CN102507123A CN2011103008726A CN201110300872A CN102507123A CN 102507123 A CN102507123 A CN 102507123A CN 2011103008726 A CN2011103008726 A CN 2011103008726A CN 201110300872 A CN201110300872 A CN 201110300872A CN 102507123 A CN102507123 A CN 102507123A
Authority
CN
China
Prior art keywords
wire
lead
ice coating
tension
ice
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011103008726A
Other languages
Chinese (zh)
Other versions
CN102507123B (en
Inventor
杨风利
张子富
邢海军
杨靖波
李清华
朱宽军
刘胜春
刘臻
韩军科
丁平
吴国强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Original Assignee
China Electric Power Research Institute Co Ltd CEPRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Electric Power Research Institute Co Ltd CEPRI filed Critical China Electric Power Research Institute Co Ltd CEPRI
Priority to CN201110300872.6A priority Critical patent/CN102507123B/en
Publication of CN102507123A publication Critical patent/CN102507123A/en
Application granted granted Critical
Publication of CN102507123B publication Critical patent/CN102507123B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention provides a test method used for transmission line ice coating disconnection. In the method, the influences of the factors such as the wire model, the ice coating thickness and wire initial tension and the like are comprehensively considered, and the method has better adaptability and higher accuracy. The test method provided by the invention comprises the following steps of constructing a serial three-gear four-rod three-line model; simulating wire ice coating by using a method of a heavy steel wire rope adopting binding and ice coating and the like; installing a disconnection trip mechanism at a side gear midspan position; testing a transverse displacement decrement curve and a non-disconnection gear disconnection tension travel time curve of an intermediate gear midspan point in each working condition on the basis that test working conditions are designed in accordance with different wire models and ice coating thicknesses; and determining the ice coating wire damping ratio and a wire tension dynamic shock factor to finally provide a basis for the tower disconnection load value of an ice coating zone. The test method comprises the following steps: designing a disconnection test line section, calculating the weight of ice coating, carrying out damping identification on the ice coating wire and testing and analyzing the disconnection tension. The method provided by the invention has the advantages of simple theory, reliable computational result, and provides a basis for the construction of a transmission line.

Description

A kind of powerline ice-covering conductor cord disconnection test method
Technical field
The invention belongs to the conductor cord disconnection load test field in the electric power line pole tower load test, specifically relate to a kind of powerline ice-covering conductor cord disconnection test method.
Background technology
Icing, wave and all possibly cause transmission line wire with meteorological disasters such as high wind or ground wire breaks.Winter, aerial condutor and shaft tower were easy to icing, and serious icing and the conductor galloping that causes because of icing are to cause the ultra-high-tension power transmission line broken string and fall the main cause of tower.Must conscientiously investigate an important parameter of calculating when ice covering thickness is the design aerial high-voltage power transmission line, calculate the stress of aerial high-voltage lead when different ice covering thickness, have crucial meaning for the safe operation that ensures transmission line of electricity.
All took place to cause flashover, broken string in the many areas of China, fell bar accidents such as (towers), caused enormous economic loss to society because of wire icing makes the loading increase of transmission line of electricity.For example, in January, 2008 universal drop in all parts of the country heavy snow, southern number is economized transmission line of electricity and is met with ice and snow disaster rarely seen in the history.Strong wind, sleet, ice and snow, make the serious icing of transmission pressure, many transmission lines of electricity fall string, broken string, fall accident such as tower.
The transmission line of electricity broken string can produce bigger longitudinal unbalance tension force; Can cause transient impact to electric power line pole tower; The internal force and the displacement response of transmission tower are obviously increased, and the lever tower that causes breaking collapses even causes that the transmission line of electricity string falls, and has a strong impact on the safe operation of transmission line of electricity.Therefore, the analysis of transmission line of electricity broken string load and experimental study is studied always and designer's extensive concern.
The article that Hu Deshan, Yuan Shun and Liu Ning deliver in 2009 annual power industry Hi-pot tests and the Electrical Measurement Technology symposial " force analysis during the serious icing of aerial condutor "; Set forth the technology of the static tension of ice coating wire in detail; The analytical calculation of ice coating wire dynamic stress; On this basis, use simulation calculation software ANSYS to set up model, the stress of the high hanging wire point place lead when calculating conductor galloping.For transmission line of electricity design is provided fundamental basis.
(electrotechnics journal, Vol25,1 in " the lead dynamic tension that ice coating wire is waved characteristic and caused " literary composition that people such as Wang Shaohua deliver; 2010; P159-166), set up the Three Degree Of Freedom physical model that ice coating wire is waved, adopted Fluent software that the aerodynamic parameter of ice coating wire has been carried out numerical simulation; Utilize the Simulink emulation module to carry out the dynamic similation that icing is waved on this basis, obtained the fundamental characteristics that ice coating wire is waved.The result shows: wave when reaching steady state (SS), vertical direction and horizontal direction vibrational waveform are approximately simple harmonic wave; It is approximate tiltedly oval to wave track; All amplitude increases along with waving, span shortens for lead Horizontal Tension, the vertical tension force component variation of hitch point amount, sag increases and increases; The wire tension variation range that the waving of single half-wave causes is maximum, the easyliest makes the lead damage; The parity of waving the half-wave number has considerable influence to tension variation number percent.
And for example application number is CN200810042499.7; Denomination of invention is the application for a patent for invention of " monitoring icing line wires ice covering thickness and the stressed method of tangent tower "; The stressing conditions of monitoring tangent tower in monitoring wire icing thickness; When the iron tower unbalanced tensile force exceeds standard, in time report to the police,, guarantee the security of circuit under the icing condition to avoid taking place the accident of falling the tower.
Above-mentioned technology is the technology or the method for actual detected wire icing thickness, and all has the construction of pair transmission pressure that foundation is provided.
Behind the electrical network ice damages in 2008, the operating mode that will break in the design specifications of new revision does not change icing, wire breaking into by there being the ice broken string.In addition, damping has considerable influence to broken string response attenuation process, in the experimental study in the past not to tower line system damping test, when numerical analysis, mostly rule of thumb adopt an assumed value, influenced the precision of conductor cord disconnection dynamical simulation analysis result.Be kinematic behavior and the broken string load of accurately confirming ice coating wire; Be necessary through making up continuous multi-gear power transmission line highway section; Adopt the icing weight of ballasting method simulation different-thickness; Carry out the conductor cord disconnection test of different conductor model, different ice covering thickness, test span centre point wire tension and span centre point transversal displacement time-histories under the different operating modes, calculate the damping ratio in test wire highway section under the different operating modes; Confirm the dynamic impact coefficient of different operating mode lower wire tension force, finally foundation is provided for icing district shaft tower broken string Load value.
Summary of the invention
The object of the invention is to provide a kind of powerline ice-covering conductor cord disconnection test method, for icing district shaft tower broken string Load value provides foundation; This method is taken all factors into consideration the influence of factors such as wire type, ice covering thickness and lead initial tension, adds the influence of damping to broken string response attenuation process simultaneously, and is higher to the test and the analysis precision of ice coating wire broken string stress, has better adaptability.
For realizing the foregoing invention purpose, the technical scheme that the present invention takes is:
A kind of powerline ice-covering conductor cord disconnection test method, its improvements are said method comprising the steps of:
1) broken string test wire highway section design:
Wire type, the string model of dangling are selected:
According to the actual span of transmission line of electricity actual design condition and test wire highway section and the discrepancy in elevation, to select the test lead model and dangle the string model, after the string length of dangling will guarantee conductor cord disconnection, the distance to the ground of dangle string and lead minimum point in swing process was greater than 0;
Steel pipe pole and basic engineering:
With the control work condition of broken string operating mode as the steel pipe pole structural design, steel pipe pole root moment of flexure when calculating broken string is according to GB50545-2010110kV~750kV overhead transmission line design specifications design steel pipe pole and basis;
Conductor cord disconnection:
Adopt manual unhook discharge mechanism to realize;
Broken string discharge mechanism, tension pick-up and displacement transducer are installed on each grade lead;
2) icing simulation and icing weight are calculated
Icing adopts quality wire rope simulations such as binding;
Icing weight computing formula is:
w=900×πδ(d+δ) (1)
Wherein: w is the icing weight of lead unit length, and units/m, δ are ice covering thickness, the m of unit, d diameter of wire, the m of unit;
Icing weight w according to the lead unit length selects the wire rope model for use;
3) the ice coating wire original state is set
f m=gl 2/8T 0 (2)
Wherein: f mBe span centre point sag, the m of unit; G is the lead unit weight, the N/m of unit; L is the lead span, the m of unit; T 0Be lead minimum point Horizontal Tension, the N of unit;
4) ice coating wire damping identification
ξ=δ m/2πm (3)
δ m≡ln(d n/d n+m) (4)
Wherein: ξ is the ice coating wire damping ratio; δ mBe the logarithmic decrement after conductor vibration m week; d nAnd d N+mFor span centre is put n and n+m displacement peak value;
5) broken string tension test and analysis
The lead dynamic tension is directly measured by tension pick-up;
Figure BDA0000096584560000031
Wherein: said broken string discharge mechanism, tension pick-up and displacement transducer are installed on the span centre position of each grade lead.
Wherein: said ice coating wire original state situation, the string vertical that dangles is in the level ground.
Owing to adopted technique scheme, compared with prior art, beneficial effect of the present invention comprises:
1) the simulation analysis precision improves
This method Considering Damping is to the influence of broken string response attenuation process, and damping is tested to tower line system, makes that conductor cord disconnection dynamical simulation analysis result is more accurate;
2) has better applicability
Than traditional nothing ice broken string testing program, this method is taken all factors into consideration the influence of factors such as wire type, ice covering thickness and lead initial tension, adapts to the present situation that present transmission pressure is built more.
Description of drawings
Below in conjunction with accompanying drawing the present invention is further specified.
Fig. 1 is the ice coating wire broken string test model that comprises continuous 3 grades of leads;
Fig. 2 is a bay span centre point transversal displacement time-histories in the A1 operating mode;
Fig. 3 is a bay span centre point transversal displacement time-histories in the A2 operating mode;
Fig. 4 is a bay wire tension time-histories in the A1 operating mode;
Fig. 5 is a bay wire tension time-histories in the A2 operating mode;
Reference numeral: angle pole, trip mechanism, 3. straight line pole 2. break; 4. insulator, 5. displacement transducer, 6. lead; 7. iron wire is used in binding, 8. simulates icing and uses wire rope, 9. is used to regulate the earth anchor of lead initial tension; 10. basic, tension pick-up.
Embodiment
Below in conjunction with instance the present invention is carried out detailed explanation.
In the numerical analysis and experimental study of relevant broken string, all do not consider the icing influence at present.In addition, damping has considerable influence to broken string response attenuation process, in the experimental study in the past not to tower line system damping test, when numerical analysis, mostly rule of thumb adopt an assumed value, influenced the precision of conductor cord disconnection dynamical simulation analysis result.
The invention provides a kind of powerline ice-covering conductor cord disconnection test method that is used for.This method has been taken all factors into consideration the influence of factors such as wire type, ice covering thickness and lead initial tension; Through making up continuous multi-gear power transmission line highway section; Adopt the icing weight of ballasting method simulation different-thickness; Carry out the conductor cord disconnection test of different conductor model, different ice covering thickness, test span centre point wire tension and span centre point transversal displacement time-histories under the different operating modes, calculate the damping ratio in test wire highway section under the different operating modes; Confirm the dynamic impact coefficient of different operating mode lower wire tension force, finally foundation is provided for icing district shaft tower broken string Load value.Compare with traditional nothing ice broken string test method, this method has the precision of better applicability and Geng Gao.
A kind of powerline ice-covering conductor cord disconnection test method may further comprise the steps:
(1) broken string test wire highway section method for designing
1. at first select work transmission line to use wire type always; According to actual span in test wire highway section and meteorological condition, select the string model of dangling that is fit to.
2. be the control work condition of steel pipe pole structural design with the broken string operating mode, by broken string load design steel pipe pole and basis.
3. adopt manual unhook discharge mechanism to realize conductor cord disconnection.
4. break discharge mechanism, tension pick-up and displacement transducer is installed in the span centre position of each grade lead, and the tension pick-up range can be confirmed with broken string tension force according to the lead initial tension that finite element analysis is confirmed.
(2) icing simulation and computation method for hot
1. lead adopts S.C. in the broken string test, and icing adopts the method simulation of quality wire rope such as binding
The icing weight w (kg/m) of lead unit length when 2. calculating different ice thickness according to formula (1) uses the wire rope model according to calculating the ice gravity treatment.
w=900×πδ(d+δ) (1)
δ is ice covering thickness (m) in the formula, and d is diameter of wire (m).
(3) ice coating wire original state establishing method
Regulate the lead initial tension through earth anchor, when guaranteeing to dangle string vertical state, make it to reach design conditions initial tension value.The lead initial tension can directly be recorded by tension pick-up; Also to adopt total powerstation centering bay span centre point sag to measure during test; The tension force that records, sag should satisfy the theoretical corresponding relation shown in the formula (2), thereby further verify the tonometric accuracy of initial static.
f m=gl 2/8T 0 (2)
F in the formula mBe span centre point sag (m) that g is lead unit weight (N/m), l is lead span (m), T 0Be minimum point Horizontal Tension (N).
(4) ice coating wire damping recognition methods
The displacement transducer of 1 horizontal path direction is installed in lead span centre position, is adopted artificial excitation's method that lead is laterally vibrated, measure span centre point displacement time-history curves.Calculate the ice coating wire damping ratio according to the free Attenuation Method shown in the formula (3) again.
ξ=δ m/2πm (3)
δ in the formula m≡ l n(d n/ d N+m) be the logarithmic decrement of m after week, d nAnd d N+mFor span centre is put n and n+m displacement peak value.
(5) broken string tension test and analytical approach
1. the lead dynamic tension adopts the dynamic strain test macro to measure, input sample frequency as required before the broken string, and Measuring Time is set beginning from the ice coating wire original state, until broken string back lead, the string that dangles reach settling position and finish.
2. according to the wire tension time-history curves, confirm peak tensions and remaining static tension force, calculate broken string tension force dynamic impulsion coefficient.
Embodiment 1:
The invention provides a kind of powerline ice-covering conductor cord disconnection test method that is used for.This method has been taken all factors into consideration the influence of factors such as wire type, ice covering thickness and lead initial tension, compares with traditional nothing ice broken string test method, has the precision of better applicability and Geng Gao.
For achieving the above object, the present invention is through making up continuous 3 grade of 4 bar 3 line model, and test unit is arranged shown in accompanying drawing 1.Adopt the method analog conducting wire icing of heavy wire rope such as binding and icing; The broken string trip mechanism is installed in shelves span centre position on the limit; Different designs operating condition of test according to wire type, ice covering thickness; The bay span centre point transversal displacement die-away curve and the shelves conductor cord disconnection tension force time-history curves that do not break are confirmed ice coating wire damping ratio and wire tension dynamic impulsion coefficient in testing under each operating mode.
A kind of powerline ice-covering conductor cord disconnection test method of the present invention is characterized in that, may further comprise the steps:
1. broken string test wire highway section design
At first select work transmission line to use wire type always; According to actual span in test wire highway section and meteorological condition, select the string model of dangling that is fit to.According to the design discipline requirement, the broken string operating mode is the control work condition of steel pipe pole structural design, by broken string load design steel pipe pole and basis.Broken string adopts manual unhook discharge mechanism to realize, the discharge mechanism two ends link to each other with the steel anchor at conductor compression jointing place through U type ring.Spur the trigger extension rod laterally, the hook that will link to each other with the steel anchor ejects, thereby realizes the broken string simulation.
Broken string discharge mechanism, tension pick-up and displacement transducer are installed in the span centre position of each grade lead.The broken string peak tension generally can not surpass the lead initial tension, and the tension pick-up range can be according to confirming based on the static analysis result who waits the line length method.
2. icing weight is calculated
Lead adopts S.C. in the broken string test, and icing adopts the method simulation of quality wire rope such as binding.The icing weight w (kg/m) of lead unit length when calculating different ice thickness according to formula (1) uses the wire rope model according to calculating the ice gravity treatment.
w=900×πδ(d+δ) (1)
δ is ice covering thickness (m) in the formula, and d is diameter of wire (m).
3. icing weight is calculated
Can regulate the lead initial tension through the north side earth anchor shown in the accompanying drawing 1, when guaranteeing to dangle string vertical state, make it to reach design conditions initial tension value.The lead initial tension can directly be recorded by tension pick-up; Also to adopt total powerstation centering bay span centre point sag to measure during test; The tension force that records, sag should satisfy the theoretical corresponding relation shown in the formula (2), thereby further verify the tonometric accuracy of initial static.
f m=gl 2/8T 0 (2)
F in the formula mBe span centre point sag (m) that g is lead unit weight (N/m), l is lead span (m), T 0Be minimum point Horizontal Tension (N).
4. ice coating wire damping identification
Model analysis by 3 grades of models of typical case can know that preceding two first order modes of ice coating wire are transverse vibration.The displacement transducer of 1 horizontal path direction is installed in middle bay lead span centre position, is adopted artificial excitation's method that lead is laterally vibrated, measure span centre point displacement time-history curves.Calculate the ice coating wire damping ratio according to the free Attenuation Method shown in the formula (3) again.
ξ=δ m/2πm (3)
δ in the formula m≡ ln (d n/ d N+m) be the logarithmic decrement of m after week, d nAnd d N+mFor span centre is put n and n+m displacement peak value.
5. broken string tension test and analysis
The lead dynamic tension adopts the dynamic strain test macro to measure, input sample frequency as required before the broken string, and Measuring Time is set beginning from the ice coating wire original state, until broken string back lead, the string that dangles reach settling position and finish.According to the wire tension time-history curves, confirm peak tensions and remaining static tension force, calculate broken string tension force dynamic impulsion coefficient (the dynamic impulsion coefficient is the ratio of peak tensions and remaining static tension force).
Use the process that said method identification ice coating wire damping ratio and test lead broken string tension force are adopted in the instantiation introduction at present.
According to break test wire highway section design of step 1, continuous 3 grades of spans are followed successively by 95m, 100m and 95m.Two ends steel pipe pole bar type is the DDG5 terminal pole, high 5m; Middle two basic steel pipe pole bar types are the DZG8 straight line pole, the high 8m of bar.Wire type adopts JL/GIA400/35, maximum working tension 39.48kN.The string that dangles adopts composite insulator, structure length 1.7m, 7 tons of specified pulling force.Concrete operating condition of test such as following table:
The operating mode numbering Initial tension (kN) Ice covering thickness (mm)
A1 28.4 20
A2 36.0 30
The icing weight of calculating A1 and A2 operating mode correspondence according to the formula (1) in the step 2 is 2.65kg/m and 4.82kg/m.According to calculate wire rope model that the ice gravity treatment uses as Φ 26 (6 * 37+FC) with Φ 28 (unit weight of 6 * 37+FC), two kinds of wire rope is respectively 2.34kg/m and 2.71kg/m.Wherein the 20mm icing is by 1 Φ, 28 wire rope approximate simulations, and the 30mm icing is by 1 Φ 26 and 1 Φ 28 wire rope approximate simulation.
According to step 3, lead span centre point tension force is transferred to the design conditions setting, bay lead span centre point lead sag in two operating modes to be measured, A1 and A2 working condition measuring value are respectively 1.70m and 2.12m.Calculated value is respectively 1.78m and 2.19m, differs 4.9% and 3.5%, and the tension pick-up precision of test result has been described.
According to step 4, measure bay lead span centre point transversal displacement time-histories in A1, the A2 operating mode, shown in accompanying drawing 2 and accompanying drawing 3.Employing formula (2) is calculated each operating mode ice coating wire damping ratio, and concrete result of calculation sees the following form.
The operating mode numbering Initial spike d n/mm Initial spike d n+m/mm All number m decay Damping ratio ξ
A1 121.1 45.5 11 0.014
A2 161.2 102.7 2 0.036
According to step 5, setting the tension pick-up SF is 30Hz, when measuring A1 and A2 operating mode ice coating wire broken string respectively in bay wire tension time-histories, shown in accompanying drawing 4 and accompanying drawing 5.According to accompanying drawing 4 and the tension force time-history curves shown in the accompanying drawing 5, obtain each operating mode peak-peak tension force, remaining static tension force and dynamic impulsion coefficient and see the following form.
The operating mode numbering Peak tensions (kN) Remaining static tension force (kN) The dynamic impulsion coefficient
A1 18.50 6.20 2.98
A2 20.36 9.88 2.06
Invention has been described according to specific exemplary embodiment here.It will be conspicuous under not departing from the scope of the present invention, carrying out suitable replacement to one skilled in the art or revise.Exemplary embodiment only is illustrative, rather than to the restriction of scope of the present invention, scope of the present invention is by appended claim definition.

Claims (3)

1. powerline ice-covering conductor cord disconnection test method is characterized in that said method comprising the steps of:
1) broken string test wire highway section design:
Wire type, the string model of dangling are selected:
According to the actual span of transmission line of electricity actual design condition and test wire highway section and the discrepancy in elevation, to select the test lead model and dangle the string model, after the string length of dangling will guarantee conductor cord disconnection, the distance to the ground of dangle string and lead minimum point in swing process was greater than 0;
Steel pipe pole and basic engineering:
With the control work condition of broken string operating mode as the steel pipe pole structural design, steel pipe pole root moment of flexure when calculating broken string is according to GB50545-2010110kV~750kV overhead transmission line design specifications design steel pipe pole and basis;
Conductor cord disconnection:
Adopt manual unhook discharge mechanism to realize;
Broken string discharge mechanism, tension pick-up and displacement transducer are installed on each grade lead;
2) icing simulation and icing weight are calculated
Icing adopts quality wire rope simulations such as binding;
Icing weight computing formula is:
w=900×πδ(d+δ) (1)
Wherein: w is the icing weight of lead unit length, and units/m, δ are ice covering thickness, the m of unit, d diameter of wire, the m of unit;
Icing weight w according to the lead unit length selects the wire rope model for use;
3) the ice coating wire original state is set
f m=gl 2/8T 0 (2)
Wherein: f mBe span centre point sag, the m of unit; G is the lead unit weight, the N/m of unit; L is the lead span, the m of unit; T 0Be lead minimum point Horizontal Tension, the N of unit;
4) ice coating wire damping identification
ξ=δ m/2πm (3)
δ m≡l n(d n/d n+m) (4)
Wherein: ξ is the ice coating wire damping ratio; δ mBe the logarithmic decrement after conductor vibration m week; d nAnd d N+mFor span centre is put n and n+m displacement peak value;
5) broken string tension test and analysis
The lead dynamic tension is directly measured by tension pick-up;
Figure 20111030087261000011
2. a kind of powerline ice-covering conductor cord disconnection test method as claimed in claim 1 is characterized in that said broken string discharge mechanism, tension pick-up and displacement transducer are installed on the span centre position of each grade lead.
3. a kind of powerline ice-covering conductor cord disconnection test method as claimed in claim 1 is characterized in that said ice coating wire original state situation, and the string vertical that dangles is in the level ground.
CN201110300872.6A 2011-09-29 2011-09-29 Test method used for transmission line ice coating disconnection Active CN102507123B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110300872.6A CN102507123B (en) 2011-09-29 2011-09-29 Test method used for transmission line ice coating disconnection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110300872.6A CN102507123B (en) 2011-09-29 2011-09-29 Test method used for transmission line ice coating disconnection

Publications (2)

Publication Number Publication Date
CN102507123A true CN102507123A (en) 2012-06-20
CN102507123B CN102507123B (en) 2015-03-25

Family

ID=46219230

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110300872.6A Active CN102507123B (en) 2011-09-29 2011-09-29 Test method used for transmission line ice coating disconnection

Country Status (1)

Country Link
CN (1) CN102507123B (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103033158A (en) * 2012-12-26 2013-04-10 湖北省电力公司检修分公司 Three-dimensional monitoring system and monitoring method of transmission conductors based on displacement sensors
WO2015149411A1 (en) * 2014-04-01 2015-10-08 清华大学深圳研究生院 De-icing jumping simulation testing method for ice coating lead
CN105675242A (en) * 2016-01-19 2016-06-15 北京工业大学 Electromechanical control inhaul cable instant breaking device
CN106225748A (en) * 2016-08-15 2016-12-14 国网山西省电力公司电力科学研究院 The simulation Compare System of electric power line ice-covering thickness monitoring device and comparison method thereof
CN106289702A (en) * 2016-08-10 2017-01-04 国家电网公司 A kind of mechanical guide wire load discharges suddenly device and the method carrying out crossing frame impact experiment
CN107908806A (en) * 2017-07-17 2018-04-13 国网浙江省电力公司湖州供电公司 A kind of single grade of wire tension change modeling computational methods of transmission line of electricity and simulation test device
CN107907311A (en) * 2017-07-11 2018-04-13 国网浙江省电力公司湖州供电公司 A kind of wire icing of transmission line unbalanced tensile force test method and system
CN109583025A (en) * 2018-10-30 2019-04-05 国网江西省电力有限公司电力科学研究院 A kind of icing corrosion ground wire Analysis of Bearing Capacity method and system
CN109839571A (en) * 2019-03-28 2019-06-04 国网河南省电力公司电力科学研究院 A kind of test method deicing the Study on Fault suitable for multi gear transmission pressure
CN110361126A (en) * 2019-08-12 2019-10-22 中国南方电网有限责任公司超高压输电公司检修试验中心 A kind of method and its sensing device for transmission line icing load monitoring
CN110455511A (en) * 2019-08-16 2019-11-15 国网江苏省电力有限公司电力科学研究院 Measure the experimental rig and test method of compound cross-arm dynamic response under the operating condition that breaks
CN110457799A (en) * 2019-07-30 2019-11-15 中国航发沈阳发动机研究所 A kind of hot test device damping screen design method
CN110994461A (en) * 2019-12-31 2020-04-10 国家电网有限公司 Method for preventing ice coating of power transmission line by improving paying-off tension and inhibiting torsion of lead
CN111678579A (en) * 2020-06-04 2020-09-18 中国电力工程顾问集团西南电力设计院有限公司 Device for automatically measuring ice coating weight of analog lead
CN113701689A (en) * 2021-07-26 2021-11-26 贵州电网有限责任公司 Method and system for measuring equivalent icing thickness of power transmission line of strain tower

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU881922A2 (en) * 1980-01-11 1981-11-15 Башкирский сельскохозяйственный институт Aerodynamic damper of wire twisting
SU902129A1 (en) * 1980-04-22 1982-01-30 Башкирский сельскохозяйственный институт Device for removing glaze ice from wires
CN101446517A (en) * 2008-12-17 2009-06-03 中国电力科学研究院 Method for testing vibration of high-tower structure of transmission line
CN101667319A (en) * 2008-09-04 2010-03-10 华东电力试验研究院有限公司 Method for giving wire damage alarm when lead wire is coated by ice
CN101701842A (en) * 2009-11-03 2010-05-05 杭州海康雷鸟信息技术有限公司 Method and system for real-time monitoring of analog wire coated by ice of overhead power transmission line

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU881922A2 (en) * 1980-01-11 1981-11-15 Башкирский сельскохозяйственный институт Aerodynamic damper of wire twisting
SU902129A1 (en) * 1980-04-22 1982-01-30 Башкирский сельскохозяйственный институт Device for removing glaze ice from wires
CN101667319A (en) * 2008-09-04 2010-03-10 华东电力试验研究院有限公司 Method for giving wire damage alarm when lead wire is coated by ice
CN101446517A (en) * 2008-12-17 2009-06-03 中国电力科学研究院 Method for testing vibration of high-tower structure of transmission line
CN101701842A (en) * 2009-11-03 2010-05-05 杭州海康雷鸟信息技术有限公司 Method and system for real-time monitoring of analog wire coated by ice of overhead power transmission line

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
袁光辉: "输电塔线体系覆冰与脱冰的数值模拟研究", 《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》 *

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103033158A (en) * 2012-12-26 2013-04-10 湖北省电力公司检修分公司 Three-dimensional monitoring system and monitoring method of transmission conductors based on displacement sensors
CN103033158B (en) * 2012-12-26 2015-11-18 国家电网公司 The transmission pressure three-dimension monitor system of deformation based sensor and monitoring method thereof
WO2015149411A1 (en) * 2014-04-01 2015-10-08 清华大学深圳研究生院 De-icing jumping simulation testing method for ice coating lead
CN105675242B (en) * 2016-01-19 2017-12-15 北京工业大学 The instantaneous disrumpent feelings device of Electromechanical Control drag-line
CN105675242A (en) * 2016-01-19 2016-06-15 北京工业大学 Electromechanical control inhaul cable instant breaking device
CN106289702A (en) * 2016-08-10 2017-01-04 国家电网公司 A kind of mechanical guide wire load discharges suddenly device and the method carrying out crossing frame impact experiment
CN106225748A (en) * 2016-08-15 2016-12-14 国网山西省电力公司电力科学研究院 The simulation Compare System of electric power line ice-covering thickness monitoring device and comparison method thereof
CN107907311A (en) * 2017-07-11 2018-04-13 国网浙江省电力公司湖州供电公司 A kind of wire icing of transmission line unbalanced tensile force test method and system
CN107907311B (en) * 2017-07-11 2019-08-06 国网浙江省电力公司湖州供电公司 A kind of wire icing of transmission line unbalanced tensile force test method and system
CN107908806B (en) * 2017-07-17 2021-03-05 国网浙江省电力公司湖州供电公司 Simulation calculation method and simulation test device for tension change of single-gear wire of power transmission line
CN107908806A (en) * 2017-07-17 2018-04-13 国网浙江省电力公司湖州供电公司 A kind of single grade of wire tension change modeling computational methods of transmission line of electricity and simulation test device
CN109583025A (en) * 2018-10-30 2019-04-05 国网江西省电力有限公司电力科学研究院 A kind of icing corrosion ground wire Analysis of Bearing Capacity method and system
CN109583025B (en) * 2018-10-30 2023-06-16 国网江西省电力有限公司电力科学研究院 Icing corrosion ground wire bearing capacity analysis method and system
CN109839571A (en) * 2019-03-28 2019-06-04 国网河南省电力公司电力科学研究院 A kind of test method deicing the Study on Fault suitable for multi gear transmission pressure
CN110457799A (en) * 2019-07-30 2019-11-15 中国航发沈阳发动机研究所 A kind of hot test device damping screen design method
CN110361126A (en) * 2019-08-12 2019-10-22 中国南方电网有限责任公司超高压输电公司检修试验中心 A kind of method and its sensing device for transmission line icing load monitoring
CN110455511A (en) * 2019-08-16 2019-11-15 国网江苏省电力有限公司电力科学研究院 Measure the experimental rig and test method of compound cross-arm dynamic response under the operating condition that breaks
CN110455511B (en) * 2019-08-16 2022-03-15 国网江苏省电力有限公司电力科学研究院 Test device and test method for measuring dynamic response of composite cross arm under wire breakage working condition
CN110994461A (en) * 2019-12-31 2020-04-10 国家电网有限公司 Method for preventing ice coating of power transmission line by improving paying-off tension and inhibiting torsion of lead
CN111678579A (en) * 2020-06-04 2020-09-18 中国电力工程顾问集团西南电力设计院有限公司 Device for automatically measuring ice coating weight of analog lead
CN111678579B (en) * 2020-06-04 2021-09-28 中国电力工程顾问集团西南电力设计院有限公司 Device for automatically measuring ice coating weight of analog lead
CN113701689A (en) * 2021-07-26 2021-11-26 贵州电网有限责任公司 Method and system for measuring equivalent icing thickness of power transmission line of strain tower
CN113701689B (en) * 2021-07-26 2024-01-16 贵州电网有限责任公司 Method and system for measuring equivalent icing thickness of tension tower power transmission line

Also Published As

Publication number Publication date
CN102507123B (en) 2015-03-25

Similar Documents

Publication Publication Date Title
CN102507123B (en) Test method used for transmission line ice coating disconnection
CN103942417B (en) Ice coating wire ice-shedding emulation test method
CN107657090B (en) Method for judging icing instability of tension tower of power transmission line
CN110285909B (en) Method for calculating instantaneous cable force of cable-supported bridge based on synchronous compression transformation
CN107907311B (en) A kind of wire icing of transmission line unbalanced tensile force test method and system
Huang et al. Study on jump height of transmission lines after ice-shedding by reduced-scale modeling test
CN105004504A (en) Vibration wind speed evaluation method for composite insulator and selection method thereof
CN111859767A (en) Power transmission line icing risk simulation evaluation method and device
CN104406777A (en) Three-dimensional space variable angle loading device
CN109918854B (en) Composite insulation cross arm durability evaluation method and device
CN101858945B (en) Laboratory icing simulating test method of optical power ground wires (OPGWs)
Zhang et al. Short-term failure warning for transmission tower under land subsidence condition
CN104166802B (en) A kind of continuous shelves transmission line of electricity ice-shedding method for determining height
CN106253137A (en) A kind of overhead transmission line lead wire and earth wire explosion de-icing method of linear charge
CN102983533A (en) Electric transmission line guide line /ground wire wind load calculation method
Lou et al. Jump height of an iced transmission conductor considering joint action of ice-shedding and wind
CN107908806A (en) A kind of single grade of wire tension change modeling computational methods of transmission line of electricity and simulation test device
CN103441450B (en) A kind ofly shovel the de-icing method scraped based on the spreading of transmission line pulley
CN110807220B (en) Method for calculating instantaneous cable force of bridge inhaul cable with anti-noise function
CN102798509B (en) Test method for high-speed railway contact network wind-induced response wind tunnel
CN207036401U (en) A kind of wire icing of transmission line unbalanced tensile force pilot system
Shimizu et al. A wind tunnel study on aerodynamic characteristics of ice accreted transmission lines
CN107860502B (en) A kind of vibratory drilling method cable force measurement method for considering damper and influencing
Zhang et al. Research on the wind-induced dynamic response analysis method of the high-voltage transmission tower-line system under strong wind
Pan et al. Computer Simulation of Electric Conductor Dynamic Response in Cold Region

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20130521

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20130521

Address after: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15

Applicant after: China Electric Power Research Institute

Applicant after: State Grid Corporation of China

Address before: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15

Applicant before: China Electric Power Research Institute

C14 Grant of patent or utility model
GR01 Patent grant