CN102508684A - Method for downloading and updating programs of distribution transformer monitoring terminal - Google Patents
Method for downloading and updating programs of distribution transformer monitoring terminal Download PDFInfo
- Publication number
- CN102508684A CN102508684A CN2011103576781A CN201110357678A CN102508684A CN 102508684 A CN102508684 A CN 102508684A CN 2011103576781 A CN2011103576781 A CN 2011103576781A CN 201110357678 A CN201110357678 A CN 201110357678A CN 102508684 A CN102508684 A CN 102508684A
- Authority
- CN
- China
- Prior art keywords
- program
- next step
- terminal
- jump
- condensing routine
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Stored Programmes (AREA)
Abstract
The invention relates to the technical field of distribution transformer detection, in particular to a method for downloading and updating programs of a distribution transformer monitoring terminal, which includes steps of downloading a program package, decompressing the program package to an assigned address, restarting for updating and the like. The method only uses intrinsic functions of a terminal chip without increasing terminal complexity and cost.
Description
Technical field
The present invention relates to the power transformer detecting technical field, relate in particular to a kind of program down loading updating method of distribution transformer monitoring terminal.
Background technology
In electrical power distribution system, substation transformer is a power equipment of voltage directly being distributed to low-voltage customer, and its service data is the important component part of whole power distribution network basic data, and whether good whether these data normally be power distribution network operation important reflection.And distribution transformer monitoring terminal is used for monitoring in real time the operating various parameters of substation transformer exactly; Data according to gathering are carried out statistical study; Find the abnormal conditions of substation transformer emerged in operation in time and control timely or solves, can realize that stable, the optimization of electrical network moves.Distribution transformer monitoring terminal when defective appears in the installed device program, when perhaps the user has proposed new demand, need carry out remote update to terminal program as the built-in terminal product simultaneously, to guarantee the correctness of terminal operating.
The method for updating program of prior art distribution transformer monitoring terminal mainly contains two kinds: 1, adopt embedded real-time operating system; This method has mainly increased the requirement to memory capacity; So need to change the bigger hardware of memory capacity, increased hardware cost; 2, adopt the method that increases the outer control programming system, this method has not only reduced the reliability at terminal itself, and has increased the complexity and the cost at terminal.So these two kinds of methods are not the best approaches.
Summary of the invention
Technical matters to be solved by this invention is: provide a kind of to utilize the function of terminal chip itself and do not increase the program down loading updating method of the distribution transformer monitoring terminal of terminal complexity and cost.
The technical scheme that the present invention adopts is: a kind of program down loading updating method of distribution transformer monitoring terminal, and it is characterized in that: it may further comprise the steps:
Whether inspection existed the program updates sign when (1) terminal program started, if do not exist updating mark then to get into next step, if exist updating mark then to jump to step (6);
(2) if normal working procedure when receiving the condensing routine bag that main website sends over, gets into next step, does not then continue normal working procedure if receive;
(3) receive the condensing routine bag, and the condensing routine bag is stored in the external memory storage of correspondence position on the terminal chip, get into next step then;
(4) whether inspection condensing routine bag receives fully, fully then gets into next step if receive, and does not fully then jump to step (3) if receive;
(5) add the program updates sign, preserve data, jump to step (11) then
(6) call refresh routine, get into next step then;
(7) from the external memory storage of terminal chip, take out the condensing routine bag,, get into next step then then to its decompress(ion);
(8) application program in the internal storage of terminal chip is wiped, will separate the program copy that presses then in the internal storage of terminal chip, get into next step again;
(9) whether detection condensing routine bag is all got and is over, if getting to be over then gets into next step, does not then jump to step (7) if got;
(10) clear program updating mark gets into next step then;
(11) restart, promptly jump to step (1).
As preferably, described terminal chip model is LPC2378.
The program down loading updating method of a kind of distribution transformer monitoring terminal of the present invention compared with prior art has following significant advantage and beneficial effect:
This method makes full use of the function of terminal inner chip itself, does not increase the complicacy of peripheral components and system, has practiced thrift cost, and can well accomplish the down loading updating task of program.
Description of drawings
Accompanying drawing is the process flow diagram of the program down loading updating method of distribution transformer monitoring terminal of the present invention.
Embodiment
Below in conjunction with accompanying drawing and embodiment the present invention is done to further describe, but the present invention is not limited only to following embodiment.
Shown in accompanying drawing, a kind of program down loading updating method of distribution transformer monitoring terminal, it is characterized in that: it may further comprise the steps:
Whether inspection existed the program updates sign when (1) terminal program started, if do not exist updating mark then to get into next step, if exist updating mark then to jump to step (6);
(2) if normal working procedure when receiving the condensing routine bag that main website sends over, gets into next step, does not then continue normal working procedure if receive;
(3) receive the condensing routine bag, and the condensing routine bag is stored in the external memory storage of correspondence position on the terminal chip, get into next step then;
(4) whether inspection condensing routine bag receives fully, fully then gets into next step if receive, and does not fully then jump to step (3) if receive;
(5) add the program updates sign, preserve data, jump to step (11) then
(6) call refresh routine, get into next step then;
(7) from the external memory storage of terminal chip, take out the condensing routine bag,, get into next step then then to its decompress(ion);
(8) application program in the internal storage of terminal chip is wiped, will separate the program copy that presses then in the internal storage of terminal chip, get into next step again;
(9) whether detection condensing routine bag is all got and is over, if getting to be over then gets into next step, does not then jump to step (7) if got;
(10) clear program updating mark gets into next step then;
(11) restart, promptly jump to step (1).
Described terminal chip model is LPC2378.
The practical implementation step of the program down loading updating method of distribution transformer monitoring terminal of the present invention: at first be to start terminal program, detection is enough to have the program updates sign, if there is not the program updates sign, and then normal working procedure.When normal working procedure, receiving the condensing routine bag that main website sends over; The condensing routine bag can be accepted in the terminal; Be stored in it in the external memory storage of correspondence position on the terminal chip then, and then check whether the condensing routine bag has received fully, accept and store if do not receive fully then continue; If received complete then add the program updates sign, preserve data and restart.Just start terminal program after restarting, begin inspection again and whether have the program updates sign, because added the program updates sign just now; So there is the program updates sign, call refresh routine then, take out the condensing routine bag in the external memory storage from terminal chip; These condensing routine bags of decompress(ion) are then removed the program that is applied in the internal storage in the terminal chip afterwards earlier, then will separate in the program copy that the presses internal storage in the terminal chip; Whether detect the condensing routine bag has more got and has been over; If do not got, continuation taking-up condensing routine bag decompress(ion) then duplicates, and is over if get; Then the clear program updating mark restarts then.Still can detect after restarting specifically and whether have the program updates sign; Because wiped the program updates sign just now; Do not have the program updates sign specifically; Program just can normally have been moved, if main website does not send the condensing routine bag that upgrades usefulness, then the program at terminal will normally be moved always.
Claims (2)
1. the program down loading updating method of a distribution transformer monitoring terminal, it is characterized in that: it may further comprise the steps:
Whether inspection existed the program updates sign when (1) terminal program started, if do not exist updating mark then to get into next step, if exist updating mark then to jump to step (6);
(2) if normal working procedure when receiving the condensing routine bag that main website sends over, gets into next step, does not then continue normal working procedure if receive;
(3) receive the condensing routine bag, and the condensing routine bag is stored in the external memory storage of correspondence position on the terminal chip, get into next step then;
(4) whether inspection condensing routine bag receives fully, fully then gets into next step if receive, and does not fully then jump to step (3) if receive;
(5) add the program updates sign, preserve data, jump to step (11) then
(6) call refresh routine, get into next step then;
(7) from the external memory storage of terminal chip, take out the condensing routine bag,, get into next step then then to its decompress(ion);
(8) application program in the internal storage of terminal chip is wiped, will separate the program copy that presses then in the internal storage of terminal chip, get into next step again;
(9) whether detection condensing routine bag is all got and is over, if getting to be over then gets into next step, does not then jump to step (7) if got;
(10) clear program updating mark gets into next step then;
(11) restart, promptly jump to step (1).
2. the program down loading updating method of distribution transformer monitoring terminal according to claim 1, it is characterized in that: described terminal chip model is LPC2378.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011103576781A CN102508684A (en) | 2011-11-14 | 2011-11-14 | Method for downloading and updating programs of distribution transformer monitoring terminal |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011103576781A CN102508684A (en) | 2011-11-14 | 2011-11-14 | Method for downloading and updating programs of distribution transformer monitoring terminal |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102508684A true CN102508684A (en) | 2012-06-20 |
Family
ID=46220776
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011103576781A Pending CN102508684A (en) | 2011-11-14 | 2011-11-14 | Method for downloading and updating programs of distribution transformer monitoring terminal |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102508684A (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1581101A (en) * | 2003-08-12 | 2005-02-16 | 联想(北京)有限公司 | Embedded system upgrading method |
US20050144616A1 (en) * | 2003-10-27 | 2005-06-30 | Hammond Brad T. | System and method for updating a software program |
CN101453374A (en) * | 2008-12-29 | 2009-06-10 | 武汉烽火网络有限责任公司 | On-line updating method and system for network appliance |
-
2011
- 2011-11-14 CN CN2011103576781A patent/CN102508684A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1581101A (en) * | 2003-08-12 | 2005-02-16 | 联想(北京)有限公司 | Embedded system upgrading method |
US20050144616A1 (en) * | 2003-10-27 | 2005-06-30 | Hammond Brad T. | System and method for updating a software program |
CN101453374A (en) * | 2008-12-29 | 2009-06-10 | 武汉烽火网络有限责任公司 | On-line updating method and system for network appliance |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105979103B (en) | Battery power guarantee method and device for portable electronic product and mobile terminal | |
US9785428B2 (en) | Internal software updating method and system | |
CN101557583B (en) | Remote-updating and version-switching method of repeater equipment embedded software | |
US20170206079A1 (en) | Method and Device for Upgrading Software | |
CN103117879B (en) | A kind of computer hardware operational factor network monitoring system | |
CN103428333B (en) | Mobile terminal, server and errors repair method | |
CN105677477A (en) | Method and device for optimizing application program resources and electronic equipment | |
CN103177077B (en) | The storage of a kind of APK file and output intent | |
CN106877442B (en) | Battery management method | |
CN103886729B (en) | Warning image display method and system | |
CN102624875B (en) | Method for replacing or updating language packs of terminal equipment | |
CN102946600A (en) | Method and system for updating mobile terminal parameters by firmware | |
CN104461786A (en) | Recovery method and system for Android system | |
CN109688427A (en) | A kind of smart television and its system repair | |
CN102339264B (en) | A kind of satellite borne electronic system equipment plug and play control method and system | |
CN102567062B (en) | System for upgrading software based on monitoring vehicle | |
CN102426529A (en) | Method, device and system for firmware update | |
CN103024540A (en) | Method for collecting network activation information of intelligent television | |
CN115712447A (en) | Method and system for realizing incremental upgrading of intelligent electric meter | |
CN104750516A (en) | Upgrading method for terminal equipment operating system | |
CN105472377A (en) | Television debugging method and apparatus thereof | |
CN105470590A (en) | Method and device for managing battery parameters | |
CN105262805A (en) | Method and system for automatic updating of learning data of mobile terminal | |
CN102508684A (en) | Method for downloading and updating programs of distribution transformer monitoring terminal | |
WO2020192669A1 (en) | Gas meter intelligent controller and firmware upgrade start-up method therefor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20120620 |