CN102468983B - Method, device and system for testing electricity consumption information acquisition system - Google Patents

Method, device and system for testing electricity consumption information acquisition system Download PDF

Info

Publication number
CN102468983B
CN102468983B CN201010531143.7A CN201010531143A CN102468983B CN 102468983 B CN102468983 B CN 102468983B CN 201010531143 A CN201010531143 A CN 201010531143A CN 102468983 B CN102468983 B CN 102468983B
Authority
CN
China
Prior art keywords
main website
response data
ammeter
concentrator
issues
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201010531143.7A
Other languages
Chinese (zh)
Other versions
CN102468983A (en
Inventor
赵成
张丽萍
李飞
李亦非
邹战明
刘恒
邢宏伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Beijing Electric Power Corp
Original Assignee
State Grid Corp of China SGCC
Beijing Electric Power Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Beijing Electric Power Corp filed Critical State Grid Corp of China SGCC
Priority to CN201010531143.7A priority Critical patent/CN102468983B/en
Publication of CN102468983A publication Critical patent/CN102468983A/en
Application granted granted Critical
Publication of CN102468983B publication Critical patent/CN102468983B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a method, a device and a system for testing an electricity consumption information acquisition system. The method comprises the following steps that: a master station transmits an electric meter parameter setting command for setting parameters of an electric meter to the electric meter through a concentrator; and the master station receives response data from the electric meter through the concentrator, and counts a success rate of transmitting the electric meter parameters according to a receiving state of the response data, wherein under the condition that the response data is effective, the master station stores the response data and successfully records the transmitted electric meter parameters; and under the condition that the response data is ineffective or no response data is received, the master station fails to record the transmitted electric meter parameters. By the method, the device and the system, electricity purchase information and parameter setting information which are transmitted by the electricity consumption information acquisition system can be inspected conveniently and efficiently, and the success rate and the reliability of setting the electric meter parameters are improved.

Description

The method of testing of power information acquisition system, Apparatus and system
Technical field
The present invention relates to power domain, in particular to a kind of method of testing, Apparatus and system of power information acquisition system.
Background technology
At present, domestic and international each business unit, research and development institution are placed on stability, reliability, the aspect such as fail safe and bi-directional communication function of communication products mostly to the research emphasis of local communication technology, and have achieved obvious effect.But the practical application effect of local communication product is detected and there is no corresponding codes and standards, there is no complete detection method and detect foundation.
Provide a kind of method in the related, for the platform district having realized low-voltage collecting meter reading at present, emphatically by copying the point of ammeters all under platform district, record success rate and the communication time of the communication of each stoichiometric point, relatively different communication technical scheme single copy reading success rate in a certain amount of time, judges the reliability and stability of each communication technology with this.
Additionally provide a kind of method in the related, the method select line is more complicated, the mixing station district of the combination area of city and country that local communication difficulty is larger, emphatically from practical application, Standardization Construction for low pressure local communication provides reference frame and guidance data, and main purpose is the low pressure local communication scheme extracting a set of adaptation local power grid characteristic.
In the related, the detection for local communication product is only limitted to the test of communication products performance itself at present, and the integrated application effect detection for product not yet forms unified technical standard.Along with the progressively development that intelligent grid is built, local communication technology is from now on had higher requirement, need the effect more paying attention to product in communication check, such as: the adaptive capacity of two-way communications capabilities, concurrency conflict dodging ability, environmental change, the automatic recovery ability etc. of networking collapse.
For the problem that power information acquisition system in correlation technique is tested the performance quality that local communication device issues power purchase and parameter setting information, at present effective solution is not yet proposed.
Summary of the invention
For power information acquisition system in correlation technique, the performance quality problem of testing of power purchase and parameter setting information issued to local communication device and propose the present invention, for this reason, main purpose of the present invention is the method for testing, the Apparatus and system that provide a kind of power information acquisition system, to solve the problem.
To achieve these goals, according to an aspect of the present invention, a kind of method of testing of power information acquisition system is provided.
Method of testing according to power information acquisition system of the present invention comprises: main website issues ammeter optimum configurations order for carrying out optimum configurations to ammeter by concentrator to ammeter; Main website receives the response data from ammeter by concentrator, according to the reception condition of response data, adds up the success rate that main website issues ammeter parameter, wherein, when in the effective situation of response data, this main website preserves response data, and records the success of electricity table parameter; When response data is invalid or do not receive response data, main website records the failure of generating table parameter.
Further, main website receives from the response data of ammeter by concentrator, according to the reception condition of response data, adds up the success rate that main website issues ammeter parameter and comprises: main website issues and reads ammeter number order, and obtains the first response data; In the effective situation of the first response data, this main website issues the first setting command by concentrator to ammeter, and obtains the second response data; In the effective situation of the second response data, this main website issues the first reading order by concentrator to ammeter, and obtains the 3rd response data; In the effective situation of the 3rd response data, main website preserves the 3rd response data, and records the success of generating table parameter; Wherein, in the first response data, the second response data, the 3rd response data, any one or more response data is invalid, main website records the failure of generating table parameter.
Further, before acquisition first response data, method also comprises: judge that whether the return time returning the first response data of main website is more than first scheduled time, wherein, be more than or equal to for first scheduled time upon return, main website records the failure of generating table parameter, otherwise main website issues the first setting command.
Further, before main website records the failure of generating table parameter, method also comprises: main website re-issues and reads ammeter number order, if re-issue in main website the number of times reading ammeter number order to exceed pre-determined number, main website records the failure of generating table parameter.
Further, before acquisition second response data, method also comprises: judge that whether the return time returning the second response data of main website is more than second scheduled time, wherein, be more than or equal to for second scheduled time upon return, main website records the failure of generating table parameter, otherwise main website issues the first reading order.
Further, before main website records the failure of generating table parameter, method also comprises: main website re-issues the first setting command, if the number of times that main website re-issues the first setting command exceedes pre-determined number, main website records the failure of generating table parameter.
Further, before acquisition the 3rd response data, method also comprises: judge that whether the return time returning the 3rd response data of main website is more than the 3rd scheduled time, wherein, be more than or equal to for the 3rd scheduled time upon return, main website records the failure of generating table parameter, otherwise main website records the success of generating table parameter.
Further, before main website records the failure of generating table parameter, method also comprises: main website re-issues the first reading order, if the number of times that main website re-issues the first reading order exceedes pre-determined number, main website records the failure of generating table parameter.
Further, before main website obtains any one response data in the first response data, the second response data, the 3rd response data, method also comprises: main website sends to concentrator and ceases and desist order; Main website receives from the acknowledge message of concentrator, and records main website and issue the failure of ammeter parameter.
To achieve these goals, according to a further aspect in the invention, a kind of testing apparatus of power information acquisition system is provided.This device comprises: sending module, issues ammeter optimum configurations order for carrying out optimum configurations to ammeter for making main website by concentrator to ammeter; Statistical module, for main website by the response data of concentrator reception from ammeter, according to the reception condition of response data, add up the success rate that main website issues ammeter parameter, wherein, when in the effective situation of response data, make main website preserve response data, and record the success of electricity table parameter; When response data is invalid, main website is made to record the failure of generating table parameter.
To achieve these goals, according to another aspect of the invention, provide a kind of test macro of power information acquisition system, this system comprises: main website, for issuing the order of ammeter optimum configurations by concentrator to ammeter, and statistics issues the success rate of ammeter parameter command, ammeter parameter comprises: read ammeter number order, arrange number order of period rate and read number order of period rate; Concentrator, for receiving and forwarding the ammeter parameter of main website, and returns response data to main website; Ammeter, forwards for receiving concentrator the ammeter parameter of coming, and generates corresponding response data, response data is transmitted to concentrator.
Further, system also comprises collecting device, is connected with concentrator, gathers all response datas of ammeter.
By the present invention, main website is adopted to issue ammeter optimum configurations order for carrying out optimum configurations to ammeter by concentrator to ammeter; Main website receives the response data from ammeter by concentrator, according to the reception condition of response data, adds up the success rate that main website issues ammeter parameter, wherein, when in the effective situation of response data, this main website preserves response data, and records the success of electricity table parameter; When response data is invalid or do not receive response data, main website records the failure of generating table parameter, solve the problem that in correlation technique, power information acquisition system is tested the performance quality that local communication device issues power purchase and parameter setting information, and then reach and investigate power information acquisition system conveniently, efficiently and issue power purchase and parameter setting information, improve and the effect that ammeter parameter obtains success rate and reliability is set.
Accompanying drawing explanation
The accompanying drawing forming a application's part is used to provide a further understanding of the present invention, and schematic description and description of the present invention, for explaining the present invention, does not form inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the structural representation of the test macro of power information acquisition system according to the embodiment of the present invention;
Fig. 2 is the flow chart of the method for testing of power information acquisition system according to the embodiment of the present invention; And
Fig. 3 is the schematic diagram of the testing apparatus of power information acquisition system according to the embodiment of the present invention.
Embodiment
It should be noted that, when not conflicting, the embodiment in the application and the feature in embodiment can combine mutually.Below with reference to the accompanying drawings and describe the present invention in detail in conjunction with the embodiments.
According to embodiments of the invention, provide a kind of method of testing and system, main website of power information acquisition system.
Fig. 1 is the structural representation of the test macro of power information acquisition system according to the embodiment of the present invention.
As shown in Figure 1, main website, concentrator and ammeter is comprised according to the test macro of the power information acquisition system of the embodiment of the present invention.
Wherein, main website, for issuing the order of ammeter optimum configurations by concentrator to ammeter, and statistics issues the success rate of ammeter parameter command, and ammeter parameter comprises: read ammeter number order, arrange number order of period rate and read number order of period rate; Concentrator, for receiving and forwarding the ammeter parameter of main website, and returns response data to main website; Ammeter, forwards for receiving concentrator the ammeter parameter of coming, and generates corresponding response data, response data is transmitted to concentrator.
The test macro of the above-mentioned power information acquisition system according to the embodiment of the present invention can also comprise: collecting device, is connected with concentrator, gathers all response datas of ammeter.
Test macro (or power information gathers local communication technology detection platform) according to the known power information acquisition system of the embodiment of the present invention is made up of main website, concentrator, collecting device, ammeter and data display system platform.
Local communication device comprises concentrator, collecting device, ammeter, form local communication network, main station system by wireless or cable network and concentrator mutual, according to fixing flow process and method of testing, according to the test set meal of customization, automatically complete the detection to local communication device, data display system, to the data analysis detected, finally forms complete test report and test result.Wherein, above-mentioned test macro comprises local communication device and apparatus for remote communication, and apparatus for remote communication comprises main website, data server and data display platform.
Wherein, main website, data server, data display platform can utilize Java to work out main interface, adopt Access database, comprise data communication function, parameter value-added tax function, equipment Management Function, data reading system function, testing of equipment function, testing scheme customization function, anti-cheating function, testing of equipment automation.
Concentrator Functional Design can perform according to state's net company technique standard-required, in communication protocol, substantially can meet the requirement of uplink communication agreement DL/T698.41 and downlink communication agreement DL/T645-1997; Meanwhile, be strengthen test Detection results, the section communication agreement of this test particular/special requirement need be met.
Collecting device can adopt external module form, also can directly be mounted to electric energy meter inside, and communication protocol meets the particular protocol requirement of DL/T645-1997 and this experiment.
Fig. 2 is the flow chart of the method for testing of power information acquisition system according to the embodiment of the present invention.As shown in Figure 2, this method of testing comprises following step S202 to step S204:
Main website in step S202, Fig. 1 issues ammeter optimum configurations order for carrying out optimum configurations to ammeter by concentrator to ammeter, carries out optimum configurations to ammeter, and ammeter generates and corresponding arranges structure, and responsively data return to concentrator.
Whether the main website in step S204, Fig. 1 receives the response data from ammeter by concentrator, effective according to response data, add up the success rate that main website issues ammeter parameter, wherein, when in the effective situation of response data, this main website preserves response data, and records the success of electricity table parameter; When response data is invalid, main website records the failure of generating table parameter.
In this embodiment, ammeter parameter command is issued to concentrator batch by using main website, this ammeter parameter command comprises the various parameters in practical power systems, it can be ammeter number, time the information such as segment number or frequency, ammeter parameter is pass-through to ammeter by concentrator, ammeter obtains according to optimum configurations ammeter and arranges result, and return to main website by by arranging the response data that result forms by concentrator, the state of main website to response data is assessed, obtain the success rate issuing ammeter parameter, the carrying out realized local communication device issues in reception the performance quality that response parameter in parametric procedure issues is tested.Wherein, the success rate that main website obtains the data of ammeter response ammeter parameter is higher, illustrates that the performance of local communication device is better, otherwise, illustrate that the performance of local communication device is poorer.Thus, by to success rate simple, test efficiently, can investigate power information acquisition system and issue power purchase and parameter setting information, raising arranges ammeter parameter and obtains success rate and reliability, guarantees that resident's power purchase information issues, performs real-time and the reliability of bidding price adjustment from now on.
In the embodiment of the present invention, main website issues to concentrator batch and arranges the order of ammeter optimum configurations, concentrator forwards described ammeter parameter to ammeter, ammeter acquisition ammeter parameter is data and alignment processing of carrying out meets with a response, main website receives the response data from ammeter by concentrator, whether effectively the success rate issuing ammeter parameter according to the statistics main website of response data can comprise: main website issues and reads ammeter number order, and obtains the first response data; In the effective situation of the first response data, this main website issues the first setting command by concentrator to ammeter, and obtains the second response data; In the effective situation of the second response data, this main website issues the first reading order by concentrator to ammeter, and obtains the 3rd response data; In the effective situation of the 3rd response data, main website preserves the 3rd response data, and record the success of generating table parameter, wherein, in the first response data, the second response data, the 3rd response data, any one or more response data is invalid, main website records the failure of generating table parameter.In this embodiment, ammeter parameter can comprise ammeter number, arranges period rate number and read period rate number.
In above-described embodiment before acquisition first response data, method can also comprise: judge that whether the return time returning the first response data of main website is more than first scheduled time, wherein, be more than or equal to for first scheduled time upon return, main website records the failure of generating table parameter, otherwise main website issues the first setting command.Wherein, before main website records the failure of generating table parameter, method also comprises: main website re-issues and reads ammeter number order, if re-issue in main website the number of times reading ammeter number order to exceed pre-determined number, main website records the failure of generating table parameter.In this embodiment, if return the first response data time-out, system starts to re-issue ammeter parameter, if also effectively do not responded, so system can repeat to send this ammeter parameter again, and the number of times repeating to send is restricted, if exceed the number of times of restriction, main website then records the flow process failure that this time issues ammeter parameter, if successfully issue the parameter in this step, main website then issues next step parameter.
In addition, the present embodiment is before acquisition second response data, method can also comprise: judge that whether the return time returning the second response data of main website is more than second scheduled time, wherein, be more than or equal to for second scheduled time upon return, main website records the failure of generating table parameter, otherwise main website issues the first reading order.Wherein, before main website records the failure of generating table parameter, method can also comprise: main website re-issues the first setting command, if the number of times that main website re-issues the first setting command exceedes pre-determined number, main website records the failure of generating table parameter.The same reason, if successfully do not return response data in the scheduled time, or the number of times of repetitive operation exceedes pre-determined number, and so this time issues the flow process failure of ammeter parameter, otherwise enters next step operation.
In the present embodiment before acquisition the 3rd response data, method can also comprise: judge that whether the return time returning the 3rd response data of main website is more than the 3rd scheduled time, wherein, be more than or equal to for the 3rd scheduled time upon return, main website records the failure of generating table parameter, otherwise main website records the success of generating table parameter.Wherein, before main website records the failure of generating table parameter, method also comprises: main website re-issues the first reading order, if the number of times that main website re-issues the first reading order exceedes pre-determined number, main website records the failure of generating table parameter.In this embodiment, if successfully do not return response data in the scheduled time, or the number of times of repetitive operation exceedes pre-determined number, and so this time issues the flow process failure of ammeter parameter, otherwise terminates testing process, records the flow process success that this time issues ammeter parameter.
Preferably, before main website obtains any one response data in the first response data, the second response data, the 3rd response data, method can also comprise: main website sends to concentrator and ceases and desist order; Main website receives from the acknowledge message of concentrator, and records main website and issue the failure of ammeter parameter.
The above embodiment of the present invention is carried out batch by main station system and is issued ammeter parameter, ammeter parameter is pass-through to ammeter by concentrator, and be pass-through to main station system by arranging result, test data (ammeter parameter) in this testing process can use corresponding tentation data to test, and this tentation data is mainly used to the ammeter parameter after the encryption replacing issuing in real system.
This success rate issuing the testing process of parameter can be set as, carry out batch setting ammeter by main station system and operate, concentrator is back to local software by when arranging fructufy, and local software display arranges ammeter reply data and makes successful rate statistics.Wherein, concentrator arranges the order of every block ammeter for three times by issuing, calculating and setting ammeter success rates.
Preferably, the method for testing specific embodiment step of power information acquisition system of the present invention is as follows:
A) order of reading ammeter table number is issued by main website batch.Main website sends the reading table number order in data retransmission to concentrator, in waiting for 40 seconds, concentrator can return to main website confirmation or deny data retransmission, main website can be returned as denied and deny order, or after 40s, main website thinks automatically/nonreply/send and unsuccessfully order, now main website can retransmit 3 times, main website is as received confirmation (namely main website reads table number by the forwarding of concentrator), and interval 1S, can perform step B).
B) main website issues after receiving correct response and arranges period rate number order.The period rate number that arranges that main website sends in data retransmission to concentrator is ordered, in waiting for 40 seconds, concentrator can return to main website confirmation or deny data retransmission, main website can be returned as denied and deny order, or after 40s, main website thinks automatically/nonreply/send and unsuccessfully order, now main website can retransmit 3 times, main website is as received confirmation (namely main website to be provided with the period rate number of electric energy meter by the forwarding of concentrator), and interval 1S, can perform step C).
C) main website issues after receiving correct response and reads period rate number order.Main website sends the reading period rate number order in data retransmission to concentrator, in waiting for 40 seconds, concentrator can return to main website confirmation or deny data retransmission, main website can be returned as denied and deny order, or after 40s, main website thinks automatically/nonreply/and send and unsuccessfully order, now main website can retransmit 3 times, main website is as received confirmation (namely main website is by the period rate number of the forwarding reading power meters of concentrator), and testing process terminates.
D) main website preserves data after receiving correct response, and according to the reply data statistics success rate in above-mentioned steps.
It should be noted that, can perform in the computer system of such as one group of computer executable instructions in the step shown in the flow chart of accompanying drawing, and, although show logical order in flow charts, but in some cases, can be different from the step shown or described by order execution herein.
From above description, can find out, present invention achieves following technique effect: formulate the collection construction scheme that low pressure public affairs become user, solve low-voltage customer acquisition mode indefinite, run the problem being difficult to effectively carry out, the practical work of collection of specification low-voltage customer, the building-up work of Beijing area " all standing, full collection, control in full " power information acquisition system will be accelerated, meet the construction requirements of Guo Wang company strong intelligent marketing system first stage.
Formulate clear and definite local communication technology standard, technical foundation is established in reasonable stable development for Beijing area acquisition technique from now on, for strengthening providing foundation to the technical management of local communication product, realizing the consistency of various product technical standard, suiting the demand that company's acquisition system is built.
Formulate complete local communication technology detection method, carry out the network access testing to all kinds of local communication product, to effectively pass judgment on communication performance and the effect of various types of communication product, form the evaluation result quantized, technical basis is provided for company carries out product type selection, ensure that bid product meets company technique requirement, meet the construction needs of low-voltage customer acquisition system.
As can be seen from the above description, the present invention can facilitate, test the performance quality of power information acquisition system local communication device efficiently.
According to embodiments of the invention, provide a kind of testing apparatus of power information acquisition system, as shown in Figure 3, the testing apparatus of this power information acquisition system can comprise sending module 302, statistical module 304.
Wherein, sending module 302 issues ammeter optimum configurations order for ammeter carry out optimum configurations by concentrator to ammeter for making main website; Statistical module 304 is received from the response data of ammeter by concentrator for main website, according to the reception condition of response data, adds up the success rate that main website issues ammeter parameter, wherein, when in the effective situation of response data, make main website preserve response data, and record the success of electricity table parameter; When response data is invalid, main website is made to record the failure of generating table parameter.
Obviously, those skilled in the art should be understood that, above-mentioned of the present invention each module or each step can realize with general calculation element, they can concentrate on single calculation element, or be distributed on network that multiple calculation element forms, alternatively, they can realize with the executable program code of calculation element, thus, they can be stored and be performed by calculation element in the storage device, or they are made into each integrated circuit modules respectively, or the multiple module in them or step are made into single integrated circuit module to realize.Like this, the present invention is not restricted to any specific hardware and software combination.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for a person skilled in the art, the present invention can have various modifications and variations.Within the spirit and principles in the present invention all, any amendment done, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (11)

1. a method of testing for power information acquisition system, is characterized in that, comprising:
Main website issues ammeter optimum configurations order for carrying out optimum configurations to described ammeter by concentrator to ammeter, carries out optimum configurations to described ammeter, and described ammeter generates and corresponding arranges result, and responsively data return described concentrator;
Described main website receives the response data from described ammeter by concentrator, according to the reception condition of described response data, adds up the success rate that main website issues described ammeter parameter, wherein,
When in the effective situation of described response data, this main website preserves described response data, and the described ammeter parameter success that record issues;
When described response data is invalid or do not receive described response data, described main website record issues the failure of described ammeter parameter;
Wherein, described main website receives from the response data of described ammeter by concentrator, according to the reception condition of described response data, adds up the success rate that main website issues described ammeter parameter and comprises:
Described main website issues and reads ammeter number order, and obtains the first response data;
In the effective situation of described first response data, this main website issues the first setting command by described concentrator to ammeter, and obtains the second response data;
In the effective situation of described second response data, this main website issues the first reading order by described concentrator to ammeter, and obtains the 3rd response data;
In the effective situation of described 3rd response data, described main website preserves described 3rd response data, and records the success of generating table parameter;
Wherein, in described first response data, described second response data, described 3rd response data, any one or more response data is invalid, described main website record issues the failure of described ammeter parameter;
Wherein, be respectively in described first response data, described second response data and the 3rd response data and confirm or deny data retransmission, described first setting command be period rate number order is set, the first reading order be read period rate number order when
Described main website sends the described reading ammeter number order in data retransmission to concentrator, described concentrator can return to main website confirmation or deny data retransmission, main website can be returned as denied and deny order, or after 40s, main website thinks that nonreply or send unsuccessfully is ordered automatically, now main website can retransmit 3 times, after described main website confirms response as received, can issue and described period rate number order is set to described concentrator, described concentrator can return to main website confirmation or deny data retransmission, main website can be returned as denied and deny order, or after 40s, main website thinks that nonreply or send unsuccessfully is ordered automatically, now main website can retransmit 3 times, described main website is as after receiving confirmation, can issue and read period rate number order to described concentrator, described concentrator can return to main website confirmation or deny data retransmission, main website can be returned as denied and deny order, or after 40s, main website thinks that nonreply or send unsuccessfully is ordered automatically, now main website can retransmit 3 times, described main website is as received confirmation, testing process terminates.
2. method according to claim 1, is characterized in that, before acquisition first response data, described method also comprises:
Judge that whether the return time returning described first response data of described main website is more than first scheduled time, wherein, when described return time is more than or equal to described first scheduled time, described main website record issues the failure of described ammeter parameter, otherwise described main website issues described first setting command.
3. method according to claim 2, is characterized in that, before described main website record issues the failure of described ammeter parameter, described method also comprises:
Described main website re-issues number order of described reading ammeter, if re-issue a described reading ammeter number number of times of ordering in described main website to exceed pre-determined number, described main website record issues the failure of described ammeter parameter.
4. method according to claim 1, is characterized in that, before acquisition second response data, described method also comprises:
Judge that whether the return time returning described second response data of described main website is more than second scheduled time, wherein, when described return time is more than or equal to described second scheduled time, described main website record issues the failure of described ammeter parameter, otherwise described main website issues described first reading order.
5. method according to claim 4, is characterized in that, before described main website record issues the failure of described ammeter parameter, described method also comprises:
Described main website re-issues described first setting command, if the number of times that described main website re-issues described first setting command exceedes pre-determined number, described main website record issues the failure of described ammeter parameter.
6. method according to claim 1, is characterized in that, before acquisition the 3rd response data, described method also comprises:
Judge that whether the return time returning described 3rd response data of described main website is more than the 3rd scheduled time, wherein, when described return time is more than or equal to described 3rd scheduled time, described main website record issues the failure of described ammeter parameter, otherwise described main website records the success of generating table parameter.
7. method according to claim 6, is characterized in that, before described main website record issues the failure of described ammeter parameter, described method also comprises:
Described main website re-issues described first reading order, if the number of times that described main website re-issues described first reading order exceedes pre-determined number, described main website record issues the failure of described ammeter parameter.
8. method according to claim 1, is characterized in that, before described main website obtains any one response data in described first response data, the second response data, the 3rd response data, described method also comprises:
Described main website sends to described concentrator and ceases and desist order;
Described main website receives the acknowledge message from described concentrator, and records described main website and issue the failure of described ammeter parameter.
9. a testing apparatus for power information acquisition system, is characterized in that, comprising:
Sending module, ammeter optimum configurations order for carrying out optimum configurations to described ammeter is issued by concentrator to ammeter for making main website, carry out optimum configurations to described ammeter, what described ammeter generation was corresponding arranges result, and responsively data return described concentrator;
Statistical module, for described main website by the response data of concentrator reception from described ammeter, according to the reception condition of described response data, add up the success rate that main website issues described ammeter parameter, wherein, when in the effective situation of described response data, described main website is made to preserve described response data, and the described ammeter parameter success that record issues; When described response data is invalid, described main website record is made to issue the failure of described ammeter parameter;
Described statistical module comprises: the first acquisition module, issues and reads ammeter number order, and obtain the first response data for described main website; Arrange module, in the effective situation of described first response data, this main website issues the first setting command by described concentrator to ammeter, and obtains the second response data; Read module, in the effective situation of described second response data, this main website issues the first reading order by described concentrator to ammeter, and obtains the 3rd response data; Preserve module, in the effective situation of described 3rd response data, described main website preserves described 3rd response data, and records the success of generating table parameter; Wherein, in described first response data, described second response data, described 3rd response data, any one or more response data is invalid, described main website record issues the failure of described ammeter parameter;
Wherein, in described first response data, described second response data and the 3rd response data are respectively and confirm or deny data retransmission, described first setting command is for arranging period rate number order, first reading order is when reading period rate number order, described statistical module also for, described main website sends the described reading ammeter number order in data retransmission to concentrator, described concentrator can return to main website confirmation or deny data retransmission, main website can be returned as denied and deny order, or after 40s, main website thinks that nonreply or send unsuccessfully is ordered automatically, now main website can retransmit 3 times, after described main website confirms response as received, can issue and described period rate number order is set to described concentrator, described concentrator can return to main website confirmation or deny data retransmission, main website can be returned as denied and deny order, or after 40s, main website thinks that nonreply or send unsuccessfully is ordered automatically, now main website can retransmit 3 times, described main website is as after receiving confirmation, can issue and read period rate number order to described concentrator, described concentrator can return to main website confirmation or deny data retransmission, main website can be returned as denied and deny order, or after 40s, main website thinks that nonreply or send unsuccessfully is ordered automatically, now main website can retransmit 3 times, described main website is as received confirmation, testing process terminates.
10. a test macro for power information acquisition system, is characterized in that, comprising:
Main website, for issuing the order of ammeter optimum configurations by concentrator to ammeter, and statistics issues the success rate of described ammeter parameter command, and described ammeter parameter comprises: read ammeter number order, arrange number order of period rate and read number order of period rate;
Concentrator, for receiving and forwarding the described ammeter parameter of described main website, and returns response data to described main website;
Ammeter, forwarding for receiving described concentrator the described ammeter parameter of coming, carrying out optimum configurations to described ammeter, what described ammeter generation was corresponding arranges result, and responsively data return described concentrator;
Wherein, described main website issues and reads ammeter number order, and obtains the first response data; In the effective situation of described first response data, this main website issues the first setting command by described concentrator to ammeter, and obtains the second response data; In the effective situation of described second response data, this main website issues the first reading order by described concentrator to ammeter, and obtains the 3rd response data; In the effective situation of described 3rd response data, described main website preserves described 3rd response data, and records the success of generating table parameter; Wherein, in described first response data, described second response data, described 3rd response data, any one or more response data is invalid, described main website record issues the failure of described ammeter parameter;
Wherein, in described first response data, described second response data and the 3rd response data are respectively and confirm or deny data retransmission, described first setting command is for arranging period rate number order, first reading order is when reading period rate number order, described main website sends the described reading ammeter number order in data retransmission to concentrator, described concentrator can return to main website confirmation or deny data retransmission, main website can be returned as denied and deny order, or after 40s, main website thinks that nonreply or send unsuccessfully is ordered automatically, now main website can retransmit 3 times, after described main website confirms response as received, can issue and described period rate number order is set to described concentrator, described concentrator can return to main website confirmation or deny data retransmission, main website can be returned as denied and deny order, or after 40s, main website thinks that nonreply or send unsuccessfully is ordered automatically, now main website can retransmit 3 times, described main website is as after receiving confirmation, can issue and read period rate number order to described concentrator, described concentrator can return to main website confirmation or deny data retransmission, main website can be returned as denied and deny order, or after 40s, main website thinks that nonreply or send unsuccessfully is ordered automatically, now main website can retransmit 3 times, described main website is as received confirmation, testing process terminates.
11. systems according to claim 10, is characterized in that, also comprise:
Collecting device, is connected with described concentrator, gathers all response datas of described ammeter.
CN201010531143.7A 2010-10-29 2010-10-29 Method, device and system for testing electricity consumption information acquisition system Active CN102468983B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010531143.7A CN102468983B (en) 2010-10-29 2010-10-29 Method, device and system for testing electricity consumption information acquisition system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010531143.7A CN102468983B (en) 2010-10-29 2010-10-29 Method, device and system for testing electricity consumption information acquisition system

Publications (2)

Publication Number Publication Date
CN102468983A CN102468983A (en) 2012-05-23
CN102468983B true CN102468983B (en) 2015-06-17

Family

ID=46072189

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010531143.7A Active CN102468983B (en) 2010-10-29 2010-10-29 Method, device and system for testing electricity consumption information acquisition system

Country Status (1)

Country Link
CN (1) CN102468983B (en)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102932035B (en) * 2012-10-19 2014-12-24 华为技术有限公司 Power line communication frequency band selection method, concentrator and power line meter reading system
CN104468270A (en) * 2014-12-01 2015-03-25 深圳市友讯达科技发展有限公司 Interconnection and interworking site testing system and method
CN105282249B (en) * 2015-10-30 2019-06-14 国网新疆电力公司电力科学研究院 Transparent acquisition tasks remotely issue parameters of electric energy meter and control command device and method
CN107070589A (en) * 2016-12-30 2017-08-18 国网浙江省电力公司电力科学研究院 A kind of electric energy meter adaptive approach, device and electric energy meter based on object-oriented agreement and legacy protocol
CN108898743B (en) * 2018-06-29 2021-08-24 宁波三星智能电气有限公司 Illegal judging and processing method for rate and related parameters
CN109035746B (en) * 2018-07-30 2021-12-17 深圳市科陆电子科技股份有限公司 Function judgment method and system for centralized meter reading terminal
CN109253751A (en) * 2018-09-18 2019-01-22 中国电力科学研究院有限公司 A kind of measuring equipment is for can control unsuccessfully judgment method and system
CN109326116A (en) * 2018-09-26 2019-02-12 国网河北省电力有限公司电力科学研究院 Ammeter parameter batch delivery method and system
CN109982284B (en) * 2019-02-21 2020-11-03 国网山东省电力公司临沂供电公司 Communication system and method for line inspection
CN110298513A (en) * 2019-07-02 2019-10-01 国家电网有限公司 A method of prediction power purchase issues abnormal
CN110620699B (en) * 2019-08-02 2021-12-28 北京字节跳动网络技术有限公司 Message arrival rate determination method, device, equipment and computer readable storage medium
CN112769637A (en) * 2020-12-15 2021-05-07 科陆国际技术有限公司 Ammeter data forwarding method, device and system, electronic equipment and storage medium
CN115835055B (en) * 2022-11-22 2023-10-27 宁夏隆基宁光仪表股份有限公司 Dynamic regulation method for concentrator communication process

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1838193A (en) * 2006-03-13 2006-09-27 常州苏源永利达电子科技有限公司 Remote management system for ammeter data
CN101236693A (en) * 2007-02-01 2008-08-06 上海久隆电力(集团)有限公司 Intelligent meter reading system
CN201349216Y (en) * 2009-01-20 2009-11-18 珠海天瑞电力科技有限公司 Metering reading system for power line broadband network

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1838193A (en) * 2006-03-13 2006-09-27 常州苏源永利达电子科技有限公司 Remote management system for ammeter data
CN101236693A (en) * 2007-02-01 2008-08-06 上海久隆电力(集团)有限公司 Intelligent meter reading system
CN201349216Y (en) * 2009-01-20 2009-11-18 珠海天瑞电力科技有限公司 Metering reading system for power line broadband network

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
低压集抄测试系统的研发及应用;周毅波等;《广西电力》;20090630(第6期);14-17页 *

Also Published As

Publication number Publication date
CN102468983A (en) 2012-05-23

Similar Documents

Publication Publication Date Title
CN102468983B (en) Method, device and system for testing electricity consumption information acquisition system
CN102468984B (en) The method of testing of power information acquisition system and system, main website
CN102468986B (en) The method of testing of power information acquisition system and system, main website
KR101971156B1 (en) solar photovoltaic generation monitoring system type wired and wireless hybrid
CN102313880A (en) Method and system for testing local communication equipment of power utilization information acquisition system, and master station
CN201449661U (en) Remote electric power meter reading system
CN203192219U (en) Electric energy meter collector with rapid reading function
CN102917024B (en) Based on milk quality monitoring system and the monitoring method thereof of cloud computing and RFID
CN205265682U (en) Wireless communicator
CN102354441A (en) Concentrator-network-based meter reading system and method
CN103021154A (en) Wireless meter reading system based on Ad Hoc
CN109375046A (en) A kind of non-formula electric energy meter of registering one's residence of multi-frequency based on plc communication technology is visited one house after another examination device and method
CN104935489A (en) Information collection network networking method and electric energy data acquiring network
KR20030034326A (en) Automatic Meter Reading System
Ahmed et al. Automatic electric meter reading system: A cost-feasible alternative approach in meter reading for bangladesh perspective using low-cost digital wattmeter and wimax technology
CN210016487U (en) Interactive system based on PLC
CN103200241A (en) Remote wireless meter reading control device
CN105427569A (en) Intelligent meter reading system and meter reading method thereof
CN103152427A (en) Remote wireless meter-reading control method
CN102595654A (en) Indoor communication network architecture and indoor communication network architectural method
CN109949564A (en) A kind of power information acquisition system
CN106777755B (en) Verification device and system for spacer layer locking logic
Di Leo et al. Towards visual smart metering exploiting wM-Bus and DLMS/COSEM
CN116744152A (en) Ammeter data acquisition method, device, equipment and readable storage medium
CN105741515A (en) Electronic meter reading system based on two-dimensional code and meter reading method of electronic meter reading system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Free format text: FORMER OWNER: BEIJING ELECTRIC POWER CORP.

Effective date: 20121221

Owner name: BEIJING ELECTRIC POWER CORP.

Effective date: 20121221

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 100031 XICHENG, BEIJING TO: 100031 DONGCHENG, BEIJING

TA01 Transfer of patent application right

Effective date of registration: 20121221

Address after: 100031 West Chang'an Avenue, Beijing, No. 86

Applicant after: State Grid Corporation of China

Applicant after: Beijing Electric Power Corp.

Address before: 100031 Beijing Qianmen West Street, Xicheng District, No. 41

Applicant before: Beijing Electric Power Corp.

C14 Grant of patent or utility model