CN102493343A - Construction method for building trestle bridge piers in bedrock-exposed riverbed - Google Patents

Construction method for building trestle bridge piers in bedrock-exposed riverbed Download PDF

Info

Publication number
CN102493343A
CN102493343A CN2011103808416A CN201110380841A CN102493343A CN 102493343 A CN102493343 A CN 102493343A CN 2011103808416 A CN2011103808416 A CN 2011103808416A CN 201110380841 A CN201110380841 A CN 201110380841A CN 102493343 A CN102493343 A CN 102493343A
Authority
CN
China
Prior art keywords
bridge pier
trestle
bedrock
building
basement rock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011103808416A
Other languages
Chinese (zh)
Inventor
阳利平
王灶华
刘宇廷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 5 Engineering Group Co Ltd
Second Engineering Co Ltd of China Railway 25th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Original Assignee
China Railway No 5 Engineering Group Co Ltd
Second Engineering Co Ltd of China Railway 25th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 5 Engineering Group Co Ltd, Second Engineering Co Ltd of China Railway 25th Bureau Group Co Ltd filed Critical China Railway No 5 Engineering Group Co Ltd
Priority to CN2011103808416A priority Critical patent/CN102493343A/en
Publication of CN102493343A publication Critical patent/CN102493343A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a construction method for building trestle bridge piers in a bedrock-exposed riverbed, wherein the bedrock-embedded trestle bridge piers are fixed by manually-excavated bedrock and concrete. The construction method comprises the following steps of: 1, building a temporary straw bag cofferdam; 2, removing water in the temporary cofferdam; 3, excavating foundation pits of the trestle bridge piers on the bedrock; and 4, pouring trestle steel pipe pile pier foundations in the foundation pits, so that the piers are embedded into the bedrock and are fixed with a foundation. The construction method disclosed by the invention can realize the purposes of rapid construction and reduced cost.

Description

A kind of job practices of in the riverbed of exposed bedrock, building the trestle bridge pier
Technical field
The present invention relates to a kind of job practices of in the riverbed of exposed bedrock, building the trestle bridge pier.
Background technology
At present; The construction bridge bridge pier generally adopts rig boring or crawler crane to join vibrating hammer in the riverbed of exposed bedrock; Cost is higher, progress is slow to adopt rig to hole; Adopt crawler crane to join that the vibrating hammer cost is high, progress is slow, and when the saturated compressive strength of single shaft of basement rock greatly the time, vibrating hammer can't be squeezed into the steel pipe pile bridge pier degree of depth of basement rock design demand.
Summary of the invention
The object of the present invention is to provide a kind of new job practices of in the riverbed of exposed bedrock, building the trestle bridge pier, the cost that prior art exists is higher to overcome, progress waits deficiency slowly.
Technical scheme of the present invention is following: the trestle bridge pier that embeds basement rock is fixed by hand excavation's basement rock, concrete, specifically may further comprise the steps:
Step 1 is built the interim cofferdam of straw bag;
Step 2 is removed the ponding in the interim cofferdam;
Step 3, excavation trestle bridge pier foundation ditch on basement rock;
Step 4 is built trestle steel pipe pile pier footing in foundation ditch, bridge pier embeds basement rock, with bridge pier and basic fixed.
In step 2, adopt water pumper that the ponding in the interim cofferdam is drained.
In step 3, adopt manual work, comprise that the crushing appliance that uses pneumatic pick is broken with basement rock, and excavate and transport.
In step 4, the half the concrete of cast inserts concrete to the steel pipe pile bridge pier of trestle then in the bridge pier foundation ditch, continues fluid concrete to basement rock surface, and the steel pipe pile bridge pier is laterally connected by design, and the trestle bridge pier is built and finished.
When in the riverbed of exposed bedrock, building the trestle bridge pier, confirm the planar dimension and the cross dimensions of trestle bridge pier according to working design, the interim cofferdam of build planar dimension outside, and remove ponding in the interim cofferdam, for the trestle bridge pier provides the construction plant.
The invention has the beneficial effects as follows that can construct simultaneously many places, progress is very fast, it is less to compare the mechanical execution potential safety hazard, reduces overall cost.
The specific embodiment
Below in conjunction with the specific embodiment the present invention is described further.
A kind of job practices of in the riverbed of exposed bedrock, building the trestle bridge pier provided by the invention may further comprise the steps:
Step 1 is built the interim cofferdam of straw bag: adopt common straw bag to build interim cofferdam at the water surface during low or dry season.
Step 2 is removed the ponding in the interim cofferdam: adopt water pumper that the ponding in the interim cofferdam is drained, for formal foundation ditch cofferdam or trestle bridge pier provide the construction plant.
Step 3, excavation cofferdam foundation ditch or trestle bridge pier foundation ditch on basement rock: equipment such as use pneumatic pick are broken with basement rock, and excavate and transport.Foundation depth and cross dimensions are calculated according to instructions for use and are confirmed.
Step 4, in foundation ditch, build trestle steel pipe pile pier footing: the half the concrete of cast in the bridge pier foundation ditch, insert concrete to the steel pipe pile bridge pier of trestle then, continue fluid concrete to basement rock surface, the steel pipe pile bridge pier is laterally connected by design.The trestle bridge pier is built and is finished.

Claims (4)

1. job practices of in the riverbed of exposed bedrock, building the trestle bridge pier, it is characterized in that: the trestle bridge pier that embeds basement rock is fixed by hand excavation's basement rock, concrete, specifically may further comprise the steps:
Step 1 is built the interim cofferdam of straw bag;
Step 2 is removed the ponding in the interim cofferdam;
Step 3, excavation trestle bridge pier foundation ditch on basement rock;
Step 4 is built trestle steel pipe pile pier footing in foundation ditch, bridge pier embeds basement rock, with bridge pier and basic fixed.
2. job practices of in the riverbed of exposed bedrock, building the trestle bridge pier according to claim 1 is characterized in that: in step 2, adopt water pumper that the ponding in the interim cofferdam is drained.
3. job practices of in the riverbed of exposed bedrock, building the trestle bridge pier according to claim 1 is characterized in that: in step 3, adopt manual work, comprise that the crushing appliance that uses pneumatic pick is broken with basement rock, and excavate and transport.
4. job practices of in the riverbed of exposed bedrock, building the trestle bridge pier according to claim 1; It is characterized in that: in step 4; The half the concrete of cast inserts concrete to the steel pipe pile bridge pier of trestle then in the bridge pier foundation ditch, continues fluid concrete to basement rock surface; The steel pipe pile bridge pier is laterally connected by design, and the trestle bridge pier is built and is finished.
CN2011103808416A 2011-11-25 2011-11-25 Construction method for building trestle bridge piers in bedrock-exposed riverbed Pending CN102493343A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011103808416A CN102493343A (en) 2011-11-25 2011-11-25 Construction method for building trestle bridge piers in bedrock-exposed riverbed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011103808416A CN102493343A (en) 2011-11-25 2011-11-25 Construction method for building trestle bridge piers in bedrock-exposed riverbed

Publications (1)

Publication Number Publication Date
CN102493343A true CN102493343A (en) 2012-06-13

Family

ID=46185199

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011103808416A Pending CN102493343A (en) 2011-11-25 2011-11-25 Construction method for building trestle bridge piers in bedrock-exposed riverbed

Country Status (1)

Country Link
CN (1) CN102493343A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111335171A (en) * 2020-03-13 2020-06-26 山东省公路桥梁建设有限公司 Construction method of steel trestle

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004324340A (en) * 2003-04-28 2004-11-18 Nishimatsu Constr Co Ltd Steel shell for footing foundation, bridge structure, bridge construction method, and three-dimensional intersection bridge construction method
JP2006028750A (en) * 2004-07-12 2006-02-02 Takenaka Doboku Co Ltd Construction method of pier
CN101235648A (en) * 2008-01-04 2008-08-06 贵州省桥梁工程总公司 Underwater bridge foundation construction method
CN101962954A (en) * 2010-09-27 2011-02-02 中铁大桥局集团第一工程有限公司 Cylindrical steel boxed cofferdam and construction method thereof
CN102191777A (en) * 2011-05-12 2011-09-21 广州市市政集团有限公司 Steel sheet pile coefferdam structure and topdown construction method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004324340A (en) * 2003-04-28 2004-11-18 Nishimatsu Constr Co Ltd Steel shell for footing foundation, bridge structure, bridge construction method, and three-dimensional intersection bridge construction method
JP2006028750A (en) * 2004-07-12 2006-02-02 Takenaka Doboku Co Ltd Construction method of pier
CN101235648A (en) * 2008-01-04 2008-08-06 贵州省桥梁工程总公司 Underwater bridge foundation construction method
CN101962954A (en) * 2010-09-27 2011-02-02 中铁大桥局集团第一工程有限公司 Cylindrical steel boxed cofferdam and construction method thereof
CN102191777A (en) * 2011-05-12 2011-09-21 广州市市政集团有限公司 Steel sheet pile coefferdam structure and topdown construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111335171A (en) * 2020-03-13 2020-06-26 山东省公路桥梁建设有限公司 Construction method of steel trestle

Similar Documents

Publication Publication Date Title
CN100465386C (en) Foundation Pit Supporting Method with Pile and Anchor
CN201883438U (en) Pit-in-foundation-pit steel sheet pile foundation pit supporting structure
CN102383431B (en) Middle pick prestressed centrifugally pile tube pile-sinking device and pile sinking method thereof
CN103882869A (en) Inclined supporting pile structure for foundation pit support and construction method thereof
CN203583498U (en) Micropile combination wall supporting structure
CN206070508U (en) Device for reinforcing foundation
CN101614020A (en) Flexible bladder type anti-corrosive apparatus and use the anticorrosion stake and the job practices of this device
CN107386285A (en) A kind of novel steel tube pile foundation rock borehole anchorage method
CN104196014A (en) Combined rock-embedded anchor cable slide-resistant pile where round steel is implanted and construction method thereof
CN101629421A (en) Method for pulling out deep pile foundation by utilizing full slewing drilling machine
CN103243740B (en) Construction method of rotary excavating and long spiral combination bored concrete pressure grouting secant pile continuous wall
CN207260148U (en) Service sleeve pile crown integrally abolishes device
CN107191001A (en) Tear down and build the strengthening of foundation construction method of house foundation
CN101985836B (en) Processing method of pile-wall type deep base pit supporting structure in case of encountering large boulder stone
CN103485344A (en) Method for extracting construction engineering pile foundation
CN102220764B (en) Construction method of deep foundation pit bracing system
CN203768914U (en) Foundation pit bracing diagonal support pile structure
CN104074183A (en) Drilling and concrete injected root composite pile implanting pile structure and construction method
CN102418348A (en) Construction process for forming underground continuous wall by using secant pile
CN201671104U (en) Combined tower type crane base
CN102493343A (en) Construction method for building trestle bridge piers in bedrock-exposed riverbed
CN203411988U (en) Independent medium-sized pile foundation
CN202031081U (en) Pipe sinking cast-in-place pile with soil discharge pipes
CN206917616U (en) A kind of auger stem
CN206928281U (en) Pretensioning prestressed concrete porous hollow ecology stake

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120613