CN102466563B - The method of operating of link holding capacity pick-up unit - Google Patents

The method of operating of link holding capacity pick-up unit Download PDF

Info

Publication number
CN102466563B
CN102466563B CN201010534230.8A CN201010534230A CN102466563B CN 102466563 B CN102466563 B CN 102466563B CN 201010534230 A CN201010534230 A CN 201010534230A CN 102466563 B CN102466563 B CN 102466563B
Authority
CN
China
Prior art keywords
link
unit
holding capacity
linkage unit
preset pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201010534230.8A
Other languages
Chinese (zh)
Other versions
CN102466563A (en
Inventor
朱德康
俞宏群
姜峰
林宗泉
孙杰
郭建斌
寿鉴标
姜生青
曹军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuchunjiang Hydroelectric Power Plant State Grid Xinyuan Hydropower Co Ltd
STATE GRID XINYUAN HYDROPOWER CO Ltd
State Grid Corp of China SGCC
Original Assignee
Fuchunjiang Hydroelectric Power Plant State Grid Xinyuan Hydropower Co Ltd
STATE GRID XINYUAN HYDROPOWER CO Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuchunjiang Hydroelectric Power Plant State Grid Xinyuan Hydropower Co Ltd, STATE GRID XINYUAN HYDROPOWER CO Ltd, State Grid Corp of China SGCC filed Critical Fuchunjiang Hydroelectric Power Plant State Grid Xinyuan Hydropower Co Ltd
Priority to CN201010534230.8A priority Critical patent/CN102466563B/en
Publication of CN102466563A publication Critical patent/CN102466563A/en
Application granted granted Critical
Publication of CN102466563B publication Critical patent/CN102466563B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of link holding capacity pick-up unit, comprising: beam, the two ends of link are fixed on beam; The force bearing plate be arranged in parallel with beam; At least one pressure-strain sheet, pressure-strain sheet is fixed on link; First linkage unit, one end of the first linkage unit is fixed at the bottom of the ring of link, and the other end of the first linkage unit is fixed on described force bearing plate; Second linkage unit, the two ends of the second linkage unit are separately fixed on beam and force bearing plate; Force application element, one end of force application element contacts with beam, and between the first linkage unit and the second linkage unit; Pressure transducer, is placed on the other end of force application element, and contacts with force bearing plate; And the display unit to be connected with described pressure transducer.Detecting element connection is each other simple, and use principle is simple.

Description

The method of operating of link holding capacity pick-up unit
Technical field
The present invention relates to the charger detecting holding capacity, particularly relate to a kind of link holding capacity pick-up unit and method of operating thereof.
Background technology
The block components of safeguard protection utensil when high-altitude metal link may be used for work high above the ground; metal link can bear the effect of power to a certain degree usually when operation; Long-Time Service can make metal link occur when concrete operation to come off with mounting article; or self-deformation is bending and cause security incident, therefore changes link in time and seem particularly important.
At present for using the link of a period of time to adopt the mode of periodic replacement to solve potential safety hazard, and the structural strength of each link non-equal, therefore aging degree (i.e. coefficient of depreciation) is not identical, therefore batch replacement, material is caused to waste greatly, in addition, link is carried out removing and reinstall the skilled labour intensity that all can cost a lot of money and very long working time.Change measure for batch blindly, in the urgent need to the measure of the substandard link of a kind of effective detection, change targetedly and solve the problem of potential safety hazard.
Summary of the invention
The object of the present invention is to provide a kind of link holding capacity pick-up unit and method of operating thereof, to solve the problem that existing link carries out without detection method blindly changeing in batches.
For solving the problem, the present invention proposes a kind of link holding capacity pick-up unit, for detecting stress suffered by link, described pick-up unit comprises: beam, and the two ends of link are fixed on described beam; The force bearing plate be arranged in parallel with described beam; At least one pressure-strain sheet, described pressure-strain sheet is fixed on described link; First linkage unit, one end of described first linkage unit is fixed at the bottom of the ring of link, and the other end of described first linkage unit is fixed on described force bearing plate; Second linkage unit, the two ends of described second linkage unit are separately fixed on described beam and force bearing plate; Force application element, one end of described force application element contacts with described beam, and between described first linkage unit and described second linkage unit; Pressure transducer, is placed on the other end of described force application element, and contacts with described force bearing plate; And the display unit to be connected with described pressure transducer.
Optionally, in described link holding capacity pick-up unit, described first linkage unit to bear load capacity stronger than described link.
Optionally, in described link holding capacity pick-up unit, described second linkage unit to bear load capacity stronger than described link.
Optionally, in described link holding capacity pick-up unit, described pressure-strain sheet is fixed on position on described link near described beam.
Optionally, in described link holding capacity pick-up unit, described beam is beams of concrete.
Optionally, in described link holding capacity pick-up unit, described force bearing plate is steel plate.
Optionally, in described link holding capacity pick-up unit, described force application element is lifting jack.
Optionally, in described link holding capacity pick-up unit, described display unit is double screen weight display.
Optionally, in described link holding capacity pick-up unit, described first linkage unit is chain, and described second linkage unit is chain.
The present invention also provides a kind of method of operating of link holding capacity pick-up unit, comprising: force application element applies an original pressure to link; Under original pressure effect, if abnormal occurrence appears in described link, then identify that described link is defective, detect and terminate; If there is not abnormal occurrence in described link, force application element applies a preset pressure to link, wherein, preset pressure value is greater than described initial pressure value, the payload values of described link that described display unit shows described preset pressure value and obtained by the measurement of pressure-strain sheet; Under preset pressure effect, if abnormal occurrence appears in described link, then identify that described link is defective, detect and terminate; If abnormal occurrence does not appear in described link, the payload values of more described preset pressure value and link, if the difference of preset pressure value and payload values is less than or equal to normal value, then identifies that described link is qualified; If the difference of preset pressure value and payload values is greater than normal value, then link holding capacity pick-up unit is in abnomal condition, checks described link holding capacity pick-up unit.
Optionally, in the method for operating of described link holding capacity pick-up unit, described abnormal occurrence comprises described link and fixed position place to be had break-off or described link to have to be out of shape or described link is bending or combinations thereof.
Optionally, in the method for operating of described link holding capacity pick-up unit, described preset pressure value is 2.4-2.6 times of the actual bearing load of described link.
Optionally, in the method for operating of described link holding capacity pick-up unit, the time that force application element applies preset pressure to link is 15-17 minute.
The detecting element comprised in link holding capacity pick-up unit provided by the invention is with low cost, and detecting element connection is each other simple, and use principle is simple.Present invention also offers a kind of method of operating of link holding capacity pick-up unit, simple force application element is utilized indirectly to apply preset pressure to detected object link, the payload values obtaining link is detected by the pressure-strain sheet that link is installed, compare with preset pressure value, if the difference of payload values and preset pressure value is less than or equal to normal value, then link is qualified, in this testing process, simple to operate, accuracy rate is high, and apply the original pressure less than preset pressure by early stage to link, even if ensure that link, under low-force, abnormal conditions occurs, also security incident can not be there is, thus enhance the detection safety of link.
Accompanying drawing explanation
The link holding capacity structure of the detecting device schematic diagram that Fig. 1 provides for the embodiment of the present invention;
The steps flow chart schematic diagram of the method for operating of the link holding capacity pick-up unit that Fig. 2 provides for the embodiment of the present invention.
Embodiment
The link holding capacity pick-up unit proposed the present invention below in conjunction with the drawings and specific embodiments and method of operating thereof are described in further detail.According to the following describes and claims, advantages and features of the invention will be clearer.It should be noted that, accompanying drawing all adopts the form that simplifies very much and all uses non-ratio accurately, only for object that is convenient, the aid illustration embodiment of the present invention lucidly.
Core concept of the present invention is, provide a kind of link holding capacity pick-up unit, detecting element is with low cost, and detecting element connection is each other simple, and use principle is simple.Present invention also offers a kind of method of operating of link holding capacity pick-up unit, in testing process, simple to operate, accuracy rate is high, and apply the original pressure less than preset pressure by early stage to link, even if ensure that link, under low-force, abnormal conditions occurs, also can not there is security incident, thus enhance the detection safety of link.
Please refer to Fig. 1, its link holding capacity structure of the detecting device schematic diagram provided for the embodiment of the present invention, in conjunction with this Fig. 1, this link holding capacity pick-up unit 10 comprises: beam 11, and the two ends of link 12 are fixed on described beam 11; The force bearing plate 13 be arranged in parallel with described beam 11; At least one pressure-strain sheet 14, described pressure-strain sheet 14 is fixed on described link 12; First linkage unit 15, one end of described first linkage unit 15 is fixed at the bottom of the ring of link 12, and the other end of described first linkage unit 15 is fixed on described force bearing plate 13; Second linkage unit 16, the two ends of described second linkage unit 16 are separately fixed on described beam 11 and described force bearing plate 13; Force application element 17, one end of described force application element 17 contacts with described beam 11, and between described first linkage unit 15 and described second linkage unit 16; Pressure transducer 18, is placed on the other end of described force application element 17, and contacts with described force bearing plate 13; The display unit (not shown) be connected with described pressure transducer 18.
Preferably, described first linkage unit 15 or the second linkage unit 16 bear load capacity than described link the last 12, avoid in force process, due to described first linkage unit 15 or the second linkage unit 16 load capacity low and rupture, cause link holding capacity pick-up unit 10 not carry out smoothly.In the present embodiment, described first linkage unit 15 and the second linkage unit 16 are chain, and wherein the setting of the second linkage unit 16 is to ensure whole link holding capacity pick-up unit 10 stress balance.
Preferably, described pressure-strain sheet 14 is fixed on position on described link 12 near described beam 11, because the power acted on link 12 is maximum in the position near described beam 11, be therefore fixed on by pressure-strain sheet 14 on the link 12 of beam 11, the result of detection is the most effective.In the present embodiment, respectively arrange a pressure-strain sheet 14 near link 12 two ends, described pressure-strain sheet 14 can test link 12 stress suffered in loading procedure.
In the present embodiment, described beam 11 is beams of concrete, and the two ends of link 12 are fixed in beams of concrete, ensure that link 12 is connected with beam 11 securely to a certain extent.Described force bearing plate 13 is steel plate, and will be understood by those skilled in the art that, the material of force bearing plate 13 is not only limited as steel, can be the material possessing identical or close hardness.
In the present embodiment, described force application element 17 is lifting jack, and lifting jack applies power in pressure transducer 18, finally by force bearing plate 13 and the first linkage unit 15 indirectly-acting on link 12.Described display unit is double screen weight display, and show two data about power, one is the power that lifting jack puts on pressure transducer 18 simultaneously, and another is that pressure-strain sheet 14 tests link 12 stress suffered in lifting jack loading procedure.
The steps flow chart schematic diagram of the method for operating of the link holding capacity pick-up unit that Fig. 2 provides for the embodiment of the present invention.As shown in Figure 2, the step that the method for operating of described link holding capacity pick-up unit 10 comprises is:
S21, force application element apply an original pressure to link;
S22, under original pressure effect, if abnormal occurrence appears in described link, then identify that described link is defective, detect and terminate;
If there is not abnormal occurrence in the described link of S23, force application element applies a preset pressure to link, wherein, preset pressure value is greater than described initial pressure value, the payload values of described link that described display unit shows described preset pressure value and obtained by the measurement of pressure-strain sheet;
S24, under preset pressure effect, if abnormal occurrence appears in described link, then identify that described link is defective, detect and terminate;
If abnormal occurrence does not appear in the described link of S25, then the payload values of more described preset pressure value and link, if the difference of preset pressure value and payload values is less than or equal to normal value, then identify that described link is qualified; If the difference of preset pressure value and payload values is greater than normal value, then link holding capacity pick-up unit is in abnomal condition, checks described link holding capacity pick-up unit.
With reference to above-mentioned steps and composition graphs 1, the method for operating of the link holding capacity pick-up unit of the embodiment of the present invention is described in more detail.
In step S21, force application element 17 applies an original pressure to pressure transducer 18, because pressure transducer 18 contacts with force bearing plate 13, therefore force bearing plate 13 is also subject to the effect of this original pressure, further, one end of described first linkage unit 15 is fixed at the bottom of the ring of link 12, and the other end of described first linkage unit 15 is fixed on described force bearing plate 13, therefore the original pressure that force bearing plate 13 is subject to acts on link 12 by the first linkage unit 15, makes link 12 be subject to certain stress.
In step S22, under original pressure effect, if there is abnormal occurrence in link 12, such as, described link 12 is with there is break-off at fixed position place, described link 12 has distortion, described link is bending, then identify that described link 12 is defective, detect and terminate, the link 12 carrying out detecting is replaced.
In step S23, the setting of preset pressure value searches its stress reference value allowing to use according to the material of link 12, consider the real work time limit of link 12 again, according to L226-1998 " Hydraulic and Hydro-Power Engineering metal construction Rejection standard ", reduction is carried out to its permissible stress, obtains after getting corresponding reduction coefficient.Preset pressure value is generally the 2.4-2.6 of the actual bearing load of described link 12 doubly, in the present embodiment, get 2.4 times that described preset pressure value is the actual bearing load of described link 12, and, the preset pressure applied continues for some time, for 15-17 minute, in the present embodiment, getting the time applying preset pressure is 15 minutes.
In step S24, because preset pressure value is larger than initial pressure value, therefore there is abnormal occurrence than easier under the effect of original pressure in link 12 under the effect of preset pressure.
In step S25, when link holding capacity pick-up unit 10 is in abnomal condition, pressure-strain sheet 14 Rig up error be arranged on link 12 may be there is, cause the payload values of the link 12 recorded to there is deviation, make the difference of payload values and preset pressure value increase further, thus exceed normal value; Also likely occur that the position that force application element 17 is installed is unfavorable for that force application element 17 accurately exerts a force, cause the preset pressure value generation deviation applied by force application element 17, make the difference of preset pressure value and payload values increase further, thus exceeded normal value.
In sum, the invention provides a kind of link holding capacity pick-up unit, the detecting element of described link holding capacity pick-up unit is with low cost, and detecting element connection is each other simple, and use principle is simple.Present invention also offers a kind of method of operating of link holding capacity pick-up unit, simple force application element 17 is utilized indirectly to apply preset pressure to detected object link 12, the payload values obtaining link 12 is detected by the pressure-strain sheet 14 that link 12 is installed, compare with preset pressure value, if the difference of payload values and preset pressure value is less than or equal to normal value, then link 12 is qualified, in this testing process, simple to operate, accuracy rate is high, and apply the original pressure less than preset pressure by giving link 12 early stage, even if ensure that link 12, under low-force, abnormal conditions occurs, also security incident can not be there is, thus enhance the detection safety of link 12.
Obviously, those skilled in the art can carry out various change and modification to invention and not depart from the spirit and scope of the present invention.Like this, if these amendments of the present invention and modification belong within the scope of the claims in the present invention and equivalent technologies thereof, then the present invention is also intended to comprise these change and modification.

Claims (1)

1. a method of operating for link holding capacity pick-up unit, is applied on link holding capacity pick-up unit, it is characterized in that, described link holding capacity pick-up unit comprises:
Beam, the two ends of link are fixed on described beam;
The force bearing plate be arranged in parallel with described beam;
At least one pressure-strain sheet, described pressure-strain sheet is fixed on described link, and described pressure-strain sheet is fixed on position on described link near described beam;
First linkage unit, one end of described first linkage unit is fixed at the bottom of the ring of link, and the other end of described first linkage unit is fixed on described force bearing plate;
Second linkage unit, the two ends of described second linkage unit are separately fixed on described beam and force bearing plate;
Force application element, one end of described force application element contacts with described beam, and between described first linkage unit and described second linkage unit;
Pressure transducer, is placed on the other end of described force application element, and contacts with described force bearing plate; And
The display unit be connected with described pressure transducer;
The method of operating of described link holding capacity pick-up unit comprises:
Force application element applies an original pressure to link;
Under original pressure effect, if abnormal occurrence appears in described link, then identify that described link is defective, detect and terminate;
If there is not abnormal occurrence in described link, force application element applies a preset pressure to link, wherein, preset pressure value is greater than described initial pressure value, the payload values of described link that described display unit shows described preset pressure value and obtained by the measurement of pressure-strain sheet;
Under preset pressure effect, if abnormal occurrence appears in described link, then identify that described link is defective, detect and terminate;
If abnormal occurrence does not appear in described link, the payload values of more described preset pressure value and link, if the difference of preset pressure value and payload values is less than or equal to normal value, then identifies that described link is qualified; If the difference of preset pressure value and payload values is greater than normal value, then link holding capacity pick-up unit is in abnomal condition, checks described link holding capacity pick-up unit;
Wherein, described abnormal occurrence comprises described link and fixed position place to be had break-off or described link to have to be out of shape or described link bends, described preset pressure value is 2.4-2.6 times of the actual bearing load of described link, and the time that force application element applies preset pressure to link is 15-17 minute.
CN201010534230.8A 2010-11-05 2010-11-05 The method of operating of link holding capacity pick-up unit Active CN102466563B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010534230.8A CN102466563B (en) 2010-11-05 2010-11-05 The method of operating of link holding capacity pick-up unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010534230.8A CN102466563B (en) 2010-11-05 2010-11-05 The method of operating of link holding capacity pick-up unit

Publications (2)

Publication Number Publication Date
CN102466563A CN102466563A (en) 2012-05-23
CN102466563B true CN102466563B (en) 2015-11-25

Family

ID=46070467

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010534230.8A Active CN102466563B (en) 2010-11-05 2010-11-05 The method of operating of link holding capacity pick-up unit

Country Status (1)

Country Link
CN (1) CN102466563B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104198171B (en) * 2014-09-02 2016-10-19 南车二七车辆有限公司 A kind of rolling stock top operation coupler composition assay device and using method thereof
CN108304016B (en) * 2018-02-28 2021-01-22 京东方科技集团股份有限公司 Aging protection device, control method thereof and aging protection system

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1988005907A1 (en) * 1987-01-28 1988-08-11 Proof Load (Services) Limited Testing of linking elements
JPH0498136A (en) * 1990-08-16 1992-03-30 Yamato Scale Co Ltd Load cell
CN201110822Y (en) * 2007-09-14 2008-09-03 王志伟 Self-balance multifunctional structure static loaded experiment loading unit
CN201229214Y (en) * 2008-06-13 2009-04-29 西安金源电气有限公司 Tensile force monitoring device for ice-coated powerline on-line monitoring system
CN201323421Y (en) * 2008-12-22 2009-10-07 广州长川科技有限公司 Electric hardware tool with function of tension detection
CN101728802A (en) * 2009-12-15 2010-06-09 四川电力试验研究院 Electric connecting anchor clamp with measurable force
CN201576919U (en) * 2009-12-15 2010-09-08 四川电力试验研究院 Power connection fitting capable of monitoring force

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1988005907A1 (en) * 1987-01-28 1988-08-11 Proof Load (Services) Limited Testing of linking elements
JPH0498136A (en) * 1990-08-16 1992-03-30 Yamato Scale Co Ltd Load cell
CN201110822Y (en) * 2007-09-14 2008-09-03 王志伟 Self-balance multifunctional structure static loaded experiment loading unit
CN201229214Y (en) * 2008-06-13 2009-04-29 西安金源电气有限公司 Tensile force monitoring device for ice-coated powerline on-line monitoring system
CN201323421Y (en) * 2008-12-22 2009-10-07 广州长川科技有限公司 Electric hardware tool with function of tension detection
CN101728802A (en) * 2009-12-15 2010-06-09 四川电力试验研究院 Electric connecting anchor clamp with measurable force
CN201576919U (en) * 2009-12-15 2010-09-08 四川电力试验研究院 Power connection fitting capable of monitoring force

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
薄通 等."电力金具试验方法 第1部分:机械试验".《中华人民共和国国家标准 电力金具试验方法 第1部分:机械试验》.中国标准出版社,2009, *

Also Published As

Publication number Publication date
CN102466563A (en) 2012-05-23

Similar Documents

Publication Publication Date Title
CN204420317U (en) Constant-force spring hanger
CN110378040B (en) Method for monitoring working state of holding pole
CN101746675A (en) Crane super lifting device, control system and control method thereof
CN102963828B (en) Method and device for health diagnosis and safety monitoring of lifting appliance
CN105329734A (en) Sensing pin roll fault diagnosis method for lifter overload protective device
CN110487578B (en) Beam structure damage identification method based on support reaction force and strain
TW201439402A (en) Synchronous control integration system for bridge lifting
CN102466563B (en) The method of operating of link holding capacity pick-up unit
CN102167259B (en) Measuring method of loading quality of hoisting machine
CN205449476U (en) High voltage circuit breaker operating mechanism static performance monitoring devices
CN103674727B (en) A kind of method detecting battery bending strength and device thereof
CN201876387U (en) Static load anchoring performance testing device
CN203178141U (en) Beam structure damage monitoring device
CN205825946U (en) A kind of bridge rubber bearing deformation monitoring device
CN105699067B (en) A kind of high-voltage breaker operation mechanism static properties monitoring device and method
CN103162877B (en) A kind of method checking bolt load
CN103274304A (en) Method for dynamically adjusting monitoring and safety pre-warning threshold values of crane structure
CN103323282A (en) Tower crane safety assessment method and assessment equipment thereof
CN207675340U (en) A kind of monitoring standard module engineering rack upright bar axle power device
CN203785882U (en) Pneumatic and hydraulic clutch and brake static torque test bed
CN204454309U (en) A kind of rapid and convenient detects load lifting limiter equipment
CN113125136A (en) Sling static load test device
CN204139071U (en) A kind of Hanging Basket rhombus frame pre-pressing system
CN105572537A (en) Testing method for lightning arrester of transformer station in power grid
CN110186667A (en) A kind of disc spring endurance testing system and method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE GRID XINYUAN HYDROELECTRIC COMPANY LIMITED F

Effective date: 20130607

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: FUCHUNJIANG HYDROELECTRIC POWER STATION OF EAST CHINA GRID CO., LTD.

Effective date: 20130607

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 311504 HANGZHOU, ZHEJIANG PROVINCE TO: 100031 XICHENG, BEIJING

TA01 Transfer of patent application right

Effective date of registration: 20130607

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant after: State Grid Corporation of China

Applicant after: State Grid Xinyuan Hydropower Co., Ltd.

Applicant after: Fuchunjiang Hydroelectric Power Station of East China Grid Co., Ltd.

Address before: 311504 the Fuchun River power plant, the Fuchun River Town, Tonglu County, Zhejiang

Applicant before: Fuchunjiang Hydroelectric Power Station of East China Grid Co., Ltd.

CI01 Correction of invention patent gazette

Correction item: Applicant

Correct: Fuchunjiang Hydroelectric Power Station of East China Grid Co., Ltd.|311504 the Fuchun River power plant, the Fuchun River Town, Tonglu County, Zhejiang

False: State Grid Corporation| 100031, West Chang'an Avenue, Beijing, Xicheng District 86|State Grid Xin Yuan hydropower Co., Ltd.| East China power grid of the Fuchun River Hydropower Station

Number: 27

Volume: 29

ERR Gazette correction

Free format text: CORRECT: APPLICANT; FROM: STATE GRID CORPORATION OF CHINA:100031 XICHENG, BEIJING; STATE GRID XINYUAN HYDROELECTRIC COMPANY LIMITED, FUCHUNJIANG HYDROELECTRIC POWER STATION OF EAST CHINA GRID CO., LTD. TO: FUCHUNJIANG HYDROELECTRIC POWER STATION OF EAST CHINA GRID CO., LTD.:311504 FUCHUNJIANG HYDROELECTRIC POWER STATION OF EAST CHINA GRID CO., LTD.

ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Free format text: FORMER OWNER: FUCHUNJIANG HYDROELECTRIC POWER STATION OF EAST CHINA GRID CO., LTD.

Effective date: 20140702

Owner name: STATE GRID XINYUAN HYDROELECTRIC COMPANY LIMITED S

Effective date: 20140702

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 311504 HANGZHOU, ZHEJIANG PROVINCE TO: 100031 XICHENG, BEIJING

TA01 Transfer of patent application right

Effective date of registration: 20140702

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant after: State Grid Corporation of China

Applicant after: State Grid Xinyuan Hydropower Co., Ltd.

Applicant after: Fuchunjiang Hydroelectric Power Plant, State Grid Xinyuan Hydropower Co., Ltd.

Address before: 311504 the Fuchun River power plant, the Fuchun River Town, Tonglu County, Zhejiang

Applicant before: Fuchunjiang Hydroelectric Power Station of East China Grid Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant