CN102507101A - Air tight test bed for F-8 distribution valve center body - Google Patents

Air tight test bed for F-8 distribution valve center body Download PDF

Info

Publication number
CN102507101A
CN102507101A CN2011103520682A CN201110352068A CN102507101A CN 102507101 A CN102507101 A CN 102507101A CN 2011103520682 A CN2011103520682 A CN 2011103520682A CN 201110352068 A CN201110352068 A CN 201110352068A CN 102507101 A CN102507101 A CN 102507101A
Authority
CN
China
Prior art keywords
cylinder
water tank
air tight
tight test
pneumatic control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011103520682A
Other languages
Chinese (zh)
Inventor
付劝业
刘春玲
黄金林
刘力勋
陈军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN JL RAILWAY TRANSPORT EQUIPMENT CO Ltd
Original Assignee
TIANJIN JL RAILWAY TRANSPORT EQUIPMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN JL RAILWAY TRANSPORT EQUIPMENT CO Ltd filed Critical TIANJIN JL RAILWAY TRANSPORT EQUIPMENT CO Ltd
Priority to CN2011103520682A priority Critical patent/CN102507101A/en
Publication of CN102507101A publication Critical patent/CN102507101A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Examining Or Testing Airtightness (AREA)

Abstract

The invention discloses an air tight test bed for an F-8 distribution valve center body. A cylinder bracket is arranged on an underframe, and is provided with a water tank; a lower cylinder pin is connected below the water tank, and is connected with a cylinder; the cylinder is connected with an upper cylinder pin through a connecting pipe; the upper cylinder pin is connected with a pneumatic control box; a floating workbench is arranged above the water tank; two sides of the workbench are provided with workbench limiting plugs; the cylinder is provided with a cylinder pull rod, and is communicated with an 8mm elbow which is connected with an 8mm high pressure air pipe; a 3/8 ball valve is connected below the water tank; and the pneumatic control box is provided with an inter-leakage test plate. In a mode of performing an air tight test in water, various pipes to be inflated are connected, the center body to be subjected to the air tight test is immersed in a trough through a pneumatic control device, plugs for controlling the various pipes to be inflated are set to an inflation state in turn, other control plugs are closed, inter-leakage small holes are painted with suds, and whether the center body is leaked is determined by checking whether air bubbles exist in water. The operating procedures of the air tight test are simplified, the labor intensity is reduced, and the air tight test quality of a product is ensured.

Description

F-8 distribution valve intermedium is beaten the pump testing platform
Technical field
The invention belongs to the leakage testing table of testing of cast iron products airproof test, particularly a kind of F-8 distribution valve intermedium of air-tight test of the F-8 of being applicable to distribution valve intermedium is beaten the pump testing platform.Wherein make pump and be the general appellation of air-tight test.
Technical background
The F-8 distribution valve intermedium of our factory production in the past need be made pump (beating the general appellation that pump is air-tight test).It is to be the input air from corresponding gas circuit hole, with each screw plug of suds inspections, rivet, screw hole, outside surface and other each gas circuit holes, checks whether sew and go here and there Lou.Original pump of beating detects, and is manually-operated, observes.Check carefully inadequately if beat the pump operating personnel, very easily tiny seepage is ignored.Beat that the operating personnel need plug and unplug the inflation hydraulic quick coupler repeatedly and smear suds repeatedly in the pump process, program is more loaded down with trivial details, and labour intensity is bigger.
Summary of the invention
The purpose of this invention is to provide a kind of F-8 distribution valve intermedium water and beat the pump testing platform, can satisfy the leak hunting requirement of robotization of test of F-8 distribution valve intermedium.
Content of the present invention:
A kind of F-8 distribution valve intermedium water is beaten the pump testing platform, it is characterized by: the cylinder support is housed on underframe, on the cylinder support water tank is housed; The water tank below connects the lower cylinder pin, cylinder pin connects cylinder, and cylinder is by connecting pipe upper cylinder pin, and the upper cylinder pin connects the pneumatic control case; The water tank top has floating work bench, worktable both sides to have worktable spacing stifled, and air cylinder tie rod is arranged on the cylinder; Cylinder is communicated with the 8mm elbow, and the 8mm elbow connects the 8mm high-pressure air pipe; Water tank connects 3/8 ball valve below the below, and the pneumatic control case is for there being string test leakage test plate (panel).F-8 distribution valve intermedium is beaten the pump testing platform; Each pipeline that to inflate the intermedium that will make pump connects, and is placed in the tank, and the Sai Men that will control each pipeline inflation successively is set to inflated condition; Other each operation valves are closed; Smear the examination string with suds and leak aperture, and see whether bubble is arranged, simplified the running program of making pump in the water.
Advantage of the present invention:
This F-8 distribution valve intermedium is beaten the pump testing platform:
(1) F-8 passenger vehicle distribution valve intermedium is made pump and in water, is carried out, and the seepage that intermedium is tiny also can be seen very clearly.
(2) intermedium before making pump connects each pilot piping, and the inflation of operation valve pilot piping is simplified and beaten the pump job procedure.
(3) immerse, rise from the water surface with Pneumatic power elevator apparatus control intermedium, reduce labor intensity.
Description of drawings
Fig. 1 F-8 distribution valve intermedium is played pump testing platform front view
Fig. 2 F-8 distribution valve intermedium is played pump testing platform side view
Fig. 3 F-8 distribution valve intermedium is beaten pump testing platform vertical view
Fig. 4 is a pneumatic control case synoptic diagram
Among the figure: spacing stifled, the 9 8mm elbows of the assembling of 1 underframe, 2 cylinder supports, 3 lower cylinder pins, 4 cylinders, 5 connecting pipes, 6 upper cylinder pins, 7 pneumatic control casees, 8 worktable, 10 8mm high-pressure air pipes, 11 3/8 ball valves, 12 string test leakage test plate (panel)s, 13 floating work bench, the assembling of 14 water tanks, 15 air cylinder tie rods
Embodiment
A kind of F-8 distribution valve intermedium water is beaten the pump testing platform, and the cylinder support is housed on underframe, on the cylinder support water tank is housed; The water tank below connects the lower cylinder pin, cylinder pin connects cylinder, and cylinder is by connecting pipe upper cylinder pin, and the upper cylinder pin connects the pneumatic control case; The water tank top has floating work bench, worktable both sides to have worktable spacing stifled, and air cylinder tie rod is arranged on the cylinder; Cylinder is communicated with the 8mm elbow, and the 8mm elbow connects the 8mm high-pressure air pipe; Water tank connects 3/8 ball valve below the below, and the pneumatic control case is for there being string test leakage test plate (panel).
Use method of operating:
F-8 distribution valve intermedium is beaten the pump testing platform; Each pipeline that to inflate the intermedium that will make pump connects, and is placed in the tank, and the Sai Men that will control each pipeline inflation successively is set to inflated condition; Other each operation valves are closed; Smear the examination string with suds and leak aperture, and see whether bubble is arranged, simplified the running program of making pump in the water.
The F-8 distribution valve intermedium that will make pump is ready to be placed on the floating work bench; Connect each pipeline connecting pipe, push away last plug door of pneumatic control case, make floating work bench drive intermedium and sink in the water tank together; Successively each gas circuit plug door is placed aerating position; Whether whether in water have bubble emerge, and smear other gas circuit apertures on the string test leakage test plate (panel) with suds if seeing, see and go here and there Lou.

Claims (1)

1. a F-8 distribution valve intermedium water is beaten the pump testing platform, it is characterized by: the cylinder support is housed on underframe, on the cylinder support water tank is housed; The water tank below connects the lower cylinder pin, cylinder pin connects cylinder, and cylinder is by connecting pipe upper cylinder pin, and the upper cylinder pin connects the pneumatic control case; The water tank top has floating work bench, worktable both sides to have worktable spacing stifled, and air cylinder tie rod is arranged on the cylinder; Cylinder is communicated with the 8mm elbow, and the 8mm elbow connects the 8mm high-pressure air pipe; Water tank connects 3/8 ball valve below the below, and the pneumatic control case is for there being string test leakage test plate (panel).
CN2011103520682A 2011-11-09 2011-11-09 Air tight test bed for F-8 distribution valve center body Pending CN102507101A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011103520682A CN102507101A (en) 2011-11-09 2011-11-09 Air tight test bed for F-8 distribution valve center body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011103520682A CN102507101A (en) 2011-11-09 2011-11-09 Air tight test bed for F-8 distribution valve center body

Publications (1)

Publication Number Publication Date
CN102507101A true CN102507101A (en) 2012-06-20

Family

ID=46219208

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011103520682A Pending CN102507101A (en) 2011-11-09 2011-11-09 Air tight test bed for F-8 distribution valve center body

Country Status (1)

Country Link
CN (1) CN102507101A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103091049A (en) * 2012-11-13 2013-05-08 天津机辆轨道交通装备有限责任公司 Brake single piece coalition pumping test platform

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070028675A1 (en) * 2005-08-08 2007-02-08 O'sullivan Raymond Re-usable main drain testing method and apparatus
CN1971230A (en) * 2005-11-23 2007-05-30 天津市吉鑫达金属制品有限公司 Radiator integral pressure measuring device
CN201688948U (en) * 2010-05-18 2010-12-29 威海联桥仲精机械有限公司 Engine cylinder air-tightness detection platform
CN201852681U (en) * 2010-11-18 2011-06-01 沈阳维用精密机械有限公司 Bubble leakage detection device
CN201925574U (en) * 2010-12-22 2011-08-10 宿迁市科路养护技术有限公司 Steel shot flow control valve of chiseling machine

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070028675A1 (en) * 2005-08-08 2007-02-08 O'sullivan Raymond Re-usable main drain testing method and apparatus
CN1971230A (en) * 2005-11-23 2007-05-30 天津市吉鑫达金属制品有限公司 Radiator integral pressure measuring device
CN201688948U (en) * 2010-05-18 2010-12-29 威海联桥仲精机械有限公司 Engine cylinder air-tightness detection platform
CN201852681U (en) * 2010-11-18 2011-06-01 沈阳维用精密机械有限公司 Bubble leakage detection device
CN201925574U (en) * 2010-12-22 2011-08-10 宿迁市科路养护技术有限公司 Steel shot flow control valve of chiseling machine

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
孙清洲等: "《气密性实验台设计》", 《铸造设备研究》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103091049A (en) * 2012-11-13 2013-05-08 天津机辆轨道交通装备有限责任公司 Brake single piece coalition pumping test platform

Similar Documents

Publication Publication Date Title
CN201852681U (en) Bubble leakage detection device
CN203551217U (en) Valve body water test fixture
CN102607777B (en) Leakage check device for metal hoses in batch
CN104236825B (en) Shell leakage testing clamp
CN203249742U (en) Water leakage detection device for washing kettle
CN207556767U (en) A kind of bend pipe tools testing agency
CN106969911B (en) Locomotive brake hose test device
CN102507101A (en) Air tight test bed for F-8 distribution valve center body
CN110905887A (en) High-voltage and ultrahigh-voltage combined test board
CN103091049A (en) Brake single piece coalition pumping test platform
CN106644254B (en) Pressure transmitter on-bne repair method and its on-bne repair system
CN104677562A (en) Full-automatic butterfly valve sealing performance testing machine and testing method thereof
CN202255783U (en) Rubber tube air tightness examination device
CN102749177B (en) Submerged air leakage test device for bicycle front fork casts
CN210322285U (en) Valve pressure testing platform
CN202631200U (en) Air-tightness inspection equipment
CN103207053B (en) Windshield Washer leakage inspector
CN104833499A (en) Pressure test moulds, pressure test apparatus and pressure test method
JP5766057B2 (en) Gas leak inspection method
CN104406746A (en) Bottom cylinder pressure testing tool
CN203657980U (en) Engine gear chamber semi-automatic leak detection test apparatus
CN209689830U (en) A kind of automatic leakage tester of air inlet pipe
CN207050932U (en) A kind of multifunctional water-proofing fog detecting system
CN206920077U (en) Pressure meter calibration servicing unit
CN202693224U (en) Immersion type air leakage testing device for bicycle front fork casting

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120620