CN102505585B - 火箭撬施工工艺 - Google Patents

火箭撬施工工艺 Download PDF

Info

Publication number
CN102505585B
CN102505585B CN2011104034573A CN201110403457A CN102505585B CN 102505585 B CN102505585 B CN 102505585B CN 2011104034573 A CN2011104034573 A CN 2011104034573A CN 201110403457 A CN201110403457 A CN 201110403457A CN 102505585 B CN102505585 B CN 102505585B
Authority
CN
China
Prior art keywords
cross beam
channel steel
embedded
rocket sled
steel cross
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2011104034573A
Other languages
English (en)
Other versions
CN102505585A (zh
Inventor
卫芷
霍小妹
朱永清
杜卫平
王续东
常彦妮
晋斌
郭美庆
朱海伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Shanxi Sijian Group Co Ltd
Original Assignee
China Shanxi Sijian Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Shanxi Sijian Group Co Ltd filed Critical China Shanxi Sijian Group Co Ltd
Priority to CN2011104034573A priority Critical patent/CN102505585B/zh
Publication of CN102505585A publication Critical patent/CN102505585A/zh
Application granted granted Critical
Publication of CN102505585B publication Critical patent/CN102505585B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明涉及一种建筑物施工工艺,具体为一种火箭撬施工工艺。解决火箭撬施工中存在的轨道支撑部位精度差的问题,步骤首先在箱梁位置两侧安装模板,拉直线,根据拉直线的走向将预埋钢板初步安装到位,然后在模板上架设槽钢横梁,打螺栓孔,安装螺栓并和槽钢横梁固定;螺栓与预埋钢板焊接,再将立柱插到预埋钢板的立柱孔内并焊接在一起,最后浇注混凝土,砼浇筑完毕并凝固后,松开槽钢横梁上部螺母,将槽钢横梁及模板拆除。解决了火箭撬的箱梁预埋件数量多、安装精度高的问题,为火箭撬的轨道安装奠定了基础,为今后复杂预埋件高质量、高精度、高标准施工提供了新的思路。

Description

火箭撬施工工艺
技术领域
本发明涉及一种建筑物施工工艺,具体为一种火箭撬施工工艺。 
背景技术
火箭撬是一种空气动力学试验设备,利用推力强大的火箭助推器,推动测试物体在类似铁路的专用滑轨上高速前进,再用高速摄影机及其他设备记录数据,以分析其空气动力学性能。我国西北地区某兵器工业研究基地,火箭撬试验设施建设项目,由于要求飞行速度快,所以对于轨道的精度要求极为严格,而高标准建设轨道的前提是对支撑轨道梁箱的精确施工。 
在精度要求上,为了满足火箭发射试验要求,在支撑轨道梁箱的两侧预埋件纵向螺栓应在同一空间直线上,合理化避免误差,即“0”误差施工;同时严格控制横向每组两个螺栓之间的间距,达到空间直线效果;以使火箭顺利发射。其质量标准,施工精度远高于我国在建的高速铁路箱梁预埋件精度要求,因此箱梁预埋件的安装位置准确控制是施工的难点。 
发明内容
本发明为了解决火箭撬施工中存在的轨道支撑部位精度差的问题,提供了一种高精度的火箭撬施工工艺。 
本发明是由以下技术方案实现的,一种高精度的火箭撬施工工艺,首先在箱梁位置两侧安装模板,在模板内安装钢筋网笼;在钢筋网笼上面沿着箱梁纵向拉相互平行的两条直线,根据拉直线的走向将预埋钢板初步安装到位,然后在模板上架设槽钢横梁,槽钢横梁上根据图纸设计尺寸打螺栓孔,安装螺栓并分别通过螺帽组和槽钢横梁固定;对预埋钢板平整度检测,螺栓与预埋钢板焊接,再将立柱分别插到预埋钢板的立柱孔内并焊接在一起,预埋件全部安装就位后,用钢丝拉线检查其顺直度,最后浇注混凝土,砼浇筑完毕并凝固后,松开槽钢横梁上部螺母,将槽钢横梁及模板拆除。 
本发明工艺适用于预埋件构造复杂、安装位置精度要求高的预埋件的安装。解决了火箭撬的箱梁预埋件数量多、安装精度高的问题,为火箭撬的轨道安装奠定了基础,为今后复杂预埋件高质量、高精度、高标准施工提供了新的思路。 
本发明的优点:可以将预埋件化整为零,分步安装,将复杂的预埋件化整为零,分步安装,安装误差分步控制。有效解决了当预埋件锚固钢筋多且箱梁内配筋密集时,传统预埋所造成误差不易调整的问题。 
精细测量,构件准确放样,在分布安装施工过程中,可以不断采用精密仪器对其放样、校核,复测以确保构件的位置准确。 
增设槽钢横梁对预埋件准确定位,通过在箱梁两侧模板上架设槽钢横梁,槽钢横梁上打螺栓孔,利用螺栓孔固定预埋螺栓,对预埋件螺栓准确定位。 
附图说明
图1为本发明工艺施工安装完成后的梁箱结构示意图 
图2为图1的俯视图
图3为预埋件的俯视图 
图4为预埋件的侧视图
图5为预埋件的正视图
 图6为H型钢柱结构示意图
图7为图6的俯视图
 图中:1-立柱、2-模板、3-螺帽组、4-螺栓、5-螺帽组、6-螺栓、7-槽钢横梁、8-螺帽组、9-螺栓、10-螺帽组、11-螺栓、12-预埋钢板、13-立柱、14-模板、15-预埋钢板、16-立柱孔、17-立柱孔、18-直线、19-直线。
具体实施方式
该工程轨道全长9000m,轨道支撑在600榀箱梁上,每榀箱梁上部两侧埋设有2排共30组预埋件。每组预埋件由400×500×8钢板、 2根φ36长650螺栓、1个388长H型钢立柱并焊有1根φ36横向螺栓三个部分组成,预埋件构造复杂。其具体施工技术如下: 
预埋件半成品进场,先检查钢板是否平整且完好无损。检查方法为:将钢板放于水平钢板上,目测钢板四边是否有翘头;如有翘头,则进行校正,平整度误差为±1㎜;如无翘头且完好无损,方可使用。采用游标卡尺检测螺栓的直径,用钢板尺检测钢板上螺栓孔的间距、螺栓和型钢立柱的尺寸,并检查螺栓的丝扣有无破损。特别注意预埋件所用材料的材质必须符合设计及规范要求,并有产品质量证明书。使用游标卡尺对进场螺栓进行复测以保证质量。
一种高精度的火箭撬施工工艺,如图1、2所示意,首先在箱梁位置两侧安装模板2、14,在模板2、14内安装钢筋网笼; 
根据设计图纸预埋钢板位置,在钢筋网笼上面沿着箱梁纵向拉相互平行的两条直线19、18,根据拉直线的走向将预埋钢板15、12初步安装到位,
根据图纸的位置尺寸,在已加固合格的外模板上确定位置线,将加固预埋件的槽钢横梁7采用螺栓固定于模板2、14上,
槽钢横梁7上根据图纸设计尺寸打螺栓孔,安装螺栓4、6、9、11并通过螺帽组3、5、8、10和槽钢横梁7固定;槽钢横梁采用12号槽钢,根据图纸位置尺寸,用比螺栓大一个规格的不锈钢开孔器在槽钢横梁上开孔。固定预埋件横梁所用槽钢不得有变形等缺陷;并用DT—202L电子经纬仪(精度为2〞)找出螺栓的准确位置后,并用钢板尺对其间距进行校正。
在螺栓位置校核无误后,使用螺帽组在横梁上下两面固定螺栓。在螺栓就位与横梁固定好后,先在螺栓头部套一层定制的塑料套,然后在整个预埋件上部盖一用竹胶板制作的方形保护盒; 
对所有的预埋钢板平整度检测,用DL501水准仪(精度为±0.2㎜)抄出每块钢板的标高,并进行校正,保证水平。
如图3、4、5所示意,任意预埋件的结构相同,以其一为例,预埋钢板15上设有两个螺栓孔和一个立柱孔16,立柱孔16内穿设立柱1. 
螺栓4、6、9、11分别与预埋钢板15、12焊接,注意是校核高程后与预埋钢板焊接固定。
如图6、7所示意,立柱的结构包括一个H型钢和一个螺杆。 
再将立柱1、13分别插到预埋钢板15、12的立柱孔16、17内并焊接在一起,预埋件全部安装就位后,用钢丝拉线检查其顺直度,每组的两个螺栓之间的距离用钢尺测量。最后浇注混凝土,砼浇筑完毕并凝固后,松开槽钢横梁上部螺母,将槽钢横梁及模板拆除。 
箱梁施工地区,气候极端恶劣,在砼浇筑完毕,箱梁模板拆除后,要及时给螺栓上油,并重新套上定制的塑料套,保护成品。浇筑过程中加强对工人说服教育,避免砼及振捣棒直接冲击预埋螺栓,减少人为因素造成的误差。钢板与下部钢筋焊接、螺栓与钢板、钢板与型钢柱的点焊必须牢固,确保浇筑箱梁砼时不松动位移。 
主要机械设备配置表
序号 机械或设备名称 型号规格精度 单位 数量
1 电子经纬仪 DT—202L(2〞) 1
2 精密水准仪 DL501(0.2mm) 2
3 钢尺 10m 4
4 钢板尺 0—1000mm 5
5 钢板尺 0—600mm 5
6 游标卡尺 0.1mm 5
7 电焊机 BX1-500 2
8 不锈钢专用开孔器 A38 5
质量标准
序号 检查项目 允许偏差 检查方法
1 同一预埋件两个螺栓安装中心间距 +1,0 用尺量
2 两排螺栓间距 +1,0 用尺量
3 纵向螺栓安装直线度 ±1 经纬仪测量
4 螺栓的垂直度 2 用尺量
5 钢板安装标高 ±2 水准仪测量
6 钢板平整度 ±1 用尺量

Claims (1)

1.一种火箭撬施工工艺,其特征是步骤为,首先在箱梁位置两侧安装模板(2、14),在模板(2、14)内安装钢筋网笼;在钢筋网笼上面沿着箱梁纵向拉相互平行的两条直线(19、18),根据拉直线的走向将预埋钢板(15、12)初步安装到位,然后在模板(2、14)上架设槽钢横梁(7),槽钢横梁(7)上根据图纸设计尺寸打螺栓孔,安装螺栓(4、6、9、11)并分别通过螺帽组(3、5、8、10)和槽钢横梁(7)固定;对预埋钢板(15、12)平整度检测,螺栓(4、6、9、11)分别与预埋钢板(15、12)焊接,再将立柱(1、13)分别插到预埋钢板(15、12)的立柱孔(16、17)内并焊接在一起,预埋件全部安装就位后,用钢丝拉线检查其顺直度,最后浇注混凝土,砼浇筑完毕并凝固后,松开槽钢横梁上部螺母,将槽钢横梁及模板拆除。
CN2011104034573A 2011-12-07 2011-12-07 火箭撬施工工艺 Active CN102505585B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011104034573A CN102505585B (zh) 2011-12-07 2011-12-07 火箭撬施工工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011104034573A CN102505585B (zh) 2011-12-07 2011-12-07 火箭撬施工工艺

Publications (2)

Publication Number Publication Date
CN102505585A CN102505585A (zh) 2012-06-20
CN102505585B true CN102505585B (zh) 2013-12-11

Family

ID=46217714

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011104034573A Active CN102505585B (zh) 2011-12-07 2011-12-07 火箭撬施工工艺

Country Status (1)

Country Link
CN (1) CN102505585B (zh)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104746529B (zh) * 2015-03-30 2016-07-06 河南省第二建筑工程发展有限公司 一种预埋槽钢安装工具
CN113684763B (zh) * 2021-08-17 2023-02-03 中铁北京工程局集团第一工程有限公司 一种基于弓弦式中线定位法的异形箱梁架设施工工艺

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2526146Y (zh) * 2001-07-20 2002-12-18 杨明 预埋铁座定位装置
ES2261024B1 (es) * 2004-07-29 2007-09-16 Atros España, S.A. Sistema modular de alta seguridad para soporte provisional de vias ferreas en circulacion durante los trabajos bajo via.
JP5276801B2 (ja) * 2007-05-25 2013-08-28 東日本旅客鉄道株式会社 省力化軌道の補強方法
CN201648890U (zh) * 2010-03-17 2010-11-24 中国建筑土木建设有限公司 轨道板曲线段施工抗位移控制架

Also Published As

Publication number Publication date
CN102505585A (zh) 2012-06-20

Similar Documents

Publication Publication Date Title
CN105040717B (zh) 地脚螺栓固定支架及安装方法
CN101985826B (zh) 一种大型混凝土箱梁高空分段预制、移梁、存梁、拼装的施工方法
CN106436579A (zh) 异形截面节段梁短线台位匹配法线形控制方法及装置
CN110318340B (zh) 一种悬臂施工挂篮模板快速定位装置及定位方法
CN112376606A (zh) 一种设备基础地脚螺栓安装模具及其施工方法
CN102720362A (zh) 一种高精度钢筋混凝土反力墙施工工艺
CN107336346A (zh) 一种制梁台座
CN110549487A (zh) 可移动预制箱梁腹板钢筋定位胎架及其施工方法
CN102505585B (zh) 火箭撬施工工艺
CN115977398A (zh) 一种方钢套管组合件定位安装的施工方法
CN114086467A (zh) 一种钢混组合梁桥面板预制安装施工方法
CN201172971Y (zh) 一种控制混凝土原浆地面平整度的施工控制装置
CN103696410A (zh) 齿轮齿条爬升式垂直升船机螺母柱高效安装方法及辅助装置
CN109163834A (zh) 现浇梁预压监测装置
CN106351246A (zh) T型螺栓直径≤48mm的整体式套筒安装方法
CN211714567U (zh) 一种间距可调的爬模装置
CN109822282B (zh) 一种反力墙、反力台座用加载孔单元焊接工装
CN101844210A (zh) 连铸机弧形段支承结构及其安装方法
CN108425321B (zh) 一种新型变截面桥梁线性控制装置的安装方法
CN105735228A (zh) 高扬程齿爬式升船机齿条系统施工方法及安装精度控制方法
CN116590967A (zh) 一种高架区间磁浮道岔顶推接驳精度控制方法
CN102587283B (zh) 一种现浇混凝土桥梁的现浇施工方法
CN203855865U (zh) 高速铁路无砟整体道床施工用双块单梁式轨道排架
CN210658021U (zh) 一种悬臂施工挂篮模板快速定位装置
CN110185479B (zh) 隧道二衬环向钢筋定位控制装置及其使用方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Wang Changwei

Inventor after: Zhu Haiwei

Inventor after: Wei Zhi

Inventor after: Huo Xiaomei

Inventor after: Zhu Yongqing

Inventor after: Du Weiping

Inventor after: Wang Xudong

Inventor after: Chang Yanni

Inventor after: Jin Bin

Inventor after: Guo Meiqing

Inventor before: Wei Zhi

Inventor before: Huo Xiaomei

Inventor before: Zhu Yongqing

Inventor before: Du Weiping

Inventor before: Wang Xudong

Inventor before: Chang Yanni

Inventor before: Jin Bin

Inventor before: Guo Meiqing

Inventor before: Zhu Haiwei

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: WEI ZHI HUO XIAOMEI ZHU YONGQING DU WEIPING WANG XUDONG CHANG YANNI JIN BIN GUO MEIQING ZHU HAIWEI TO: WANG CHANGWEI WEI ZHI HUO XIAOMEI ZHU YONGQING DU WEIPING WANG XUDONG CHANG YANNI JIN BIN GUO MEIQING ZHU HAIWEI

CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Wei Zhi

Inventor after: Zhu Haiwei

Inventor after: Wang Changwei

Inventor after: Huo Xiaomei

Inventor after: Zhu Yongqing

Inventor after: Du Weiping

Inventor after: Wang Xudong

Inventor after: Chang Yanni

Inventor after: Jin Bin

Inventor after: Guo Meiqing

Inventor before: Wang Changwei

Inventor before: Zhu Haiwei

Inventor before: Wei Zhi

Inventor before: Huo Xiaomei

Inventor before: Zhu Yongqing

Inventor before: Du Weiping

Inventor before: Wang Xudong

Inventor before: Chang Yanni

Inventor before: Jin Bin

Inventor before: Guo Meiqing