CN109253751A - A kind of measuring equipment is for can control unsuccessfully judgment method and system - Google Patents

A kind of measuring equipment is for can control unsuccessfully judgment method and system Download PDF

Info

Publication number
CN109253751A
CN109253751A CN201811087606.8A CN201811087606A CN109253751A CN 109253751 A CN109253751 A CN 109253751A CN 201811087606 A CN201811087606 A CN 201811087606A CN 109253751 A CN109253751 A CN 109253751A
Authority
CN
China
Prior art keywords
purchase
measuring equipment
time interval
energy
standard value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811087606.8A
Other languages
Chinese (zh)
Inventor
刘宣
唐悦
阿辽沙·叶
张海龙
窦健
郑国权
卢继哲
夏桃芳
李思韬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Fuzhou Power Supply Co of State Grid Fujian Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Fuzhou Power Supply Co of State Grid Fujian Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, China Electric Power Research Institute Co Ltd CEPRI, Fuzhou Power Supply Co of State Grid Fujian Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201811087606.8A priority Critical patent/CN109253751A/en
Publication of CN109253751A publication Critical patent/CN109253751A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01DMEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
    • G01D18/00Testing or calibrating apparatus or arrangements provided for in groups G01D1/00 - G01D15/00
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01FMEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUID LEVEL; METERING BY VOLUME
    • G01F25/00Testing or calibration of apparatus for measuring volume, volume flow or liquid level or for metering by volume
    • G01F25/10Testing or calibration of apparatus for measuring volume, volume flow or liquid level or for metering by volume of flowmeters
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01KMEASURING TEMPERATURE; MEASURING QUANTITY OF HEAT; THERMALLY-SENSITIVE ELEMENTS NOT OTHERWISE PROVIDED FOR
    • G01K19/00Testing or calibrating calorimeters
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R35/00Testing or calibrating of apparatus covered by the other groups of this subclass
    • G01R35/04Testing or calibrating of apparatus covered by the other groups of this subclass of instruments for measuring time integral of power or current

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Measuring Volume Flow (AREA)
  • Arrangements For Transmission Of Measured Signals (AREA)

Abstract

The invention discloses a kind of measuring equipments for can control unsuccessfully judgment method and system, belongs to energy measurement management domain.The method of the present invention specifically includes: step 1, and the communication message parameter of the independent communication of energy measurement management system main website independent acquisition measuring equipment and purchase can issue successfully time interval parameter;Step 2: comparing the communication message parameter and standard value of independent communication, judges that measuring equipment purchase can issue and whether fail;If parameter value is greater than standard value, measuring equipment purchase can issue failure;Step 3: time interval parameter and standard value can be issued successfully by comparing purchase, judge whether measuring equipment is in purchase energy status of fail;Step 4: valve opening control operation is carried out to measuring equipment by writing valve control command, if the operating time is more than that 1 hour determining measuring equipment is in for can control status of fail.The present invention is used for electricity-water-gas heat energy metering management system, improves work efficiency, improves system operation reliability.

Description

A kind of measuring equipment is for can control unsuccessfully judgment method and system
Technical field
The present invention relates to energy measurement management domains, and relate more specifically to a kind of measuring equipment and sentence for can control failure Disconnected method and system.
Background technique
The country has carried out the construction of electricity-water-gas heat energy metering management system, and accumulative covering user has reached millions of families.With The expansion of system scale, the O&M difficulty of system and equipment greatly improves, for maintenance work amoun, precise positioning system is effectively reduced The failure of system and equipment, reasonable analysis user's state with energy should effectively collect device data based on automation collection means, and lead to It crosses reasonable calculation method and automatically analyzes and obtain corresponding conclusion, support live maintenance work.
Building for acquiring electric energy information and management system last decade has been used for reference in the construction of electricity-water-gas heat energy metering management system If experience, using the acquiring electric energy information technology for electric energy meter as core, while water meter, gas meter, flow meter and calorimeter are accessed and acquired Data, carry out Data Integration in system main website, realize the convenience-for-people functions such as more single unifications.Acquiring electric energy information and management system pass through Construction and O&M for many years are crossed, a large amount of experience is had accumulated, effectively promotes the development of intelligent measurement technology, improves power grid intelligence Change level, the Various types of data of acquisition is in electricity transaction, tariff recovery, power utility check, market demand side, line loss lean point Important branch has been played in multiple specialized service applications such as analysis, power distribution network operational monitoring, power supply quality monitoring and breakdown repair Support effect, it has also become important foundation data source.
Summary of the invention
In view of the above-mentioned problems, the present invention proposes that a kind of measuring equipment supplies to can control unsuccessfully judgment method, specifically include:
Step 1, the communication message parameter of the independent communication of energy measurement management system main website independent acquisition measuring equipment and Purchase can issue successfully time interval parameter;
It includes that purchase for the first time can not issue successfully time interval that the purchase, which can issue successfully time interval parameter, second of purchase Time interval can not be issued successfully;
Step 2: comparing the communication message parameter and standard value of independent communication, judges that measuring equipment purchase can issue and whether lose It loses;If parameter value is greater than standard value, measuring equipment purchase can issue failure;
Step 3: time interval parameter and standard value can be issued successfully by comparing purchase, judge whether measuring equipment is in purchase energy Status of fail;
It is to meet to purchase energy time interval parameter for the first time greater than standard value and second that the measuring equipment, which purchases energy status of fail, Purchase can succeed in 24 hours to 48 hours sections for the first time while secondary purchase energy time interval parameter is greater than standard value;
Step 4: valve opening control operation is carried out to measuring equipment by writing valve control command, if the operating time is more than 1 small When determine that measuring equipment is in for can control status of fail.
Optionally, the communication message parameter of the independent communication includes: and purchases energy data to issue rear measuring equipment from main website The confession that measuring equipment can not be inquired with system main website after purchase energy data distributing by replying confirmation message time interval can control information Or inquire the data time interval purchased before capable of issuing.
Optionally, measuring equipment includes electric energy meter, water meter, gas meter, flow meter and calorimeter.
Optionally, the range of standard value is to purchase energy data to issue rear measuring equipment reply confirmation message time interval from main website The confession that standard value is 10min, system main website can not inquire measuring equipment after purchase energy data distributing can control information or inquire Purchase can issue before data time separation standard value be 60min, purchase can not issue successfully time interval standard value and be for the first time It is for 24 hours that 48h and second of purchase, which can not issue successfully time interval standard value,.
Optionally, when step 2 further includes that measuring equipment purchase can issue unsuccessfully, circulating repetition purchase energy data distributing is waited really Recognize message and the process for can control inquiry.
The present invention also provides a kind of measuring equipments unsuccessfully to judge system for can control, the system comprises:
Acquisition module, the communication message parameter of the independent communication of energy measurement management system main website independent acquisition measuring equipment Time interval parameter can be issued successfully with purchase;
It includes that purchase for the first time can not issue successfully time interval that the purchase, which can issue successfully time interval parameter, second of purchase Time interval can not be issued successfully;
Judgement purchase can issue unsuccessfully module, compare the communication message parameter and standard value of independent communication, judge measuring equipment Purchase can issue whether fail;If parameter value is greater than standard value, measuring equipment purchase can issue failure;
The module that can fail is purchased in judgement, can be issued successfully time interval parameter and standard value compared with purchase than measuring equipment, be judged to count Whether amount equipment is in purchase can status of fail;
It is to meet to purchase energy time interval parameter for the first time greater than standard value and second that the measuring equipment, which purchases energy status of fail, Purchase can succeed in 24 hours to 48 hours sections for the first time while secondary purchase energy time interval parameter is greater than standard value;
It determines energy supply failure module, valve opening control operation is carried out to measuring equipment by writing valve control command, if operation Time is more than that 1 hour determining measuring equipment is in for can control status of fail.
The present invention has the advantages that
(1) present invention purchases the comparison result of energy information and the measuring equipment communication information according to user, and analysis measuring equipment is real There is a possibility that abnormal in border operation, and triggers corresponding process flow.
(2) present invention is used for electricity-water-gas heat energy metering management system, sets suitable for system main website, acquisition equipment and metering The standby system structure constructed jointly acquires measuring equipment data by acquisition equipment, carries out data analysis in system main website, judges to supply It can control status of fail and event, analysis result can support the operation and maintenance of energy measurement management system, improve work effect Rate, lifting system operational reliability.
Detailed description of the invention
Fig. 1 is a kind of measuring equipment of the present invention for can control unsuccessfully judgment method flow chart;
Fig. 2 is that a kind of measuring equipment of the present invention supplies can control unsuccessfully to judge system construction drawing.
Specific embodiment
Exemplary embodiments of the present invention are introduced referring now to the drawings, however, the present invention can use many different shapes Formula is implemented, and is not limited to the embodiment described herein, and to provide these embodiments be at large and fully disclose The present invention, and the scope of the present invention is sufficiently conveyed to person of ordinary skill in the field.Show for what is be illustrated in the accompanying drawings Term in example property embodiment is not limitation of the invention.In the accompanying drawings, identical cells/elements use identical attached Icon note.
Unless otherwise indicated, term (including scientific and technical terminology) used herein has person of ordinary skill in the field It is common to understand meaning.Further it will be understood that with the term that usually used dictionary limits, should be understood as and its The context of related fields has consistent meaning, and is not construed as Utopian or too formal meaning.
The present invention provides a kind of measuring equipment for can control unsuccessfully judgment method, as shown in Figure 1, comprising:
Step 1, the communication message parameter of the independent communication of energy measurement management system main website independent acquisition measuring equipment and Purchase can issue successfully time interval parameter;Measuring equipment includes electric energy meter, water meter, gas meter, flow meter and calorimeter;
Wherein, it includes that purchase for the first time can not issue successfully time interval that purchase, which can issue successfully time interval parameter, and second Purchase can not issue successfully time interval;The communication message parameter of independent communication includes: to measure to set after purchase energy data are issued from main website The confession that system main website can not inquire measuring equipment after standby reply confirmation message time interval and purchase energy data distributing can control letter Cease or inquire the data time interval purchased before capable of issuing.
The range of the standard value of parameter is to purchase energy data to issue rear measuring equipment reply confirmation message time interval from main website The confession that standard value is 10min, system main website can not inquire measuring equipment after purchase energy data distributing can control information or inquire Purchase can issue before data time separation standard value be 60min, purchase can not issue successfully time interval standard value and be for the first time It is for 24 hours that 48h and second of purchase, which can not issue successfully time interval standard value,.
Step 2: comparing the communication message parameter and standard value of independent communication, judges that measuring equipment purchase can issue and whether lose It loses;If parameter value is greater than standard value, measuring equipment purchase can issue failure;When measuring equipment purchase can issue unsuccessfully, circulating repetition purchase Energy data distributing waits confirmation message and the process for can control inquiry, if measuring equipment purchase can issue failure, enters step Three, otherwise exit;
Step 3: time interval parameter and standard value can be issued successfully by comparing purchase, judge whether measuring equipment is in purchase energy Status of fail;
Wherein, it is to meet to purchase energy time interval parameter for the first time greater than standard value and second that measuring equipment, which purchases energy status of fail, Purchase can succeed in 24 hours to 48 hours sections for the first time while secondary purchase energy time interval parameter is greater than standard value;
If measuring equipment is in purchase energy status of fail, four are entered step, is otherwise exited;
Step 4: valve opening control operation is carried out to measuring equipment by writing valve control command, if the operating time is more than 1 small When determine that measuring equipment is in for can control status of fail.
The present invention also provides a kind of measuring equipments unsuccessfully to judge system for can control, and the system 200 includes:
Acquisition module 201, the communication message of the equipment independent communication of energy measurement management system main website independent acquisition metering Parameter and purchase can issue successfully time interval parameter;
It includes that purchase for the first time can not issue successfully time interval that the purchase, which can issue successfully time interval parameter, second of purchase Time interval can not be issued successfully;
Judgement purchase can issue unsuccessfully module 202, compare the communication message parameter and standard value of independent communication, judge that metering is set Standby purchase can issue whether fail;If parameter value is greater than standard value, measuring equipment purchase can issue failure;
The module 203 that can fail is purchased in judgement, can be issued successfully time interval parameter and standard value compared with purchase than measuring equipment, be judged Whether measuring equipment is in purchase can status of fail;
It is to meet to purchase energy time interval parameter for the first time greater than standard value and second that the measuring equipment, which purchases energy status of fail, Purchase can succeed in 24 hours to 48 hours sections for the first time while secondary purchase energy time interval parameter is greater than standard value;
It determines energy supply failure module 204, valve opening control operation is carried out to measuring equipment by writing valve control command, if behaviour Making the time is more than that 1 hour determining measuring equipment is in for can control status of fail.
The present invention purchases the comparison result of energy information and the measuring equipment communication information according to user, analyzes the practical behaviour of measuring equipment Make a possibility that abnormal occur, and triggers corresponding process flow.
The present invention is used for electricity-water-gas heat energy metering management system, is suitable for system main website, acquisition equipment and measuring equipment The system structure constructed jointly acquires measuring equipment data by acquisition equipment, carries out data analysis in system main website, judges to energize Status of fail and event are controlled, analysis result can support the operation and maintenance of energy measurement management system, improve working efficiency, Lifting system operational reliability.

Claims (6)

1. a kind of measuring equipment is for can control unsuccessfully judgment method characterized by comprising
Step 1, the communication message parameter and purchase energy of the independent communication of energy measurement management system main website independent acquisition measuring equipment Issue successfully time interval parameter;
It includes that purchase for the first time can not issue successfully time interval that the purchase, which can issue successfully time interval parameter, and second of purchase can be not Issue successfully time interval;
Step 2: comparing the communication message parameter and standard value of independent communication, judges that measuring equipment purchase can issue and whether fail;If Parameter value is greater than standard value, and measuring equipment purchase can issue failure, enter step three, otherwise exit;
Step 3: time interval parameter and standard value can be issued successfully by comparing purchase, judge whether measuring equipment is in purchase and can fail State enters step four, otherwise exits if measuring equipment is in measuring equipment purchase energy status of fail;
It is to meet purchase energy time interval parameter for the first time to purchase greater than standard value and second that the measuring equipment, which purchases energy status of fail, Purchase for the first time can succeed in 24 hours to 48 hours sections while energy time interval parameter is greater than standard value;
Step 4: valve opening control operation is carried out to measuring equipment by writing valve control command, if the operating time is more than 1 hour true Metrology device is in for can control status of fail.
2. according to the method for claim 1, it is characterized by: the communication message parameter of the independent communication includes: purchase energy Data issue system main website after rear measuring equipment replys confirmation message time interval and purchase energy data distributing from main website and can not inquire Confession to measuring equipment can control information or inquire the data time interval purchased before capable of issuing.
3. according to the method for claim 1, it is characterized by: the measuring equipment includes electric energy meter, water meter, gas meter, flow meter And calorimeter.
4. according to the method for claim 1, it is characterized by: the range of the standard value is purchase energy data under main website Measuring equipment is replied system main website after confirmation message time interval standard value is 10min, purchases energy data distributing and can not be inquired after hair What it is to measuring equipment is 60min, first for can control information or inquire the data time separation standard value purchased before capable of issuing Secondary purchase can not issue successfully time interval standard value and be 48h and purchase for the second time that time interval standard value can not be issued successfully as 24 hours.
5. according to the method for claim 1, it is characterized by: the step two further includes that measuring equipment purchase can issue mistake When losing, circulating repetition purchase can data distributing, waiting confirmation message and the process for can control inquiry.
6. a kind of measuring equipment unsuccessfully judges system for can control characterized by comprising
Acquisition module, the communication message parameter and purchase of the independent communication of energy measurement management system main website independent acquisition measuring equipment Time interval parameter can be issued successfully;
It includes that purchase for the first time can not issue successfully time interval that the purchase, which can issue successfully time interval parameter, and second of purchase can be not Issue successfully time interval;
Judgement purchase can issue unsuccessfully module, compare the communication message parameter and standard value of independent communication, judge that measuring equipment purchases energy It issues and whether fails;If parameter value is greater than standard value, measuring equipment purchase can issue failure;
The module that can fail is purchased in judgement, can be issued successfully time interval parameter and standard value compared with purchase than measuring equipment, be judged that metering is set It is standby whether to be in purchase energy status of fail;
It is to meet purchase energy time interval parameter for the first time to purchase greater than standard value and second that the measuring equipment, which purchases energy status of fail, Purchase for the first time can succeed in 24 hours to 48 hours sections while energy time interval parameter is greater than standard value;
It determines energy supply failure module, valve opening control operation is carried out to measuring equipment by writing valve control command, if the operating time More than 1 hour, determining measuring equipment was in for can control status of fail.
CN201811087606.8A 2018-09-18 2018-09-18 A kind of measuring equipment is for can control unsuccessfully judgment method and system Pending CN109253751A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811087606.8A CN109253751A (en) 2018-09-18 2018-09-18 A kind of measuring equipment is for can control unsuccessfully judgment method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811087606.8A CN109253751A (en) 2018-09-18 2018-09-18 A kind of measuring equipment is for can control unsuccessfully judgment method and system

Publications (1)

Publication Number Publication Date
CN109253751A true CN109253751A (en) 2019-01-22

Family

ID=65048206

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811087606.8A Pending CN109253751A (en) 2018-09-18 2018-09-18 A kind of measuring equipment is for can control unsuccessfully judgment method and system

Country Status (1)

Country Link
CN (1) CN109253751A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005133616A (en) * 2003-10-29 2005-05-26 Toyota Motor Corp Fuel volume measuring device and fuel meter failure judging device
CN102468983A (en) * 2010-10-29 2012-05-23 北京市电力公司 Method, device and system for testing electricity consumption information acquisition system
US20160363956A1 (en) * 2015-06-15 2016-12-15 Honeywell International Inc. Synchronizing interval data despite loss of time
CN106408370A (en) * 2016-08-29 2017-02-15 成都支付通卡友电子商务有限公司 Commissioned electrical charge collection maintenance method
CN107315158A (en) * 2017-06-22 2017-11-03 南方电网科学研究院有限责任公司 The data of expense control electric energy meter copy back function test method and system
CN107416752A (en) * 2016-05-24 2017-12-01 阿里巴巴集团控股有限公司 The fuel oil supply control system of multiple oil-fired power generating equipment
CN107993016A (en) * 2017-12-08 2018-05-04 囯网河北省电力有限公司电力科学研究院 Take control management method and terminal device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005133616A (en) * 2003-10-29 2005-05-26 Toyota Motor Corp Fuel volume measuring device and fuel meter failure judging device
CN102468983A (en) * 2010-10-29 2012-05-23 北京市电力公司 Method, device and system for testing electricity consumption information acquisition system
US20160363956A1 (en) * 2015-06-15 2016-12-15 Honeywell International Inc. Synchronizing interval data despite loss of time
CN107416752A (en) * 2016-05-24 2017-12-01 阿里巴巴集团控股有限公司 The fuel oil supply control system of multiple oil-fired power generating equipment
CN106408370A (en) * 2016-08-29 2017-02-15 成都支付通卡友电子商务有限公司 Commissioned electrical charge collection maintenance method
CN107315158A (en) * 2017-06-22 2017-11-03 南方电网科学研究院有限责任公司 The data of expense control electric energy meter copy back function test method and system
CN107993016A (en) * 2017-12-08 2018-05-04 囯网河北省电力有限公司电力科学研究院 Take control management method and terminal device

Similar Documents

Publication Publication Date Title
CN106971351B (en) The automatic Acceptance Test System of intelligent substation regulation and controlling of information integration and method
CN103760874A (en) Method for locating meter reading fault source of low-voltage area
CN103187735A (en) Bidirectional intelligent gateway device for distributed new energy grid connection
CN109345786A (en) A kind of non-resident user power utilization abnormal conditions automatic alarm system of low pressure
CN110083640A (en) A kind of recognition methods of platform area and device based on power failure data
CN108490285B (en) Low-voltage transformer area line loss rate calculation method based on voltage drop method
Li et al. Researches on the reliability evaluation of integrated energy system based on Energy Hub
CN112254207A (en) Abnormal state online monitoring and alarming system for heat supply pipe network
CN110011423A (en) Realize that family becomes the system and method for the online dynamic and intelligent monitoring function of relationship based on big data
CN103308762A (en) Intensive energy consumption subentry measurement warning system and implementation method
CN107290019A (en) A kind of wireless watermeter system based on GSM
CN102999031A (en) Condition monitoring method for area-country integration zonal statistic and maintenance
CN102426623A (en) Automatic failure fitting modeling method for power load modeling
CN105335824B (en) Distribution network failure repairing command methods and system based on data center
CN109253751A (en) A kind of measuring equipment is for can control unsuccessfully judgment method and system
CN103928986A (en) Error correcting and checking system for power grid dispatching wiring diagram and checking method thereof
CN111626542A (en) Big data-based detection method for generator excitation system
CN203397431U (en) System for wirelessly reading gas meter employing integrated circuit (IC) card prepaid multi-rate
CN116014893A (en) Remote visual intelligent inspection system for transformer substation
Jha et al. Portal based prepaid energy billing system using GSM
CN205318266U (en) Nuclear power station technology pipeline electric tracer heating system
CN109443395A (en) A kind of Energy intensity multiple spot metering difference is more than limit value judgment method and system
CN104165667A (en) Remote and concentrated resident water meter reading system
CN209072514U (en) A kind of intelligent power acquisition terminal detection device
CN108414851B (en) Intelligent checking method based on EMS theory electric quantity data and collected electric quantity data

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190122

RJ01 Rejection of invention patent application after publication