CN102509168A CN2011102929199A CN201110292919A CN102509168A CN 102509168 A CN102509168 A CN 102509168A CN 2011102929199 A CN2011102929199 A CN 2011102929199A CN 201110292919 A CN201110292919 A CN 201110292919A CN 102509168 A CN102509168 A CN 102509168A
Authority
CN
China
Prior art keywords
pmu
node
nodes
vector set
matrix
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011102929199A
Other languages
English (en)
Inventor
原怀泽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUZHI ELECTRIC POWER Corp
Original Assignee
WUZHI ELECTRIC POWER Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUZHI ELECTRIC POWER Corp filed Critical WUZHI ELECTRIC POWER Corp
Priority to CN2011102929199A priority Critical patent/CN102509168A/zh
Publication of CN102509168A publication Critical patent/CN102509168A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明公开了一种基于改进整数规划法的PMU最优配置方法,采用PMU作为故障潮流指纹特征,则电网可观测性OPP问题的数学模型为:
Figure DEST_PATH_IMAGE002
,其中,,Y1、Y2是Y子集,Y1表示与0注入节点不关联节点对应的向量集,Y2表示0注入节点的关联节点对应的向量集,X=[x 1,x 2,…x n],表示节点PMU的配置向量,xi是二进制变量,取值为:
Figure DEST_PATH_IMAGE006
;A为节点关联矩阵,其主对角元素均为1;并且假设有m个节点与0注入节点不关联,
Figure DEST_PATH_IMAGE008
,是m×1矩阵;Tmj表示0注入节点及其关联节点的关系矩阵,Bmj是对应向量集。采用该技术方案后,有效实现了基于开关量故障诊断和电气量故障诊断的决策层融合,实时性高,能够把握连锁故障本质,同时在一定程度上弥补了传统故障诊断的不足,且在保证诊断精度的同时能有效节省投资。

Description

一种基于改进整数规划法的PMU最优配置方法
技术领域
本发明涉及一种基于改进整数规划法的PMU最优配置方法,属于领域电网故障诊断和预防领域。
背景技术
随着我国“智能电网”战略的实施以及特高压、大电网互联格局的形成,电网的安全和稳定运行面临着新的挑战,为了遏制大面积停电事故的发生和演化,需要一种快速、准确的故障诊断和故障定位技术来为电网安全保驾护航。
前我国电网仍处于建设阶段,PMU及其配套通讯等设备价格仍然比较昂贵,限于经济因素,现阶段还难以实现PMU的完全配置。因此,考虑系统可观测性的PMU优化配置问题便成为了目前PMU最优配置(OPP,optimm PMu plaucement)问题了的最主要的研究方向。
传统故障诊断方法中存在专家知识库、训练样本集等难以满足完备性的问题,这些问题严重制约着智能电网的发展和普及。
发明内容
针对上述现有技术存在的不足之处,本发明的目的在于提供一种基于改进整数规划法的PMU最优配置方法。
本发明的目的通过下述技术方案实现:
一种基于改进整数规划法的PMU最优配置方法,采用PMU作为故障潮流指纹特征,则电网可观测性OPP问题的数学模型为:
,其中,
Figure 207424DEST_PATH_IMAGE002
,Y1、Y2是Y子集,Y1表示与0注入节点不关联节点对应的向量集,Y2表示0注入节点的关联节点对应的向量集,X=[x 1,x 2,…x n],表示节点PMU的配置向量,xi是二进制变量,取值为:;A为节点关联矩阵,其主对角元素均为1;并且假设有m个节点与0注入节点不关联,
Figure 124565DEST_PATH_IMAGE004
,是m×1矩阵;Tmj表示0注入节点及其关联节点的关系矩阵,Bmj是对应向量集。
本发明将OPP问题简化为线性整数规划问题,假设电气量信息完全基于PMU数据源,支路潮流数据未知,仅考虑0功率注入节点。采用该技术方案后,有效实现了基于开关量故障诊断和电气量故障诊断的决策层融合,实时性高,能够把握连锁故障本质,同时在一定程度上弥补了传统故障诊断的不足,且在保证诊断精度的同时能有效节省投资。
附图说明
图1是本发明的节点3注入量图。
具体实施方式
下面结合实施例对本发明作进一步地详细说明,但本发明的实施方式不限于此。
具体地,采用7节点系统对改进的OPP问题及其求解过程进行说明,其中假设节点3处已知节点注入电流I3。结合系统拓扑结构,直接获得对应节点关联矩阵,即:
Figure 2011102929199100002DEST_PATH_IMAGE005
根据改进模型可知,该系统OPP问题对应的约束条件为:
Figure 215886DEST_PATH_IMAGE006
,其中,
Figure 2011102929199100002DEST_PATH_IMAGE007
因为AX=Y,使得PMU配置问题完全转化成了线性整数规划问题,有利于快速、准确求解OPP问题。
上面结合附图对本发明优选实施方式进行了详细说明,但是本发明并不限于上述实施方式,在本领域普通技术人员所具备的知识范围内,还可以在不脱离本发明宗旨的前提下作出各种变化。

Claims (1)

1.一种基于改进整数规划法的PMU最优配置方法,其特征在于:采用PMU作为故障潮流指纹特征,则电网可观测性OPP问题的数学模型为:
,其中,
Figure 658579DEST_PATH_IMAGE002
,Y1、Y2是Y子集,Y1表示与0注入节点不关联节点对应的向量集,Y2表示0注入节点的关联节点对应的向量集,X=[x 1,x 2,…x n],表示节点PMU的配置向量,xi是二进制变量,取值为:
Figure 857480DEST_PATH_IMAGE003
;A为节点关联矩阵,其主对角元素均为1;并且假设有m个节点与0注入节点不关联,
Figure 526358DEST_PATH_IMAGE004
,是m×1矩阵;Tmj表示0注入节点及其关联节点的关系矩阵,Bmj是对应向量集。
CN2011102929199A 2011-10-06 2011-10-06 一种基于改进整数规划法的pmu最优配置方法 Pending CN102509168A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011102929199A CN102509168A (zh) 2011-10-06 2011-10-06 一种基于改进整数规划法的pmu最优配置方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011102929199A CN102509168A (zh) 2011-10-06 2011-10-06 一种基于改进整数规划法的pmu最优配置方法

Publications (1)

Publication Number Publication Date
CN102509168A true CN102509168A (zh) 2012-06-20

Family

ID=46221248

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011102929199A Pending CN102509168A (zh) 2011-10-06 2011-10-06 一种基于改进整数规划法的pmu最优配置方法

Country Status (1)

Country Link
CN (1) CN102509168A (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104008424A (zh) * 2014-03-29 2014-08-27 华北电力大学(保定) 一种电力系统pmu优化配置方法
CN105470986A (zh) * 2015-12-17 2016-04-06 国家电网公司 一种电力系统分区方法
CN105785231A (zh) * 2016-05-16 2016-07-20 河南工程学院 一种配电网在线故障容错性定位的线性整数规划方法
CN109782088A (zh) * 2018-12-29 2019-05-21 天津大学 考虑信道数目可变的配电网同步相量量测配置方法
CN110676940A (zh) * 2019-10-21 2020-01-10 国网上海市电力公司 一种提高参数辨识精度的配电网pmu配置方法及系统

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
BEI GOU: "Generalized Integer Linear Programming Formulation for Optimal PMU Placement", 《IEEE TRANSACTIONS ON POWER SYSTEMS》 *
BEI GOU: "Optimal Placement of PMUs by Integer Linear Programming", 《IEEE TRANSACTIONS ON POWER SYSTEMS》 *
蒋正威: "基于线型整数规划模型的高适应性PMU配置算法", 《电网技术》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104008424A (zh) * 2014-03-29 2014-08-27 华北电力大学(保定) 一种电力系统pmu优化配置方法
CN104008424B (zh) * 2014-03-29 2017-06-13 华北电力大学(保定) 一种电力系统pmu优化配置方法
CN105470986A (zh) * 2015-12-17 2016-04-06 国家电网公司 一种电力系统分区方法
CN105785231A (zh) * 2016-05-16 2016-07-20 河南工程学院 一种配电网在线故障容错性定位的线性整数规划方法
CN109782088A (zh) * 2018-12-29 2019-05-21 天津大学 考虑信道数目可变的配电网同步相量量测配置方法
CN110676940A (zh) * 2019-10-21 2020-01-10 国网上海市电力公司 一种提高参数辨识精度的配电网pmu配置方法及系统
CN110676940B (zh) * 2019-10-21 2021-02-02 国网上海市电力公司 一种提高参数辨识精度的配电网pmu配置方法及系统

Similar Documents

Publication Publication Date Title
CN102509168A (zh) 一种基于改进整数规划法的pmu最优配置方法
CN105740977A (zh) 一种基于多目标粒子群的停电管理优化方法
Liu et al. Vulnerability assessment for coupled network consisting of power grid and EV traffic network
CN103020853A (zh) 一种短期交易计划安全校核的方法
Pan et al. Analysis on integrated energy system cascading failures considering interaction of coupled heating and power networks
CN103077325B (zh) 基于自适应分区状态估计的智能电网不良数据检测方法
Jadhav et al. Stochastic optimal power flow incorporating offshore wind farm and electric vehicles
Fan et al. Invulnerability of power grids based on maximum flow theory
CN103887792B (zh) 一种含分布式电源的低压配电网建模方法
Mohsen et al. Enhancement of self-healing property of smart grid in islanding mode using electric vehicles and direct load control
CN103761682A (zh) 一种电力系统相量测量单元的配置方法
Zhang et al. Evolution of a transmission network with high proportion of renewable energy in the future
Shen et al. Self-healing evaluation of smart distribution network based on uncertainty theory
CN107316118A (zh) 一种交直流混合配电网低碳效益评价指标体系构建方法
Pang et al. Two-stage self-healing restoration strategy considering operating performance
CN104201723A (zh) 基于时序模拟的离网型微网可靠性评估方法
Ge et al. Analysis method and empirical research on economic benefit of large‐scale consumptive power grid investment
CN102419855B (zh) 一种电网中清洁能源电力分布的计算方法
Sun et al. Optimization of Energy Saving and Fuel-Cell Durability for Range-Extended Electric Vehicle
CN104240039B (zh) 一种考虑不确定性影响的电力系统故障分析方法
Sheng et al. Design of lithium battery pack fault diagnosis system based on two levels state machine
Zhang et al. Enhancing Power Grid Resilience against Typhoon Disasters by Coordinated Scheduling of Source-Network-Load
Wu et al. Formal verification method considering electric vehicles and data centers participating in distribution network planning
CN103400309A (zh) 一种特高压接入对省级电网稳定性影响的评估方法
CN103399954A (zh) 一种基于vs平台的城区中低压配电网故障管理系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120620