CN102502365B - 热工巡检仪专用双向绕线器 - Google Patents
热工巡检仪专用双向绕线器 Download PDFInfo
- Publication number
- CN102502365B CN102502365B CN201110328777.7A CN201110328777A CN102502365B CN 102502365 B CN102502365 B CN 102502365B CN 201110328777 A CN201110328777 A CN 201110328777A CN 102502365 B CN102502365 B CN 102502365B
- Authority
- CN
- China
- Prior art keywords
- bobbin winoler
- rocking handle
- wire
- take
- furnished
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Storage Of Web-Like Or Filamentary Materials (AREA)
Abstract
本发明涉及测试仪器附件,具体涉及热工巡检仪专用双向绕线器。该绕线器内部固定座与上、下收线轮间布置有2个轴承,保证2个收线轮独立转动,分别收布传感器端与记录仪端导线且互不缠绕,1侧表面挖有凹槽收纳传感器确保其安全无损,双侧表面均有3个六棱柱突起和凹陷,可实现几十路绕线器互相串接成串,节省空间,该装置配有摇柄座使绕线器受力均匀,摇柄座可收纳于任何1个绕线器上,摇柄则可收纳于任何1个绕线器摇柄收纳槽内,穿线孔用于整根导线的连接。本发明的优点是构造科学合理,收布导线快速方便不缠绕,节省测试空间,避免传感器不必要损坏,节约人力、物力、财力。
Description
技术领域
本发明涉及测试仪器技术领域,具体涉及热工巡检仪专用双向绕线器。
背景技术
热工巡检仪通常涉及多达几十路测点,测试用导线一侧接传感器,另一侧与记录仪相连,导线总长十余米,如无绕线器辅助,布置后常常是满地线缆并且极易互相缠绕,测试完毕收线是痛苦不堪,而传感器极有可能在运输、收线时损坏,维修则不仅另需费用且耽误下一次测试,造成不必要的人力、物力、财力浪费。
发明内容
本发明的目的是针对前述测试中实际问题,创造一种实用热工巡检仪专用双向绕线器,达到双向安全、快速布线收线并且确保传感器安全,节约人力、物力、财力。
为了实现上述目的,本发明的技术方案为:热工巡检仪专用双向绕线器,该双向绕线器内部固定座1与上、下收线轮间布置有2个轴承,保证2个收线轮独立转动,分别收布传感器端与记录仪端导线且互不缠绕,该双向绕线器配有摇柄座4使绕线器受力均匀,摇柄座4可收纳于绕线器上,摇柄5则可收纳于双向绕线器摇柄收纳槽9内,穿线孔10用于整根导线的连接,其特征在于:双向绕线器一侧表面挖有凹槽(6)收纳传感器确保其安全无损,双向绕线器双侧表面均有3个六棱柱突起(7)和凹陷(8)。可实现几十路绕线器互相串接成串,节省空间,该装置配有摇柄座使双向绕线器受力均匀,摇柄座可收纳双向绕线器上,摇柄则可收纳双向绕线器摇柄收纳槽内,穿线孔用于整根导线的连接。
本发明的优点是构造科学合理,收布导线快速方便不缠绕,节省测试空间,避免传感器不必要损坏。
附图说明
图1是本发明热工巡检仪专用双向绕线器的示意图。
图2是绕线器互相串接示意图。
图3是绕线器摇柄连接示意图。
具体实施方式
为了对发明做进一步说明,现结合实例加以阐明。
该双向绕线器内部固定座1与上收线轮3和下收线轮2间布置有2个轴承,保证2个收线轮独立转动,分别收布传感器端与记录仪端导线且互不缠绕,双向绕线器一侧表面挖有凹槽6收纳传感器确保其安全无损,双向绕线器双侧表面均有3个六棱柱突起7和凹陷8,可实现几十路双向绕线器互相串接成串,节省空间,该装置配有摇柄座4使双向绕线器受力均匀,摇柄座4可收纳于任何1个双向绕线器上,摇柄5则可收纳于任何1个双向绕线器摇柄收纳槽9内,穿线孔10用于整根导线的连接。实际使用时,先定好双向绕线器串接地点,取出传感器,按图3安装摇柄,摇动上轮布置传感器测点,摇动下轮将导线连至记录仪,收线时反向操作。
Claims (1)
1.热工巡检仪专用双向绕线器,该双向绕线器内部固定座(1)与上收线轮(3)和下收线轮(2)间布置有2个轴承,保证2个收线轮独立转动,分别收布传感器端与记录仪端导线且互不缠绕,该双向绕线器配有摇柄座(4)使双向绕线器受力均匀,摇柄座(4)可收纳于双向绕线器上,摇柄(5)则可收纳于双向绕线器摇柄收纳槽(9)内,穿线孔(10)用于整根导线的连接,其特征在于:双向绕线器一侧表面挖有凹槽(6)收纳传感器确保其安全无损,双向绕线器双侧表面均有3个六棱柱突起(7)和凹陷(8)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110328777.7A CN102502365B (zh) | 2011-10-26 | 2011-10-26 | 热工巡检仪专用双向绕线器 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110328777.7A CN102502365B (zh) | 2011-10-26 | 2011-10-26 | 热工巡检仪专用双向绕线器 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102502365A CN102502365A (zh) | 2012-06-20 |
CN102502365B true CN102502365B (zh) | 2015-11-25 |
Family
ID=46214516
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110328777.7A Expired - Fee Related CN102502365B (zh) | 2011-10-26 | 2011-10-26 | 热工巡检仪专用双向绕线器 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102502365B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103166162B (zh) * | 2013-03-28 | 2015-08-12 | 中航锂电(洛阳)有限公司 | 理线装置及使用该理线装置的理线方法 |
CN105775888A (zh) * | 2016-04-08 | 2016-07-20 | 朱德仲 | 一种粗电线放卷轮机构 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09195653A (ja) * | 1996-01-17 | 1997-07-29 | Iris Ohyama Inc | ホースリール付き踏み台 |
JPH09194147A (ja) * | 1996-01-16 | 1997-07-29 | Iris Ohyama Inc | ホースリール付き踏み台 |
CN2546420Y (zh) * | 2002-05-23 | 2003-04-23 | 黄月云 | 具串联式收线盒 |
CN2626162Y (zh) * | 2003-04-22 | 2004-07-14 | 魏国扬 | 线材之集线装置 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6942172B2 (en) * | 2003-09-05 | 2005-09-13 | Steven William Thomas | Reel |
-
2011
- 2011-10-26 CN CN201110328777.7A patent/CN102502365B/zh not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09194147A (ja) * | 1996-01-16 | 1997-07-29 | Iris Ohyama Inc | ホースリール付き踏み台 |
JPH09195653A (ja) * | 1996-01-17 | 1997-07-29 | Iris Ohyama Inc | ホースリール付き踏み台 |
CN2546420Y (zh) * | 2002-05-23 | 2003-04-23 | 黄月云 | 具串联式收线盒 |
CN2626162Y (zh) * | 2003-04-22 | 2004-07-14 | 魏国扬 | 线材之集线装置 |
Also Published As
Publication number | Publication date |
---|---|
CN102502365A (zh) | 2012-06-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102798660A (zh) | 基于三轴漏磁与电涡流的管道内外壁缺陷检测装置及方法 | |
SG165351A1 (en) | Method and system for passively detecting and locating wire harness defects | |
CN103983525A (zh) | 测定frp-混凝土单面剪切性能的测试装置和测定方法 | |
CN102502365B (zh) | 热工巡检仪专用双向绕线器 | |
CN101907537A (zh) | 色带拉力测试装置 | |
CN102735902A (zh) | 高温超导导线拉力测试设备及其测试方法 | |
CN201763312U (zh) | 带有振动解卡功能的测井马笼头 | |
CN202256126U (zh) | 一种用于测试纸板层间接合强度的夹具 | |
CN203582188U (zh) | 一种测试电缆性能用卷绕装置 | |
CN204086019U (zh) | 一种便捷式冰的垂直粘接力测试装置 | |
JP6059943B2 (ja) | 構造物のき裂監視装置 | |
CN203894126U (zh) | 测定frp-混凝土单面剪切性能的测试装置 | |
DE602005004621D1 (de) | Messsensor | |
CN201819664U (zh) | 位移传感器量程放大装置 | |
CN103663000A (zh) | 一种滑动式测斜仪的电缆缠绕装置 | |
CN105300450A (zh) | 新型电缆检测装置 | |
CN203981803U (zh) | 光学电场传感器监测绝缘子装置 | |
CN203732508U (zh) | 一种支柱绝缘子振动声学检测装置的便携式集成箱 | |
CN204346704U (zh) | 自制负载试验台 | |
CN210198778U (zh) | 一种伸缩式水样检测取样装置 | |
CN205397684U (zh) | 一种通过现场绕制线圈进行索体检测的装置 | |
CN105565065A (zh) | 一种通过现场绕制线圈进行索体检测的装置及方法 | |
CN203808971U (zh) | 一种矿山液压钻机姿态监控装置 | |
CN207263866U (zh) | 一种便携式校验仪用多功能检测线 | |
CN105866508B (zh) | 柔性光纤在线电流测试钳 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151125 Termination date: 20171026 |