CN102465525B - 冻融地区平面高程控制点的深埋桩及其埋设方法 - Google Patents
冻融地区平面高程控制点的深埋桩及其埋设方法 Download PDFInfo
- Publication number
- CN102465525B CN102465525B CN201010540446.5A CN201010540446A CN102465525B CN 102465525 B CN102465525 B CN 102465525B CN 201010540446 A CN201010540446 A CN 201010540446A CN 102465525 B CN102465525 B CN 102465525B
- Authority
- CN
- China
- Prior art keywords
- protection tube
- mark post
- cement
- hole
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
本发明是冻融地区平面高程控制点的深埋桩及其埋设方法,标杆由其上部的钢质和水泥保护管及其之间的细砂填充层、钢质保护管与标杆之间的滑动结构和标杆的水泥砂浆保护层、芯柱、泥浆表层构成。埋设方法由开挖上部桩孔、埋设水泥保护管、钻孔、置入标杆、注入水泥砂浆、设置滑动结构和固定基点测标等步骤组成。本深埋桩的滑动结构以及可以消除不良空洞的标杆水泥砂浆保护层和标杆的芯柱能够明显降低切向冻胀力。细砂填充层在充分饱水条件下的冻结过程中几乎不产生冻胀现象。试验证明,本深埋桩对于融沉、强融沉地区均能将融沉量控制在容许范围内,特别是标杆的埋设深度可以根据冻深调整达冻深以下的砂砾土层,该深度的切向冻胀力几乎趋近于零。
Description
技术领域
本发明属于无砟轨道铺设和运营维护的三维基准设施,特别是涉及一种冻融地区平面高程控制点的深埋桩及其埋设方法。
背景技术
现有技术中,平面高程控制点的测标固定于标石,标石埋设方法通常采取挖基坑→灌注水泥→放置基点标石→水泥凝固养护等主要步骤,标石规格要求为:顶部30cm×30cm,底部50cm×50cm,标石埋入冻土层以下0.5m。
但是上述标石及其埋设方法在地下水位较高(1~2m)、冻土层较厚(2~2.7m)、春秋季干旱多风蒸发量大于降水量约3倍左右的冻融地区不能保证基点测标的稳定性。
发明内容
本发明的目的是公开一种冻融地区平面高程控制点的深埋桩及其深埋方法,本发明的深埋桩在上述气候和地质特征的冻融地区能有效控制其融沉量,进而能够保证所述控制点测标的稳定性。
本发明的冻融地区平面高程控制点深埋桩包括基点测标,特征是,标杆自顶端至地下2.5-3.5m的上端部外侧自内向外依次间隔设有高度相等的钢质保护管和水泥保护管,钢质保护管与水泥保护管之间设有细砂填充层,对应钢质保护管的标杆表面设有润滑剂表层,钢质保护管内壁设有与标杆润滑剂表层滑动接合的沥青砂胶层,钢质保护管底端设有托盘,托盘外沿与水泥保护管底口内沿相衔接,托盘以下1m的标杆表面设有泥浆表层,泥浆表层以下的标杆表面设有水泥砂浆保护层,标杆中设有由水泥砂浆构成的芯柱。
所述钢质保护管和水泥保护管的直径分别为Φ200mm和Φ400mm。
所述标杆直径为Φ89mm,由管箍连接的各节钢管构成。
本发明的冻融地区平面高程控制点深埋桩的埋设方法由以下步骤组成:
(1)在深埋桩埋设位置开挖上部桩孔,上部桩孔直径大于水泥保护管外径300mm,深度与水泥保护管高度相对应;
(2)清理上部桩孔,在上部桩孔中置入高度为2.5-3.5m、直径为Φ400mm的水泥保护管,并在水泥保护管与上部桩孔孔壁之间回填土石固定;
(3)在设置水泥保护管之后的上部桩孔中心钻孔,钻孔直径300mm,孔深至冻土层以下2-3m的砂砾土层,钻孔垂直度误差不大于1度,达到孔深要求后提钻终孔,清孔;
(4)检测钻孔的孔径、孔斜、孔深,在钻孔不合格情况下重复进行扫孔、清孔,直至检测合格;
(5)将直径为Φ89mm的各节钢管逐节用标准管箍连接并置入钻孔至孔底,标杆顶端与水泥保护管上口平齐;
(6)从标杆顶端向孔底注入水泥砂浆,水泥砂浆沿钻孔孔壁向上返至距水泥保护管下口1米处形成水泥砂浆保护层,并使水泥砂浆注满标杆成为芯柱;
(7)在标杆与钻孔孔壁之间的水泥砂浆保护层以上的钻孔中回填泥浆至水泥保护管底口构成标杆的泥浆表层;
(8)在对应水泥保护管的标杆表面涂覆润滑剂表层;
(9)将底口焊接有托盘的钢质保护管套装于标杆,钢质保护管上口与标杆顶端平齐,钢质保护管直径为Φ200mm,高度与水泥保护管相等,托盘外沿与水泥保护管底口内沿相衔接并支撑于回填的泥浆表层;
(10)在钢质保护管与标杆之间注入沥青砂胶,形成与标杆润滑剂表层滑动接合的沥青砂胶层;
(11)在钢质保护管与水泥保护管之间填满细砂并夯实而形成细砂填充层;
(12)在标杆顶端安装固定基点测标,修砌保护盖,埋设标点保护标识牌。
所述标杆的润滑剂表层的润滑剂是黄油。
本发明的有益效果和优点在于:本深埋桩的标杆与钢质保护管之间设置的滑动结构以及可以消除不良空洞的标杆水泥砂浆保护层和标杆的芯柱,能够明显降低切向冻胀力。钢质保护管与水泥保护管之间填满并夯实的细砂在充分饱水条件下的冻结过程中几乎不产生冻胀现象。根据试验证明,本深埋桩对于弱融沉、融沉、强融沉地区均可以把融沉量控制在容许范围内,特别是标杆的埋设深度可以根据冻深调整,使其埋设深度达冻深以下的砂砾土层,该深度的切向冻胀力几乎趋近于零。本发明具有结构合理、施工工艺成熟、可以保证基点测标稳定性的突出优点。
附图说明
附图1是深埋桩实施例及深埋方法示意图。
图中标号:1基点测标,2标杆,3水泥砂浆芯柱,4钢质保护管,4-1托盘,5沥青砂胶层,6水泥保护管,7细砂填充层,8泥浆表层,9水泥砂浆保护层。
具体实施方式
下面结合实施例及其附图进一步说明本发明。
如图所示深埋桩实施例,深埋桩由标杆2和标杆2中的水泥砂浆芯柱3和钢质保护管4为基本结构件组成,标杆2的顶端固定基点测标1。
标杆自顶端至地下2.5-3.5m的上端部外侧自内向外依次间隔设有高度相等的钢质保护管4和水泥保护管6,钢质保护管和水泥保护管的直径分别为Φ200mm和Φ400mm,钢质保护管与水泥保护管之间设有细砂填充层7。在对应钢质保护管4的标杆表面设有润滑剂表层(附图未示出),钢质保护管内壁设有与标杆润滑剂表层滑动接合的沥青砂胶层5。钢质保护管4底端设有托盘4-1,托盘外沿与水泥保护管6底口内沿相衔接。托盘以下1m的标杆2表面设有泥浆表层8,泥浆表层以下的标杆表面设有水泥砂浆保护层9,标杆中设有由水泥砂浆构成的水泥砂浆芯柱3。
图示实施例的标杆2直径为Φ89mm,由标准管箍(附图未示出)连接的各节钢管构成。
如图所示深埋桩的埋设方法是:
(1)在深埋桩埋设位置开挖上部桩孔,上部桩孔直径700mm,深度与水泥保护管高度相对应;
(2)清理上部桩孔,在上部桩孔中置入高度为2.5-3.5m、直径为Φ400mm的水泥保护管,并在水泥保护管与上部桩孔孔壁之间回填土石固定;
(3)在设置水泥保护管之后的上部桩孔中心采用GC130钻机和Φ110三翼钻头钻孔,钻孔直径300mm,孔深至冻土层以下2-3m的砂砾土层,钻孔垂直度误差不大于1度,达到孔深要求后提钻终孔,清孔;
(4)检测钻孔的孔径、孔斜、孔深,在钻孔不合格情况下重复进行扫孔、清孔,直至检测合格;
(5)将直径为Φ89mm的各节钢管逐节用标准管箍连接并置入钻孔至孔底,标杆顶端与水泥保护管上口平齐;
(6)从标杆顶端向孔底注入水泥砂浆,水泥砂浆沿钻孔孔壁向上返至距水泥保护管下口1米处形成水泥砂浆保护层9,并使水泥砂浆注满标杆成为水泥砂浆芯柱3;
(7)在标杆与钻孔孔壁之间的水泥砂浆保护层以上的钻孔中回填泥浆至水泥保护管底口构成标杆的泥浆表层8;
(8)在对应水泥保护管的标杆表面涂覆润滑剂表层(附图未示出);
(9)将底口焊接有托盘4-1的钢质保护管4套装于标杆2,钢质保护管上口与标杆顶端平齐,钢质保护管直径为Φ200mm,高度与水泥保护管6相等,托盘4-1外沿与水泥保护管底口内沿相衔接并支撑于回填的泥浆表层8;
(10)在钢质保护管与标杆之间注入沥青砂胶,形成与标杆润滑剂表层滑动接合的沥青砂胶层5;
(11)在钢质保护管与水泥保护管之间填满细砂并夯实而形成细砂填充层7;
(12)在标杆顶端安装固定基点测标1,并按现有技术修砌保护盖,埋设标点保护标识牌。
Claims (3)
1.一种冻融地区平面高程控制点的深埋桩,包括基点测标,其特征在于:标杆自顶端至地下2.5-3.5m的上端部外侧自内向外依次间隔设有高度相等的钢质保护管和水泥保护管,钢质保护管与水泥保护管之间设有细砂填充层,对应钢质保护管的标杆表面设有润滑剂表层,钢质保护管内壁设有与标杆润滑剂表层滑动接合的沥青砂胶层,钢质保护管底端设有托盘,托盘外沿与水泥保护管底口内沿相衔接,托盘以下1m的标杆表面设有泥浆表层,泥浆表层以下的标杆表面设有水泥砂浆保护层,标杆中设有由水泥砂浆构成的芯柱;所述钢质保护管和水泥保护管的直径分别为Φ200mm和Φ400mm;所述标杆直径为Φ89mm,由管箍连接的各节钢管构成。
2.根据权利要求1所述的深埋桩,其特征在于深埋桩的深埋方法由以下步骤组成:
(1)在深埋桩埋设位置开挖上部桩孔,上部桩孔直径大于水泥保护管外径300mm,深度与水泥保护管高度相对应;
(2)清理上部桩孔,在上部桩孔中置入高度为2.5-3.5m、直径为Φ400mm的水泥保护管,并在水泥保护管与上部桩孔孔壁之间回填土石固定;
(3)在设置水泥保护管之后的上部桩孔中心钻孔,钻孔直径300mm,孔深至冻土层以下2-3m的砂砾土层,钻孔垂直度误差不大于1度,达到孔深要求后提钻终孔,清孔;
(4)检测钻孔的孔径、孔斜、孔深,在钻孔不合格情况下重复进行扫孔、清孔,直至检测合格;
(5)将直径为Φ89mm的各节钢管逐节用标准管箍连接并置入钻孔至孔底,标杆顶端与水泥保护管上口平齐;
(6)从标杆顶端向孔底注入水泥砂浆,水泥砂浆沿钻孔孔壁向上返至距水泥保护管下口1米处形成水泥砂浆保护层,并使水泥砂浆注满标杆成为芯柱;
(7)在标杆与钻孔孔壁之间的水泥砂浆保护层以上的钻孔中回填泥浆至水泥保护管底口构成标杆的泥浆表层;
(8)在对应水泥保护管的标杆表面涂覆润滑剂表层;
(9)将底口焊接有托盘的钢质保护管套装于标杆,钢质保护管上口与标杆顶端平齐,钢质保护管直径为Φ200mm,高度与水泥保护管相等,托盘外沿与水泥保护管底口内沿相衔接并支撑于回填的泥浆表层;
(10)在钢质保护管与标杆之间注入沥青砂胶,形成与标杆润滑剂表层滑动接合的沥青砂胶层;
(11)在钢质保护管与水泥保护管之间填满细砂并夯实而形成细砂填充层;
(12)在标杆顶端安装固定基点测标,修砌保护盖,埋设标点保护标识牌。
3.根据权利要求2所述的深埋桩,其特征在于:所述标杆的润滑剂表层的润滑剂是黄油。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010540446.5A CN102465525B (zh) | 2010-11-11 | 2010-11-11 | 冻融地区平面高程控制点的深埋桩及其埋设方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010540446.5A CN102465525B (zh) | 2010-11-11 | 2010-11-11 | 冻融地区平面高程控制点的深埋桩及其埋设方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102465525A CN102465525A (zh) | 2012-05-23 |
CN102465525B true CN102465525B (zh) | 2015-11-25 |
Family
ID=46069613
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201010540446.5A Active CN102465525B (zh) | 2010-11-11 | 2010-11-11 | 冻融地区平面高程控制点的深埋桩及其埋设方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102465525B (zh) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104121895B (zh) * | 2013-04-28 | 2016-07-20 | 上海勘测设计研究院 | 软土地区平面高程测量控制点的桩杆及其埋设方法 |
CN103453895A (zh) * | 2013-08-20 | 2013-12-18 | 中国建筑第六工程局有限公司 | 沉降观测标在混凝土结构中的埋设方法 |
CN103758145B (zh) * | 2014-02-24 | 2015-08-19 | 东南大学 | 青藏公路多年冻土地基小直径现浇管桩复合地基处治方法 |
CN109736296B (zh) * | 2019-01-04 | 2020-12-08 | 武汉船用机械有限责任公司 | 厂房基准的设置方法 |
CN109990743A (zh) * | 2019-05-07 | 2019-07-09 | 辽宁科技大学 | 高寒富含水露天铜矿矿区岩层冷冻深度测量装置及方法 |
CN111997035B (zh) * | 2020-09-04 | 2022-08-19 | 广州市大新特种建筑新技术开发有限公司 | 一种高水位地下室新增钢管桩的施工方法 |
CN113529682A (zh) * | 2021-06-24 | 2021-10-22 | 中国五冶集团有限公司 | 一种软弱土层测量控制点结构及施工方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1019059A1 (ru) * | 1981-07-01 | 1983-05-23 | Pinchuk Petr S | Фундамент зданий,сооружений,возводимых на пучинистых грунтах |
JP3071381B2 (ja) * | 1994-05-30 | 2000-07-31 | 日本鋼管株式会社 | 永久凍土地帯の基礎構造に用いられる杭およびそれを用いた杭基礎 |
CN2614225Y (zh) * | 2003-01-21 | 2004-05-05 | 新渠热传导技术应用开发(大连)有限公司 | 一种保持冻土稳定的复合体热棒 |
CN2680734Y (zh) * | 2004-02-25 | 2005-02-23 | 新渠热传导技术应用开发(大连)有限公司 | 热棒防腐层的防护装置 |
CN101397800A (zh) * | 2008-09-17 | 2009-04-01 | 中冶集团武汉勘察研究院有限公司 | 深桩测量标志埋设方法 |
CN202073086U (zh) * | 2010-11-11 | 2011-12-14 | 铁道第三勘察设计院集团有限公司 | 冻融地区平面高程控制点的深埋桩 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0854235A (ja) * | 1994-08-11 | 1996-02-27 | Fumiaki Kanetoshi | 境界杭設定方法 |
-
2010
- 2010-11-11 CN CN201010540446.5A patent/CN102465525B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1019059A1 (ru) * | 1981-07-01 | 1983-05-23 | Pinchuk Petr S | Фундамент зданий,сооружений,возводимых на пучинистых грунтах |
JP3071381B2 (ja) * | 1994-05-30 | 2000-07-31 | 日本鋼管株式会社 | 永久凍土地帯の基礎構造に用いられる杭およびそれを用いた杭基礎 |
CN2614225Y (zh) * | 2003-01-21 | 2004-05-05 | 新渠热传导技术应用开发(大连)有限公司 | 一种保持冻土稳定的复合体热棒 |
CN2680734Y (zh) * | 2004-02-25 | 2005-02-23 | 新渠热传导技术应用开发(大连)有限公司 | 热棒防腐层的防护装置 |
CN101397800A (zh) * | 2008-09-17 | 2009-04-01 | 中冶集团武汉勘察研究院有限公司 | 深桩测量标志埋设方法 |
CN202073086U (zh) * | 2010-11-11 | 2011-12-14 | 铁道第三勘察设计院集团有限公司 | 冻融地区平面高程控制点的深埋桩 |
Non-Patent Citations (1)
Title |
---|
高原多年冻土区铁路建设施工技术管理;周小霞;《铁道建筑》;20050720(第07期);第69-71页 * |
Also Published As
Publication number | Publication date |
---|---|
CN102465525A (zh) | 2012-05-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102465525B (zh) | 冻融地区平面高程控制点的深埋桩及其埋设方法 | |
CN108442382B (zh) | 横穿深基坑的压力管线原位保护及围护挡土结构及施工方法 | |
WO2020248596A1 (zh) | 防止隧道注浆加固引起地表隆起的防护结构及注浆方法 | |
CN108842819B (zh) | 一种城市轨道交通电缆线路隧道施工方法 | |
CN106759473A (zh) | 地下综合管廊和道路的施工结构及其施工方法 | |
CN104110038A (zh) | 深厚淤泥质软土地区大面积基坑围护结构的施工方法 | |
CN207109475U (zh) | 傍山高填路堤稳定与变形控制结构 | |
CN107503257A (zh) | 一种傍山高填路堤稳定与变形控制结构及施工方法 | |
CN103774674B (zh) | 一种钢管托换桩与锚杆深基坑支护结构及其施工方法 | |
CN103277103A (zh) | 一种立井开凿穿越巨厚富水基岩非全深冻结方法 | |
CN102839670A (zh) | 一种浅层基坑冻结围护及其施工方法 | |
CN111119128B (zh) | 一种堰塞湖天然堆石坝除险加固防渗方法 | |
CN108517877A (zh) | 杂填土超深基坑固结注浆结合双排钢管桩支护工法 | |
CN104947680A (zh) | 一种流砂地层水上承台基坑开挖施工方法 | |
CN102995647B (zh) | 一种桩孔注浆隔渗的地下水控制方法 | |
CN108487234B (zh) | 现浇桩板式站台墙施工的方法 | |
CN101793027B (zh) | 一种桩心注浆静压锚杆桩 | |
CN208293588U (zh) | 一种膨胀土路堑边坡加筋式换填综合结构 | |
CN110500119B (zh) | 一种穿越泥石流堆积体隧道的防水固结结构施工方法 | |
CN111706366A (zh) | 一种穿越大型全充填溶洞的隧道衬砌结构及施工方法 | |
CN102425179B (zh) | 一种微型钢管灌注桩支撑加筋土渗沟结构 | |
CN208917850U (zh) | 一种微型钢管桩加格栅喷锚深基坑联合支护体系 | |
CN111424685A (zh) | 一种大型岩溶洼地内回填地基深部落水洞处理结构及方法 | |
CN102979105A (zh) | 一种井孔注浆隔渗的地下水控制方法 | |
CN202073086U (zh) | 冻融地区平面高程控制点的深埋桩 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 300251 No. 10 Minjiang Road, Minquan gate, Tianjin, Hebei District Patentee after: China Railway Design Group Limited Address before: 300251 No. 10 Minjiang Road, Minquan gate, Tianjin, Hebei District Patentee before: China Railway Third Survey and Design Institute Group Ltd. |