450V, frequency range: 47HZ~51.5HZ;
4) DC side wiring: the maximum open circuit voltage of photovoltaic module is no more than 880V, and not charged when connecting the input cable, namely the line breaker of DC power distribution cabinet must be in off-state; Measure the input voltage positive-negative polarity with universal meter, avoid inputting reverse polarity connection; Just just connecing input terminal with input, to input the negative input terminal that connects;
5) AC wiring: when connecting the electric current electrical network, AC is not charged, and namely the line breaker of AC power distribution cabinet/AC distribution panel is in off-state;
6) ground wire wiring: the ground connection copper bar of photovoltaic DC-to-AC converter reliably is connected with the earth gets final product;
(8) ground device is installed
1) ground device is installed: natural grounding substance, and utilize and do ground connector without waterproof baseplate reinforcing bar or deep foundation, by designing requirement, the baseplate reinforcing bar overlap joint is welded; With two reinforcing bar and baseplate reinforcing bar welding of facing mutually the diagonal angle in post, and main muscle in post is carried out mark with colour code, the colour code color is separated with the color of using on civil works in same construction unit;
2) the ground connection main line lays: surface is established dismounting and the maintenance that ground wire does not hinder equipment; Grounding wire is answered level or vertical run, or along the building surface parallel lay-up; When grounding wire laid along building walls, the ground connection main line was not less than 200 ㎜ apart from ground, be not less than 10m apart from metope, and the horizontal range between supporter is 1m, and vertical component is 1.5m, and round part is divided into 0.5m; The grounding wire surface brush that surface is established is pitch-dark, but ground connection clamp and connect terminal etc. and locate not brush oil; When through walls, casing protection is crossed over the shrinkage joint; Carefully connect the wire and guide the place, building entrance into, be marked with black ground connection sign;
(9) monitoring system is installed
1) environment temperature sensor: adopt radiation shield to realize anti-spoke, the plane parallel of total solar radiation sensor and photovoltaic module, deviation be no more than ± and 2 °;
2) measuring equipment is installed: the photovoltaic system environment temperature sensor is arranged on the sun-shading ventilating place of photovoltaic module central point equal height, in photovoltaic module 1.5m-10m scope; The assembly surface temperature pick up is arranged on the center at the photovoltaic module back side; The total solar radiation installation of sensors is on important actor;
3) data acquisition unit is installed: the data acquisition unit construction and installation meet the regulation in " instrument and meter for automation engineering construction and standards of acceptance " GB50093; The holding wire conductor adopts shielding line, avoids and the parallel cabling of strong signal cable, or uses the steel pipe shielding; It is clear that the sign of signal keeps, and the pressure reduction between the multi-analog input signal of a module is not more than 24V;
(10) anti-backflow device is installed: anti-backflow device is arranged in the photovoltaic plant AC power distribution cabinet/AC distribution panel, the current signal of distribution transformer low-pressure side and voltage signal acquisition in AC power distribution cabinet/AC distribution panel;
(11) lightning protection facility is installed
1) first order power arrester is installed on the end of incoming cables; Direct lightning strike, conduction thunder, induction thunder are implemented end of incoming cables department level protection;
2) the arrester circuit distance of one-level arrester that is installed on distribution end and requires distance in the second level is greater than 10 meters; Be struck by lightning energy and lightning wave reflection, indirect lightning strike of the remnants of elementary protection protected;
3) third level arrester is installed on protected equipment end, and greater than 10 meters, and the distance of the circuit between protected equipment is not more than 10 meters apart from the circuit of second level arrester distance, and surpassing 10 meters needs to append the one-level arrester, prevents the lightning wave reflection;
4) ground connection way: require all exposed metal support component reliably to be connected with ground connector, after field trial, adopt the self-tapping screw of M5 to carry out hinged, ground connector forms and is no less than two places, diagonal angle after ring-type and original roof lighting proof strip reliably welds;
5) at photovoltaic module one week of periphery and middle escape way place's increase lightning protection grounding network of roofing, adopt 25 * 4 galvanizing band irons, and reliably be welded to connect with original roof lighting proof strip, weld adopts 2 times red lead anti-corrosive paints to do preservative treatment, and brushes aluminium paint 2 times.
The present invention combines common traditional curtain wall (roof) with the photoelectric effect principle, make its metope or roof have the Support Function effect, can take shelter from rain, shade, windproof, heatstroke prevention, winter protection etc., can also utilize simultaneously the solar energy use of generating electricity, two getting, have obvious economical characters at one stroke.
The present invention can use in the existing building object of construction production, also can use in reconstruction of existing building, and it has wide range of applications, and has the practicality characteristics; Photoelectric curtain wall roof construction is applicable to solar energy resources and enriches the zone and be applicable to three-dimensional building, is applicable to building position at sunshine etc.
The invention will be further described below in conjunction with embodiment.
The specific embodiment
A kind of job practices of glass film photoelectric curtain wall is characterized in that: comprise the following steps:
(1) support is installed: at first carry out sign on agent structure, then the good line of bullet punches, gluing is fixed on the support location in the hole, then processes carrying out water-tight around the hole;
(2) roofing is laid
1. photovoltaic module by the design pitch marshalling and be fixed on support or connector on;
2. leave installing space between photovoltaic module and building coats and the gap of dispelling the heat, this gap must not be clogged by foreign material such as constructions;
3. the roofing photovoltaic square formation is arranged according to minimal channel width 500mm;
(3) cable testing bridge is installed
1) before cable testing bridge is installed, with the position that civil engineering water service pipe, the specialty of ventilating are coordinated, at first carry out unwrapping wire location, mounting suspension, the suspension and support spacing is chosen span by line of load and is supported, span is 1.5m~3m, and during at right angle setting, the fixed point spacing is not more than 2m;
2) after suspension bracket, support are installed and are finished, carrying out trailing arm installs, trailing arm and hang between support and to use brace to fix, vertical can the gravitate run-off the straight not sagging to guarantee between support and crane span structure body maintenance, erection bridge body again, the crane span structure body uses junction plate to be connected and fixed, and with set bolt, the body of a bridge is fixed on trailing arm, in case the crane span structure slippage;
Height off the ground when 3) cable bridge horizontal is installed is not less than 2.5m, during at right angle setting apart from ground 1.8m;
When 4) cable bridge horizontal is installed, choose best span by line of load and support fixing; Several groups of cable testing bridges arrange maintenance, maintenance distance between each adjacent cable crane span structure when the parallel installation of sustained height;
5) on cable testing bridge continuously apart from cabling, the filling rate in cable cross section in crane span structure, power cable is not more than 40%, control cables is not more than 50%;
6) cable testing bridge is parallel with various pipelines or when intersecting, its minimum low coverage meets following requirement:
The pipeline classification Parallel clear distance The intersection clear distance
The general technology pipeline 0.4m 0.3m
Have corrosive liquids or gas pipeline 0.5m 0.5m
The insulation layer heat distribution pipeline is arranged 0.5m 0.5m
Without the insulation layer heat distribution pipeline 1.0m 1.0m
7) the every road of cable testing bridge is adopted and is no less than 2 place's reliable grounds, and ground connection adopts the galvanizing band iron to be connected with natural grounding substance, ground resistance≤1 Ω;
(4) electric wire lays
1) wire connects
The crimping method is adopted in the connection of wire in case, box, uses wiring terminal and copper or aluminum casing, wire clamp to connect; The sub-thread aluminum core line adopts the wiring of insulation spiral to turn round connection; During being connected between wire and electric terminal, sub-thread copper or aluminium core and conductor cross-section are 25.mm 2And following multiply copper conductor directly connects, and the core of multiply copper conductor adopted connect after first tightening, ward off tin again; Multiply copper conductor and conductor cross-section surpass 2.5mm 2Many copper conductors crimp type terminal after be connected with the terminal of electric device again; Copper, aluminum conductor are connected and use copper-aluminum transition terminal, copper-aluminium transition sleeve pipe or copper-aluminium transition wire clip to connect, and copper, when aluminium terminal is connected, copper tip are done and are warded off tin and process; When using the crimping method to connect wire, the specification of wiring terminal copper or aluminum casing, pressing mold is consistent with the core cross section;
2) color mark of insulated electric conductor or bare conductor in circuit:
AC three-phase circuit: L1 is yellow mutually; L2 is green mutually; L3 is red mutually; The neutral conductor is light blue; The protection ground wire is yellowish green alternate color; Greenish-yellow Double-colour horn wire only is used for the mark protection grounding can not be used for other purposes; Light blue is used for neutrality or medium line;
3) calculate every cable length by design and Actual path before laying, arrange every dish cable, the minimizing cable connector;
4) minimum bending radius of cable meets: control cables and PVC insulated power cable are not less than 10D, and power cable with cross-linked polyethylene insulation is not less than 15D, and D is the outside diameter of cable here;
5) during cable laying, cable is drawn from the upper end of dish;
6) layout of power cable connector
1. the cable that lays side by side, stagger mutually in the position of its joint;
2. the joint during the cable surface, put fixing with the supporting plate holder;
3. there is the protection box of the mechanical damage of preventing direct-buried cable connector box outside; Be positioned at the protection box of frozen soil layer, annotate with pitch in box;
7) installing of sign board
In cable terminal, cable connector, corner, interlayer, in the two ends of tunnel and vertical shaft, people's well, install sign board on cable, indicate circuit number on sign board, when without numbering, write cable model, specification and origin exactly, the cable that uses in parallel has serial number;
8) cable that lays of vertical run or the inclination over 45 ° is in each support place; On crane span structure every the 2m place; The cable of horizontal laying is at the place, two ends of cable head and end and turning, cable connector; When the cable spacing is had requirement, every the 5-10m place; Single-core cable fixedly meet designing requirement;
9) fireproofing of cable is fire-retardant
Pass vertical shaft, wall, floor or enter the hole place of electrical panel, cabinet at cable, with the closely knit shutoff of fire prevention calking; In cable trench and tunnel, segmentation or answer the soft flame-proof material that fire resisting wall is set on request to the cable in important loop, in the special raceway groove that is laid in separately or in fire-resistant enclosed slot box, or applies fireproof paint, fire prevention band to it; In the power cable connector both sides and the long section of adjacent cable 2-3 apply fireproof paint or fire prevention band, adopt fire-resistant or flame retardant type cable;
(5) direct current conflux case install, wiring: by design and installation figure carry out frame, rack is installed screw and must be tightened; Frame, machine apart from install should with the inlet wire position alignment; During installation, should adjust level, verticality, deviation and be not more than 3mm; The installation drawing, the design arrangement figure that provide by the supplier carry out the distribution installation; The metal base of frame, rack, distributing frame is all carried out grounding connection; Before termination, the rack inner cable performs colligation, should leave the mobile surplus of 1 meter; Be ready to distributing frame termination table before termination, cable termination carries out according to the termination table; At first the cable that enters in rack from the scene will carry out the verification numbering, and the cable that enters in rack from the scene will be fixed; Enter cable in rack from the scene, should leave surplus; The cable that enters in rack from the scene does not admit of joint;
(6) low-voltage distribution cabinet installation, wiring
When 1) in a row the length of power distribution cabinet surpassed 6m, the channel setting after cabinet led to the outlet in this chamber or other rooms, and outlet is arranged in the both sides of passage, when the distance between two outlets surpasses 15m, also increased export therebetween;
2) designing requirement of construction drawing is pressed in the plan-position of low-voltage distribution cabinet, the locus unified standard size Control in the reference lamina vertical shaft;
3) independent low-voltage distribution cabinet, the verticality of only looking for cabinet face and side;
4) power distribution cabinet in column in place after, first look for the cabinet at two ends, little line is tightened in supreme 2/3 high position under the cabinet again, and is by the platform centering, as nonstandard in cabinet, be as the criterion with the cabinet face, adopt the 0.5mm iron plate to adjust during centering, every place pad can not surpass 3, the size of then pressing set bolt at most, use drilling of electric hand drill on the foundation trench steelframe, low-voltage distribution cabinet is fixed with the galvanized bolt of M12;
5) in a row power distribution cabinet is fixed with bolt between cabinet and cabinet, according to the difference of the height of cabinet, selects corresponding fixed point;
(7) inverter is installed
1) photovoltaic combining inverter requires installation ground smooth, and the rack surrounding has enough spaces, is convenient to heat radiation and safeguards, headroom is not less than 50cm, and the space, back is not less than 50cm, and rack the place ahead can not be less than 80cm;
By assembly access situation divide single group conspire to create, organize more conspire to create, centralized;
2) be connected with photovoltaic array: when designing the group serial type photovoltaic array that is connected with the 100KW Photovoltaic Inverter, photovoltaic array both positive and negative polarity open-circuit voltage is no more than 880V;
3) be connected with electrical network: as long as the three phase network electric voltage frequency meets the requirements, photovoltaic combining inverter can work, voltage range: 310V~450V, frequency range: 47HZ~51.5HZ;
4) DC side wiring: the maximum open circuit voltage of photovoltaic module is no more than 880V, and not charged when connecting the input cable, namely the line breaker of DC power distribution cabinet must be in off-state; Measure the input voltage positive-negative polarity with universal meter, avoid inputting reverse polarity connection; Just just connecing input terminal with input, to input the negative input terminal that connects;
5) AC wiring: when connecting the electric current electrical network, AC is not charged, and namely the line breaker of AC power distribution cabinet/AC distribution panel is in off-state;
6) ground wire wiring: the ground connection copper bar of photovoltaic DC-to-AC converter reliably is connected with the earth gets final product;
(8) ground device is installed
1) ground device is installed: natural grounding substance, and utilize and do ground connector without waterproof baseplate reinforcing bar or deep foundation, by designing requirement, the baseplate reinforcing bar overlap joint is welded; With two reinforcing bar and baseplate reinforcing bar welding of facing mutually the diagonal angle in post, and main muscle in post is carried out mark with colour code, the colour code color is separated with the color of using on civil works in same construction unit;
2) the ground connection main line lays: surface is established dismounting and the maintenance that ground wire does not hinder equipment; Grounding wire is answered level or vertical run, or along the building surface parallel lay-up; When grounding wire laid along building walls, the ground connection main line was not less than 200 ㎜ apart from ground, be not less than 10m apart from metope, and the horizontal range between supporter is 1m, and vertical component is 1.5m, and round part is divided into 0.5m; The grounding wire surface brush that surface is established is pitch-dark, but ground connection clamp and connect terminal etc. and locate not brush oil; When through walls, casing protection is crossed over the shrinkage joint; Carefully connect the wire and guide the place, building entrance into, be marked with black ground connection sign;
(9) monitoring system is installed
1) environment temperature sensor: adopt radiation shield to realize anti-spoke, the plane parallel of total solar radiation sensor and photovoltaic module, deviation be no more than ± and 2 °;
2) measuring equipment is installed: the photovoltaic system environment temperature sensor is arranged on the sun-shading ventilating place of photovoltaic module central point equal height, in photovoltaic module 1.5m-10m scope; The assembly surface temperature pick up is arranged on the center at the photovoltaic module back side; The total solar radiation installation of sensors is on important actor;
3) data acquisition unit is installed: the data acquisition unit construction and installation meet the regulation in " instrument and meter for automation engineering construction and standards of acceptance " GB50093; The holding wire conductor adopts shielding line, avoids and the parallel cabling of strong signal cable, or uses the steel pipe shielding; It is clear that the sign of signal keeps, and the pressure reduction between the multi-analog input signal of a module is not more than 24V;
(10) anti-backflow device is installed: anti-backflow device is arranged in the photovoltaic plant AC power distribution cabinet/AC distribution panel, the current signal of distribution transformer low-pressure side and voltage signal acquisition in AC power distribution cabinet/AC distribution panel;
(11) lightning protection facility is installed
1) first order power arrester is installed on the end of incoming cables; Direct lightning strike, conduction thunder, induction thunder are implemented end of incoming cables department level protection;
2) the arrester circuit distance of one-level arrester that is installed on distribution end and requires distance in the second level is greater than 10 meters; Be struck by lightning energy and lightning wave reflection, indirect lightning strike of the remnants of elementary protection protected;
3) third level arrester is installed on protected equipment end, and greater than 10 meters, and the distance of the circuit between protected equipment is not more than 10 meters apart from the circuit of second level arrester distance, and surpassing 10 meters needs to append the one-level arrester, prevents the lightning wave reflection;
4) ground connection way: require all exposed metal support component reliably to be connected with ground connector, after field trial, adopt the self-tapping screw of M5 to carry out hinged, ground connector forms and is no less than two places, diagonal angle after ring-type and original roof lighting proof strip reliably welds;
5) at photovoltaic module one week of periphery and middle escape way place's increase lightning protection grounding network of roofing, adopt 25 * 4 galvanizing band irons, and reliably be welded to connect with original roof lighting proof strip, weld adopts 2 times red lead anti-corrosive paints to do preservative treatment, and brushes aluminium paint 2 times.

Claims (1)

1. the job practices of a glass film photoelectric curtain wall, is characterized in that: comprise the following steps:
(1) support is installed: at first carry out sign on agent structure, then the good line of bullet punches, gluing is fixed on the support location in the hole, then processes carrying out water-tight around the hole;
(2) roofing is laid
1. photovoltaic module by the design pitch marshalling and be fixed on support or connector on;
2. leave installing space between photovoltaic module and building coats and the gap of dispelling the heat, this gap must not be clogged by foreign material such as constructions;
3. the roofing photovoltaic square formation is arranged according to minimal channel width 500mm;
(3) cable testing bridge is installed
1) before cable testing bridge is installed, with the position that civil engineering water service pipe, the specialty of ventilating are coordinated, at first carry out unwrapping wire location, mounting suspension, hanging set spacing chooses span by line of load and supports, span is 1.5m~3m, and during at right angle setting, the fixed point spacing is not more than 2m;
2) suspension bracket, hang support and install to finish after, carrying out trailing arm installs, trailing arm and hang between support and to use brace to fix, vertical can the gravitate run-off the straight not sagging to guarantee between support and crane span structure body maintenance, erection bridge body again, the crane span structure body uses junction plate to be connected and fixed, and with set bolt, the body of a bridge is fixed on trailing arm, in case the crane span structure slippage;
Height off the ground when 3) cable bridge horizontal is installed is not less than 2.5m, during at right angle setting apart from ground 1.8m;
When 4) cable bridge horizontal is installed, choose best span by line of load and support fixing; Several groups of cable testing bridges arrange maintenance, maintenance distance between each adjacent cable crane span structure when the parallel installation of sustained height;
5) on cable testing bridge continuously apart from cabling, the filling rate in cable cross section in crane span structure, power cable is not more than 40%, control cables is not more than 50%;
6) cable testing bridge is parallel with various pipelines or when intersecting, its minimum low coverage meets following requirement:
Figure FDA00003552993500021
7) the every road of cable testing bridge is adopted and is no less than 2 place's reliable grounds, and ground connection adopts the galvanizing band iron to be connected with natural grounding substance, ground resistance≤1 Ω;
(4) electric wire lays
1) wire connects
The crimping method is adopted in the connection of wire in case, box, uses wiring terminal and copper or aluminum casing, wire clamp to connect; The sub-thread aluminum core line adopts the wiring of insulation spiral to turn round connection; During being connected between wire and electric terminal, sub-thread copper or aluminium core and conductor cross-section are 2.5mm 2And following multiply copper conductor directly connects, and the core of multiply copper conductor adopted connect after first tightening, ward off tin again; Multiply copper conductor and conductor cross-section surpass 2.5mm 2Many copper conductors crimp type terminal after be connected with the terminal of electric device again; Copper, aluminum conductor are connected and use copper-aluminum transition terminal, copper-aluminium transition sleeve pipe or copper-aluminium transition wire clip to connect, and copper, when aluminium terminal is connected, copper tip are done and are warded off tin and process; When using the crimping method to connect wire, the specification of wiring terminal copper or aluminum casing, pressing mold is consistent with the core cross section;
2) color mark of insulated electric conductor or bare conductor in circuit:
AC three-phase circuit: L1 is yellow mutually; L2 is green mutually; L3 is red mutually; The neutral conductor is light blue; The protection ground wire is yellowish green alternate color; Greenish-yellow Double-colour horn wire only is used for the mark protection grounding can not be used for other purposes; Light blue is used for neutrality or medium line;
3) calculate every cable length by design and Actual path before laying, arrange every dish cable, the minimizing cable connector;
4) minimum bending radius of cable meets: control cables and PVC insulated power cable are not less than 10D, and power cable with cross-linked polyethylene insulation is not less than 15D, and D is the outside diameter of cable here;
5) during cable laying, cable is drawn from the upper end of dish;
6) layout of power cable connector
1. the cable that lays side by side, stagger mutually in the position of its joint;
2. the joint during the cable surface, put fixing with the supporting plate holder;
3. there is the protection box of the mechanical damage of preventing direct-buried cable connector box outside; Be positioned at the protection box of frozen soil layer, annotate with pitch in box;
7) installing of sign board
In cable terminal, cable connector, corner, interlayer, in the two ends of tunnel and vertical shaft, people's well, install sign board on cable, indicate circuit number on sign board, when without numbering, write cable model, specification and origin exactly, the cable that uses in parallel has serial number;
8) cable that lays of vertical run or the inclination over 45 ° is in each support place; On crane span structure every the 2m place; The cable of horizontal laying is at the place, two ends of cable head and end and turning, cable connector; When the cable spacing is had requirement, every the 5-10m place; Single-core cable fixedly meet designing requirement;
9) fireproofing of cable is fire-retardant
Pass vertical shaft, wall, floor or enter the hole place of electrical panel, cabinet at cable, with the closely knit shutoff of fire prevention calking; In cable trench and tunnel, segmentation or answer the soft flame-proof material that fire resisting wall is set on request to the cable in important loop, in the special raceway groove that is laid in separately or in fire-resistant enclosed slot box, or applies fireproof paint, fire prevention band to it; In the power cable connector both sides and the long section of adjacent cable 2-3 apply fireproof paint or fire prevention band, adopt fire-resistant or flame retardant type cable;
(5) direct current conflux case install, wiring: by design and installation figure carry out frame, rack is installed screw and must be tightened; Frame, machine apart from install should with the inlet wire position alignment; During installation, should adjust level, verticality, deviation and be not more than 3mm; The installation drawing, the design arrangement figure that provide by the supplier carry out the distribution installation; The metal base of frame, rack, distributing frame is all carried out grounding connection; Before termination, the rack inner cable performs colligation, should leave the mobile surplus of 1 meter; Be ready to distributing frame termination table before termination, cable termination carries out according to the termination table; At first the cable that enters in rack from the scene will carry out the verification numbering, and the cable that enters in rack from the scene will be fixed; Enter cable in rack from the scene, should leave surplus; The cable that enters in rack from the scene does not admit of joint;
(6) low-voltage distribution cabinet installation, wiring
When 1) in a row the length of power distribution cabinet surpassed 6m, the channel setting after cabinet led to the outlet in this chamber or other rooms, and outlet is arranged in the both sides of passage, when the distance between two outlets surpasses 15m, also increased export therebetween;
2) designing requirement of construction drawing is pressed in the plan-position of low-voltage distribution cabinet, the locus unified standard size Control in the reference lamina vertical shaft;
3) independent low-voltage distribution cabinet, the verticality of only looking for cabinet face and side;
4) power distribution cabinet in column in place after, first look for the cabinet at two ends, little line is tightened in supreme 2/3 high position under the cabinet again, and is by the platform centering, as nonstandard in cabinet, be as the criterion with the cabinet face, adopt the 0.5mm iron plate to adjust during centering, every place pad can not surpass 3, the size of then pressing set bolt at most, use drilling of electric hand drill on the foundation trench steelframe, low-voltage distribution cabinet is fixed with the galvanized bolt of M12;
5) in a row power distribution cabinet is fixed with bolt between cabinet and cabinet, according to the difference of the height of cabinet, selects corresponding fixed point;
(7) inverter is installed
1) photovoltaic combining inverter requires installation ground smooth, and the rack surrounding has enough spaces, is convenient to heat radiation and safeguards, headroom is not less than 50cm, and the space, back is not less than 50cm, and rack the place ahead can not be less than 80cm;
By assembly access situation divide single group conspire to create, organize more conspire to create, centralized;
2) be connected with photovoltaic array: when designing the group serial type photovoltaic array that is connected with the 100KW Photovoltaic Inverter, photovoltaic array both positive and negative polarity open-circuit voltage is no more than 880V;
3) be connected with electrical network: as long as the three phase network electric voltage frequency meets the requirements, photovoltaic combining inverter can work, voltage range: 310V~450V, frequency range: 47HZ~51.5HZ;
4) DC side wiring: the maximum open circuit voltage of photovoltaic module is no more than 880V, and not charged when connecting the input cable, namely the line breaker of DC power distribution cabinet must be in off-state; Measure the input voltage positive-negative polarity with universal meter, avoid inputting reverse polarity connection; Just just connecing input terminal with input, to input the negative input terminal that connects;
5) AC wiring: when connecting the electric current electrical network, AC is not charged, and namely the line breaker of AC power distribution cabinet/AC distribution panel is in off-state;
6) ground wire wiring: the ground connection copper bar of photovoltaic DC-to-AC converter reliably is connected with the earth gets final product;
(8) ground device is installed
1) ground device is installed: natural grounding substance, and utilize and do ground connector without waterproof baseplate reinforcing bar or deep foundation, by designing requirement, the baseplate reinforcing bar overlap joint is welded; With two reinforcing bar and baseplate reinforcing bar welding of facing mutually the diagonal angle in post, and main muscle in post is carried out mark with colour code, the colour code color is separated with the color of using on civil works in same construction unit;
2) the ground connection main line lays: surface is established dismounting and the maintenance that ground wire does not hinder equipment; Grounding wire is answered level or vertical run, or along the building surface parallel lay-up; When grounding wire laid along building walls, the ground connection main line was not less than 200 ㎜ apart from ground, be not less than 10m apart from metope, and the horizontal range between supporter is 1m, and vertical component is 1.5m, and round part is divided into 0.5m; The grounding wire surface brush that surface is established is pitch-dark, but ground connection clamp and connect terminal etc. and locate not brush oil; When through walls, casing protection is crossed over the shrinkage joint; Carefully connect the wire and guide the place, building entrance into, be marked with black ground connection sign;
(9) monitoring system is installed
1) environment temperature sensor: adopt radiation shield to realize anti-spoke, the plane parallel of total solar radiation sensor and photovoltaic module, deviation be no more than ± and 2 °;
2) measuring equipment is installed: the photovoltaic system environment temperature sensor is arranged on the sun-shading ventilating place of photovoltaic module central point equal height, in photovoltaic module 1.5m-10m scope; The assembly surface temperature pick up is arranged on the center at the photovoltaic module back side; The total solar radiation installation of sensors is on important actor;
3) data acquisition unit is installed: the data acquisition unit construction and installation meet the regulation in " instrument and meter for automation engineering construction and standards of acceptance " GB50093; The holding wire conductor adopts shielding line, avoids and the parallel cabling of strong signal cable, or uses the steel pipe shielding; It is clear that the sign of signal keeps, and the pressure reduction between the multi-analog input signal of a module is not more than 24V;
(10) anti-backflow device is installed: anti-backflow device is arranged in the photovoltaic plant AC power distribution cabinet/AC distribution panel, the current signal of distribution transformer low-pressure side and voltage signal acquisition in AC power distribution cabinet/AC distribution panel;
(11) lightning protection facility is installed
1) first order power arrester is installed on the end of incoming cables; Direct lightning strike, conduction thunder, induction thunder are implemented end of incoming cables department level protection;
2) the arrester circuit distance of one-level arrester that is installed on distribution end and requires distance in the second level is greater than 10 meters; Be struck by lightning energy and lightning wave reflection, indirect lightning strike of the remnants of elementary protection protected;
3) third level arrester is installed on protected equipment end, and greater than 10 meters, and the distance of the circuit between protected equipment is not more than 10 meters apart from the circuit of second level arrester distance, and surpassing 10 meters needs to append the one-level arrester, prevents the lightning wave reflection;
4) ground connection way: require all exposed metal support component reliably to be connected with ground connector, after field trial, adopt the self-tapping screw of M5 to carry out hinged, ground connector forms and is no less than two places, diagonal angle after ring-type and original roof lighting proof strip reliably welds;
5) at photovoltaic module one week of periphery and middle escape way place's increase lightning protection grounding network of roofing, adopt 25 * 4 galvanizing band irons, and reliably be welded to connect with original roof lighting proof strip, weld adopts 2 times red lead anti-corrosive paints to do preservative treatment, and brushes aluminium paint 2 times.
CN 201110408439 2011-12-09 2011-12-09 Construction method of photoelectric curtain wall of glass film Expired - Fee Related CN102518310B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110408439 CN102518310B (en) 2011-12-09 2011-12-09 Construction method of photoelectric curtain wall of glass film

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110408439 CN102518310B (en) 2011-12-09 2011-12-09 Construction method of photoelectric curtain wall of glass film

Publications (2)

Publication Number Publication Date
CN102518310A CN102518310A (en) 2012-06-27
CN102518310B true CN102518310B (en) 2013-11-06

Family

ID=46289349

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110408439 Expired - Fee Related CN102518310B (en) 2011-12-09 2011-12-09 Construction method of photoelectric curtain wall of glass film

Country Status (1)

Country Link
CN (1) CN102518310B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109911134A (en) * 2019-03-15 2019-06-21 中国能源建设集团安徽电力建设第一工程有限公司 Water surface floating photovoltaic power generation construction method

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103197352B (en) * 2013-03-12 2015-05-13 武汉大学 Multifunctional wall body detecting instrument
JP6784079B2 (en) * 2016-07-07 2020-11-11 富士ゼロックス株式会社 Charging member, charging device, process cartridge and image forming device
CN106129926A (en) * 2016-08-18 2016-11-16 上海市政工程设计研究总院(集团)有限公司 A kind of non-wet environment cable connector fireproof protection box
CN112609917B (en) * 2020-12-18 2022-05-17 保定嘉盛光电科技股份有限公司 Vertical face installation mode based on photovoltaic wall brick
CN113819343B (en) * 2021-09-30 2022-11-08 上海宝冶集团有限公司 Method for fixing super heat-insulating material of water beam column of heating furnace

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7845128B2 (en) * 2008-09-23 2010-12-07 Architectural Glass And Aluminum Corporation, Inc. Unitized building integrated photovoltaic conversion module
KR101251709B1 (en) * 2009-06-04 2013-04-05 (주)엘지하우시스 Flat roof type curtain wall mount assembly for building integrated photovoltaic
KR20110045523A (en) * 2009-10-27 2011-05-04 알루텍 (주) Installation method of exterior material for building integrated photovoltaic

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109911134A (en) * 2019-03-15 2019-06-21 中国能源建设集团安徽电力建设第一工程有限公司 Water surface floating photovoltaic power generation construction method

Also Published As

Publication number Publication date
CN102518310A (en) 2012-06-27

Similar Documents

Publication Publication Date Title
CN102518310B (en) Construction method of photoelectric curtain wall of glass film
CN104242191A (en) Benzene hydrogenation engineering instrument pipeline laying method
CN203352080U (en) Cable splitter
CN105429034B (en) Grounding device of transformer substation containing inlet and outlet cables and mounting method thereof
CN111834954A (en) Laboratory power electrical system construction process
CN205751568U (en) Cast composite shielding isolated bus
CN206480781U (en) A kind of copper aluminium terminal terminal box and wiring system
CN213937347U (en) High-voltage bus duct device
CN211577520U (en) Communication optical cable double-route laying combined equipment for indoor transformer substation overhead incoming line
CN202771828U (en) Multi-core high voltage and low voltage composite submarine cable
CN103218941A (en) Simulated practical training device for indoor distribution line
CN208908260U (en) The independent compound earthed system of antistatic
CN202978001U (en) Complete switch cabinet assembly type bus bridge stand
CN207518166U (en) Power plant 1000kV outlet grade transmitting system mounting structures
CN219591848U (en) Equipotential connection structure based on old building setting
CN114759374B (en) Independent grounding device for important equipment and construction method thereof
CN203179365U (en) Simulation training device of indoor distributing lines
CN220913924U (en) Aluminum alloy armored cable capable of being directly laid
CN116093829A (en) Construction process of electric installation engineering
Ave et al. PGH INFRASTRUCTURE PROJECT FELICIDAD SY MULTI-SPECIALTY BUILDING
CN203826580U (en) Roof top stainless steel rail grounding terminal
CN211127059U (en) Outdoor to indoor cable channel
CN220421138U (en) Optical cable down-leading device and indoor transformer station system
CN207938334U (en) A kind of bus duct and its flexible reversing arrangement
CN211290250U (en) Anti-aging and anti-leakage electric heater

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: HANGZHOU ZEDA CIVIL ENGINEERING CONSULTING CO., LT

Free format text: FORMER OWNER: GE JIAJUN

Effective date: 20140109

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 226400 NANTONG, JIANGSU PROVINCE TO: 310016 HANGZHOU, ZHEJIANG PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20140109

Address after: 209, room 3, building 193, 310016 sailing Road, Hangzhou, Zhejiang, Jianggan District

Patentee after: Hangzhou Zeda Civil Engineering Consulting Co., Ltd.

Address before: Rudong County, Jiangsu province 226400 Nantong juegang Taishan Road East Development Building 1002

Patentee before: Ge Jiajun

ASS Succession or assignment of patent right

Owner name: ZHEJIANG HANGZHOU BAY CONSTRUCTION GROUP CO., LTD.

Free format text: FORMER OWNER: HANGZHOU ZEDA CIVIL ENGINEERING CONSULTING CO., LTD.

Effective date: 20140326

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 310016 HANGZHOU, ZHEJIANG PROVINCE TO: 310021 HANGZHOU, ZHEJIANG PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20140326

Address after: 310021 No. 238 Airport Road, Hangzhou, Zhejiang, Jianggan District

Patentee after: ZHEJIANG HANGZHOU BAY CONSTRUCTION GROUP CO., LTD.

Address before: 209, room 3, building 193, 310016 sailing Road, Hangzhou, Zhejiang, Jianggan District

Patentee before: Hangzhou Zeda Civil Engineering Consulting Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131106

Termination date: 20171209