CN102477811A - 多功能建筑 - Google Patents

多功能建筑 Download PDF

Info

Publication number
CN102477811A
CN102477811A CN2010105530487A CN201010553048A CN102477811A CN 102477811 A CN102477811 A CN 102477811A CN 2010105530487 A CN2010105530487 A CN 2010105530487A CN 201010553048 A CN201010553048 A CN 201010553048A CN 102477811 A CN102477811 A CN 102477811A
Authority
CN
China
Prior art keywords
great wall
ancient
corridor
length direction
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010105530487A
Other languages
English (en)
Inventor
单春校
单佳欣
单千华
单广伟
单伯恩
单广庆
杨丹
张钧琳
王德伦
李明煜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HARBIN DAOLI DISTRICT AOJI BUILDING AND ENVIRONMENT ENGINEERING INSTITUTE
Original Assignee
HARBIN DAOLI DISTRICT AOJI BUILDING AND ENVIRONMENT ENGINEERING INSTITUTE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HARBIN DAOLI DISTRICT AOJI BUILDING AND ENVIRONMENT ENGINEERING INSTITUTE filed Critical HARBIN DAOLI DISTRICT AOJI BUILDING AND ENVIRONMENT ENGINEERING INSTITUTE
Priority to CN2010105530487A priority Critical patent/CN102477811A/zh
Publication of CN102477811A publication Critical patent/CN102477811A/zh
Pending legal-status Critical Current

Links

Images

Abstract

多功能建筑,本发明涉及一种连体建筑物。通过技术改造以解决古长城的的修复和保护。用于古长城的修复和保护。技术方案是按照古长城的外形在其已经毁坏部分的遗址上修建一条新长城,所述新长城与古长城留存下来的部分相对接,在新长城的内腹中沿其长度方向建设有上层隧廊和下层隧廊,下层隧廊铺设有轨交通运输路轨,上层隧廊沿其长度方向间隔设置有休息室、休闲娱乐室和购物区,上层隧廊的侧壁上设置有人文壁画。由于本发明不但能利于对古长城的遗址遗迹加以保护和修复,其内部结构予以改造后,创建头设尾添足模拟城镇化设施赋予了它新的功能。

Description

多功能建筑
技术领域
本发明涉及一种建筑物。 
背景技术
古长城经历了千百年的历史沧桑,经历了千百年风雨的洗礼和人为的破坏,现修整与尚存的部分不足10%,从总体上看现在已经是名存实亡。如果再不及时的拯救,其痕迹会被人类分割占用和自然湮灭,就很难恢复和保护。原古长城是历史时期为防御战争和维护经济权利而修筑的宏伟建筑物,它历经几百年的社会进步和发展,早已经失去了防御体系的功能。但其对军事文化、建筑文化和民族文化史的传承和发展具有文化价值,它是世界文化和旅游产业重要的遗产。如果单纯地对古长城进行修复和保护会耗费大量人力和社会资源,而且利用价值不高。 
发明内容
本发明的目的是提供一种多功能建筑,通过技术改造以解决古长城的遗迹修复和保护。它的技术方案是:按照古长城的外形在其已经毁坏部分的遗址上修建一条新长城,所述新长城与古长城留存下来的部分相对接,在新长城的内腹中沿其长度方向建设有上层隧廊1和下层隧廊2,沿长城的长度方向的地下设置有基层管网隧道,基层管网隧道内铺设供电、供水、供气和排水管网,下层隧廊2铺设有轨交通运输路轨2-1,上层隧廊1沿其长度方向间隔设置有休息室1-1、休闲娱乐室1-2和购物区1-3,上层隧廊1的侧壁上设置有人文壁画1-4。 
本发明把长城墙体沿其长度方向的腹内设成多层空间隧廊,下层隧廊2用于交通运输通道,可与成乡公路与地铁联网,当下大雪等自然灾变发生时,古长城成为了抢救生命和运送急救物资的快速干道。上层隧廊1作为旅游者休息的场所,长城顶部的甬道用于游客饱览长城的自然风光。由于本发明对古长城的结构予以改造,赋予了它新的 功能,有利于对它的长久保护。 
附图说明
图1是本发明的结构示意图,图2是本发明实施方式五的结构示意图。 
具体实施方式
具体实施方式一:下面结合图1具体说明本实施方式,本实施方式按照古长城的外形在其已经毁坏部分的遗址上修建一条新长城,所述新长城与古长城留存下来的部分相对接,在新长城的内腹中沿其长度方向建设有上层隧廊1和下层隧廊2,沿长城的长度方向的地下设置有基层管网隧道,基层管网隧道内铺设供电、供水、供气和排水管网,下层隧廊2铺设有轨交通运输路轨2-1,上层隧廊1沿其长度方向间隔设置有休息室1-1、休闲娱乐室1-2和购物区1-3,上层隧廊1的侧壁上设置有人文壁画1-4。新长城的建筑材料可根据施工方案而定。 
具体实施方式二:下面结合图1具体说明本实施方式。本实施方式与实施方式一的区别点在于:下层隧廊2的下方还开凿有底层长廊3,底层长廊3沿其长度方向间隔设置有假日酒店3-1、餐厅3-2、医院3-3和博物馆3-4,上层隧廊1、下层隧廊2和底层长廊3之间设置有阶梯通道4。 
具体实施方式三:下面结合图2具体说明本实施方式。本实施方式与实施方式一或二的区别点在于:古长城的两端各设置为龙头状。两端的龙头中,作为进出通道的龙口的上下嘴唇与上下齿和舌头外围设多层U型平台塔式观景台,龙眼睛可以设置为大型的电子屏幕,电子屏幕内隐摄影或监控装置,如放映所摄录的场景和发设光、电舞台效果等,龙角作为雷达天线。龙口上还可以设置人造喷泉、人造喷雾装置和雷电音频效果产生装置等。 
具体实施方式四:下面结合图2具体说明本实施方式。本实施方式与实施方式一或二的区别点在于:沿古长城的长度方向设置多个龙爪状站台5,每个龙爪状站台5都与古长城的内腹中的上层隧廊1、下层隧廊2或底层长廊3其中之一相连通。所述龙爪状站台5可以建成多 民族文化区宾馆、展览馆、体活馆和游乐商服中心等休闲度假的聚集场所。 
具体实施方式五:下面结合图2具体说明本实施方式。本实施方式与实施方式三的区别点在于:第一龙头6设置在嘉峪关,如果长城像一条巨龙,它就是整条巨龙的龙头,内建大型展览馆。第二龙头7设置在山海关老龙头处的海中,老龙头内和下面可以建造大型水族馆。第二龙头7口含巨龙的尾巴,像老龙头在海面上牵着巨龙尾巴不让其出走,其情形如神话或传说中的一般。 
只有对原古长城‘长宽高’的城墙体,城墙体内的建筑结构进行技术开发和改造,有效的利用其城墙体内部空间和外部特征。将其实体城墙体内设计多出层空间,赋予其新的功能和历史生命,在其体内容入人类科技文化,增设交通设施、壁画隧廊、休闲度假购物区,体外添足、建头设尾和内隐城镇文化公共设施等,两翼瓮城可做露天场馆,囤兵营多可做为民族文化区。并且让新城与古城优化衔接成为一体,确保其外观特征不变,但新长城的公共设施等可隐于地下或绕行,保证尚存古迹的完好。提高建筑与环境的和谐,以科学文化为主题,才有利于长久地保护这一历史文化遗产和遗址及使用价值。如老北京的文化,在历史的进化中被新北京的文化优化了70%,才孕育出了及强更有活力生命的——新北京。新长城的建设不但可解决解很决多人的就业问题,还能够推动建筑行业、旅游行业、服务行业和商业与运输业等相关行业的经济发展。新长城的建成会使古长城更有生命力,它能创造出许多——世界之最。如世界上最长的建物、最长的城、最长的隧廊、最长的画廊和最长的景街等。以两翼的万水千山为自然依托可成为名副其实的—万里长龙城。 

Claims (4)

1.多功能建筑,其特征在于按照古长城的外形在其已经毁坏部分的遗址上修建一条新长城,所述新长城与古长城留存下来的部分相对接,在新长城的内腹中沿其长度方向建设有上层隧廊(1)和下层隧廊(2),沿长城的长度方向的地下设置有基层管网隧道,基层管网隧道内铺设供电、供水、供气和排水管网,下层隧廊(2)铺设有轨交通运输路轨(2-1),上层隧廊(1)沿其长度方向间隔设置有休息室(1-1)、休闲娱乐室(1-2)和购物区(1-3),上层隧廊(1)的侧壁上设置有人文壁画(1-4)。
2.根据权利要求1所述的多功能建筑,其特征在于下层隧廊(2)的下方还开凿有底层长廊(3),底层长廊(3)沿其长度方向间隔设置有假日酒店(3-1)、餐厅(3-2)、医院(3-3)和博物馆(3-4),上层隧廊(1)、下层隧廊(2)和底层长廊(3)之间设置有阶梯通道(4)。
3.根据权利要求1或2所述的多功能建筑,其特征在于古长城的两端各设置为龙头状;两端的龙头中龙口作为进出的通道,龙眼睛设置为大型的摄影或监控装置,龙角作为雷达天线;龙口上设置人造喷泉或人造喷雾装置等。
4.根据权利要求1或2所述的多功能建筑,其特征在于沿古长城的长度方向设置多个龙爪状站台(5),每个龙爪状站台(5)都与古长城的内腹中的上层隧廊(1)、下层隧廊(2)或底层长廊(3)连通。 
CN2010105530487A 2010-11-22 2010-11-22 多功能建筑 Pending CN102477811A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105530487A CN102477811A (zh) 2010-11-22 2010-11-22 多功能建筑

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105530487A CN102477811A (zh) 2010-11-22 2010-11-22 多功能建筑

Publications (1)

Publication Number Publication Date
CN102477811A true CN102477811A (zh) 2012-05-30

Family

ID=46090581

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105530487A Pending CN102477811A (zh) 2010-11-22 2010-11-22 多功能建筑

Country Status (1)

Country Link
CN (1) CN102477811A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108388167A (zh) * 2018-01-12 2018-08-10 福建省雾精灵环境科技有限公司 一种模拟环境智能造景的系统及方法
CN110528903A (zh) * 2019-08-13 2019-12-03 同济大学 一种兼具地下遗址原位保护与展示功能的地铁隧道系统及施工方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108388167A (zh) * 2018-01-12 2018-08-10 福建省雾精灵环境科技有限公司 一种模拟环境智能造景的系统及方法
CN110528903A (zh) * 2019-08-13 2019-12-03 同济大学 一种兼具地下遗址原位保护与展示功能的地铁隧道系统及施工方法

Similar Documents

Publication Publication Date Title
Shrestha Street typology in Kathmandu and street transformation
CN102477811A (zh) 多功能建筑
Sharon et al. Podium structures with lateral access: Authority ploys in royal architecture in the Iron Age Levant
Decker Modern north: architecture on the frozen edge
Remesar Public Art in Urban Regeneration. Piotrkowska street. Pride of a city: Łódź
Shane Urban patch dynamics and resilience: Three London urban design ecologies
Rjoub et al. Urban and architectural impacts of hejaz railway in Mafraq-Jordan
Savchuk et al. Formation of hypotheses of redevelopment of cultural heritage objects of the residential complex “Krasny Vyborzhets”
Kurokawa Kisho Kurokawa, Architect and Associates: Selected and Current Works;[edited by Andy Whyte].
Li et al. An Analysis of Historical Urban Area's Renovation in Shantou
Xinxin et al. Study on Urban Design of Luohu Railway Station Area from the Perspective of Integrated Urban Design.
Duffaut Underground city-planning: a French born concept for sustainable cities of tomorrow
Wang Nanjing City Wall: embodied heritage in wallscape
Council A Conservation Management Plan for Darlington Rail Heritage Quarter
Agrawal et al. The next level up is down: exploring the subsurface for our common future
Martínez-Medina et al. Rehabilitating, repairing and restoring against demolishing, tearing down and destroying: the recovery of the military fort for the Santa Pola town museum
Clark A1 Landmarks: Fascinating Points Along the Route
Mochales On the importance of materials in the Monegros colonisation settlements
Badiuk Inhabiting Manufactured Landscape: An Architectural Approach to Minnesota’s Post-Industrial Iron Range
Kirichkov et al. Cultural development of the underground urban spaces on the experience of Saint-Petersburg and Harbin
PRIETO MOCHALES On the importance of materials in the Monegros colonisation settlements.
Reeder Case Studies in Resource Efficiency
Gao et al. Exploration of beautiful village renovation against the backdrop of global tourism
Ambrose et al. Strong winds and rising currents: A design proposal for Grand Bahama international airport
ALONTSEVA Cloud. The Internet research center in North Woolwich, London

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120530