CN102493493A - Method for plugging horizontal fissures of basement concrete structure by grouting microorganisms - Google Patents

Method for plugging horizontal fissures of basement concrete structure by grouting microorganisms Download PDF

Info

Publication number
CN102493493A
CN102493493A CN2011104121622A CN201110412162A CN102493493A CN 102493493 A CN102493493 A CN 102493493A CN 2011104121622 A CN2011104121622 A CN 2011104121622A CN 201110412162 A CN201110412162 A CN 201110412162A CN 102493493 A CN102493493 A CN 102493493A
Authority
CN
China
Prior art keywords
crack
liquid
bacterium liquid
salt solution
perfusion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011104121622A
Other languages
Chinese (zh)
Other versions
CN102493493B (en
Inventor
贾强
张鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Jian special special engineering Co., Ltd.
Original Assignee
Shandong Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Jianzhu University filed Critical Shandong Jianzhu University
Priority to CN 201110412162 priority Critical patent/CN102493493B/en
Publication of CN102493493A publication Critical patent/CN102493493A/en
Application granted granted Critical
Publication of CN102493493B publication Critical patent/CN102493493B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Materials For Medical Uses (AREA)
  • Micro-Organisms Or Cultivation Processes Thereof (AREA)

Abstract

The invention discloses a method for plugging horizontal fissures of a basement concrete structure by grouting microorganisms. The method comprises the following steps of: excavating filled earth, pouring water, constructing a cement mortar grouting trough, preparing bacteria liquid and a nutritive salt solution, pouring the bacteria liquid, and pouring the nutritive salt solution. In the processes of pouring the bacteria liquid, and the nutritive salt solution, poured liquid are allowed to flow out of the inner sides of the fissures, but the flowing amount is gradually reduced along with the increasing of the pouring frequency, and finally the poured liquid stops flowing completely; and if the width of the fissures is more than 0.5mm, in order to prevent most of the bacteria liquid and the nutritive salt solution from flowing out, the inner sides of the fissures are plugged by using absorbent cotton and gauze, and then the liquid and solution are grouted. Calcium chloride is introduced by the bacteria liquid to generate calcium carbonate sediments which can effectively fill and plug the fissures and pouring holes.

Description

The method of microorganism grout sealing Basement Concrete Structures transverse crack
Technical field
The present invention relates to the shutoff and the restorative procedure of distress in concrete in a kind of civil engineering, especially a kind of method of microorganism grout sealing Basement Concrete Structures transverse crack.
Background technology
According in recent years national basement in high rise building investigation being found that the cracking quantity of basement in high rise building exterior wall accounts for by about 85% of investigation engineering sum, the phenomenon that the crack appears in base plate accounts for by about 10% of investigation sum.Simultaneously analysis of survey results is found that in the various negative consequences that caused by the crack, seepage accounts for 60%.Therefore, the Crack Control problem of concrete structure just becomes one of important research project in the construction work.Particularly over the past two decades, after the pumping commercial concrete obtained extensive use, the problem that the crack produces was outstanding day by day.
The blocking method of existing basement has a lot, but effect is all undesirable.Reason has two aspects: after (1) basement built up, wall outside backfill was difficult in exterior wall and repairs; (2) mostly existing patching material is the material of organic or hydrophobic, and problem of aging is arranged, and the coefficient of expansion and concrete are inconsistent.Therefore, leakage problems becomes old, big, the difficult problem of puzzlement engineering circle.Repairing method of microorganism is a kind of method of novel repairing concrete crack, and product is consistent with former concrete, should not ftracture after the reparation.Grouting agent is liquid, is easy to infiltrate in the seam, in seam, forms deposition.The durability and the intensity of the concrete material after the reparation all are greatly increased, and good with the associativity of concrete material.
Utilizing microorganism diagenesis recovery technique is a kind of international advanced technology of subject crossing.Its mechanism is to utilize microorganism induction to generate mineral deposition to fill up and the rehabilitating concrete defective: some basophilous edaphon utilizes the urease that self produces that hydrolysis of urea is ammonia and carbon dioxide; The increase of decomposing the ammonia quantity that generates can cause the rising of pH value on every side, thereby causes the deposition of calcium carbonate.In inducing the process of tosca, action of microorganisms is not only the generation urease, but also for the deposition of calcium carbonate the place of nucleation is provided.In civil engineering, the microorganism recovery technique mainly is to utilize cultured microorganism to induce tosca rehabilitating concrete defective, and shutoff and ground processing etc. are carried out in the crack at present.The application of the Cheng Xiao of Tsing-Hua University brightness patent " a kind of microorganism cause cement or concrete and production method and application " (CN200810105947.3); Propose to utilize Pasteur bacillus bacterium liquid that can produce urase and the fluid,matching that contains urea and mineral calcium salt to mix; Reaction under certain condition get final product microorganism cause cement or concrete method, but do not provide especially the method that specifically mends a split about basement.
One Chinese patent application 200810019165.8 discloses a kind of microorganism reparation cement-based material crack method and nutrient solution and reparation nutrient solution of utilizing.It adopts microbial inoculum and reparation nutrient solution is injected cement stony fracture seam, carries out maintenance.But this method and useless relating to bacterium liquid and concrete grammar, the step of repairing in the nutrient solution injection crack.
Summary of the invention
The objective of the invention is for overcoming the deficiency of above-mentioned prior art, a kind of method of microorganism grout sealing Basement Concrete Structures transverse crack is provided, this method is easy to operate, and crack closure is effective, is easy to construction.
For realizing above-mentioned purpose, the present invention adopts following technical proposals:
A kind of method of microorganism grout sealing Basement Concrete Structures transverse crack, step is following:
(1) excavation that bankets
Excavation basement wall external is banketed, and exposes lateral slot;
(2) pour water
The clear and definite percolation path of pouring water is removed corresponding site body of wall surface layer in the basement clean simultaneously;
(3) construction cement mortar grout groove
A del grout groove is done with cement mortar in the crack outside, prevents that the infiltration of bacterium liquid and nutritive salt from banketing;
(4) bacterium liquid and nutrient salt solution preparation
Prepare 3-5 with fermentation tank and rise the Pasteur bacillus, enzymatic activity OD600 is greater than 1; Preparation contains the calcium chloride of 1mol/L and the nutrient salt solution of 1mol/L urea;
(5) perfusion bacterium liquid
In the crack, pour into bacterium liquid from grout groove, in seam, fill, liquid level exceeds crack 3-5mm;
(6) perfusion nutrient salt solution
Wait for that bacterium liquid liquid level descends, the bacterium liquid more than 80% injects the calcium chloride that contains 1mol/L of twice bacteria liquid amount and the nutrient salt solution of 1mol/L urea respectively after infiltrating the crack in grout groove.
(7) continued perfusion bacterium liquid in follow-up 4 days
Pour into one time bacterium liquid follow-up 4 day every day, method for filling is with (5) step;
(8) continued the perfusion nutrient salt solution in follow-up 9 days
Pour into the one time of nutrition salting liquid follow-up 9 day every day, method for filling is with (6) step, and the tosca thing that bacterium liquid induces calcium chloride to generate can be filled crack and fill orifice and shutoff effectively.
Said step (5) in the process of bacterium liquid and nutritive salt perfusion, allows that the liquid of perfusion flows out in the inboard in crack to step (8), but the amount that flows out can progressively reduce along with the increase of perfusion number of times, stops fully at last; If the width in crack is greater than 0.5mm, for preventing big outflow of bacterium liquid and nutritive salt, capable again being in the milk after the inboard in crack is with absorbent cotton and gauze shutoff.
The invention has the beneficial effects as follows that this method is easy to operate, crack closure is effective, is easy to construction, can primary fissure be sewed with the effect shutoff.Check behind water injection test and rain seepage do not occur with the crack of this method shutoff.
Description of drawings
Fig. 1 is the present invention's sketch map when implementing;
Fig. 2-Fig. 6 is the photo of field trial; Wherein Fig. 2 is that grout groove is made photo; Fig. 3 is the water injection test photo; Fig. 4 is water injection test (body of wall is spread and sunk in a wet) photo before the leak stopping; Fig. 5 is water injection test after the leak stopping (leakproof) photo; Fig. 6 contrasts photo behind leak stopping place (left side) and not leak stopping place (right side) rain;
Wherein 1. basement wall external are banketed, 2. grout groove, 3. bacterium liquid and nutritive salt, 4. lateral slot, 5. concrete exterior wall, 6. absorbent cotton and gauze.
The specific embodiment
Below in conjunction with accompanying drawing and embodiment the present invention is further specified.
Like Fig. 1-shown in Figure 6, the method for microorganism grout sealing Basement Concrete Structures transverse crack, step is following:
(1) excavation that bankets
Excavation basement wall external bankets 1, exposes lateral slot 4;
(2) pour water
The clear and definite percolation path of pouring water is removed corresponding site body of wall surface layer in the basement clean simultaneously;
(3) construction cement mortar grout groove
A del grout groove 2 is done with cement mortar in the crack outside, in preventing bacterium liquid 2 infiltrations being banketed with nutritive salt;
(4) bacterium liquid and nutrient salt solution preparation
Prepare 3-5 with fermentation tank and rise the Pasteur bacillus, enzymatic activity OD600 is greater than 1; Preparation contains the calcium chloride of 1mol/L and the nutrient salt solution of 1mol/L urea;
(5) perfusion bacterium liquid
In the crack, pour into bacterium liquid from grout groove 2, in seam, fill, liquid level exceeds crack 3-5mm;
(6) perfusion nutrient salt solution
Wait for that bacterium liquid liquid level descends, the bacterium liquid more than 80% injects the calcium chloride that contains 1mol/L of twice bacteria liquid amount and the nutrient salt solution of 1mol/L urea respectively after infiltrating the crack in grout groove 2.
(7) continued perfusion bacterium liquid in follow-up 4 days
Pour into one time bacterium liquid follow-up 4 day every day, method for filling is with (5) step;
(8) continued the perfusion nutrient salt solution in follow-up 9 days
Pour into the one time of nutrition salting liquid follow-up 9 day every day, method for filling is with (6) step, and the tosca thing that bacterium liquid induces calcium chloride to generate can be filled crack and fill orifice and shutoff effectively.
Said step (5) in the process of bacterium liquid and nutritive salt 3 perfusions, allows that the liquid of perfusion flows out in the inboard in crack to step (8), but the amount that flows out can progressively reduce along with the increase of perfusion number of times, stops fully at last; If the width in crack greater than 0.5mm, flows out for preventing bacterium liquid and nutritive salt 3 big portions, capable again being in the milk after the inboard in crack is with absorbent cotton and gauze 6 shutoff.
Though the above-mentioned accompanying drawing specific embodiments of the invention that combines is described; But be not restriction to protection domain of the present invention; One of ordinary skill in the art should be understood that; On the basis of technical scheme of the present invention, those skilled in the art need not pay various modifications that creative work can make or distortion still in protection scope of the present invention.

Claims (2)

1. the method for a microorganism grout sealing Basement Concrete Structures transverse crack is characterized in that step is following:
(1) excavation that bankets
Excavation basement wall external is banketed, and exposes lateral slot;
(2) pour water
The clear and definite percolation path of pouring water is removed corresponding site body of wall surface layer in the basement clean simultaneously;
(3) construction cement mortar grout groove
A del grout groove is done with cement mortar in the crack outside, prevents that the infiltration of bacterium liquid and nutritive salt from banketing;
(4) bacterium liquid and nutrient salt solution preparation
Prepare 3-5 with fermentation tank and rise the Pasteur bacillus, enzymatic activity OD600 is greater than 1; Preparation contains the calcium chloride of 1mol/L and the nutrient salt solution of 1mol/L urea;
(5) perfusion bacterium liquid
In the crack, pour into bacterium liquid from grout groove, in seam, fill, liquid level exceeds crack 3-5mm;
(6) perfusion nutrient salt solution
Wait for that bacterium liquid liquid level descends, the bacterium liquid more than 80% injects the calcium chloride that contains 1mol/L of twice bacteria liquid amount and the nutrient salt solution of 1mol/L urea respectively after infiltrating the crack in grout groove.
(7) continued perfusion bacterium liquid in follow-up 4 days
Pour into one time bacterium liquid follow-up 4 day every day, method for filling is with (5) step;
(8) continued the perfusion nutrient salt solution in follow-up 9 days
Pour into the one time of nutrition salting liquid follow-up 9 day every day, method for filling is with (6) step; The tosca thing that bacterium liquid induces calcium chloride to generate can be filled crack and fill orifice and shutoff effectively.
2. the method for claim 1 is characterized in that, said step (5) is to step (8); In the process of bacterium liquid and nutritive salt perfusion; The liquid of allowing perfusion flows out in the inboard in crack, but the amount that flows out can progressively reduce along with the increase of perfusion number of times, stops fully at last; If the width in crack is greater than 0.5mm, for preventing big outflow of bacterium liquid and nutritive salt, capable again being in the milk after the inboard in crack is with absorbent cotton and gauze shutoff.
CN 201110412162 2011-12-12 2011-12-12 Method for plugging horizontal fissures of basement concrete structure by grouting microorganisms Active CN102493493B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110412162 CN102493493B (en) 2011-12-12 2011-12-12 Method for plugging horizontal fissures of basement concrete structure by grouting microorganisms

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110412162 CN102493493B (en) 2011-12-12 2011-12-12 Method for plugging horizontal fissures of basement concrete structure by grouting microorganisms

Publications (2)

Publication Number Publication Date
CN102493493A true CN102493493A (en) 2012-06-13
CN102493493B CN102493493B (en) 2013-08-28

Family

ID=46185349

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110412162 Active CN102493493B (en) 2011-12-12 2011-12-12 Method for plugging horizontal fissures of basement concrete structure by grouting microorganisms

Country Status (1)

Country Link
CN (1) CN102493493B (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103043937A (en) * 2012-12-27 2013-04-17 同济大学 Compound capsule underground structure concrete self-repairing system provided with aerobic microorganisms inside
CN104196131A (en) * 2014-09-11 2014-12-10 山东建筑大学 Method for plugging cast-in-situ concrete slab or base-plate crack with microbe-sedimented calcium carbonate
CN104818719A (en) * 2015-03-16 2015-08-05 山东建筑大学 Microorganism grouting method capable of improving early-stage calcium carbonate deposit volume
CN105484298A (en) * 2016-01-08 2016-04-13 三峡大学 Microorganism reinforced grouting maintenance test device
CN105911260A (en) * 2016-06-15 2016-08-31 天津大学 Testing device for repairing concrete cracks through microorganisms
CN106835878A (en) * 2017-01-24 2017-06-13 华中科技大学 A kind of embankment structure and construction method
CN109184255A (en) * 2018-10-31 2019-01-11 山东建筑大学 A method of utilizing microorganism grout sealing outer wall of basement crack
CN109459364A (en) * 2018-10-30 2019-03-12 河海大学 A kind of experimental rig and method for reinforcing calcareous coarse-grained soil based on MICP
CN110863517A (en) * 2019-12-12 2020-03-06 昆明理工大学 Method for sealing and blocking leakage of storage yard by utilizing microbial induction
CN112142409A (en) * 2020-09-27 2020-12-29 长安大学 Microbial self-healing waterproof anti-permeability mortar and preparation method thereof
CN112573941A (en) * 2020-12-31 2021-03-30 武汉工程大学 Method for repairing early cracks of cement stabilized macadam pavement base
CN113307656A (en) * 2021-05-29 2021-08-27 兰州理工大学 Method for repairing concrete cracks by using microorganisms
CN113685058A (en) * 2021-09-14 2021-11-23 山东建筑大学 Method for replacing low-strength mortar of wall by utilizing microbial grouting
CN114607167A (en) * 2022-03-15 2022-06-10 中国水利水电科学研究院 Crack repairing method and device combining microbial cement and chemical grouting technology

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004123437A (en) * 2002-10-01 2004-04-22 Fujikura Ltd Material and method of repairing concrete crack
CN1778934A (en) * 2005-10-10 2006-05-31 东南大学 Preparation of calcium carbonate by microbe deposition
CN101270369A (en) * 2008-05-06 2008-09-24 清华大学 Microorganism cause concrete or concrete, producing method and application thereof
CN101302484A (en) * 2008-01-15 2008-11-12 东南大学 Method for recovering cement-based material crack by means of microorganism, culture fluid and repair nutrient fluid
CN201169924Y (en) * 2008-03-18 2008-12-24 启东建筑集团有限公司 Basement concrete wall slit mending body
CN101851968A (en) * 2009-03-30 2010-10-06 殷保卫 Construction method for preventing outer wall of basement from cracking

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004123437A (en) * 2002-10-01 2004-04-22 Fujikura Ltd Material and method of repairing concrete crack
CN1778934A (en) * 2005-10-10 2006-05-31 东南大学 Preparation of calcium carbonate by microbe deposition
CN101302484A (en) * 2008-01-15 2008-11-12 东南大学 Method for recovering cement-based material crack by means of microorganism, culture fluid and repair nutrient fluid
CN201169924Y (en) * 2008-03-18 2008-12-24 启东建筑集团有限公司 Basement concrete wall slit mending body
CN101270369A (en) * 2008-05-06 2008-09-24 清华大学 Microorganism cause concrete or concrete, producing method and application thereof
CN101851968A (en) * 2009-03-30 2010-10-06 殷保卫 Construction method for preventing outer wall of basement from cracking

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
《山西建筑》 20050731 梁全虎 混凝土结构裂缝修复的方法--壁可注入法 第39-40页 1-2 , 第13期 *
梁全虎: "混凝土结构裂缝修复的方法——壁可注入法", 《山西建筑》, no. 13, 31 July 2005 (2005-07-31), pages 39 - 40 *
王瑞兴: "微生物沉积碳酸钙修复水泥基材料表面缺陷", 《硅酸盐学报》, no. 4, 30 April 2008 (2008-04-30), pages 457 - 464 *
袁雄洲: "水泥基材料裂缝微生物修复技术的研究与进展", 《硅酸盐学报》, no. 01, 31 January 2009 (2009-01-31), pages 160 - 170 *
黄伟明: "钢筋混凝土结构裂缝的修补方法", 《上海建设科技》, no. 4, 31 August 2009 (2009-08-31), pages 45 - 47 *

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103043937A (en) * 2012-12-27 2013-04-17 同济大学 Compound capsule underground structure concrete self-repairing system provided with aerobic microorganisms inside
CN104196131A (en) * 2014-09-11 2014-12-10 山东建筑大学 Method for plugging cast-in-situ concrete slab or base-plate crack with microbe-sedimented calcium carbonate
CN104818719A (en) * 2015-03-16 2015-08-05 山东建筑大学 Microorganism grouting method capable of improving early-stage calcium carbonate deposit volume
CN105484298A (en) * 2016-01-08 2016-04-13 三峡大学 Microorganism reinforced grouting maintenance test device
CN105911260A (en) * 2016-06-15 2016-08-31 天津大学 Testing device for repairing concrete cracks through microorganisms
CN105911260B (en) * 2016-06-15 2018-01-12 天津大学 A kind of experimental rig of microorganism remediation distress in concrete
CN106835878A (en) * 2017-01-24 2017-06-13 华中科技大学 A kind of embankment structure and construction method
CN109459364A (en) * 2018-10-30 2019-03-12 河海大学 A kind of experimental rig and method for reinforcing calcareous coarse-grained soil based on MICP
CN109459364B (en) * 2018-10-30 2021-04-09 河海大学 Test device and method for reinforcing calcareous coarse-grained soil based on MICP
CN109184255A (en) * 2018-10-31 2019-01-11 山东建筑大学 A method of utilizing microorganism grout sealing outer wall of basement crack
CN110863517A (en) * 2019-12-12 2020-03-06 昆明理工大学 Method for sealing and blocking leakage of storage yard by utilizing microbial induction
CN112142409A (en) * 2020-09-27 2020-12-29 长安大学 Microbial self-healing waterproof anti-permeability mortar and preparation method thereof
CN112573941A (en) * 2020-12-31 2021-03-30 武汉工程大学 Method for repairing early cracks of cement stabilized macadam pavement base
CN113307656A (en) * 2021-05-29 2021-08-27 兰州理工大学 Method for repairing concrete cracks by using microorganisms
CN113685058A (en) * 2021-09-14 2021-11-23 山东建筑大学 Method for replacing low-strength mortar of wall by utilizing microbial grouting
CN114607167A (en) * 2022-03-15 2022-06-10 中国水利水电科学研究院 Crack repairing method and device combining microbial cement and chemical grouting technology
CN114607167B (en) * 2022-03-15 2023-09-08 中国水利水电科学研究院 Crack repairing method and device by combining microorganism cement and chemical grouting technology

Also Published As

Publication number Publication date
CN102493493B (en) 2013-08-28

Similar Documents

Publication Publication Date Title
CN102493493B (en) Method for plugging horizontal fissures of basement concrete structure by grouting microorganisms
CN102493494B (en) Method for sealing vertical cracks of basement concrete structures by using microbial grouting
CN104196131B (en) The cast-in-place slab-type apartment building plate of microbiological precipitation of CaCO 3 blocking concrete or soleplate crack method
AU2020102841A4 (en) A soil improvement methods for saline-alkaline land
CN109838113B (en) Method for plugging cracks of basement roof and outer wall by utilizing microbial grouting
CN105507232A (en) Microorganism slab grouting device and method used for reinforcing liquefiable foundation
CN102913250B (en) Shield tunnel-entering construction method at stratum rich in water powder and soil powder sand
CN101545251B (en) Method for storing and getting water by blocking river on natural river course
CN109184255A (en) A method of utilizing microorganism grout sealing outer wall of basement crack
CN102226335A (en) Foundation treatment method for controlling post-construction settlement and deformation of soft soil
CN103277120A (en) Post-unfreezing water burst prevention method of non-full-depth freezing vertical shaft
CN106544961A (en) A kind of distress in concrete blocking method
CN108999179B (en) Method for reinforcing and treating soft soil foundation by combining vacuum preloading and microorganism sand consolidation technology
CN206721822U (en) A kind of Novel geogrid and the old and new's dyke joint portion ruggedized construction
CN106884424A (en) A kind of device and construction method that microorganism solidification is carried out in thin silt
CN202040445U (en) Salt drainage pipe for soil improvement
CN215669744U (en) Masonry structure basement seepage slip casting repair structure
CN105155510A (en) Method capable of carrying out microorganism solidifying and crusting on super soft foundation surface and matching device
CN109881660A (en) A kind of microorganism solidifies the marine structure foundation scouring protection construction method of joint cut-pff wall
CN204715426U (en) A kind of water burst drainage system for closed deep foundation ditch exploratory hole
CN104399740B (en) A kind of horizontal sealing Rotating fields and its method for contaminated soil remediation
CN114657971B (en) Microbial microcapsule, preparation method thereof and application of microbial microcapsule in curing soft soil foundation
CN112942388B (en) Water burst disaster treatment system and method suitable for crack development side slope
CN205224011U (en) A dull and stereotyped slip casting device of microorganism for reinforcing ground that can liquefy
CN112081125A (en) Bottom sealing structure of foundation pit in submersible sandy gravel stratum and construction process

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20170329

Address after: 250014 Heping Road, Lixia District, Shandong, Ji'nan, China, No. 47

Patentee after: Shandong Jian special special engineering Co., Ltd.

Address before: Feng Ming Licheng District Lingang Development Zone, 250101 Ji'nan Road, Shandong Province

Patentee before: Shandong Construction University

TR01 Transfer of patent right