CN102496092A - Problem processing system used for electrical network - Google Patents

Problem processing system used for electrical network Download PDF

Info

Publication number
CN102496092A
CN102496092A CN2011104442553A CN201110444255A CN102496092A CN 102496092 A CN102496092 A CN 102496092A CN 2011104442553 A CN2011104442553 A CN 2011104442553A CN 201110444255 A CN201110444255 A CN 201110444255A CN 102496092 A CN102496092 A CN 102496092A
Authority
CN
China
Prior art keywords
unit
database
data
electrical network
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011104442553A
Other languages
Chinese (zh)
Inventor
黄敏
周珏
但荣平
蒋兴竹
尚晓梅
万俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QINAN POWER SUPPLY BUREAU OF CHONGQING POWER CO
State Grid Corp of China SGCC
Original Assignee
QINAN POWER SUPPLY BUREAU OF CHONGQING ELECTRIC POWER CORP
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QINAN POWER SUPPLY BUREAU OF CHONGQING ELECTRIC POWER CORP filed Critical QINAN POWER SUPPLY BUREAU OF CHONGQING ELECTRIC POWER CORP
Priority to CN2011104442553A priority Critical patent/CN102496092A/en
Publication of CN102496092A publication Critical patent/CN102496092A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Abstract

The invention provides a problem processing system used for an electrical network. The system comprises a database, a problem accepting unit, a task distribution unit, a solution feedback unit, a solution rate statistical unit and a client satisfaction statistical unit. Through division and cooperation of the problem accepting unit, the task distribution unit, the solution feedback unit, the solution rate statistical unit and the client satisfaction statistical unit, whole process monitoring is carried out from accepting a problem to processing and feeding back the problem, a problem distribution processing process is effectively completed, satisfaction of a client is raised substantially, a reminding cost advice note is sent timely when the client does not pay fees, meter reading data is more accurate, and an error is avoided.

Description

The problem processing system that is used for electrical network
Technical field
The present invention relates to a kind of network operation system.
Background technology
In the electrical network routine work, often run into the client and submit the various problems of reporting for repairment to, need maintenance department to deal with, because the daily operation work of electrical network at present all is to rely on artificial treatment; Carry out manual register from receiving problem, with the problem classification, be distributed to relevant departments again; Relevant departments assign staff and handle, and remarks are carried out in handling problem, feed back to the department of accepting; Whole process all is to write down monitoring by the staff, causes intermediate link often to occur handling untimely, can't feed back and handle problems such as record; Make the consumer think that network operation department work efficiency is low, the reaction problem can not get effective solution, and satisfaction is extremely low.
Summary of the invention
The object of the invention just provides a kind of problem processing system that is used for electrical network, and it effectively accomplishes the electrical network routine work, significantly improves CSAT.
The objective of the invention is to realize that through such technical scheme it includes database, problem handling unit, task allocation unit, solution feedback unit, fix-rate statistics unit and CSAT statistic unit,
The problem handling unit is used for the receiving record client and reports barrier information, and newspaper barrier information includes customer name, contact address, telephone number and failure problems information, and information recorded is stored in the database;
Task allocation unit according to the newspaper barrier information that stores in the database, is given corresponding maintenance department with the fault Task Distribution;
Solve feedback unit, after corresponding maintenance department accomplishes the fault task, through solving feedback unit fault task completion information, finishing time information and remark information are deposited in the database, and let the client fill in service satisfaction;
The fix-rate statistics unit according to solving the feedback unit feedack, carries out counting statistics to fix-rate;
The CSAT statistic unit according to solving the service satisfaction that the client fills in, is added up and record, and the task at the bottom of the satisfaction is listed separately, carries out accountability.
Further, said system also includes the charge for call notice and provides the unit, and the charge for call notice is provided the unit and from database, called the data of paying the fees, and sends the charge for call notice from the unpaid expense of trend family.
Further, said system also includes the unit of checking meter, and the staff back of checking meter deposits data in the database in through the unit of checking meter, in the institute data of copying and the database before data compare, the unsteady excessive prompting of then sending, the staff checks meter reading data again.
Further, said system also includes the corrigendum unit, and the data that have mistake in the database are corrected and stored.
Further, said corrigendum unit through the login of ID log-in unit with authority audit then data are made amendment.
Owing to adopted technique scheme, the present invention to have following advantage:
The present invention shares out the work and help one another through problem handling unit, task allocation unit, solution feedback unit, fix-rate statistics unit and CSAT statistic unit; To handling feedback problem, complete monitoring has effectively been accomplished problem allocation process process from the problem of accepting; Significantly improve client's satisfaction; The unpaid time-consuming charge for call advice note that in time sends of client, meter reading data is more accurate, avoids makeing mistakes.
Other advantages of the present invention, target and characteristic will be set forth in instructions subsequently to a certain extent; And to a certain extent; Based on being conspicuous to those skilled in the art, perhaps can from practice of the present invention, obtain instruction to investigating of hereinafter.Target of the present invention and other advantages can realize and obtain through following instructions and claims.
Description of drawings
Description of drawings of the present invention is following.
Fig. 1 is a structural representation of the present invention.
Embodiment
Below in conjunction with accompanying drawing and embodiment the present invention is described further.
The problem processing system that is used for electrical network, it includes database, problem handling unit, task allocation unit, solution feedback unit, fix-rate statistics unit and CSAT statistic unit,
The problem handling unit is used for the receiving record client and reports barrier information, and newspaper barrier information includes customer name, contact address, telephone number and failure problems information, and information recorded is stored in the database;
Task allocation unit according to the newspaper barrier information that stores in the database, is given corresponding maintenance department with the fault Task Distribution;
Solve feedback unit, after corresponding maintenance department accomplishes the fault task, through solving feedback unit fault task completion information, finishing time information and remark information are deposited in the database, and let the client fill in service satisfaction;
The fix-rate statistics unit according to solving the feedback unit feedack, carries out counting statistics to fix-rate;
The CSAT statistic unit according to solving the service satisfaction that the client fills in, is added up and record, and the task at the bottom of the satisfaction is listed separately, carries out accountability.
Window-unit as the electric power operation need contact with the client, when the customer response failure message often; Through the problem handling unit, in database, the internal schedule department of Utilities Electric Co. will be correlated with and report barrier Task Distribution to associated maintenance department to handle with relevant information records; Associated maintenance department receives after the newspaper barrier task that the personnel of assigning the job handle in official hour; And the task performance is fed back to database through solving feedback unit, realize responsibility system, according to the statistics of fix-rate statistics unit and CSAT statistic unit; Effectively carry out internal control, significantly improved client's satisfaction.
Said system also includes the charge for call notice and provides the unit, and the charge for call notice is provided the unit and from database, called the data of paying the fees, and sends the charge for call notice from the unpaid expense of trend family.Client's payment of fees situation is added up in database, regularly broadcast the charge for call notice for unpaid client.
Said system also includes the unit of checking meter, and the staff back of checking meter deposits data in the database in through the unit of checking meter, in the institute data of copying and the database before data compare, the unsteady excessive prompting of then sending, the staff checks meter reading data again.Meter reading data is deposited in the database and compares; Can effectively monitor the correctness of meter reading data; In general significantly changing can not appear in residential electricity consumption, if close bimestrial power consumption has big difference, the personnel that then arrange work check meter again; Avoid checking meter and make mistakes, can also effectively monitor out illegal phenomenons such as power stealing.
Said system also includes the corrigendum unit, and the data that have mistake in the database are corrected and stored.When the information that needs corrigendum is arranged in the database,
Make amendment to data through login of ID log-in unit and authority audit back in said corrigendum unit, authority is not then revised in login.
Explanation is at last; Above embodiment is only unrestricted in order to technical scheme of the present invention to be described; Although with reference to preferred embodiment the present invention is specified, those of ordinary skill in the art should be appreciated that and can make amendment or be equal to replacement technical scheme of the present invention; And not breaking away from the aim and the scope of present technique scheme, it all should be encompassed in the middle of the claim scope of the present invention.

Claims (5)

1. be used for the problem processing system of electrical network, it is characterized in that: it includes database, problem handling unit, task allocation unit, solution feedback unit, fix-rate statistics unit and CSAT statistic unit,
The problem handling unit is used for the receiving record client and reports barrier information, and newspaper barrier information includes customer name, contact address, telephone number and failure problems information, and information recorded is stored in the database;
Task allocation unit according to the newspaper barrier information that stores in the database, is given corresponding maintenance department with the fault Task Distribution;
Solve feedback unit, after corresponding maintenance department accomplishes the fault task, through solving feedback unit fault task completion information, finishing time information and remark information are deposited in the database, and let the client fill in service satisfaction;
The fix-rate statistics unit according to solving the feedback unit feedack, carries out counting statistics to fix-rate;
The CSAT statistic unit according to solving the service satisfaction that the client fills in, is added up and record, and the task at the bottom of the satisfaction is listed separately, carries out accountability.
2. the problem processing system that is used for electrical network as claimed in claim 1; It is characterized in that: said system also includes the charge for call notice and provides the unit; The charge for call notice is provided the unit and from database, is called the data of paying the fees, and sends the charge for call notice from the unpaid expense of trend family.
3. the problem processing system that is used for electrical network as claimed in claim 1; It is characterized in that: said system also includes the unit of checking meter; After checking meter, the staff data are deposited in the database through the unit of checking meter; Data are compared before in the institute data of copying and the database, the unsteady excessive prompting of then sending, and the staff checks meter reading data again.
4. the problem processing system that is used for electrical network as claimed in claim 3 is characterized in that: said system also includes the corrigendum unit, and the data that have mistake in the database are corrected and stored.
5. the problem processing system that is used for electrical network as claimed in claim 4 is characterized in that: make amendment to data through login of ID log-in unit and authority audit back in said corrigendum unit.
CN2011104442553A 2011-12-27 2011-12-27 Problem processing system used for electrical network Pending CN102496092A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011104442553A CN102496092A (en) 2011-12-27 2011-12-27 Problem processing system used for electrical network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011104442553A CN102496092A (en) 2011-12-27 2011-12-27 Problem processing system used for electrical network

Publications (1)

Publication Number Publication Date
CN102496092A true CN102496092A (en) 2012-06-13

Family

ID=46187916

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011104442553A Pending CN102496092A (en) 2011-12-27 2011-12-27 Problem processing system used for electrical network

Country Status (1)

Country Link
CN (1) CN102496092A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106651680A (en) * 2016-12-23 2017-05-10 广西中金大通资产管理有限公司 House renting intelligent management system
CN109145006A (en) * 2018-09-21 2019-01-04 深圳蜜獾智抄科技有限公司 A kind of collection copies data analysis management system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2445303Y (en) * 2000-10-13 2001-08-29 黄中阳 Data treatment device for user energy source meter
CN1842811A (en) * 2003-08-29 2006-10-04 西门子医疗健康服务公司 Customer service support system
CN101005540A (en) * 2006-01-19 2007-07-25 北京讯鸟软件有限公司 Method for realizing sitting service level evaluation of calling center service
CN102137155A (en) * 2011-02-25 2011-07-27 浪潮通信信息系统有限公司 Method for handling communication network quality complaints based on customer perception

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2445303Y (en) * 2000-10-13 2001-08-29 黄中阳 Data treatment device for user energy source meter
CN1842811A (en) * 2003-08-29 2006-10-04 西门子医疗健康服务公司 Customer service support system
CN101005540A (en) * 2006-01-19 2007-07-25 北京讯鸟软件有限公司 Method for realizing sitting service level evaluation of calling center service
CN102137155A (en) * 2011-02-25 2011-07-27 浪潮通信信息系统有限公司 Method for handling communication network quality complaints based on customer perception

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106651680A (en) * 2016-12-23 2017-05-10 广西中金大通资产管理有限公司 House renting intelligent management system
CN109145006A (en) * 2018-09-21 2019-01-04 深圳蜜獾智抄科技有限公司 A kind of collection copies data analysis management system

Similar Documents

Publication Publication Date Title
CN106815709B (en) Service quick response center support system and method
WO2019006654A1 (en) Financial self-service equipment maintenance dispatch generation method, hand-held terminal and electronic device
EP3076346A1 (en) Systems and methods for improved demand response management system (drms)
US20090310774A1 (en) Customer service methods, apparatus and report/alert generation based on customer service call information
CN101901399A (en) Operation management platform
JP4982196B2 (en) Replacement part order processing apparatus, replacement part order processing method, and replacement part order processing program
CN105373838A (en) Door-to-door maintenance service trading management system
CN103136623A (en) On-line management method for project progress payment application
CN114186786A (en) Work order distribution method, device, terminal and storage medium
CN105589000A (en) Power consumption data graphical management and control system
CN108829466A (en) A kind of data processing method, device, electronic equipment and storage medium
CN109524094A (en) A kind of entourage's auth method
US9047757B2 (en) Systems and methods for remotely controlling an advanced metering infrastructure
CN102496092A (en) Problem processing system used for electrical network
TWI509429B (en) Electricity load management device and electricity load management method thereof
CN109840675A (en) Intelligently turn electric application system and method under a kind of distribution network failure state
CN102842073A (en) Operation and maintenance management system
CN110516828B (en) Monitoring information processing system and method
CN109242665B (en) Business rule multi-channel sharing method, device, equipment and storage medium
JP2014016721A (en) Gas supply stop instruction system and gas supply stop instruction method
US20140095245A1 (en) Service request orchestrator
CN107093023A (en) Handling of goods and materials device and material Management System
JP2013254417A (en) Gas meter-reading system and meter-reading method
EP3279840A1 (en) Display generating device, display control device, and display generating method
Yadav et al. Management Information System for Electricity Utility

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Effective date: 20121211

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20121211

Address after: Shuanglong road 401420 Chongqing city Qijiang County Gunan town No. 51

Applicant after: Qinan Power Supply Bureau of Chongqing Power Co.

Applicant after: State Grid Corporation of China

Address before: Shuanglong road 401420 Chongqing city Qijiang County Gunan town No. 51

Applicant before: Qinan Power Supply Bureau of Chongqing Power Co.

C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120613