CN102518120A - Prestressed reinforcement and non-prestressed reinforcement combined H-shaped reinforced concrete sheet pile and manufacture method thereof - Google Patents

Prestressed reinforcement and non-prestressed reinforcement combined H-shaped reinforced concrete sheet pile and manufacture method thereof Download PDF

Info

Publication number
CN102518120A
CN102518120A CN2012100014626A CN201210001462A CN102518120A CN 102518120 A CN102518120 A CN 102518120A CN 2012100014626 A CN2012100014626 A CN 2012100014626A CN 201210001462 A CN201210001462 A CN 201210001462A CN 102518120 A CN102518120 A CN 102518120A
Authority
CN
China
Prior art keywords
sheet pile
steel bar
concrete sheet
type steel
prestressed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012100014626A
Other languages
Chinese (zh)
Inventor
谢晓东
卢寿根
黄立伟
刘国锋
丁朝辉
卢静民
谢曙东
卢静芳
杨孙忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Chengdi Construction Co., Ltd.
Original Assignee
SHANGHAI CHENGDI CONSTRUCTION DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI CHENGDI CONSTRUCTION DEVELOPMENT Co Ltd filed Critical SHANGHAI CHENGDI CONSTRUCTION DEVELOPMENT Co Ltd
Priority to CN2012100014626A priority Critical patent/CN102518120A/en
Publication of CN102518120A publication Critical patent/CN102518120A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention relates to a prestressed reinforcement and non-prestressed reinforcement combined H-shaped reinforced concrete sheet pile and a manufacture method thereof. The H-shaped reinforced concrete sheet pile adopts an I-shaped structure; and prestressed reinforcement and non-prestressed reinforcement are arranged in the H-shaped reinforced concrete sheet pile at the same time. Compared with the prior art, the H-shaped reinforced concrete sheet pile has the advantages of good bending resistance and shearing resistance, low cost, high efficiency, zero contamination, environmental protection and the like.

Description

The H type steel bar concrete sheet pile and the manufacturing approach of a kind of prestressing force and non-prestressed combination
Technical field
The present invention relates to a kind of H type steel bar concrete sheet pile, especially relate to the H type steel bar concrete sheet pile of a kind of prestressing force and non-prestressed combination.
Background technology
In civilian and industrial construction, the bracing of foundation pit majority adopts following several method at present:
1. insert H shaped steel in the employing cement mixing method as sealing and retaining soil, H shaped steel majority is lease, and the time, long more rent was high more, and some location does not have the position to stop crane in addition, so shaped steel just can not pull out, cost is higher, and rate are bigger.
2. adopt bored pile retaining soil, the cement mixing method sealing, cost is high, waste is big, and the mud contamination environment is arranged again.
3. adopt many drainings earth agitation pile---gravity dam, as sealing retaining soil, to be that peripheral space is big could implement prerequisite, but can not going along with sb. to guard him as deep foundation ditch.
Summary of the invention
The object of the invention be exactly provide in order to overcome the defective that above-mentioned prior art exists that a kind of bending resistance shear behavior is good, cost is low, effect is high, pollution-free, the H type steel bar concrete sheet pile of the prestressing force of environmental protection and non-prestressed combination again.
The object of the invention can be realized through following technical scheme: the H type steel bar concrete sheet pile of a kind of prestressing force and non-prestressed combination; This H type steel bar concrete sheet pile is " worker " font reinforced concrete slab pilework; It is characterized in that, dispose prestressed reinforcement and nonprestressed reinforcement simultaneously in the described H type steel bar concrete sheet pile.
Described prestressed reinforcement and nonprestressed reinforcement are provided with many, are evenly distributed on respectively in the H type steel bar concrete sheet pile.
Described H type steel bar concrete sheet pile is divided into more piece, and each saves the joint embedded iron is set, and to the building site, adopts steel plate or angle steel to splice connection.
Through welding between the embedded iron separately, satisfy the needs that ultra-deep foundation pit is gone along with sb. to guard him between the more piece H type steel bar concrete sheet pile.
The manufacturing approach of the H type steel bar concrete sheet pile of a kind of prestressing force and non-prestressed combination; It is characterized in that this method is after the nonprestressed reinforcement colligation is accomplished, pre-buried again prestressed reinforcement and embedded iron; Disturbing concrete again; Maintenance waits concrete strength to reach after 70~100% the pre-buried prestressed reinforcement of stretch-draw again, and anchoring gets final product after accomplishing.
The embedded iron at described nonprestressed reinforcement and pile cover place is directly welded.
Described prestressed reinforcement is anchored on two pile covers.
Compared with prior art, the present invention has the following advantages:
1. prestressing force and non-prestressed H type steel bar concrete sheet pile, it has improved the rigidity of sheet pile, has increased the durability of sheet pile, has reduced vibration and elastic deformation, has strengthened the bending resistance shear behavior.Extra-Deep Foundation Pit adopts prestressing force and non-prestressed H type steel bar concrete sheet pile, can reduce the deflection of foundation ditch greatly.
2. native with the slotting H shaped steel in cement-soil and the bored pile retaining of routine, the cement-soil stirring water-stop is compared, and 30-40% can reduce cost.
3.H type steel bar concrete sheet pile is batch production production, to field Welding, length controlled is used for underground four layers (20 meters) Extra-Deep Foundation Pit engineering of foundation ditch, is widely used.
4.H type steel bar concrete sheet pile is that factory is customized, to on-the-spot just welding, inserts then in the cement mixing method, and pollution-free no mud, the duration shortens greatly, and the civilized construction degree is high.
5. because nonprestressed reinforcement directly is welded on the embedded iron of pile cover, guaranteed the switching performance of joint stake up and down, the tensile property of joint area is guaranteed.
Description of drawings
Fig. 1 is prestressing force of the present invention and non-prestressed H type steel bar concrete sheet pile structure figure;
Fig. 2 is more piece prestressing force of the present invention and non-prestressed H type steel bar concrete sheet pile connection layout;
Fig. 3 is prestressing force of the present invention and non-prestressed H type steel bar concrete sheet pile working drawing.
Wherein: cement mixing method 1, H type steel bar concrete sheet pile 2, embedded iron 3, prestressed reinforcement 4, nonprestressed reinforcement 5.
The specific embodiment
Below in conjunction with accompanying drawing and specific embodiment the present invention is elaborated.
Embodiment
Shown in Fig. 1-3; The H type steel bar concrete sheet pile of a kind of prestressing force and non-prestressed combination; This H type steel bar concrete sheet pile is " worker " font reinforced concrete slab pilework, divides single-unit and more piece sheet pile according to the length of sheet pile, when length is longer, is divided into more piece; Need the more piece pile extension, need be provided with embedded iron 3 in the joint.Dispose prestressed reinforcement 4 and nonprestressed reinforcement 5 in the described H type steel bar concrete sheet pile 2 simultaneously.Described prestressed reinforcement 4 is provided with many with nonprestressed reinforcement 5 and (can prepares according to the size requirement of actual stake; Like 6 of 4 preparations of prestressed reinforcement in the present embodiment; 14 of nonprestressed reinforcement 5 preparations); Be evenly distributed on respectively in the H type steel bar concrete sheet pile that (6 prestressed reinforcements 4 are distributed on each one side in the connecting portion of two ends in the present embodiment, and 14 nonprestressed reinforcements 5 are 12 each one sides that is distributed in the connecting portion of two ends wherein, and 2 are distributed on middle interconnecting piece; The number of configured of prestressed reinforcement and conventional reinforcing bar is calculated configuration according to stressing conditions, and is as shown in Figure 1).
Pass through the welding of embedded iron 3 separately between the more piece H type steel bar concrete sheet pile, as shown in Figure 2, connect two joint and more piece sheet pile usefulness through embedded iron 3, satisfy the needs that ultra-deep foundation pit is gone along with sb. to guard him.
Concrete operations are:
(1) makes H type steel bar concrete sheet pile, at produce in factory, make the H type steel bar concrete sheet pile of different length according to designing requirement before the construction; After nonprestressed reinforcement colligation completion, pre-buried again prestressed reinforcement and embedded iron, disturbing concrete again; Maintenance waits concrete strength to reach after 70~100% the pre-buried prestressed reinforcement of stretch-draw again, and weld the job site of dispatching from the factory after stretch-draw is good; The embedded iron at nonprestressed reinforcement and pile cover place is directly welded, and prestressed reinforcement is anchored on two pile covers.
(2) embodiment.Be to form cement mixing method 1 earlier, being inserted in the cement mixing method 1, play retaining soil and sealing effect then by the good H type steel bar concrete sheet pile 2 of design length welding, as shown in Figure 3.

Claims (7)

1. the H type steel bar concrete sheet pile of prestressing force and non-prestressed combination, this H type steel bar concrete sheet pile is " worker " font reinforced concrete slab pilework, it is characterized in that, disposes prestressed reinforcement and nonprestressed reinforcement simultaneously in the described H type steel bar concrete sheet pile.
2. the H type steel bar concrete sheet pile of a kind of prestressing force according to claim 1 and non-prestressed combination is characterized in that described prestressed reinforcement and nonprestressed reinforcement are provided with many, is evenly distributed on respectively in the H type steel bar concrete sheet pile.
3. the H type steel bar concrete sheet pile of a kind of prestressing force according to claim 1 and non-prestressed combination is characterized in that, described H type steel bar concrete sheet pile is divided into more piece, and each saves the joint embedded iron is set, and to the building site, adopts steel plate or angle steel to splice connection.
4. the H type steel bar concrete sheet pile of a kind of prestressing force according to claim 3 and non-prestressed combination is characterized in that, through welding between the embedded iron separately, satisfies the needs that ultra-deep foundation pit is gone along with sb. to guard him between the more piece H type steel bar concrete sheet pile.
5. the manufacturing approach of the H type steel bar concrete sheet pile of prestressing force as claimed in claim 1 and non-prestressed combination; It is characterized in that this method is after the nonprestressed reinforcement colligation is accomplished, pre-buried again prestressed reinforcement and embedded iron; Disturbing concrete again; Maintenance waits concrete strength to reach after 70~100% the pre-buried prestressed reinforcement of stretch-draw again, and anchoring gets final product after accomplishing.
6. the manufacturing approach of the H type steel bar concrete sheet pile of prestressing force according to claim 5 and non-prestressed combination is characterized in that the embedded iron at described nonprestressed reinforcement and pile cover place is directly welded.
7. the manufacturing approach of the H type steel bar concrete sheet pile of prestressing force according to claim 5 and non-prestressed combination is characterized in that described prestressed reinforcement is anchored on two pile covers.
CN2012100014626A 2012-01-05 2012-01-05 Prestressed reinforcement and non-prestressed reinforcement combined H-shaped reinforced concrete sheet pile and manufacture method thereof Pending CN102518120A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012100014626A CN102518120A (en) 2012-01-05 2012-01-05 Prestressed reinforcement and non-prestressed reinforcement combined H-shaped reinforced concrete sheet pile and manufacture method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012100014626A CN102518120A (en) 2012-01-05 2012-01-05 Prestressed reinforcement and non-prestressed reinforcement combined H-shaped reinforced concrete sheet pile and manufacture method thereof

Publications (1)

Publication Number Publication Date
CN102518120A true CN102518120A (en) 2012-06-27

Family

ID=46289164

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012100014626A Pending CN102518120A (en) 2012-01-05 2012-01-05 Prestressed reinforcement and non-prestressed reinforcement combined H-shaped reinforced concrete sheet pile and manufacture method thereof

Country Status (1)

Country Link
CN (1) CN102518120A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102828510A (en) * 2012-09-14 2012-12-19 谢建富 H-shaped support pile and preparation method thereof
CN103147438A (en) * 2013-01-28 2013-06-12 江苏鼎达建筑新技术有限公司 Cast-in-place post-tensioning method-based I-shaped support pile and manufacturing method of support pile
CN103255765A (en) * 2013-06-05 2013-08-21 江苏鼎达建筑新技术有限公司 Pile head connecting device of prestressed support pile
CN103276726A (en) * 2013-05-02 2013-09-04 江苏鼎达建筑新技术有限公司 Pre-tensioning-method I-shaped supporting pile and manufacturing method thereof
CN104131568A (en) * 2013-05-03 2014-11-05 上海城地建设股份有限公司 Novel mixed reinforcement H-shaped sheet pile and five (six)-shaft cement soil mixing wall combined building envelope and construction method thereof
CN105862856A (en) * 2016-05-18 2016-08-17 江苏鼎达建筑新技术有限公司 Reinforced concrete support pile and pile splicing structure thereof
CN115094956A (en) * 2022-07-26 2022-09-23 江苏交水建智能装备研究院有限公司 Device and method for in-situ isolation treatment of local area polluted soil

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001032267A (en) * 1999-07-21 2001-02-06 Nishitetsu Kenki Kk Concrete sheet pile structure
CN201132956Y (en) * 2007-09-27 2008-10-15 交通部公路科学研究院 Prestressing force connecting apparatus for rods for reinforcing concrete static pressure piles
CN201972148U (en) * 2011-01-26 2011-09-14 江苏建华管桩有限公司 Pretensioned prestressed concrete dynamic load pile
CN202017201U (en) * 2011-03-04 2011-10-26 上海城地建设发展有限公司 H-shaped reinforced concrete slab pile structure
CN202017197U (en) * 2011-03-09 2011-10-26 上海城地建设发展有限公司 Multi-section H-shaped reinforced concrete plate pile welding structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001032267A (en) * 1999-07-21 2001-02-06 Nishitetsu Kenki Kk Concrete sheet pile structure
CN201132956Y (en) * 2007-09-27 2008-10-15 交通部公路科学研究院 Prestressing force connecting apparatus for rods for reinforcing concrete static pressure piles
CN201972148U (en) * 2011-01-26 2011-09-14 江苏建华管桩有限公司 Pretensioned prestressed concrete dynamic load pile
CN202017201U (en) * 2011-03-04 2011-10-26 上海城地建设发展有限公司 H-shaped reinforced concrete slab pile structure
CN202017197U (en) * 2011-03-09 2011-10-26 上海城地建设发展有限公司 Multi-section H-shaped reinforced concrete plate pile welding structure

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102828510A (en) * 2012-09-14 2012-12-19 谢建富 H-shaped support pile and preparation method thereof
CN102828510B (en) * 2012-09-14 2015-09-09 谢建富 H type soldier pile and preparation method thereof
CN103147438A (en) * 2013-01-28 2013-06-12 江苏鼎达建筑新技术有限公司 Cast-in-place post-tensioning method-based I-shaped support pile and manufacturing method of support pile
CN103276726A (en) * 2013-05-02 2013-09-04 江苏鼎达建筑新技术有限公司 Pre-tensioning-method I-shaped supporting pile and manufacturing method thereof
CN103276726B (en) * 2013-05-02 2016-07-27 江苏鼎达建筑新技术有限公司 A kind of manufacture method of pre-tensioning system I shape support pile
CN104131568A (en) * 2013-05-03 2014-11-05 上海城地建设股份有限公司 Novel mixed reinforcement H-shaped sheet pile and five (six)-shaft cement soil mixing wall combined building envelope and construction method thereof
CN103255765A (en) * 2013-06-05 2013-08-21 江苏鼎达建筑新技术有限公司 Pile head connecting device of prestressed support pile
CN103255765B (en) * 2013-06-05 2015-03-18 江苏鼎达建筑新技术有限公司 Pile head connecting device of prestressed support pile
CN105862856A (en) * 2016-05-18 2016-08-17 江苏鼎达建筑新技术有限公司 Reinforced concrete support pile and pile splicing structure thereof
CN115094956A (en) * 2022-07-26 2022-09-23 江苏交水建智能装备研究院有限公司 Device and method for in-situ isolation treatment of local area polluted soil
CN115094956B (en) * 2022-07-26 2024-05-28 江苏交水建智能装备研究院有限公司 Device and method for in-situ isolation treatment of polluted soil in local area

Similar Documents

Publication Publication Date Title
CN102518120A (en) Prestressed reinforcement and non-prestressed reinforcement combined H-shaped reinforced concrete sheet pile and manufacture method thereof
CN104746422B (en) A kind of hollow pier stud delay-pour joint structure of bridge prefabrication and construction method
CN104120647B (en) It is suitable for section assembling concrete frame bridge pier system and the construction method of rapid construction
CN103924680B (en) Prestressing without bondn is connected precast concrete beam square steel tube concrete column combination node with regular reinforcement
CN101818478B (en) Connection structure for concrete-filled circular steel tubular pier column and concrete cover beam
CN102852244B (en) Detachable self-resetting type energy-dissipation coupling beam
CN102102396A (en) Node connection method for circular steel tube concrete column and reinforced concrete shear wall
CN106836492A (en) A kind of group frame-embedded faced wall Lateral Resistant System
CN204097864U (en) A kind of bridge prefabrication hollow pier stud delay-pour joint structure
CN202416300U (en) Quick coupling of prefabricated concrete pile
CN104032861B (en) Mixing coupled wall steel column and non-energy dissipating beam connecting node structure and construction method thereof
CN103790176A (en) Embedded short limb column structure and construction method thereof
CN110130485B (en) Prefabricated assembly type beam column node with toothed plates and assembly method thereof
CN104895221A (en) Assembled profile steel confined concrete shear wall structure
CN201531021U (en) Prefabricated member cement-treated-soil drilling and filling pile
CN110700274A (en) Mechanically-connected assembled stand column and stand column pile
CN103938731B (en) Combination joint of prefabricated concrete beam and round concrete filled steel tubular column connected through pre-stressed steel bars and common steel bars
CN103938732A (en) Combination joint of prefabricated concrete beam and rectangular concrete filled steel tubular column connected through pre-stressed steel bars and common steel bars
CN103924677B (en) Prestressing without bondn is connected beams of concrete square steel tube concrete column combination node with regular reinforcement
CN202865853U (en) Connecting structure of hollow lateral force resistance pile of prefabricated reinforced concrete
CN103924684B (en) Soap-free emulsion polymeization prestress connects beams of concrete square steel tube concrete column reinforcing joint
CN201132956Y (en) Prestressing force connecting apparatus for rods for reinforcing concrete static pressure piles
CN204960366U (en) Tunnel passes through device that underpins of existing large diameter pile building
CN103924685A (en) Prestress connected concrete beam round steel tube concrete column node
KR101372604B1 (en) Formless composite column and manufacturing method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: SHANGHAI CHENGDI CONSTRUCTION CO., LTD.

Free format text: FORMER OWNER: SHANGHAI CHENGDI CONSTRUCTION DEVELOPMENT CO., LTD.

Effective date: 20130201

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 201805 JIADING, SHANGHAI TO: 201800 JIADING, SHANGHAI

TA01 Transfer of patent application right

Effective date of registration: 20130201

Address after: 201800 B, zone 502-1, Lane 518, Lane 1, Jiading District, Shanghai

Applicant after: Shanghai Chengdi Construction Co., Ltd.

Address before: 201805 room 1, building 188, 126 Nanan Road, Anting Town, Shanghai, Jiading District

Applicant before: Shanghai Chengdi Construction Development Co., Ltd.

C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120627