CN102508143A - 一种光伏组件的可靠性测试方法 - Google Patents

一种光伏组件的可靠性测试方法 Download PDF

Info

Publication number
CN102508143A
CN102508143A CN2011103298659A CN201110329865A CN102508143A CN 102508143 A CN102508143 A CN 102508143A CN 2011103298659 A CN2011103298659 A CN 2011103298659A CN 201110329865 A CN201110329865 A CN 201110329865A CN 102508143 A CN102508143 A CN 102508143A
Authority
CN
China
Prior art keywords
photovoltaic module
thermal cycle
temperature
test
module temperature
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011103298659A
Other languages
English (en)
Inventor
徐建美
全鹏
戴荷琴
王昭云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changzhou Trina Solar Energy Co Ltd
Original Assignee
Changzhou Trina Solar Energy Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changzhou Trina Solar Energy Co Ltd filed Critical Changzhou Trina Solar Energy Co Ltd
Priority to CN2011103298659A priority Critical patent/CN102508143A/zh
Publication of CN102508143A publication Critical patent/CN102508143A/zh
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Photovoltaic Devices (AREA)
  • Testing Resistance To Weather, Investigating Materials By Mechanical Methods (AREA)

Abstract

本发明涉及太阳能光伏组件可靠性测试的技术领域,尤其是一种光伏组件的模拟热循环加速测试方法,提高高低温热循环试验箱的性能,通过采用快速升温和快速降温的方法,缩短光伏组件一次热循环的测试时间,减少试验次数,缩短测试总耗时。本发明的光伏组件的模拟热循环加速测试方法,用模拟热循环的加速测试方法代替常规的热循环,对光伏组件的材料进行快速有效、测试和评估,加快了光伏组件热循环的测试时间,有利于光伏材料的研发和测试评估使用,加快光伏行业材料的推广和使用。

Description

一种光伏组件的可靠性测试方法
技术领域
本发明涉及太阳能光伏组件可靠性测试的技术领域,尤其是一种光伏组件的模拟热循环加速测试方法。
背景技术
在光伏组件的可靠性测试中,如IEC61215 Crystalline siliconterrestrial photovoltaic(PV)modules-Design qualification and typeapproval的标准中,其中10.11测试项目为Thermal cycling testing,测试要求为:从-40℃到+85℃循环200次,并在组件温度高于25℃的时候给组件通正向电流,电流值为标准测试条件下的最大功率点电流。试验条件如下图一。实验目的是评估组件和材料承受由于温度重复变化而引起的热失配、疲劳和其它应力的能力。
一般的试验箱由于设备能力,对于一个1*1*2m的实验空间,在空载时候的升温和降温的速度在:25℃→+150℃≤60min;+25℃→-65℃≤80min。.当箱体缩小,如0.5*0.6*0.8m的时候,空载升降温能力为-40℃→+150℃≤60min。但是在满载的时候,升降温速度基本只有一半。
在这个测试中,一个循环需要6个小时,200个循环就需要1200小时,为50天,这样对于光伏组件和材料的测试,周期较长。而相关权威机构和论文通过研究认为,200个循环还不够,需要用500个循环才能发现质量问题,这样测试时间就更长了。
发明内容
本发明要解决的技术问题是:为克服上述存在的问题,提供一种高效的光伏组件的模拟热循环加速测试方法。
本发明解决其技术问题所采用的技术方案是:一种光伏组件的可靠性测试方法,采用光伏组件热循环加速测试方法,通过一种高性能的高低温热循环试验箱,实现快速升降温,通过寻找在新的高温和低温条件,新的升降温速度的组合条件下,和原来高温+85℃和低温-40℃,原来的升降温速度和时间的组合条件下,对组件和材料可靠性影响的关系,加快光伏组件和材料的技术测试和评估。
方法一:光伏组件测试温度在-40℃~+85℃范围内,具有如下过程:1.将光伏组件温度从+25℃升至+85℃,耗用时间10min;2.将光伏组件温度保持在85℃,高温保温15min;3.将光伏组件温度从+85℃降至-40℃,耗用时间30min;4.将光伏组件温度保持在-40℃时,低温保温15min;5.将光伏组件温度从-40℃升至+25℃,耗用时间20min;6.重复1至5的过程100次。
按照这种方法,实现一次热循环总共耗用时间90min,循环100次等效于常规的热循环200次,循环200次等效于常规的热循环500次,大大减少了试验次数,缩短测试总耗时。
方法二:光伏组件测试温度在-50℃~+100℃范围内,具有如下过程:1.将光伏组件温度从+25℃升至+100℃,耗用时间15min;2.将光伏组件温度保持在100℃,高温保温15min;3.将光伏组件温度从+100℃降至-50℃,耗用时间45min;4.将光伏组件温度保持在-50℃,低温保温15min;5.光伏组件温度从-50℃升至+25℃,耗用时间20min.6.重复1至5的过程60次。
按照这种方法,实现一次热循环总共耗用时间120min,循环60次等效于常规的热循环500次,更大程度地缩短了试验次数,缩短测试总耗时。
本发明的有益效果是:本发明的光伏组件的模拟热循环加速测试方法,用模拟热循环的加速测试方法代替常规的热循环,对光伏组件的材料进行快速有效、测试和评估,加快了光伏组件热循环的测试时间,有利于光伏材料的研发和测试评估使用,加快光伏行业材料的推广和使用。
附图说明
下面结合附图和实施例对本发明进一步说明。
图1是本发明第一实施例的曲线图;
图2是本发明第二实施例的曲线图。
具体实施方式
现在结合附图对本发明作进一步详细的说明。这些附图均为简化的示意图,仅以示意方式说明本发明的基本结构,因此其仅显示与本发明有关的构成。
一种光伏组件的可靠性测试方法,提高高低温热循环试验箱的性能,通过采用快速升温和快速降温的方法,缩短光伏组件一次热循环的测试时间,减少试验次数,缩短测试总耗时。
实施例一
如图1所示,具体过程如下:1.将光伏组件温度从+25℃升至+85℃,耗用时间10min;2.将光伏组件温度保持在85℃,高温保温15min;3.将光伏组件温度从+85℃降至-40℃,耗用时间30min;4.将光伏组件温度保持在-40℃时,低温保温15min;5.将光伏组件温度从-40℃升至+25℃,耗用时间20min;6.重复1至5的过程100次。
在图1的基础上,实现一次热循环总共耗用时间90min,循环100次等效于常规的热循环200次,循环200次等效于常规的热循环500次。
实施例二
如图2所示,具有如下过程:1.将光伏组件温度从+25℃升至+100℃,耗用时间15min;2.将光伏组件温度保持在100℃,高温保温15min;3.将光伏组件温度从+100℃降至-50℃,耗用时间45min;4.将光伏组件温度保持在-50℃,低温保温15min;5.光伏组件温度从-50℃升至+25℃,耗用时间20min.6.重复1至5的过程60次。
在图2的基础上,实现一次热循环总共耗用时间120min,循环60次等效于常规的热循环500次。
以光伏组件的涂锡铜带为例,通过制作成4pcs电池片串联的小组件和单独的涂锡铜带,在不同条件下进行测试比较,在如图1的测试条件下,100个循环可以等效为200个循环,测试前后分别测试了小组件的电性能参数和湿漏电,涂锡铜带原材料测试了延伸率,屈服强度,抗拉强度等技术指标,发现2种条件下的性能指标下降几乎相同。
这样比原来的1200h大大缩短了测试时间。
以上述依据本发明的理想实施例为启示,通过上述的说明内容,相关工作人员完全可以在不偏离本项发明技术思想的范围内,进行多样的变更以及修改。本项发明的技术性范围并不局限于说明书上的内容,必须要根据权利要求范围来确定其技术性范围。

Claims (3)

1.一种光伏组件的可靠性测试方法,其特征是:提高高低温热循环试验箱的性能,通过采用快速升温和快速降温的方法,缩短光伏组件一次热循环的测试时间,减少试验次数,缩短测试总耗时。
2.根据权利要求1所述的一种光伏组件的可靠性测试方法,其特征是:具有如下过程:1.将光伏组件温度从+25℃升至+85℃,耗用时间10min;2.将光伏组件温度保持在85℃,高温保温15min;3.将光伏组件温度从+85℃降至-40℃,耗用时间30min;4.将光伏组件温度保持在-40℃时,低温保温15min;5.将光伏组件温度从-40℃升至+25℃,耗用时间20min;6.重复1至5的过程100次。
3.根据权利要求1所述的一种光伏组件的可靠性测试方法,其特征是:具有如下过程:1.将光伏组件温度从+25℃升至+100℃,耗用时间15min;2.将光伏组件温度保持在100℃,高温保温15min;3.将光伏组件温度从+100℃降至-50℃,耗用时间45min;4.将光伏组件温度保持在-50℃,低温保温15min;5.光伏组件温度从-50℃升至+25℃,耗用时间20min.6.重复1至5的过程60次。
CN2011103298659A 2011-10-26 2011-10-26 一种光伏组件的可靠性测试方法 Pending CN102508143A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011103298659A CN102508143A (zh) 2011-10-26 2011-10-26 一种光伏组件的可靠性测试方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011103298659A CN102508143A (zh) 2011-10-26 2011-10-26 一种光伏组件的可靠性测试方法

Publications (1)

Publication Number Publication Date
CN102508143A true CN102508143A (zh) 2012-06-20

Family

ID=46220248

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011103298659A Pending CN102508143A (zh) 2011-10-26 2011-10-26 一种光伏组件的可靠性测试方法

Country Status (1)

Country Link
CN (1) CN102508143A (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103868750A (zh) * 2014-03-20 2014-06-18 航天东方红卫星有限公司 适用于星上产品返修后的非对称性热试验方法
CN105790710A (zh) * 2014-12-23 2016-07-20 国家电网公司 一种光伏组件电位诱发衰减测试方法
CN104579167B (zh) * 2014-12-30 2017-09-29 中国电器科学研究院有限公司 一种光伏组件湿热环境耐久性测试方法
CN109150099A (zh) * 2017-12-30 2019-01-04 苏州阿特斯阳光电力科技有限公司 一种光伏优化器可靠性评估装置
CN109347439A (zh) * 2018-11-19 2019-02-15 普德光伏技术(苏州)有限公司 一种用于太阳能板热循环测试装置及方法
CN112924370A (zh) * 2021-01-28 2021-06-08 无锡市产品质量监督检验院 一种光伏组件及材料的紫外热循环综合试验方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050167783A1 (en) * 2004-02-02 2005-08-04 Matsushita Electric Industrial Co., Ltd. Wafer collective reliability evaluation device and wafer collective reliability evaluation method
CN1834674A (zh) * 2005-03-18 2006-09-20 安捷伦科技有限公司 用于可靠性测试的方法和装置
CN102116724A (zh) * 2011-01-11 2011-07-06 中国第一汽车集团公司 一种铸铁材料热疲劳性能的试验方法
CN102158129A (zh) * 2011-01-30 2011-08-17 浙江昱能光伏科技集成有限公司 太阳能光伏系统及其故障探测方法
DE102011112100A1 (de) * 2011-03-02 2012-09-06 Fraunhofer-Gesellschaft zur Förderung der angewandten Forschung e.V. Verfahren zur Qualitätsprüfung einer photovoltaischen Solarzelle, Solarzellenmodul und Verfahren zur Herstellung einer photovoltaischen Solarzelle

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050167783A1 (en) * 2004-02-02 2005-08-04 Matsushita Electric Industrial Co., Ltd. Wafer collective reliability evaluation device and wafer collective reliability evaluation method
CN1834674A (zh) * 2005-03-18 2006-09-20 安捷伦科技有限公司 用于可靠性测试的方法和装置
CN102116724A (zh) * 2011-01-11 2011-07-06 中国第一汽车集团公司 一种铸铁材料热疲劳性能的试验方法
CN102158129A (zh) * 2011-01-30 2011-08-17 浙江昱能光伏科技集成有限公司 太阳能光伏系统及其故障探测方法
DE102011112100A1 (de) * 2011-03-02 2012-09-06 Fraunhofer-Gesellschaft zur Förderung der angewandten Forschung e.V. Verfahren zur Qualitätsprüfung einer photovoltaischen Solarzelle, Solarzellenmodul und Verfahren zur Herstellung einer photovoltaischen Solarzelle

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
国家质量技术监督局: "《中华人民共和国国家标准》", 17 November 1998, 中国标准出版社 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103868750A (zh) * 2014-03-20 2014-06-18 航天东方红卫星有限公司 适用于星上产品返修后的非对称性热试验方法
CN103868750B (zh) * 2014-03-20 2016-05-04 航天东方红卫星有限公司 适用于星上产品返修后的非对称性热试验方法
CN105790710A (zh) * 2014-12-23 2016-07-20 国家电网公司 一种光伏组件电位诱发衰减测试方法
CN104579167B (zh) * 2014-12-30 2017-09-29 中国电器科学研究院有限公司 一种光伏组件湿热环境耐久性测试方法
CN109150099A (zh) * 2017-12-30 2019-01-04 苏州阿特斯阳光电力科技有限公司 一种光伏优化器可靠性评估装置
CN109150099B (zh) * 2017-12-30 2020-02-18 苏州阿特斯阳光电力科技有限公司 一种光伏优化器可靠性评估装置
CN109347439A (zh) * 2018-11-19 2019-02-15 普德光伏技术(苏州)有限公司 一种用于太阳能板热循环测试装置及方法
CN112924370A (zh) * 2021-01-28 2021-06-08 无锡市产品质量监督检验院 一种光伏组件及材料的紫外热循环综合试验方法

Similar Documents

Publication Publication Date Title
CN102508143A (zh) 一种光伏组件的可靠性测试方法
CN202275142U (zh) 柔性直流输电mmc阀稳态运行试验的背靠背试验装置
CN101226218B (zh) 一种电力电容器元件的寿命试验方法
EP3506495A1 (en) Method and system for testing weather resistance of photovoltaic module
CN104459408A (zh) 用加大温度应力的加速寿命试验验证产品可靠性的方法
CN103063966B (zh) 一种光伏发电测试方法
CN106057702B (zh) 一种具有合格热斑温度范围的太阳能电池片的检测方法
CN104810558B (zh) 一种具有散热功能的化成/分容柜
CN106257734A (zh) 一种锂离子动力电池配组方法
CN105373009A (zh) 一种再生能源系统模拟测试与半实物仿真系统
Liu et al. Study on the effects of temperature on LiFePO 4 battery life
CN103294052A (zh) 采用快速温度变化测试防滑刹车控制盒故障隐患的方法
Erkaya et al. On-site characterization of PV modules using a portable, MOSFET-based capacitive load
CN111416572B (zh) 一种太阳电池组件电性能的判别方法
CN104065339A (zh) 一种太阳能电池组件pid的实验板及其测试方法
CN205280841U (zh) 一种功率单元老化测试装置
CN113765480B (zh) 一种光伏组件热斑测试方法及光伏组件热斑测试装置
CN106653642A (zh) 一种测试光伏旁路二极管正反向转换能力的系统及测试方法
CN104485705A (zh) 多串电池组均衡管理方法及系统
CN111931328B (zh) 一种基于夏季气候的车用锂离子电池工况及寿命阶段预测方法
CN108802592A (zh) 一种旁路二极管测试装置及测试方法
CN103825550A (zh) 一种测试太阳电池组件反向偏压特性的方法
CN105470325B (zh) 一种防热斑效应的太阳能电池组件
CN102175592A (zh) 光伏组件的模拟湿热试验加速试验方法
CN103595236A (zh) 光伏逆变器开机控制方法、装置及太阳能发电系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120620