CN102493348B - Transverse limitation and correction device for incremental launching of bridge - Google Patents

Transverse limitation and correction device for incremental launching of bridge Download PDF

Info

Publication number
CN102493348B
CN102493348B CN201110420959.7A CN201110420959A CN102493348B CN 102493348 B CN102493348 B CN 102493348B CN 201110420959 A CN201110420959 A CN 201110420959A CN 102493348 B CN102493348 B CN 102493348B
Authority
CN
China
Prior art keywords
counter
incremental launching
depression bar
force seat
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201110420959.7A
Other languages
Chinese (zh)
Other versions
CN102493348A (en
Inventor
胡雄伟
张维
胡军
周外男
周启辉
汪芳进
涂满明
王东辉
许佳平
张爱花
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
Original Assignee
China Railway Major Bridge Engineering Co Ltd
China Railway Major Bridge Engineering Group Co Ltd MBEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Co Ltd, China Railway Major Bridge Engineering Group Co Ltd MBEC filed Critical China Railway Major Bridge Engineering Co Ltd
Priority to CN201110420959.7A priority Critical patent/CN102493348B/en
Publication of CN102493348A publication Critical patent/CN102493348A/en
Application granted granted Critical
Publication of CN102493348B publication Critical patent/CN102493348B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention relates to the technical field of incremental launching of bridges, in particular to a transverse limitation and correction device for incremental launching of a bridge, which comprises a counter-force pedestal (5). The upper portion of the counter-force pedestal (5) is provided with a recess, the front and the top of the recess are open, a horizontal jack (4) and a moving pressure bar (3) are horizontally disposed in the recess, the horizontal jack (4) is disposed between the counter-force pedestal (5) and the moving pressure bar (3), and a rolling friction type horizontal limiter (1) is hinged to the moving pressure bar (3) through a pin (2). By means of the transverse limitation and correction device, passive transverse limitation of a steel truss in incremental launching is improved, passive correction is changed into active correction, and accordingly, difficulty in controlling transverse offset of the steel truss in incremental launching is reduced greatly.

Description

A kind of cross spacing for bridge incremental launching construction and deviation correcting device
Technical field
The present invention relates to bridge incremental launching construction technical field, is a kind of cross spacing for bridge incremental launching construction and deviation correcting device specifically.Be applicable to cross spacing and the correction of large-tonnage steel trusses incremental launching construction.
Background technology
In existing steel truss girder incremental launching construction process, by horizontal limit devices is set, steel truss girder or slide block are carried out spacing, at steel truss girder incremental launching construction, complete after certain stage, then adopt the steel truss girder that transverse horizontal jack pair is static to rectify a deviation.Although the method can meet cross spacing and correction in part steel truss girder incremental launching construction, has following defect:
1, horizontal limit devices can not adapt to steel truss girder corner off normal, and steel truss girder or slide block easily produce stuck phenomenon, and cross spacing frictional resistance is large;
2,, in steel truss girder incremental launching construction process, horizontal limit devices only can carry out passive cross spacing to steel truss girder;
3, after the steel truss girder stage, incremental launching construction completed, adopt large-tonnage level jack laterally to rectify a deviation to static steel truss girder, correction difficulty and risk are larger.
Due to above-mentioned shortcoming, make in large-tonnage steel trusses incremental launching construction the horizontal off normal of steel truss girder control difficulty very big, plant equipment drops into larger, and construction risk is larger, the problem that in the time of even cannot solving large span large-tonnage steel trusses pushing tow, horizontal off normal is controlled.
Summary of the invention
For the defect existing in prior art, the object of the present invention is to provide a kind of cross spacing for bridge incremental launching construction and deviation correcting device, improve the passive cross spacing in steel truss girder incremental launching construction, and passive correction is become to initiatively correction, thereby greatly reduce the difficulty of in steel truss girder pushing tow process, steel truss girder being carried out to horizontal off normal control.
For reaching above object, the technical scheme that the present invention takes is:
Cross spacing and a deviation correcting device for bridge incremental launching construction, is characterized in that, comprising:
Counter-force seat 5, counter-force seat 5 tops are provided with groove, and front side and the top of groove are provided with opening, and level jack 4 and movable depression bar 3 are placed horizontally in this groove, and level jack 4 is arranged between counter-force seat 5 and movable depression bar 3,
Rolling friction type horizontal limiting stopper 1 is hinged by bearing pin 2 with movable depression bar 3.
On the basis of technique scheme, between counter-force seat 5 and level jack 4, according to actual pitch, carry out pad.
On the basis of technique scheme, between the side of rolling friction type horizontal limiting stopper 1 and counter-force seat 5, leave gap A.
On the basis of technique scheme, described movable depression bar 3, for welding box structure, comprises the upper plate, the lower plate that be arranged in parallel up and down,
Upper plate, the lower plate of movable depression bar 3 is equipped with the otic placode arranging along direction across bridge, and described otic placode and upper plate, otic placode and lower plate are made into integration by a block plate, and otic placode is provided with pin shaft hole,
Rolling friction type horizontal limiting stopper 1 is inserted in the otic placode of movable depression bar 3, and hinged by bearing pin 2.
On the basis of technique scheme, rolling friction type horizontal limiting stopper 1 comprises: along vertical bridge to the roller box 1-2 arranging, formed by Plate Welding, in roller box 1-2, by wheel shaft 1-3, be equipped with two roller 1-1.
On the basis of technique scheme, counter-force seat 5 is formed by Plate Welding, and counter-force seat top board 5-2 is welded in the end face of counter-force seat 5, and is positioned at movable depression bar 3 tops, and by counter-force seat top board, 5-2 is fixed on movable depression bar 3 in groove 5-1.
On the basis of technique scheme, the groove 5-1 cross section of placing level jack 4 places is " U " shape section.
Cross spacing for bridge incremental launching construction of the present invention and deviation correcting device, improve the passive cross spacing in steel truss girder incremental launching construction, and passive correction is become to initiatively correction, thereby greatly reduce the difficulty of in steel truss girder pushing tow process, steel truss girder being carried out to horizontal off normal control.
Cross spacing for bridge incremental launching construction of the present invention and deviation correcting device, laterally correction and spacing uniting two into one, simplified construction technology; Laterally correction is carried out in steel truss girder incremental launching construction process, laterally correction only need provide a less active force, give the acceleration of the transverse movement of steel truss girder in slippage, thereby realize the object that steel truss girder progressively reduces off normal and reaches correction in slipping.Its horizontal correction counter-force of needing because overcoming stiction much smaller than prior art of correction counter-force, thus greatly reduce the difficulty of horizontal correction.
Cross spacing for bridge incremental launching construction of the present invention and deviation correcting device, have the following advantages:
1, steel truss girder incremental launching construction cross spacing and correction behavior unite two into one, and have reduced working procedure;
2, this device possesses the off normal that adapts to and limit steel truss girder, is conducive to reduce the frictional resistance in steel truss girder pushing tow process, has improved the service efficiency of continuous jack; Because the counter-force of laterally rectifying a deviation compared with prior art greatly reduces, greatly reduce the counter-force of horizontal correction, reduced the risk of difficulty of construction and steel truss girder correction;
3, simple in structure, constructability.
Accompanying drawing explanation
The present invention has following accompanying drawing:
Fig. 1 is apparatus of the present invention and steel truss girder, slipway beam relative position relation schematic diagram.
Fig. 2 is the facade arrangement diagram of apparatus of the present invention.
Fig. 3 is the top view of Fig. 2.
Fig. 4 is rolling friction type horizontal limiting stopper and the facade structures figure of movable depression bar after bearing pin is hinged.
Fig. 5 is the top view of Fig. 4.
Fig. 6 is the facade structures figure of counter-force seat.
Fig. 7 is the top view of Fig. 6.
Fig. 8 is the 1-1 sectional drawing of Fig. 6.
The specific embodiment
Below in conjunction with accompanying drawing, the present invention is described in further detail.
As shown in Figure 2,3, 4, the cross spacing for bridge incremental launching construction of the present invention and deviation correcting device, comprising:
Counter-force seat 5, counter-force seat 5 tops are provided with groove (being the 5-1 of groove shown in Fig. 6), and front side and the top of groove are provided with opening, and level jack 4 and movable depression bar 3 are placed horizontally in this groove, and level jack 4 is arranged between counter-force seat 5 and movable depression bar 3,
Rolling friction type horizontal limiting stopper 1 is hinged by bearing pin 2 with movable depression bar 3, for example: one end of movable depression bar 3 (front end) stretches out outside counter-force seat 5 from the opening part of groove front side, then hinged by bearing pin 2 and rolling friction type horizontal limiting stopper 1.
By the hinged object of bearing pin 2, be in slipping, to occur corner off normal for applicable steel truss girder.
On the basis of technique scheme, between counter-force seat 5 and level jack 4, according to actual pitch, carry out pad.
On the basis of technique scheme, as shown in Figure 3, between the side of rolling friction type horizontal limiting stopper 1 and counter-force seat 5, leave gap A.The setting of this gap A is in order to guarantee that rolling friction type horizontal limiting stopper 1 can rotate; The appearance and size of rolling friction type horizontal limiting stopper 1 is larger than counter-force seat 5, leaves gap A and can guarantee that rolling friction type horizontal limiting stopper 1 can not enter in the groove of counter-force seat 5, and can to steel truss girder, have the function of cross spacing together with counter-force seat 5.
On the basis of technique scheme, as shown in Figure 4,5, described movable depression bar 3, for welding box structure, comprises the upper plate, the lower plate that be arranged in parallel up and down,
Upper plate, the lower plate of movable depression bar 3 is equipped with the otic placode arranging along direction across bridge, described otic placode and upper plate, otic placode and lower plate are made into integration by a block plate, otic placode is provided with pin shaft hole, that is: otic placode is in fact a privileged site in upper plate, lower plate, rather than the parts that arrange separately, upper plate, lower plate are referred to as otic placode for assembling the part of rolling friction type horizontal limiting stopper 1, can be understood as: upper plate and lower plate arrange pin shaft hole by rolling friction type horizontal limiting stopper end, this position that pin shaft hole is set is referred to as otic placode
Rolling friction type horizontal limiting stopper 1 is inserted in the otic placode of movable depression bar 3, and hinged by bearing pin 2.
On the basis of technique scheme, as shown in Figure 5, rolling friction type horizontal limiting stopper 1 comprises: along vertical bridge to arrange, by Plate Welding, form roller box 1-2, in roller box 1-2, by wheel shaft 1-3, be equipped with two roller 1-1.This device lateral spacing with when correction, rolling friction type horizontal limiting stopper 1 is provided with two pressure-bearing rollers (roller 1-1) near steel truss girder one side, the friction between itself and steel truss girder is rolling friction; Between rolling friction type horizontal limiting stopper 1 and movable depression bar 3, adopt bearing pin 2 hinged to adapt to the corner off normal of steel truss girder, thereby improve the performance of cross spacing.
On the basis of technique scheme, as shown in Fig. 6,7,8, counter-force seat 5 is formed by Plate Welding, counter-force seat top board 5-2 is welded in the end face of counter-force seat 5, and be positioned at movable depression bar 3 tops, by counter-force seat top board, 5-2 is fixed on movable depression bar 3 in groove 5-1, that is: counter-force seat top board 5-2 coordinates with groove 5-1, movable depression bar 3 is fixed in groove 5-1, and movable depression bar 3 and rolling friction type horizontal limiting stopper 1 only can move by direction across bridge.
On the basis of technique scheme, as shown in Figure 8, the groove 5-1 cross section of placing level jack 4 places is " U " shape section, and the oil pressure pipe etc. of being convenient to level jack 4 can involve and arrange pad, convenient operation.Level jack 4 is positioned in the middle of the cross section of counter-force seat groove 5-1, counter-force seat 5 and slipway beam welding.
Bridge embodiment as shown in Figure 1, the bridge shown in this embodiment, is a double tower steel truss girder cable-stayed bridge (90m+240m+630m+240m+90m), and its end bay 240m+90m three-joist trussed steel beam adopts incremental launching method, and its maximum pushing tow weight is 22668t.
Fig. 1 is a facade arrangement diagram of the cross spacing for bridge incremental launching construction of the present invention and deviation correcting device and steel truss girder, slipway beam relative position relation.Lower chord outside, purlin, steel truss girder both sides respectively arranges a set of cross spacing for bridge incremental launching construction of the present invention and deviation correcting device (being designated hereinafter simply as cross spacing and deviation correcting device).
Cross spacing and the deviation correcting device course of work are as follows: the reserved certain spacing a of base plate outer edge line of cross spacing and deviation correcting device and purlin, limit box-shaped lower chord; Its objective is: if steel truss girder is by designing linear slippage, cross spacing does not contact with steel truss girder with deviation correcting device; When steel truss girder is when in slipping, the amount of offseting to one side is greater than a, cross spacing and deviation correcting device laterally indentation A(referring to Fig. 3); When the horizontal off normal of steel truss girder reaches a+A, need rectify a deviation to steel truss girder, now level jack 4 is top lifting by people, by movable depression bar 3 and rolling friction type horizontal limiting stopper 1 by steel truss girder to opposite direction pushing tow until design attitude; When this device is laterally rectified a deviation to steel truss girder, the effect counter-force of level jack 4 passes to slipway beam by counter-force seat 5 by correction counter-force.
The principle that cross spacing and deviation correcting device adopt is as follows:
Cross spacing and deviation correcting device are when cross spacing, rolling friction type horizontal limiting stopper 1 can adapt to the corner off normal occurring in steel truss girder pushing tow process, reduced the frictional resistance of cross spacing to steel truss girder, by rolling friction type horizontal limiting stopper 1, sliding friction is become to rolling friction (cross spacing counter-force becomes force of rolling friction from maximum static friction force or force of sliding friction), the frictional resistance while reducing the vertical bridge of steel truss girder to slippage;
From the textural size by rolling friction type horizontal limiting stopper 1, manufacture the size that is greater than counter-force seat 5 grooves, thereby realize the function that this device has cross spacing;
Cross spacing and deviation correcting device are when cross spacing, only need provide a less direction across bridge active force, give vertical bridge acceleration to direction across bridge motion of steel truss girder to slippage, steel truss girder just moves to bridge center line in slipping gradually at vertical bridge, thereby reach the object of correction, its correction counter-force is much smaller than the required maximum static friction force overcoming of the horizontal correction of prior art.
The present invention is not limited to above-mentioned preferred forms, and anyone should learn the structural change of making under enlightenment of the present invention, and every have identical or close technical scheme with the present invention, within all falling into protection scope of the present invention.
The content not being described in detail in this manual belongs to the known prior art of professional and technical personnel in the field.

Claims (6)

1. for cross spacing and the deviation correcting device of bridge incremental launching construction, it is characterized in that, comprising:
Counter-force seat (5), counter-force seat (5) top is provided with groove, front side and the top of groove are provided with opening, level jack (4) and movable depression bar (3) are placed horizontally in this groove, and level jack (4) is arranged between counter-force seat (5) and movable depression bar (3)
Rolling friction type horizontal limiting stopper (1) is hinged by bearing pin (2) with movable depression bar (3), between the side of rolling friction type horizontal limiting stopper (1) and counter-force seat (5), leaves gap A.
2. the cross spacing for bridge incremental launching construction as claimed in claim 1 and deviation correcting device, is characterized in that: between counter-force seat (5) and level jack (4), according to actual pitch, carry out pad.
3. the cross spacing for bridge incremental launching construction as claimed in claim 1 and deviation correcting device, is characterized in that: described movable depression bar (3), for welding box structure, comprises the upper plate, the lower plate that be arranged in parallel up and down,
Upper plate, the lower plate of movable depression bar (3) is equipped with the otic placode arranging along direction across bridge, and described otic placode and upper plate, otic placode and lower plate are made into integration by a block plate, and otic placode is provided with pin shaft hole,
Rolling friction type horizontal limiting stopper (1) is inserted in the otic placode of movable depression bar (3), and hinged by bearing pin (2).
4. the cross spacing for bridge incremental launching construction as claimed in claim 1 and deviation correcting device, it is characterized in that: rolling friction type horizontal limiting stopper (1) comprising: along vertical bridge to arrange, by Plate Welding, form roller box (1-2), in roller box (1-2), by wheel shaft (1-3), be equipped with two rollers (1-1).
5. the cross spacing for bridge incremental launching construction as claimed in claim 1 and deviation correcting device, it is characterized in that: counter-force seat (5) is formed by Plate Welding, counter-force seat top board (5-2) is welded in the end face of counter-force seat (5), and be positioned at movable depression bar (3) top, by counter-force seat top board (5-2), movable depression bar (3) be fixed in groove (5-1).
6. the cross spacing for bridge incremental launching construction as claimed in claim 5 and deviation correcting device, is characterized in that: groove (5-1) cross section that placement level jack (4) is located is " U " shape section.
CN201110420959.7A 2011-12-14 2011-12-14 Transverse limitation and correction device for incremental launching of bridge Active CN102493348B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110420959.7A CN102493348B (en) 2011-12-14 2011-12-14 Transverse limitation and correction device for incremental launching of bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110420959.7A CN102493348B (en) 2011-12-14 2011-12-14 Transverse limitation and correction device for incremental launching of bridge

Publications (2)

Publication Number Publication Date
CN102493348A CN102493348A (en) 2012-06-13
CN102493348B true CN102493348B (en) 2014-12-10

Family

ID=46185204

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110420959.7A Active CN102493348B (en) 2011-12-14 2011-12-14 Transverse limitation and correction device for incremental launching of bridge

Country Status (1)

Country Link
CN (1) CN102493348B (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103046759A (en) * 2013-01-18 2013-04-17 上海建工一建集团有限公司 Shielding steel plate correction construction technology
CN104278633B (en) * 2013-07-11 2016-08-24 中铁工程设计咨询集团有限公司 Bridge incremental launching guides and deviation correcting device and construction method
CN103911953B (en) * 2014-04-14 2015-10-28 上海市机械施工集团有限公司 The combination thrustor installed for overhead, bridge and not intermittently pushing method
CN105544411B (en) * 2016-01-26 2017-03-29 中铁十局集团有限公司 A kind of roller trolley device for integrating traveling and limit position adjusting function
CN106065574A (en) * 2016-06-17 2016-11-02 柳州黔桥工程材料有限公司 Stride incremental launching construction crosses the method for jigsaw
CN107521936B (en) * 2017-08-25 2024-02-09 中国化学工程第十三建设有限公司 Conveying device and method for large heavy-duty metal components
CN108252198A (en) * 2017-12-29 2018-07-06 中铁大桥局集团第八工程有限公司 A kind of bridge structure for being equipped with horizontal wind-proof device
CN109024307A (en) * 2018-08-24 2018-12-18 苏交科集团股份有限公司 A kind of lateral deviation-rectifying system of intelligence for bridge incremental launching construction
CN109778708A (en) * 2019-03-05 2019-05-21 中铁四局集团有限公司 A kind of Large-Span Continuous steel truss cable-stayed bridge Middle span closing longitudinal deviation correction device
CN111395164B (en) * 2020-01-16 2021-09-03 中铁二十四局集团浙江工程有限公司 Steel box girder pushing structure for bridge construction
CN112095493B (en) * 2020-10-20 2022-01-28 安徽省公路桥梁工程有限公司 Pushing device of self-correcting guy rope hanging basket for bridge construction
CN113513630A (en) * 2021-04-30 2021-10-19 四川石油天然气建设工程有限责任公司 Pipeline crossing pushing system for narrow deep valley or wide river and process thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007009474A (en) * 2005-06-29 2007-01-18 Otaki Yuatsu:Kk Heavy-load mounting equipment
CN101210416A (en) * 2007-12-20 2008-07-02 中铁大桥局股份有限公司 Semi-flexible supporting device for large span steel box girder incremental launching method construction
CN101250855A (en) * 2008-03-28 2008-08-27 山东省路桥集团有限公司 Method for construction of multi-point integral top pulling steel case beam
KR20090102182A (en) * 2008-03-25 2009-09-30 주식회사 제일엔지니어링 Launching apparatus for moving girders forwardly for incremental launching method
CN201420241Y (en) * 2009-05-07 2010-03-10 中铁四局集团第四工程有限公司 Dynamic hydraulic correcting system of steel box girder
JP2010095898A (en) * 2008-10-16 2010-04-30 Ihi Corp Trussed setting beam
CN101906755A (en) * 2010-09-06 2010-12-08 中铁大桥局集团有限公司 Three-truss continuous steel truss girder pushing device and arrangement method thereof

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007009474A (en) * 2005-06-29 2007-01-18 Otaki Yuatsu:Kk Heavy-load mounting equipment
CN101210416A (en) * 2007-12-20 2008-07-02 中铁大桥局股份有限公司 Semi-flexible supporting device for large span steel box girder incremental launching method construction
KR20090102182A (en) * 2008-03-25 2009-09-30 주식회사 제일엔지니어링 Launching apparatus for moving girders forwardly for incremental launching method
CN101250855A (en) * 2008-03-28 2008-08-27 山东省路桥集团有限公司 Method for construction of multi-point integral top pulling steel case beam
JP2010095898A (en) * 2008-10-16 2010-04-30 Ihi Corp Trussed setting beam
CN201420241Y (en) * 2009-05-07 2010-03-10 中铁四局集团第四工程有限公司 Dynamic hydraulic correcting system of steel box girder
CN101906755A (en) * 2010-09-06 2010-12-08 中铁大桥局集团有限公司 Three-truss continuous steel truss girder pushing device and arrangement method thereof

Also Published As

Publication number Publication date
CN102493348A (en) 2012-06-13

Similar Documents

Publication Publication Date Title
CN102493348B (en) Transverse limitation and correction device for incremental launching of bridge
CN206857986U (en) A kind of portal frame for being easy to adjust height
CN203820379U (en) Fine adjusting and anti-falling device of aerial working platform
CN103174283A (en) Mobile operation platform
CN210066516U (en) Deviation correcting device for control line type in steel truss pushing construction process
CN215329741U (en) Locking beam labor-saving throwing and withdrawing device and gate locking system
CN204625045U (en) A kind of steel structure hoisting door shaped stent formula hanging apparatus
CN103541300A (en) Railway concrete continuous beam implemented based on flat-pushing method and construction method thereof
CN204211323U (en) A kind of counterweight with compensated chain guide piece
CN203498743U (en) Railway concrete continuous beam implemented on basis of flat pushing method
CN209482681U (en) Protective platform in a kind of Super High Core Walls Structure
CN204608601U (en) The liftable be arranged in bridge inspection vehicle truss checks platform
CN103147409A (en) Closing construction method for steel bar-concrete superposed beam cable-stayed bridge
CN209582787U (en) A kind of mobile toter of staircase assembly
CN204873485U (en) River course is bridge crane usefulness walking portal frame for pier
CN204470643U (en) A kind of bridge combined member bar drilling equipment
CN201862956U (en) Assembly molding bed rack applicable to truss girder assembly
CN107326800A (en) A kind of clad steel is box without axle power hinge device
CN211285268U (en) Bridge falling device for erecting bridge by horizontal pushing of guide beam
CN106836770A (en) Possesses the stable type scaffold of hydraulic pressure platform assistance for lifting
CN203904840U (en) Novel frame bridge jacking jigger
CN210104588U (en) Bridge construction pushing device suitable for curves and longitudinal and transverse slopes
CN207017146U (en) A kind of box no axle power hinge device of clad steel
CN203498759U (en) Pushing construction guide sliding device capable of automatically rectifying deviations
CN113152389A (en) Locking beam labor-saving throwing and withdrawing device and gate locking system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: GROUP CO., LTD., ZHONGTIE DAQIAO BUREAU

Free format text: FORMER OWNER: CHINA ZHONGTIE MAJOR BRIDGE ENGINEERING CO., LTD.

Effective date: 20150113

Free format text: FORMER OWNER: GROUP CO., LTD., ZHONGTIE DAQIAO BUREAU

Effective date: 20150113

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 430074 WUHAN, HUBEI PROVINCE TO: 430050 WUHAN, HUBEI PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20150113

Address after: 430050 Hanyang Road, Hanyang District, Hubei, No. 38, No.

Patentee after: Group Co., Ltd., Zhongtie Daqiao Bureau

Address before: 430074 Hubei province Wuhan Dongxin East Lake New Technology Development Zone Road SBI Venture Street No. 6 Building 12 layer

Patentee before: China Zhongtie Major Bridge Engineering Co., Ltd.

Patentee before: Group Co., Ltd., Zhongtie Daqiao Bureau