CN102490733A - Method for operating double tube air supply at double ends of locomotive - Google Patents
Method for operating double tube air supply at double ends of locomotive Download PDFInfo
- Publication number
- CN102490733A CN102490733A CN2011104038451A CN201110403845A CN102490733A CN 102490733 A CN102490733 A CN 102490733A CN 2011104038451 A CN2011104038451 A CN 2011104038451A CN 201110403845 A CN201110403845 A CN 201110403845A CN 102490733 A CN102490733 A CN 102490733A
- Authority
- CN
- China
- Prior art keywords
- locomotive
- cut
- cut out
- out cock
- plug door
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
The invention provides a method for operating double tube air supply at double ends of a locomotive. Two sets of valve devices (3) are connected with a total air cylinder; and the valve device is formed in such a way that a cut-off plug door (4), an air pressure reducing valve (5) and a check valve (6) are connected with a cut-off plug door (7) in parallel after being connected with each other in series. When a single machine is pulled to a bus, the cut-off plug door (7) is closed, a locomotive total air double heading channel is cut off, the cut-off plug door (4) is opened and a vehicle air supply channel is opened (the air pressure is 600 KPa); when the bus is pulled through freight double heading, the cut-off plug door (4) is closed, a channel for supplying air to a passenger train is cut off, the cut-off plug door (7) is opened and a locomotive total air double heading channel is opened (the air pressure is 900 KPa); and when the locomotive is pulled through double heading, the cut-off plug door (7) at the corresponding end of the leading locomotive is opened, the bus is pulled through leading locomotive double heading after the cut-off plug door (4) is cut off, the leading locomotive is positioned in a double heading position, the cut-off plug door (7) shall be closed at the corresponding end when the locomotive is connected with the bus, and an air source (the air pressure is 600 KPa) is provided to the bus after the cut-off plug door (4) is opened.
Description
Technical field
The present invention relates to the railway locomotive technology, relate in particular to a kind of both ends of locomotive and operate two-tube air supply method.
Background technology
In recent years, quasi high-speed vehicle has generally adopted devices such as traveling portion air bellow, pneumatic car door, defecate collection device, has increased the auxiliary air quantity of using greatly.In order to replenish the auxiliary wind of using on the vehicle fast, need on the locomotive of traction passenger train, install two-tube air supply device additional.So-called two-tube air feed is meant carries out two-tube air feed to passenger vehicle, and one is traditional train brake pipe (500kPa or 600kPa), and another is that the independent air feed pipe of vehicle (600kPa) is referring to accompanying drawing 1.When locomotive double heading, dwell period plug door C01 opens stage plug door C04, and the train locomotive first reservoir A02 pressurized air gets into locomotive blast main road through stage plug door C04, and total wind pressure of 750~900KPa is provided to assisting vehicle through end total wind flexible pipe C06.This moment, total wind table D03 showed the first reservoir pressure, also can observe compressor start-stop pressure through this wind table.And when the two-tube air feed of passenger train; Dwell period plug door C04 then; Open stage plug door C01, the train locomotive first reservoir A02 pressurized air is through stage plug door C01, reducing valve C02; Boiler check valve C03 gets into locomotive blast main road, and total wind pressure of 600kPa is provided to passenger train through end total wind flexible pipe C06.This moment, total wind table D03 showed passenger vehicle air feed pressure, can observe compressor start-stop pressure through locomotive brake gear B01.
Because a shared total wind pressure table, in the working direction driver's cab, bus attendant can't be observed total wind pressure value of this car and the force value of independent air feed pipe is provided for vehicle through compression indicator simultaneously.After locomotive double heading operation, can't guarantee the total wind pressure value (900kPa) between locomotive simultaneously and independent air feed pipe pressure value (600kPa) is provided for vehicle.Particularly behind the locomotive et out of order, even there is blast main the breakdown locomotive end, total also can't guarantee fault locomotive wind pressure value (900kPa) simultaneously and independent air feed pipe pressure value (600kPa) is provided for vehicle.
Summary of the invention
The object of the invention overcomes the deficiency of above-mentioned prior art exactly, provides a kind of both ends of locomotive to operate two-tube air supply method, this method can:
Be that vehicle provides independent air feed pipe pressure value (600kPa) when 1, satisfying single-unit locomotive traction passenger vehicle;
2, during the locomotive traction passenger vehicle, in the driver's cab of working direction, can observe total wind pressure value of this car easily and the force value of independent air feed pipe is provided for vehicle.
When 3, locomotive double heading is operated, both can guarantee the total wind pressure value (900kPa) between locomotive, can guarantee again provides independent air feed pipe pressure value (600kPa) for vehicle.
When 4, locomotive failure need not have fiery loopback; As long as there is blast main the breakdown locomotive end, just can guarantee the puzzled volume of train, directly draw by breakdown locomotive; Guarantee the fault total wind pressure value of locomotive (900kPa), can guarantee to continue to provide independent air feed pipe pressure value (600kPa) simultaneously for vehicle.
The objective of the invention is existing like this: a kind of both ends of locomotive is operated two-tube air supply method, it is characterized in that:
A) two covers are connected to total reservoir by cut out cock (4), air pressure reducing valve (5), boiler check valve (6) series connection back with the valve gear (3) of the parallelly connected formation of cut out cock (7);
B) when the single engine passenger vehicle, need, vehicle close cut out cock (7) when providing wind regime, cut off the heavy UNICOM of the total wind of locomotive road, open cut out cock (4), open to vehicle intake adit (blast 600kPa);
C) when shipping heavily joins traction, close cut out cock (4), cut off passage, open cut out cock (7), heavy UNICOM road (blast 900kPa) of the total wind of open locomotive to the passenger train air feed;
D) when passenger traffic heavily joins traction; Open train locomotive corresponding end cut out cock (7); Close cut out cock (4) back and heavily join traction by train locomotive; This locomotive is in double-heading position, and this locomotive connects corresponding end with passenger vehicle should close cut out cock (7), can wind regime (blast 600kPa) be provided to passenger vehicle after opening cut out cock (4);
When e) the fault locomotive need be rescued, if there is total wind flexible pipe the breakdown locomotive end, fault locomotive operation mode was with d) the bar content.
Scheme of the present invention; For satisfying the various operating modes of on-the-spot utilization; On blast main road, locomotive front and back end, respectively use a cover reducing valve; Through pressure sensor, the driver's cab Real Time Observation locomotive other end (with the passenger vehicle coupling end) total wind pressure state that supplies in the operating side is observed the total wind pressure value of this joint locomotive through draught indicator; Can realize that through the cut out cock conversion single-unit locomotive traction passenger vehicle provides independent air feed pipe pressure value (600kPa), both guarantee the total wind pressure value of locomotive (900kPa) in the time of also can realizing locomotive double heading, can be passenger vehicle again independent air feed pipe pressure value (600kPa) is provided; After simultaneously also can realizing locomotive failure,, need not separate and compile direct tractor-trailer train, continue as passenger vehicle independent air feed pipe pressure value (600kPa) is provided through the total wind of breakdown locomotive.
Description of drawings
Fig. 1 is a prior art locomotive air feed system principle schematic.
Fig. 2 operates two-tube air feed system principle schematic for the both ends of locomotive of the embodiment of the invention.
The specific embodiment
For the purpose, technical scheme and the advantage that make the embodiment of the invention clearer; To combine the accompanying drawing in the embodiment of the invention below; Technical scheme in the embodiment of the invention is carried out clear, intactly description; Obviously, described embodiment is the present invention's part embodiment, rather than whole embodiment.Based on the embodiment among the present invention, those of ordinary skills are not making the every other embodiment that is obtained under the creative work prerequisite, all belong to the scope of the present invention's protection.
Referring to accompanying drawing 2.Both ends of locomotive is operated two-tube air feed system, comprises total reservoir (1), air-supply pipeline (2) and two cover valve gears (3).In valve gear (3), parallelly connected after cut out cock (4), air pressure reducing valve (5), boiler check valve (6) series connection with cut out cock (7).Label (9) is crashproof plug door, and label (10) and (11) are angle cock.Label (8) is a pressure sensor.Label (12) is a digital pressure gauge.The operation of various operating modes is following:
1, when single-unit locomotive traction passenger vehicle, need, the passenger vehicle vehicle close cut out cock (7) when providing wind regime, cut off the heavy UNICOM of the total wind of locomotive road; Open cut out cock (4), open to vehicle intake adit (blast 600kPa).
2, when the locomotive traction freight train, need the heavily through transport time spent, close cut out cock (4), cut off passage to the passenger train air feed; Open cut out cock (7), heavy UNICOM road (blast 900kPa) of the total wind of open locomotive.
3, when needs locomotive double heading traction passenger vehicle, open train locomotive corresponding end cut out cock (7), close cut out cock (4) back and heavily join traction by train locomotive, this locomotive is in double-heading position; This locomotive connects corresponding end with passenger vehicle should close cut out cock (7), can wind regime (blast 600kPa) be provided to passenger vehicle after opening cut out cock (4).
When 4, this machine fault need be rescued, if there is total wind flexible pipe the breakdown locomotive end, fault locomotive operation mode was with the 3rd content.
5, no matter under which kind of operating mode, total the driver all can pass through operator's station mechanical pressure gauge monitoring locomotive wind pressure, through the pressure of digital pressure gauge (12) monitoring to passenger vehicle air feed pipe.
What should explain at last is: above embodiment is only in order to explaining technical scheme of the present invention, but not to its restriction; Although with reference to previous embodiment the present invention has been carried out detailed explanation, those of ordinary skill in the art is to be understood that: it still can be made amendment to the technical scheme that aforementioned each embodiment put down in writing, and perhaps part technical characterictic wherein is equal to replacement; And these are revised or replacement, do not make the spirit and the scope of the essence disengaging various embodiments of the present invention technical scheme of relevant art scheme.
Claims (1)
1. a both ends of locomotive is operated two-tube air supply method, it is characterized in that:
A) two covers are connected to total reservoir by cut out cock (4), air pressure reducing valve (5), boiler check valve (6) series connection back with the valve gear (3) of the parallelly connected formation of cut out cock (7);
B) when the single engine passenger vehicle, need, vehicle close cut out cock (7) when providing wind regime, cut off the heavy UNICOM of the total wind of locomotive road, open cut out cock (4), open to vehicle intake adit (blast 600kPa);
C) when shipping heavily joins traction, close cut out cock (4), cut off passage, open cut out cock (7), heavy UNICOM road (blast 900kPa) of the total wind of open locomotive to the passenger train air feed;
D) when passenger traffic heavily joins traction; Open train locomotive corresponding end cut out cock (7); Close cut out cock (4) back and heavily join traction by train locomotive; This locomotive is in double-heading position, and this locomotive connects corresponding end with passenger vehicle should close cut out cock (7), can wind regime (blast 600kPa) be provided to passenger vehicle after opening cut out cock (4);
When e) the fault locomotive need be rescued, if there is total wind flexible pipe the breakdown locomotive end, fault locomotive operation mode was with d) the bar content.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011104038451A CN102490733A (en) | 2011-12-07 | 2011-12-07 | Method for operating double tube air supply at double ends of locomotive |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011104038451A CN102490733A (en) | 2011-12-07 | 2011-12-07 | Method for operating double tube air supply at double ends of locomotive |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102490733A true CN102490733A (en) | 2012-06-13 |
Family
ID=46182607
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011104038451A Pending CN102490733A (en) | 2011-12-07 | 2011-12-07 | Method for operating double tube air supply at double ends of locomotive |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102490733A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104442898A (en) * | 2014-11-13 | 2015-03-25 | 南车株洲电力机车有限公司 | Double-pipe air supply device of rail locomotive |
CN104590291A (en) * | 2014-12-01 | 2015-05-06 | 南车株洲电力机车有限公司 | Locomotive and locomotive double-pipe wind-supply switch apparatus |
CN105329255A (en) * | 2015-12-04 | 2016-02-17 | 南车株洲电力机车有限公司 | Haulage motor double-pipe air supply system and air supply pipe air supply monitoring method thereof |
CN105480254A (en) * | 2016-01-13 | 2016-04-13 | 中车洛阳机车有限公司 | Modularized parking braking device for railway vehicle |
CN111824200A (en) * | 2020-07-30 | 2020-10-27 | 中车大同电力机车有限公司 | Railway train end hose function conversion device and railway train |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU737273A1 (en) * | 1977-12-23 | 1980-05-30 | Московский Завод "Трансмаш" | Brake system of multisection railway traction vehicle |
EP0926037A1 (en) * | 1997-12-19 | 1999-06-30 | ABB Daimler-Benz Transportation (Technology) GmbH | Locomotive |
CN201116110Y (en) * | 2007-11-13 | 2008-09-17 | 南车戚墅堰机车有限公司 | Air feeding device of engine |
CN201432668Y (en) * | 2009-07-28 | 2010-03-31 | 中国北车集团大连机车车辆有限公司 | Novel double-tube air supply apparatus of double-headed locomotive |
-
2011
- 2011-12-07 CN CN2011104038451A patent/CN102490733A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU737273A1 (en) * | 1977-12-23 | 1980-05-30 | Московский Завод "Трансмаш" | Brake system of multisection railway traction vehicle |
EP0926037A1 (en) * | 1997-12-19 | 1999-06-30 | ABB Daimler-Benz Transportation (Technology) GmbH | Locomotive |
CN201116110Y (en) * | 2007-11-13 | 2008-09-17 | 南车戚墅堰机车有限公司 | Air feeding device of engine |
CN201432668Y (en) * | 2009-07-28 | 2010-03-31 | 中国北车集团大连机车车辆有限公司 | Novel double-tube air supply apparatus of double-headed locomotive |
Non-Patent Citations (2)
Title |
---|
胡祖健等: "SS7C型机车双管供风装置惯性故障及改进措施", 《机车电传动》 * |
赵建飞: "东风11型机车双管供风系统的设计与改进", 《内燃机车》 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104442898A (en) * | 2014-11-13 | 2015-03-25 | 南车株洲电力机车有限公司 | Double-pipe air supply device of rail locomotive |
CN104590291A (en) * | 2014-12-01 | 2015-05-06 | 南车株洲电力机车有限公司 | Locomotive and locomotive double-pipe wind-supply switch apparatus |
CN105329255A (en) * | 2015-12-04 | 2016-02-17 | 南车株洲电力机车有限公司 | Haulage motor double-pipe air supply system and air supply pipe air supply monitoring method thereof |
CN105480254A (en) * | 2016-01-13 | 2016-04-13 | 中车洛阳机车有限公司 | Modularized parking braking device for railway vehicle |
CN111824200A (en) * | 2020-07-30 | 2020-10-27 | 中车大同电力机车有限公司 | Railway train end hose function conversion device and railway train |
CN111824200B (en) * | 2020-07-30 | 2021-10-29 | 中车大同电力机车有限公司 | Railway train end hose function conversion device and railway train |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102490733A (en) | Method for operating double tube air supply at double ends of locomotive | |
CN102963344B (en) | Guideway vehicle Pneumatic brake systems control setup | |
CN201432668Y (en) | Novel double-tube air supply apparatus of double-headed locomotive | |
AU2013216636B2 (en) | Rail vehicle and consist including a dual fuel engine | |
CN104203711B (en) | Transitional coupling, with its connecting device of at least two by the vehicle group of the coupled vehicle of this type of transitional coupling and the coupling method of the connecting device of two vehicles | |
CN202439719U (en) | Rail wagon braking system | |
RU128586U1 (en) | RAILWAY BRAKE SYSTEM | |
CN205168533U (en) | Device is alleviated rapidly in car brakeing that attaches pneumatics charging | |
CN201116110Y (en) | Air feeding device of engine | |
RU122960U1 (en) | FREIGHT WAGON BRAKE SYSTEM | |
CN101698412B (en) | Push control system for electric connector of automobile coupler | |
CN203419139U (en) | Railway overhaul car | |
RU173532U1 (en) | SECTIONAL FREIGHT WAGON BRAKE EQUIPMENT | |
CN205168535U (en) | Arresting gear that steady voltage speed is alleviated | |
CN103448739A (en) | Railway maintenance car | |
CN107933603B (en) | City railway train transportation resources | |
CN105197061A (en) | Electric pneumatic breaking type rapid air charging device for replenishing compressed air | |
CN205059634U (en) | Electro -pneumatic brake who supplyes compressed air fills wind device fast | |
CN205168475U (en) | Volume reservoir joins externally type electropneumatic brake equipment | |
CN105292167A (en) | Application of railroad vehicle braking rapid release device with air pressure air charging function | |
CN205168537U (en) | Take air compressor machine of firm output pressure of suction nozzle that steps up | |
CN101700770A (en) | Automatic high pressure gas supply and supplement device of long pipe semi-trailer | |
CN105235706A (en) | Application of electric pneumatic braking rapid air charging device with air pressure supplement function | |
CN105172832A (en) | External mounting type compensation air charging brake device for carriages | |
CN202608761U (en) | Self-unloading parking brake circuit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120613 |