CN102497033B - Substation operation visualization realization method and system thereof - Google Patents

Substation operation visualization realization method and system thereof Download PDF

Info

Publication number
CN102497033B
CN102497033B CN201110456441.9A CN201110456441A CN102497033B CN 102497033 B CN102497033 B CN 102497033B CN 201110456441 A CN201110456441 A CN 201110456441A CN 102497033 B CN102497033 B CN 102497033B
Authority
CN
China
Prior art keywords
module
data
substation
utilize
monitoring system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201110456441.9A
Other languages
Chinese (zh)
Other versions
CN102497033A (en
Inventor
吴万港
冯贵宾
张加斌
甘百新
何焱
晋伟平
白彪
杨义兴
朱兴柯
李卫
李长生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG DAHUA SYSTEM ENGINEERING CO LTD
Puer Supply Power Bureau of Yunnan Power Grid Co Ltd
Original Assignee
ZHEJIANG DAHUA SYSTEM ENGINEERING CO LTD
Puer Supply Power Bureau of Yunnan Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG DAHUA SYSTEM ENGINEERING CO LTD, Puer Supply Power Bureau of Yunnan Power Grid Co Ltd filed Critical ZHEJIANG DAHUA SYSTEM ENGINEERING CO LTD
Priority to CN201110456441.9A priority Critical patent/CN102497033B/en
Publication of CN102497033A publication Critical patent/CN102497033A/en
Application granted granted Critical
Publication of CN102497033B publication Critical patent/CN102497033B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Alarm Systems (AREA)

Abstract

The invention discloses a method for realizing a visualization substation integration information platform. Through setting an IEC61850 protocol converter and an environment host between an integrated substation automation system and a substation video monitoring system, communication and video linkage can be performed between the integrated substation automation system and the substation video monitoring system, wherein the IEC61850 protocol converter and the environment host are connected with each other. The invention also discloses a system for realizing the method. According to the invention, based on electric power industry safety management regulations (a safety I area is allowed to perform one-way data transmission to a safety III area), the safety communication can be performed between the integrated substation automation system and the substation video monitoring system and the video linkage can be further realized so that a user can visually know an operation state of primary equipment in the current substation and visually observe a control action of the primary equipment.

Description

The visual implementation method of a kind of power transformation operation and system
Technical field
The present invention relates to the integrated information platform implementation method of a kind of transformer station and system, relate in particular to implementation method and the system of a kind of visual transformer station integrated information platform.
Background technology
Comprehensive automation system of transformer substation is realized to the in-service monitoring of primary equipment, protection and control, for user provides a real-time online primary equipment condition monitoring system.And user cannot pass through the operation conditions of the current transforming plant primary equipment of the visual understanding of comprehensive automation system of transformer substation, more can not observe intuitively the control action for primary equipment.
Video monitoring system for substation has solved the storage optimization of the position such as crucial scene, key equipment, escape way in transformer station for user.Comprehensive automation system of transformer substation is considered to primary system, is deployed the district with safe I; Video monitoring system for substation is considered to the electrical secondary system of the normal operation of auxiliary substation, be deployed the district with safe III, due to the needs in power industry safety management, between safe I district and safe III, forbid existing escape way, therefore between comprehensive automation system of transformer substation and video monitoring system for substation without data interaction, form two completely isolated systems.
Summary of the invention
The object of the invention is to, implementation method and the system of a kind of visual transformer station integrated information platform is provided.This invention is based on power industry safety management regulation (allowing safe I district to safe III district one-way transmission data) in the situation that, can make to carry out between comprehensive automation system of transformer substation and video monitoring system for substation safe communication, and further realize video interlink, make the operation conditions that user can the current transforming plant primary equipment of visual understanding, and observe intuitively the control action for primary equipment.
For solving the problems of the technologies described above, the present invention adopts following technical scheme: a kind of method that realizes visual transformer station integrated information platform, it is characterized in that: by connected IEC61850 protocol converter and environment main frame are set between comprehensive automation system of transformer substation and video monitoring system for substation, make between comprehensive automation system of transformer substation and video monitoring system for substation, can communicate and carry out video interlink; IEC61850 protocol converter is realized the communication between comprehensive automation system of transformer substation and video monitoring system for substation, and environment main frame is realized the video interlink between comprehensive automation system of transformer substation and video monitoring system for substation.
In the aforesaid method that realizes visual transformer station integrated information platform, described IEC61850 protocol converter comprises production module, data buffering module and consumption module; Described environment main frame comprises that environment receiver module, environment sending module, environmental modeling module, environmental analysis module, environment logical node set up module; Video monitoring system for substation comprises transformer substation video monitor supervision platform, video monitoring system for substation administrative client, DVR and video camera.
In the aforesaid method that realizes visual transformer station integrated information platform, the described method that realizes the communication between comprehensive automation system of transformer substation and video monitoring system for substation is:
A. utilize production module to receive the data A that comprehensive automation system of transformer substation produces, and several A certificates are stored in data buffering module;
B. utilize consumption module to extract data from data buffering module, and data A is converted to the data a based on IEC61850; Then data a is converted to logical node B, and sends to environment main frame;
C. utilize the logical node B obtaining in receiver module receiving step B; Utilize environment sending module that logical node B is sent to video monitoring system for substation.
In the aforesaid method that realizes visual transformer station integrated information platform, the described method that realizes the video interlink between comprehensive automation system of transformer substation and video monitoring system for substation is:
D. utilize environment receiver module to receive the data object data model D of the expression interaction relation of video monitoring system for substation foundation;
E. utilize the data model D that environmental modeling module establishment step D obtains to set up interlock bivariate table model R (Src_Do, Camera, Camera_Pos, Action);
F. utilize environment receiver module to receive the logical node B that IEC61850 protocol converter sends;
G. the Src_Do in bivariate table model R searches to logical node B to utilize environmental analysis module, if find, utilizes environment logical node to set up module according to Camera in bivariate table model R, Camera_Pos, and Action creates interlock logical node G; Otherwise video interlink finishes;
H. utilize environment sending module that interlock logical node G is sent to transformer substation video monitor supervision platform, interlock logical node G is sent to DVR simultaneously, by DVR, send cradle head control order to corresponding video camera;
I. transformer substation video monitor supervision platform sends to video monitoring system for substation administrative client by interlock logical node G;
J. video monitoring system for substation administrative client is had access to video camera real-time video by transformer substation video monitor supervision platform.
In the aforesaid method that realizes visual transformer station integrated information platform, described steps A and step B are specially:
A. utilize network receiver module to receive network event from comprehensive automation system of transformer substation;
B. utilize network event processing module to process network event; If Accept event, receives and new connection puts into event queue; If Write event, increases and writes counting; If Read event, reads the data in network, and stores data into data buffering module.
C. utilize data read module from data buffering module, to read pending data;
D. utilize data processing module to process the data that are read.
E. utilize the protocol type of agreement judge module judgement data, obtain the protocol type of these data;
F. utilize the protocol type of these data that translation module obtains according to step e and the mapping table of given this kind of agreement and IEC61850, translation obtains the data f of these data based on IEC61850;
G. the data f that utilizes data judge module to obtain according to the rule analysis step f of IEC61850, specified data f is analog acquisition value or switch acquisition value;
If h. data f is analog acquisition value, utilize model building module, according to the rule of IEC61850, it is set up to data object model H; Be specially data object oriented is added to I, II, the suffix sequence number of III represents three kinds of different data object models of middling speed message (three grades) of 1a tripping operation (one-level), 1b control command (secondary) and measured value; If data f is switch acquisition value, utilize model building module, according to the rule of IEC61850, it is set up to data object model h; Be specially data object oriented is added to i, ii, the suffix sequence number of iii represents three kinds of different data object models of middling speed message (three grades) of 1a tripping operation (one-level), 1b control command (secondary) and measured value;
I. utilize self-checking alarming module by model building module, to adopt general inputoutput data object to set up self-checking alarming object model I or self-checking alarming object model i the data object model H in step h or data object model h;
J. utilizing functional analysis module to obtain self-checking alarming object model I that data object model H and step I obtain or step h to step h obtains the self-checking alarming object model i that data object model h and step I obtain and analyzes, be specially, utilize functional analysis module to judge 1a tripping operation (one-level) data object in self-checking alarming object model I and middling speed message (three grades) the data object numerical value of measured value, if above-mentioned two numerical value have one at least not in preset range, produce action alarm source, target action device id, the tripartite relationship table of type of action, utilize model building module tripartite relationship table to be set up to the data object model J that represents action, otherwise processing finishes, utilize functional analysis module to judge 1a tripping operation (one-level) data object in self-checking alarming object model i and middling speed message (three grades) the data object numerical value of measured value, if above-mentioned two numerical value have at least one to be not equal to preset value, produce the tripartite relationship table of action alarm source, target action device id, type of action, utilize model building module tripartite relationship table to be set up to the data object model j that represents action, otherwise processing finish,
K. utilize logical node to set up module and will represent that the data object model J moving sets up logical node K and maybe will represent that the data object model j of action sets up logical node k;
1. utilize sending module, to logical node K or logical node k, transmission order is set, send it to environment main frame.
A system that realizes aforementioned visual transformer station integrated information platform method, comprises connected successively comprehensive automation system of transformer substation, IEC61850 protocol converter, environment main frame and video monitoring system for substation.
In the aforesaid system that realizes aforementioned visual transformer station integrated information platform method, described IEC61850 protocol converter comprises successively connected production module, data buffering module and consumption module, production module is also connecting comprehensive automation system of transformer substation, and consumption module is also connecting video monitoring system for substation.
In the aforesaid system that realizes aforementioned visual transformer station integrated information platform method, described production module comprises connected network receiver module and network event processing module, network receiver module also connects comprehensive automation system of transformer substation and data buffering module, and network event processing module is connection data buffer module also; Consumption module comprises connected successively data read module and data processing module, and data read module is connection data buffer module also, and data processing module also connects video monitoring system for substation; Data processing module comprises successively connected agreement judge module, translation module, data judge module and model building module, model building module is also connecting self-checking alarming module, functional analysis module and logical node and is setting up module, and logical node is set up module and also connected sending module; Agreement judge module is also connecting data read module, and sending module is also connecting video monitoring system for substation; Data buffering module comprises data storage module, data storage module is connecting data management module, Space Expanding module, spatial limitation module and production capacity limiting module, data storage module is also connecting production module and consumption module, and production capacity limiting module is connecting network receiver module.
In the aforesaid system that realizes aforementioned visual transformer station integrated information platform method, described environment main frame comprises that successively connected environment receiver module, environmental analysis module, environment logical node set up module and environment sending module; Environment receiver module is also connecting environmental modeling module, IEC61850 protocol converter and video monitoring system for substation, and environmental analysis module is also connecting environmental modeling module, and environment sending module is also connecting video monitoring system for substation.
In the aforesaid system that realizes aforementioned visual transformer station integrated information platform method, described video monitoring system for substation comprises successively connected video monitoring system for substation administrative client, transformer substation video monitor supervision platform, DVR and video camera; Transformer substation video monitor supervision platform is also being connected environment main frame with DVR.
Compared with prior art, the present invention adopts technique scheme, based on power industry safety management regulation (allowing safe I district to safe III district one-way transmission data) in the situation that, make can carry out safe communication between comprehensive automation system of transformer substation and video monitoring system for substation, and further realize video interlink, make the operation conditions that user can the current transforming plant primary equipment of visual understanding, and observe intuitively the control action for primary equipment.
Accompanying drawing explanation:
Fig. 1 is system configuration schematic diagram of the present invention;
Fig. 2 is communication flow diagram of the present invention;
Fig. 3 is video interlink flow chart of the present invention;
Fig. 4 is the flow chart that data of the present invention are produced;
Fig. 5 is the flow chart of data consumption of the present invention;
Fig. 6 is the flow chart of data processing of the present invention;
Fig. 7 is the protocol converter structural representation in the present invention.
Reference numeral:
1-comprehensive automation system of transformer substation, 2-IEC61850 protocol converter, 3-environment main frame, 4-video monitoring system for substation, 5-production module, 6-data buffering module, 7-consumes module, 8-environment receiver module, 9-environmental analysis module, 10-environment logical node is set up module, 11-environment sending module, 12-environmental modeling module, 13-video monitoring system for substation administrative client, 14-transformer substation video monitor supervision platform, 15-DVR, 16-video camera, 17-network receiver module, 18-network event processing module, 19-data read module, 20-data processing module, 21-agreement judge module, 22-translation module, 23-data judge module, 24-model building module, 25-self-checking alarming module, 26-functional analysis module, 27-logical node is set up module, 28-sending module, 29-data storage module, 30-data management module, 31-Space Expanding module, 32-spatial limitation module, 33-production capacity limiting module.
Below in conjunction with the drawings and specific embodiments, the present invention is further illustrated, but not as the foundation to the present invention's restriction.
Embodiment
Embodiment.
A kind of method that realizes visual transformer station integrated information platform, as shown in Figures 2 and 3, by connected IEC61850 protocol converter and environment main frame are set between comprehensive automation system of transformer substation and video monitoring system for substation, make between comprehensive automation system of transformer substation and video monitoring system for substation, can communicate and carry out video interlink; IEC61850 protocol converter is realized the communication between comprehensive automation system of transformer substation and video monitoring system for substation, and environment main frame is realized the video interlink between comprehensive automation system of transformer substation and video monitoring system for substation.IEC61850 protocol converter comprises production module, data buffering module and consumption module; Described environment main frame comprises that environment receiver module, environment sending module, environmental modeling module, environmental analysis module, environment logical node set up module; Video monitoring system for substation comprises transformer substation video monitor supervision platform, video monitoring system for substation administrative client, DVR and video camera.
As shown in Figure 2, the method that realizes the communication between comprehensive automation system of transformer substation and video monitoring system for substation is:
A. utilize production module to receive the data A that comprehensive automation system of transformer substation produces, and several A certificates are stored in data buffering module;
B. utilize consumption module to extract data from data buffering module, and data A is converted to the data a based on IEC61850; Then data a is converted to logical node B, and sends to environment main frame;
C. utilize the logical node B obtaining in receiver module receiving step B; Utilize environment sending module that logical node B is sent to video monitoring system for substation.
As shown in Figure 3, the method that realizes the video interlink between comprehensive automation system of transformer substation and video monitoring system for substation is:
D. utilize environment receiver module to receive the data object data model D of the expression interaction relation of video monitoring system for substation foundation;
E. utilize the data model D that environmental modeling module establishment step D obtains to set up interlock bivariate table model R (Src_Do, Camera, Camera_Pos, Action);
F. utilize environment receiver module to receive the logical node B that IEC61850 protocol converter sends;
G. the Src_Do in bivariate table model R searches to logical node B to utilize environmental analysis module, if find, utilizes environment logical node to set up module according to Camera in bivariate table model R, Camera_Pos, and Action creates interlock logical node G; Otherwise video interlink finishes;
H. utilize environment sending module that interlock logical node G is sent to transformer substation video monitor supervision platform, interlock logical node G is sent to DVR simultaneously, by DVR, send cradle head control order to corresponding video camera;
I. transformer substation video monitor supervision platform sends to video monitoring system for substation administrative client by interlock logical node G;
J. video monitoring system for substation administrative client is had access to video camera real-time video by transformer substation video monitor supervision platform.
As Figure 4-Figure 6, steps A and step B are specially:
A. utilize network receiver module to receive network event from comprehensive automation system of transformer substation;
B. utilize network event processing module to process network event; If Accept event, receives and new connection puts into event queue; If Write event, increases and writes counting; If Read event, reads the data in network, and stores data into data buffering module; Above two steps are that data are produced;
C. utilize data read module from data buffering module, to read pending data;
D. utilize data processing module to process the data that are read; Above two steps are data consumption;
E. utilize the protocol type of agreement judge module judgement data, obtain the protocol type of these data;
F. utilize the protocol type of these data that translation module obtains according to step e and the mapping table of given this kind of agreement and IEC61850, translation obtains the data f of these data based on IEC61850;
G. the data f that utilizes data judge module to obtain according to the rule analysis step f of IEC61850, specified data f is analog acquisition value or switch acquisition value;
If h. data f is analog acquisition value, utilize model building module, according to the rule of IEC61850, it is set up to data object model H; Be specially data object oriented is added to I, II, the suffix sequence number of III represents three kinds of different data object models of middling speed message (three grades) of 1a tripping operation (one-level), 1b control command (secondary) and measured value; If data f is switch acquisition value, utilize model building module, according to the rule of IEC61850, it is set up to data object model h; Be specially data object oriented is added to i, ii, the suffix sequence number of iii represents three kinds of different data object models of middling speed message (three grades) of 1a tripping operation (one-level), 1b control command (secondary) and measured value;
I. utilize self-checking alarming module by model building module, to adopt general inputoutput data object to set up self-checking alarming object model I or self-checking alarming object model i the data object model H in step h or data object model h;
J. utilizing functional analysis module to obtain self-checking alarming object model I that data object model H and step I obtain or step h to step h obtains the self-checking alarming object model i that data object model h and step I obtain and analyzes, be specially, utilize functional analysis module to judge 1a tripping operation (one-level) data object in self-checking alarming object model I and middling speed message (three grades) the data object numerical value of measured value, if above-mentioned two numerical value have one at least not in preset range, produce action alarm source, target action device id, the tripartite relationship table of type of action, utilize model building module tripartite relationship table to be set up to the data object model J that represents action, otherwise processing finishes, utilize functional analysis module to judge 1a tripping operation (one-level) data object in self-checking alarming object model i and middling speed message (three grades) the data object numerical value of measured value, if above-mentioned two numerical value have at least one to be not equal to preset value, produce the tripartite relationship table of action alarm source, target action device id, type of action, utilize model building module tripartite relationship table to be set up to the data object model j that represents action, otherwise processing finish,
K. utilize logical node to set up module and will represent that the data object model J moving sets up logical node K and maybe will represent that the data object model j of action sets up logical node k;
L. utilize sending module, to logical node K or logical node k, transmission order is set, send it to environment main frame, the content that above e-l step is deal with data.
Communication between complex automatic system and protocol conversion apparatus realizes by serial ports or network mode.Before realizing communication, must pre-define protocol type, as 0x00 represents 101 agreements, 0x02 represents 104 agreements etc.
Serial communication mapping table process of establishing:
Before complex automatic system access protocol conversion equipment, must specify on the com port of complex automatic system access protocol conversion equipment, so just bound the relation between protocol type and com port, the protocol library array of index is carried out in foundation according to string slogan, set up the relation between protocol library and serial ports, after this in communication process, the data that receive on every from then on com port are all called the agreement of binding and are carried out protocol translation.
Network communication mapping table process of establishing:
Complex automatic system is first initiated registration to protocol conversion apparatus, inform which kind of agreement protocol conversion apparatus will be used realize exchanges data, protocol conversion apparatus receives after the registration request of comprehensive automation, the SOCKET that represents communication link is (unique in a Process Extents, this is that operating system determines) and protocol type binding, the communication storehouse array that SOCKET is index is take in foundation, and after this in communication process, the data of every this SOCKET communication all adopt the agreement of binding to carry out data translation.
Realize a system for aforementioned visual transformer station integrated information platform method, as shown in Figure 1, comprise connected successively comprehensive automation system of transformer substation 1, IEC61850 protocol converter 2, environment main frame 3 and video monitoring system for substation 4.Environment main frame 3 comprises that successively connected environment receiver module 8, environmental analysis module 9, environment logical node set up module 10 and environment sending module 11; Environment receiver module 8 is also connecting environmental modeling module 12, IEC61850 protocol converter 2 and video monitoring system for substation 4, and environmental analysis module 9 is also connecting environmental modeling module 12, and environment sending module 11 is also connecting video monitoring system for substation 4.Video monitoring system for substation 4 comprises successively connected video monitoring system for substation administrative client 13, transformer substation video monitor supervision platform 14, DVR 15 and video camera 16; Transformer substation video monitor supervision platform 14 is also being connected environment main frame 3 with DVR 15.
As shown in Figure 7, IEC61850 protocol converter 2 comprises successively connected production module 5, data buffering module 6 and consumption module 7, and production module 5 is also connecting comprehensive automation system of transformer substation 1, and consumption module 7 is also connecting video monitoring system for substation 4.Production module 5 comprises connected network receiver module 17 and network event processing module 18, and network receiver module 17 also connects comprehensive automation system of transformer substation 1 and data buffering module 6, and network event processing module 18 is connection data buffer module 6 also; Consumption module 7 comprises connected successively data read module 19 and data processing module 20, and data read module 18 is connection data buffer module 6 also, and data processing module 20 also connects video monitoring system for substation 4; Data processing module 20 comprises successively connected agreement judge module 21, translation module 22, data judge module 23 and model building module 24, model building module 24 is also connecting self-checking alarming module 25, functional analysis module 26 and logical node and is setting up module 27, and logical node is set up module 27 and also connected sending module 28; Agreement judge module 21 is also connecting data read module 19, and sending module 28 is also connecting video monitoring system for substation 4; Data buffering module 6 comprises data storage module 29, data storage module 29 is connecting data management module 30, Space Expanding module 31, spatial limitation module 32 and production capacity limiting module 33, data storage module 29 is also connecting production module 5 and consumption module 7, and production capacity limiting module 33 is connecting network receiver module 17.

Claims (9)

1. a method that realizes visual transformer station integrated information platform, it is characterized in that: by connected IEC61850 protocol converter and environment main frame are set between comprehensive automation system of transformer substation and video monitoring system for substation, make between comprehensive automation system of transformer substation and video monitoring system for substation, can communicate and carry out video interlink; IEC61850 protocol converter is realized the communication between comprehensive automation system of transformer substation and video monitoring system for substation, and environment main frame is realized the video interlink between comprehensive automation system of transformer substation and video monitoring system for substation;
Described IEC61850 protocol converter comprises production module, data buffering module and consumption module; Described environment main frame comprises that environment receiver module, environment sending module, environmental modeling module, environmental analysis module, environment logical node set up module; Video monitoring system for substation comprises transformer substation video monitor supervision platform, video monitoring system for substation administrative client, DVR and video camera.
2. the method that realizes visual transformer station integrated information platform according to claim 1, is characterized in that, the described method that realizes the communication between comprehensive automation system of transformer substation and video monitoring system for substation is:
A. utilize production module to receive the data A that comprehensive automation system of transformer substation produces, and data A is stored in data buffering module;
B. utilize consumption module to extract data from data buffering module, and data A is converted to the data a based on IEC61850; Then data a is converted to logical node B, and sends to environment main frame;
C. utilize the logical node B obtaining in receiver module receiving step B; Utilize environment sending module that logical node B is sent to video monitoring system for substation.
3. the transformer station's integrated information platform visualization method of realizing according to claim 2, is characterized in that, the described method that realizes the video interlink between comprehensive automation system of transformer substation and video monitoring system for substation is:
D. utilize environment receiver module to receive the data object data model D of the expression interaction relation of video monitoring system for substation foundation;
E. utilize the data model D that environmental modeling module establishment step D obtains to set up interlock bivariate table model R(Src_Do, Camera, Camera_Pos, Action);
F. utilize environment receiver module to receive the logical node B that IEC61850 protocol converter sends;
G. the Src_Do in bivariate table model R searches to logical node B to utilize environmental analysis module, if find, utilizes environment logical node to set up module according to Camera in bivariate table model R, Camera_Pos, and Action creates interlock logical node G; Otherwise video interlink finishes;
H. utilize environment sending module that interlock logical node G is sent to transformer substation video monitor supervision platform, interlock logical node G is sent to DVR simultaneously, by DVR, send cradle head control order to corresponding video camera;
I. transformer substation video monitor supervision platform sends to video monitoring system for substation administrative client by interlock logical node G;
J. video monitoring system for substation administrative client is had access to video camera real-time video by transformer substation video monitor supervision platform.
4. the transformer station's integrated information platform visualization method of realizing according to claim 2, is characterized in that, described steps A is specially:
A. utilize network receiver module to receive network event from comprehensive automation system of transformer substation;
B. utilize network event processing module to process network event; If Accept event, receives and new connection puts into event queue; If Write event, increases and writes counting; If Read event, reads the data in network, and stores data into data buffering module;
Described step B is specially:
C. utilize data read module from data buffering module, to read pending data;
D. utilize data processing module to process the data that are read;
E. utilize the protocol type of agreement judge module judgement data, obtain the protocol type of these data;
F. utilize the protocol type of these data that translation module obtains according to step e and the mapping table of given this kind of agreement and IEC61850, translation obtains the data f of these data based on IEC61850;
G. the data f that utilizes data judge module to obtain according to the rule analysis step f of IEC61850, specified data f is analog acquisition value or switch acquisition value;
If h. data f is analog acquisition value, utilize model building module, according to the rule of IEC61850, it is set up to data object model H; Be specially data object oriented is added to I, II, the suffix sequence number of III represents three kinds of different data object models of middling speed message of 1a tripping operation, 1b control command and measured value; If data f is switch acquisition value, utilize model building module, according to the rule of IEC61850, it is set up to data object model h; Be specially data object oriented is added to i, ii, the suffix sequence number of iii represents three kinds of different data object models of middling speed message of 1a tripping operation, 1b control command and measured value;
I. utilize self-checking alarming module by model building module, to adopt general inputoutput data object to set up self-checking alarming object model I or self-checking alarming object model i the data object model H in step h or data object model h;
J. utilizing functional analysis module to obtain self-checking alarming object model I that data object model H and step I obtain or step h to step h obtains the self-checking alarming object model i that data object model h and step I obtain and analyzes, be specially, utilize functional analysis module to judge the 1a tripping operation data object in self-checking alarming object model I and the middling speed message data object numerical value of measured value, if above-mentioned two numerical value have one at least not in preset range, produce action alarm source, target action device id, the tripartite relationship table of type of action, utilize model building module tripartite relationship table to be set up to the data object model J that represents action, otherwise processing finishes, utilize functional analysis module to judge the 1a tripping operation data object in self-checking alarming object model i and the middling speed message data object numerical value of measured value, if above-mentioned two numerical value have at least one to be not equal to preset value, produce the tripartite relationship table of action alarm source, target action device id, type of action, utilize model building module tripartite relationship table to be set up to the data object model j that represents action, otherwise processing finish,
K. utilize logical node to set up module and will represent that the data object model J moving sets up logical node K and maybe will represent that the data object model j of action sets up logical node k;
L. utilize sending module, to logical node K or logical node k, transmission order is set, send it to environment main frame.
5. a system that realizes the visual transformer station of aforementioned any one integrated information platform method, is characterized in that: comprise connected successively comprehensive automation system of transformer substation (1), IEC61850 protocol converter (2), environment main frame (3) and video monitoring system for substation (4).
6. the system that realizes aforementioned visual transformer station integrated information platform method according to claim 5, it is characterized in that: described IEC61850 protocol converter (2) comprises successively connected production module (5), data buffering module (6) and consumption module (7), production module (5) is also connecting comprehensive automation system of transformer substation (1), and consumption module (7) is also connecting video monitoring system for substation (4).
7. the system that realizes aforementioned visual transformer station integrated information platform method according to claim 6, it is characterized in that: described production module (5) comprises connected network receiver module (17) and network event processing module (18), network receiver module (17) also connects comprehensive automation system of transformer substation (1) and data buffering module (6), and network event processing module (18) is connection data buffer module (6) also; Consumption module (7) comprises connected successively data read module (19) and data processing module (20), and data read module (18) is connection data buffer module (6) also, and data processing module (20) also connects video monitoring system for substation (4); Data processing module (20) comprises successively connected agreement judge module (21), translation module (22), data judge module (23) and model building module (24), model building module (24) is also connecting self-checking alarming module (25), functional analysis module (26) and logical node and is setting up module (27), and logical node is set up module (27) and also connected sending module (28); Agreement judge module (21) is also connecting data read module (19), and sending module (28) is also connecting video monitoring system for substation (4); Data buffering module (6) comprises data storage module (29), data storage module (29) is connecting data management module (30), Space Expanding module (31), spatial limitation module (32) and production capacity limiting module (33), data storage module (29) is also connecting production module (5) and consumption module (7), and production capacity limiting module (33) is connecting network receiver module (17).
8. the system that realizes aforementioned visual transformer station integrated information platform method according to claim 5, is characterized in that: described environment main frame (3) comprises that successively connected environment receiver module (8), environmental analysis module (9), environment logical node set up module (10) and environment sending module (11); Environment receiver module (8) is also connecting environmental modeling module (12), IEC61850 protocol converter (2) and video monitoring system for substation (4), environmental analysis module (9) is also connecting environmental modeling module (12), and environment sending module (11) is also connecting video monitoring system for substation (4).
9. the system that realizes aforementioned visual transformer station integrated information platform method according to claim 5, is characterized in that: described video monitoring system for substation (4) comprises successively connected video monitoring system for substation administrative client (13), transformer substation video monitor supervision platform (14), DVR (15) and video camera (16); Transformer substation video monitor supervision platform (14) is also being connected environment main frame (3) with DVR (15).
CN201110456441.9A 2011-12-30 2011-12-30 Substation operation visualization realization method and system thereof Expired - Fee Related CN102497033B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110456441.9A CN102497033B (en) 2011-12-30 2011-12-30 Substation operation visualization realization method and system thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110456441.9A CN102497033B (en) 2011-12-30 2011-12-30 Substation operation visualization realization method and system thereof

Publications (2)

Publication Number Publication Date
CN102497033A CN102497033A (en) 2012-06-13
CN102497033B true CN102497033B (en) 2014-03-26

Family

ID=46188831

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110456441.9A Expired - Fee Related CN102497033B (en) 2011-12-30 2011-12-30 Substation operation visualization realization method and system thereof

Country Status (1)

Country Link
CN (1) CN102497033B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103281319A (en) * 2013-05-24 2013-09-04 国家电网公司 Intelligent transformer substation video monitoring linked function information model abiding by IEC61850
CN103428478A (en) * 2013-08-16 2013-12-04 昆明能讯科技有限责任公司 Coordinated control system of centralized control station remote long-distance video
CN103647752A (en) * 2013-11-15 2014-03-19 益和电气集团股份有限公司 SCADA system provided with video feedback signals
CN103683494B (en) * 2013-11-21 2016-01-06 山西省电力公司朔州供电分公司 Based on the power grid regulation integral system of DMIS
CN103683495B (en) * 2013-11-21 2016-01-06 山西省电力公司朔州供电分公司 Based on twin-engined electrical network anti-misoperation apparatus
CN105373505B (en) * 2015-12-03 2018-01-09 江苏省电力公司电力科学研究院 Non real-time online communication data collecting system and method based on device model buffering
CN108448720A (en) * 2018-03-20 2018-08-24 王宇欣 It is old comprehensive from station remote browse system based on multi-computer switch and scalable figure
CN109245308A (en) * 2018-11-01 2019-01-18 常州思贝尔电能科技有限公司 A kind of linkage alarm method based on substation's comprehensive monitoring system
CN113553366A (en) * 2021-07-14 2021-10-26 上海核工程研究设计院有限公司 Acquisition, grabbing and management device and method for nuclear power project construction plan data

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201426053Y (en) * 2009-06-11 2010-03-17 河南省电力公司洛阳供电公司 Intelligent visual remote control operating system for substation equipment
CN101902075A (en) * 2010-07-07 2010-12-01 四川电力试验研究院 Remote video monitoring system of intelligent substation based on electric power data network
CN201750512U (en) * 2010-06-30 2011-02-16 重庆市电力公司 Intelligent recognition video analysis system for safety production

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010127959A (en) * 2008-11-25 2010-06-10 Toshiba Corp System monitoring board display device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201426053Y (en) * 2009-06-11 2010-03-17 河南省电力公司洛阳供电公司 Intelligent visual remote control operating system for substation equipment
CN201750512U (en) * 2010-06-30 2011-02-16 重庆市电力公司 Intelligent recognition video analysis system for safety production
CN101902075A (en) * 2010-07-07 2010-12-01 四川电力试验研究院 Remote video monitoring system of intelligent substation based on electric power data network

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
兰西柱等.基于IEC61850标准的变电站通信管理机设计.《工矿自动化》.2011,(第8期),第162-164页.
基于IEC61850标准的变电站通信管理机设计;兰西柱等;《工矿自动化》;20110831(第8期);第162-164页 *

Also Published As

Publication number Publication date
CN102497033A (en) 2012-06-13

Similar Documents

Publication Publication Date Title
CN102497033B (en) Substation operation visualization realization method and system thereof
CN103618384B (en) Secondary circuit closed loop monitoring system based on GOOSE input end mapping mechanism
CN106532935B (en) For carrying out the method and its system of secondary system of intelligent substation fault diagnosis
CN103904779B (en) A kind of full station intelligent terminal analogue means of intelligent substation and using method thereof
CN103888291A (en) Power distribution terminal plug-and-play communication method based on IEC 61850 standard
CN204028681U (en) A kind of LNG gas station Internet communication long distance control system
CN103779962B (en) Based on 61850 models of intelligent telecontrol communication machine and the conversion method of CIM
CN103729806A (en) Transformer substation alarming graph gateway minimizing system and achieving method thereof
CN202261389U (en) Power transmission line operation and maintenance routing inspection management information system
CN103441570A (en) One-button type sequential control operation control method based on integrated information platform
CN103199624A (en) Smart converting station based on international electrotechnical commission (IEC) 61850
CN104104151B (en) The cut-in method of distribution terminal facility information
CN203117313U (en) Dynamic simulation and emulation detecting platform for intelligent substation secondary system
CN102832703A (en) Transformer substation based on model converter and quick scheduling master station converting method
CN102832707A (en) Misoperation-preventive locking logic automatic test system for intelligent transformer substation
CN102427417A (en) System and method for remotely controlling Internet of things access equipment
CN107592285A (en) A kind of intelligent communication gateway device and its system
CN103683506B (en) Comprehensively-integrated linkage safety system of power system transformer substations
CN103227511A (en) On-line monitoring station end integrated processing system of transformer station
CN103268236A (en) Source side maintaining method and system based on intelligent telecontrol device
CN211124131U (en) Power distribution station topology and asset management system
CN104868596A (en) Method for rapid positioning variation influence scope of secondary virtual loop of intelligent transformer station
CN102495615A (en) Remote monitoring management system of large tonnage box girder transport and erection equipment group safety construction
CN106530653A (en) Electricity information acquisition method
CN103676669A (en) Method and system for checking motion information

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140326

Termination date: 20171230

CF01 Termination of patent right due to non-payment of annual fee