CN102445978A CN2010105086994A CN201010508699A CN102445978A CN 102445978 A CN102445978 A CN 102445978A CN 2010105086994 A CN2010105086994 A CN 2010105086994A CN 201010508699 A CN201010508699 A CN 201010508699A CN 102445978 A CN102445978 A CN 102445978A
Authority
CN
China
Prior art keywords
main frame
data center
idle condition
load
threshold value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2010105086994A
Other languages
Chinese (zh)
Other versions
CN102445978B (en
Inventor
郭填炼
吴超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Kingdee tianyanyun computing Co., Ltd.
Original Assignee
SHENZHEN KINGDEE MIDDLEWARE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN KINGDEE MIDDLEWARE CO Ltd filed Critical SHENZHEN KINGDEE MIDDLEWARE CO Ltd
Priority to CN201010508699.4A priority Critical patent/CN102445978B/en
Publication of CN102445978A publication Critical patent/CN102445978A/en
Application granted granted Critical
Publication of CN102445978B publication Critical patent/CN102445978B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a method and device for managing a data center, belonging to the field of internet communication. The method comprises the steps of: obtaining hosts in an idle state from the data center; and keeping that a second threshold value of hosts in the idle state exist in the data center. The device comprises an obtaining module and a keeping module. According to the invention, consumption of the data center to energy sources can be reduced.

Description

The method and apparatus at a kind of management data center
Technical field
The present invention relates to field of Internet communication, the method and apparatus at particularly a kind of management data center.
Background technology
Data center (DataCenter) typically refers to a physical space, in this physical space, realizes focusing on, store, transmit, exchange and managing of information.For example, data center can be a machine room, and data center comprises equipment such as main frame, electric power system and refrigeration system.
Data center is a major power consumer, and prior art reduces the consumption of data center to the energy through the method at management data center.Wherein, The method at existing management data center is through improving the ventilation condition at data center, to reduce the consumption of data center to the energy, for example; Increase the ventilating opening of data center; The heat that discharges during the main frame that leaves operation, thus can heighten the temperature that refrigeration system is freezed, to reach the purpose of minimizing to energy resource consumption.
In realizing process of the present invention, the inventor finds that there is following problem at least in prior art:
Existing method is heightened the temperature of refrigeration system refrigeration only through improving the ventilation condition of data center, the consumption that can only a spot ofly reduce data center to the energy, and data center still consumes a large amount of energy.
Summary of the invention
In order to reduce the consumption of data center, the invention provides the method and apparatus at a kind of management data center to the energy.Said technical scheme is following:
The method at a kind of management data center, said method comprises:
From data center, obtain the main frame that is in idle condition;
Keep existing in the said data center main frame of second threshold value idle condition.
The said main frame that obtains the idle condition in the data center specifically comprises:
Obtain the load of the main frame that is moving in the said data center;
Obtaining load is zero main frame, and said load is that zero main frame is the main frame of said idle condition.
The said load that obtains is before zero the main frame, also comprises:
From load greater than zero and main frame less than first threshold select two minimum main frames of load;
If the load sum of said two main frames is no more than first threshold, then the load with said two main frames is incorporated on one of them main frame.
There is the main frame of second threshold value idle condition in the said data center of said maintenance, specifically comprises:
If the number of the main frame of said idle condition greater than second threshold value, is then selected the main frame of second threshold value idle condition;
Utilize the long-range technology of closing to close the main frame of unselected idle condition.
There is the main frame of second threshold value idle condition in the said data center of said maintenance, specifically comprises:
If the number of the main frame of said idle condition less than second threshold value, then utilizes the main frame of remote wake up technology open and close, when the number of the main frame of the idle condition in said data center reaches said second threshold value till.
The equipment at a kind of management data center, said equipment comprises:
Acquisition module is used for obtaining the main frame that is in idle condition from data center;
Keep module, be used for keeping said data center to have the main frame of second threshold value idle condition.
Said acquisition module specifically comprises:
First acquiring unit is used for obtaining the load of the main frame that said data center moving;
Second acquisition unit, being used to obtain load is zero main frame, said load is that zero main frame is the main frame of said idle condition.
Said acquisition module also comprises:
First selected cell is used for from load greater than zero and select two minimum main frames of load less than the main frame of first threshold;
Merge cells is no more than first threshold if be used for the load sum of said two main frames, and then the load with said two main frames is incorporated on one of them main frame.
Said maintenance module specifically comprises:
Second selected cell is if the number of main frame that is used for said idle condition is then selected the main frame of second threshold value idle condition greater than second threshold value;
Closing unit is used to utilize the long-range technology of closing to close the main frame of unselected idle condition.
Said maintenance module specifically comprises:
Open the unit, if the number of main frame that is used for said idle condition utilizes the main frame of remote wake up technology open and close less than second threshold value, when the number of the main frame of the idle condition in said data center reaches said second threshold value till.
Through obtaining the main frame of idle condition in the data center in real time, keep existing in the data center main frame of second threshold value idle condition.So under the prerequisite that does not influence data center's normal allocation task, reduced the consumption of data center to greatest extent to the energy.
Description of drawings
In order to be illustrated more clearly in the technical scheme in the embodiment of the invention; The accompanying drawing of required use is done to introduce simply in will describing embodiment below; Obviously, the accompanying drawing in describing below only is some embodiments of the present invention, for those of ordinary skills; Under the prerequisite of not paying creative work, can also obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is the method flow diagram at a kind of management data center of providing of the embodiment of the invention 1;
Fig. 2 is the method flow diagram at a kind of management data center of providing of the embodiment of the invention 2;
Fig. 3 is the method flow diagram at a kind of management data center of providing of the embodiment of the invention 3;
Fig. 4 is the equipment synoptic diagram at first kind of management data center providing of the embodiment of the invention 4;
Fig. 5 is the equipment synoptic diagram of the secundal viae reason data center that provides of the embodiment of the invention 4.
Embodiment
For making the object of the invention, technical scheme and advantage clearer, will combine accompanying drawing that embodiment of the present invention is done to describe in detail further below.
Embodiment 1
As shown in Figure 1, the embodiment of the invention provides the method at a kind of management data center, comprising:
Step 101: from data center, obtain the main frame that is in idle condition;
Step 102: the main frame that keeps existing in the data center second threshold value idle condition.
In embodiments of the present invention, obtain the main frame of idle condition in the data center in real time, keep existing in the data center main frame of second threshold value idle condition.So under the prerequisite that does not influence data center's normal allocation task, reduced the consumption of data center to greatest extent to the energy.
Embodiment 2
As shown in Figure 2, the embodiment of the invention provides the method at a kind of management data center, comprising:
Step 201: the load that obtains each main frame that is moving in the data center in real time;
Wherein, the load of each main frame can be represented that the host parameter of each main frame comprises CPU (Central Processing Unit, central processing unit) utilization rate, network traffics, memory usage and hard disk reading speed at least by one or more host parameters.
For example, the CPU usage of use main frame is represented the load of main frame, and the operation of then obtaining the load of each main frame in the data center is specially:
In the heart the CPU usage of each main frame in the image data is with the CPU usage of each main frame load as each main frame.
For another example, the network traffics of use main frame are represented the load of main frame, and the operation of then obtaining the load of each main frame in the data center is specially:
In the heart the network traffics of each main frame in the image data are with the network traffics of each main frame load as each main frame.
Wherein, All have one or more virtual computing nodes on each main frame in the data center; When the user submits task to; Data center is the Task Distribution main frame of user's submission and the virtual computing node on this main frame, is responsible for the task that the user submits to is handled by this virtual computing node on this main frame; So there is load in certain main frame, then shows the virtual computing node that existence is moving on this main frame.Need to prove: the virtual computing node that moves on the main frame is many more, and the load of this main frame is just big more; And if the load of certain main frame is zero, then showing does not have virtual computing node in operation, so this main frame is in idle condition on this main frame.
Step 202: judge load greater than zero and whether be a plurality of less than the number of the main frame of first threshold, if, execution in step 203; If not, execution in step 206;
Particularly, from the All hosts that data center comprises, obtain load greater than zero and less than the main frame of first threshold, the number of the main frame of counting and acquiring judges whether the number of the main frame of statistics is a plurality of.
Wherein,, think that then this main frame is in than busy condition,, just should not give certain the virtual computing node on this main frame with new Task Distribution again if data center receives the new task that the user submits to if the load of certain main frame meets or exceeds first threshold.Wherein, the size of first threshold is the empirical value that obtains through a large amount of experiments.
Step 203: from load greater than zero and main frame less than first threshold select two minimum main frames of load;
Step 204: whether the load sum of judging two main frames surpasses preset first threshold value, if not, then execution in step 205, if then execution in step 206;
Step 205: load on one of them main frame is dynamically moved on another main frame, return execution in step 202;
Wherein, the virtual computing node of the load of each main frame for moving on this main frame.
Particularly, main frame of selection is hung up each the virtual computing node that is moving on the main frame of selecting from two main frames, the virtual computing node of hanging up is moved on another main frame, and recover the virtual computing node of hang-up.
Wherein, dynamically move to each the virtual computing node that is moving on one of them main frame on another main frame after, with regard to vanishing, and the current state of the main frame that is moved just becomes idle condition by the load of the main frame that moved.In addition; In the present embodiment; Before each the virtual computing node that is moving on one of them main frame is dynamically moved to another main frame, judge also whether the load sum of two main frames surpasses first threshold, just do not carry out migration operation if surpass; Another main unit load after so can preventing to move is bigger, and is in busy state.
Wherein, in the present embodiment, the load in the data center is merged the quantity that can increase the idle main frame in the data center less than the load on the main frame of first threshold.
Step 206: from all main frames that moving of data center, obtain the number that current state is the main frame of idle condition;
Particularly, from each main frame that data center comprises, selecting load is zero main frame, and wherein, the load of selection is that zero main frame is the main frame that current state is an idle condition, the number of the main frame of statistics idle condition.
Step 207: whether the number of judging the main frame of idle condition surpasses the second preset threshold value, if then execution in step 208, if not, and execution in step 209;
Wherein, the user submits task to data center, and data center receives the task that the user submits to, and gives the main frame of data center with the Task Distribution that the user submits to, so the load condition of the number of the idle main frame of data center and each main frame is to change in real time.
Wherein,, so in the present embodiment, in data center, reserve the main frame of second threshold value idle condition, supply data center's allocating task, so do not influence the computing power of data center in order to let data center's normal allocation task.
Step 208: from the main frame of idle condition, select the main frame of preset second threshold value idle condition, with the Host Shutdown of unselected idle condition, EO;
Particularly, from the main frame of idle condition, select the main frame of second threshold value idle condition, utilize the Host Shutdown of the long-range technology of closing unselected idle condition.
Wherein, The main frame of idle condition is also in operation, still in consumes energy, so in the present embodiment; In data center, keep the individual main frame that is in idle condition of second threshold value; Guarantee the task that data center can the normal allocation user submits to, and the Host Shutdown that is in idle condition that will be left has so reduced the consumption of data center to the energy.
Wherein, the most equipment in the data center is main frame, so most of energy of data center is all by main frame consumption; In addition, only when the user submits the peak of task to, just need the most of or whole main frame in the data center to open operation; And in other time; Most of main frame in the data center is in idle condition and loads less than first threshold, and in the present embodiment, load is merged less than the load on the main frame of first threshold; Obtain more many places in the main frame of idle condition; And under the prerequisite of the main frame that satisfies the required idle condition of data center's allocating task,, so reduce the consumption of data center widely to the energy with the unnecessary Host Shutdown that is in idle condition.
Further, the main frame in the data center not only consumes a large amount of energy when normal operation; Also discharge great amount of heat, make the temperature of data center raise, in data center, have refrigeration system; Refrigeration system discharges cold air, prevents that the temperature in the data center from raising.In embodiments of the present invention; Host Shutdown with the part idle condition of data center; Reduce the number of the main frame that is moving in the data center; So reduced the heat that main frame discharges to data center, thereby can heighten the temperature of refrigeration system refrigeration, thereby reduced the consumption of data center further the energy.
Wherein, the long-range technology of closing is existing comparatively proven technique, in the present embodiment, no longer this technology is made detailed explanation.
Step 209: the main frame of open and close makes the number of the main frame of idle condition in the data center reach preset second threshold value, EO.
Particularly,, calculate the number of the main frame that needs to open, from the main frame of closing, select a calculated number main frame, utilize remote wake up technology to open the main frame of selection according to the number and second threshold value of the main frame of the idle condition in the data center.
Wherein, remote wake up technology is existing comparatively proven technique, in the present embodiment, no longer this technology is made detailed description.
In embodiments of the present invention; Obtain the load of the main frame that each is moving in the data center in real time; For loading minimum and loading less than two main frames of first threshold; If the load sum of two main frames is less than first threshold, then the load with two main frames merges, and the number that in data center, keeps the main frame of the idle condition in the data center is that second threshold value is individual.So under the prerequisite that does not influence data center's normal allocation task, reduced the consumption of data center to greatest extent to the energy.
Embodiment 3
As shown in Figure 3, the embodiment of the invention provides the method at a kind of management data center, comprising:
Step 301: the main frame that obtains the idle condition in the data center in real time;
Particularly, in the main frame that from data center, is moving, obtain the load of each main frame, selecting load is zero main frame, and wherein, load is that the current state of zero main frame is an idle condition.
Wherein, data center comprises equipment such as main frame, refrigeration system, and the number of main frame occupies the majority.In addition, only when the user submits the peak of task to, just need the most of or whole main frame in the data center to open operation, and in other time, the most of main frame in the data center is in idle condition.
Step 302: whether the number of judging the main frame of idle condition surpasses the second preset threshold value, if, execution in step 303; If then execution in step 304 not;
Wherein, the user submits task to data center, and data center receives the task that the user submits to, and gives the main frame of data center with the Task Distribution that the user submits to, handles this task by the virtual computing center node on this main frame.So, in data center, keep the main frame of second threshold value idle condition in order not influence data center's normal allocation task.
Step 303: from the main frame of idle condition, select second threshold value main frame, with the Host Shutdown of unselected idle condition, EO;
Particularly, from the main frame of idle condition, select second threshold value main frame, utilize the long-range technology of closing to be left the Host Shutdown of unselected idle condition.
Wherein, The main frame of idle condition is also in operation, still in consumes energy, so in the present embodiment; In data center, keep the individual main frame that is in idle condition of second threshold value; Guarantee the task that data center can the normal allocation user submits to, and the Host Shutdown that is in idle condition that will be left has so reduced the consumption of data center to the energy.
Wherein, the most equipment in the data center is main frame, so most of energy of data center is all by main frame consumption; In addition, only when the user submits the peak of task to, just need the most of or whole main frame in the data center to open operation; And in other time; Most of main frame in the data center is in idle condition, and in the present embodiment, under the situation of the main frame that satisfies the required idle condition of data center's allocating task; With the unnecessary Host Shutdown that is in idle condition, so reduce the consumption of data center widely to the energy.
Wherein, the main frame in the data center not only consumes a large amount of energy when normal operation, also discharge great amount of heat, makes the temperature of data center raise, and in data center, has refrigeration system, and refrigeration system discharges cold air, prevents that the temperature in the data from raising.In embodiments of the present invention; Host Shutdown with the part idle condition of data center; Reduce the number of the main frame that is moving of data center; So reduced the heat that main frame discharges to data center, thereby can heighten the temperature of refrigeration system refrigeration, thereby reduced the consumption of data center further the energy.
Wherein, the long-range technology of closing is existing comparatively proven technique, in the present embodiment, no longer this technology is made detailed explanation.
Step 304: the main frame of open and close makes the number of the main frame of idle condition in the data center reach preset second threshold value, EO.
Particularly,, calculate the number of the main frame that needs to open, from the main frame of closing, select a calculated number main frame, utilize remote wake up technology to open the main frame of selection according to the number and second threshold value of the main frame of the idle condition in the data center.
Wherein, remote wake up technology is existing comparatively proven technique, in the present embodiment, no longer this technology is made detailed description.
In embodiments of the present invention, obtain the main frame of idle condition in the data center in real time, keep existing in the data center main frame of second threshold value idle condition.So under the prerequisite that does not influence data center's normal allocation task, reduced the consumption of data center to greatest extent to the energy.
Embodiment 4
As shown in Figure 4, the embodiment of the invention provides the equipment at a kind of management data center, comprising:
Acquisition module 401 is used for obtaining from data center the number of the main frame that is in idle condition;
Keep module 402, the number that is used for keeping the main frame of data center's idle condition is second threshold value.
Wherein, acquisition module 401 specifically comprises:
First acquiring unit 4011 is used for obtaining the load of the main frame that data center moving;
Second acquisition unit 4012, being used to obtain load is zero main frame, wherein, load is that zero main frame is the main frame of idle condition.
Wherein, acquisition module 401 also comprises:
First selected cell 4013 is used for from load greater than zero and select two minimum main frames of load less than the main frame of first threshold;
Merge cells 4014 is no more than first threshold if be used for the load sum of two main frames, and then the load with two main frames is incorporated on one of them main frame.
Wherein, referring to Fig. 4, in the present embodiment, keep module 402 specifically to comprise:
Second selected cell 4021 is if the number of main frame that is used for idle condition is then selected the main frame of second threshold value idle condition greater than second threshold value;
Closing unit 4022 is used to utilize the long-range technology of closing to close the main frame of unselected idle condition.
Wherein, referring to Fig. 5, in the present embodiment, keep module 402 specifically to comprise:
Open unit 4023, if the number of main frame that is used for idle condition utilizes the main frame of remote wake up technology open and close less than second threshold value, when the number of the main frame of the idle condition in data center reaches second threshold value till.
In embodiments of the present invention, obtain the main frame of idle condition in the data center in real time, keep existing in the data center main frame of second threshold value idle condition.So under the prerequisite that does not influence data center's normal allocation task, reduced the consumption of data center to greatest extent to the energy.
Need to prove: the equipment at a kind of management data center that the foregoing description provides is when the management data center; Only the division with above-mentioned each functional module is illustrated; In the practical application; Can as required above-mentioned functions be distributed by the different functional completion, the inner structure that is about to device is divided into different functional, to accomplish all or part of function of above description.In addition, the foregoing description provides the equipment at management data center and the method embodiment at management data center to belong to same design, and its concrete implementation procedure sees method embodiment for details, repeats no more here.
All or part of content in the technical scheme that above embodiment provides can realize that through software programming its software program is stored in the storage medium that can read, storage medium for example: the hard disk in the computing machine, CD or floppy disk.
The above is merely preferred embodiment of the present invention, and is in order to restriction the present invention, not all within spirit of the present invention and principle, any modification of being done, is equal to replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (10)

1. the method at a management data center is characterized in that, said method comprises:
From data center, obtain the main frame that is in idle condition;
Keep existing in the said data center main frame of second threshold value idle condition.
2. the method for claim 1 is characterized in that, the said main frame that obtains the idle condition in the data center specifically comprises:
Obtain the load of the main frame that is moving in the said data center;
Obtaining load is zero main frame, and said load is that zero main frame is the main frame of said idle condition.
3. method as claimed in claim 2 is characterized in that, the said load that obtains is before zero the main frame, also comprises:
From load greater than zero and main frame less than first threshold select two minimum main frames of load;
If the load sum of said two main frames is no more than first threshold, then the load with said two main frames is incorporated on one of them main frame.
4. the method for claim 1 is characterized in that, has the main frame of second threshold value idle condition in the said data center of said maintenance, specifically comprises:
If the number of the main frame of said idle condition greater than second threshold value, is then selected the main frame of second threshold value idle condition;
Utilize the long-range technology of closing to close the main frame of unselected idle condition.
5. the method for claim 1 is characterized in that, has the main frame of second threshold value idle condition in the said data center of said maintenance, specifically comprises:
If the number of the main frame of said idle condition less than second threshold value, then utilizes the main frame of remote wake up technology open and close, when the number of the main frame of the idle condition in said data center reaches said second threshold value till.
6. the equipment at a management data center is characterized in that, said equipment comprises:
Acquisition module is used for obtaining the main frame that is in idle condition from data center;
Keep module, be used for keeping said data center to have the main frame of second threshold value idle condition.
7. equipment as claimed in claim 6 is characterized in that, said acquisition module specifically comprises:
First acquiring unit is used for obtaining the load of the main frame that said data center moving;
Second acquisition unit, being used to obtain load is zero main frame, said load is that zero main frame is the main frame of said idle condition.
8. equipment as claimed in claim 7 is characterized in that, said acquisition module also comprises:
First selected cell is used for from load greater than zero and select two minimum main frames of load less than the main frame of first threshold;
Merge cells is no more than first threshold if be used for the load sum of said two main frames, and then the load with said two main frames is incorporated on one of them main frame.
9. equipment as claimed in claim 6 is characterized in that, said maintenance module specifically comprises:
Second selected cell is if the number of main frame that is used for said idle condition is then selected the main frame of second threshold value idle condition greater than second threshold value;
Closing unit is used to utilize the long-range technology of closing to close the main frame of unselected idle condition.
10. equipment as claimed in claim 6 is characterized in that, said maintenance module specifically comprises:
Open the unit, if the number of main frame that is used for said idle condition utilizes the main frame of remote wake up technology open and close less than second threshold value, when the number of the main frame of the idle condition in said data center reaches said second threshold value till.
CN201010508699.4A 2010-10-12 2010-10-12 A kind of method and apparatus of management data center Active CN102445978B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010508699.4A CN102445978B (en) 2010-10-12 2010-10-12 A kind of method and apparatus of management data center

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010508699.4A CN102445978B (en) 2010-10-12 2010-10-12 A kind of method and apparatus of management data center

Publications (2)

Publication Number Publication Date
CN102445978A true CN102445978A (en) 2012-05-09
CN102445978B CN102445978B (en) 2016-02-17

Family

ID=46008544

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010508699.4A Active CN102445978B (en) 2010-10-12 2010-10-12 A kind of method and apparatus of management data center

Country Status (1)

Country Link
CN (1) CN102445978B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106096874A (en) * 2016-08-18 2016-11-09 中国联合网络通信集团有限公司 The energy efficiency managing method of data center, device and system
CN109992373A (en) * 2017-12-29 2019-07-09 华为技术有限公司 Resource regulating method, approaches to IM and device and task deployment system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1717657A (en) * 2002-11-27 2006-01-04 国际商业机器公司 Automated power control policies based on application-specific redundancy characteristics
CN101436098A (en) * 2008-12-24 2009-05-20 华为技术有限公司 Method and apparatus for reducing power consumption of multiple-core symmetrical multiprocessing system
US20090327781A1 (en) * 2008-06-30 2009-12-31 Sun Microsystems, Inc. Method and system for power management in a virtual machine environment without disrupting network connectivity
CN101833366A (en) * 2010-03-29 2010-09-15 北京航空航天大学 Low-power-consumption dynamic node controlling method for cluster job management system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1717657A (en) * 2002-11-27 2006-01-04 国际商业机器公司 Automated power control policies based on application-specific redundancy characteristics
US20090327781A1 (en) * 2008-06-30 2009-12-31 Sun Microsystems, Inc. Method and system for power management in a virtual machine environment without disrupting network connectivity
CN101436098A (en) * 2008-12-24 2009-05-20 华为技术有限公司 Method and apparatus for reducing power consumption of multiple-core symmetrical multiprocessing system
CN101833366A (en) * 2010-03-29 2010-09-15 北京航空航天大学 Low-power-consumption dynamic node controlling method for cluster job management system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106096874A (en) * 2016-08-18 2016-11-09 中国联合网络通信集团有限公司 The energy efficiency managing method of data center, device and system
CN109992373A (en) * 2017-12-29 2019-07-09 华为技术有限公司 Resource regulating method, approaches to IM and device and task deployment system
CN109992373B (en) * 2017-12-29 2021-04-09 华为技术有限公司 Resource scheduling method, information management method and device and task deployment system

Also Published As

Publication number Publication date
CN102445978B (en) 2016-02-17

Similar Documents

Publication Publication Date Title
EP3367251B1 (en) Storage system and solid state hard disk
US10430347B2 (en) Power savings via dynamic page type selection
CN104238712B (en) Distributed power conveying
TWI475365B (en) Hierarchical power smoothing
CN103023963B (en) A kind of method for cloud storage resources configuration optimization
US20120117304A1 (en) Managing memory with limited write cycles in heterogeneous memory systems
CN103210379A (en) Server system, management method and device
CN104102523A (en) Method for migrating virtual machine and resource scheduling platform
CN105183565A (en) Computer and service quality control method and device
US20130167152A1 (en) Multi-core-based computing apparatus having hierarchical scheduler and hierarchical scheduling method
CN104090847A (en) Address distribution method of solid-state storage device
Satoh et al. Total energy management system for cloud computing
CN105117285B (en) A kind of nonvolatile memory method for optimizing scheduling based on mobile virtual system
US11307778B2 (en) Power management for solid state drives in a network
CN104539708A (en) Capacity reduction method, device and system for cloud platform resources
CN102413186A (en) Resource scheduling method and device based on private cloud computing, and cloud management server
CN115470216B (en) FTL-based intelligent Internet of things table storage management method and storage medium
CN102387024B (en) Power consumption control method, management node and data processing center
CN108804535B (en) Software Defined Storage (SDS) system with network layering
CN104702654A (en) Video cloud storage system based storage and extraction performance balancing method and device
CN102445978A (en) Method and device for managing data center
CN111510479B (en) Resource allocation method and device for heterogeneous cache system
CN105205015B (en) A kind of date storage method and storage equipment
CN108073449B (en) Dynamic virtual machine placement method
CN107408071A (en) A kind of memory pool access method, device and system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: South South technology twelve road 518057 in Guangdong province Shenzhen City Guangdong streets Nanshan District high tech Industrial Park, No. 2, Kingdee Software Park building A floor 2 South Block

Patentee after: Shenzhen Kingdee middleware Limited by Share Ltd.

Address before: 518057 Guangdong, Zhejiang Province, Nanshan District high tech Zone, industrial zone, industrial zone, sparrow sparrow M-6 layer 1, area 3, 4, second

Patentee before: Shenzhen Kingdee Middleware Co., Ltd.

CP03 Change of name, title or address

Address after: South South technology twelve road 518057 in Guangdong province Shenzhen City Guangdong streets Nanshan District high tech Industrial Park, No. 2, Kingdee Software Park building A floor 2 South Block

Patentee after: Shenzhen Kingdee tianyanyun computing Co., Ltd.

Address before: 518057 south block, 2f, building a, Kingdee Software Park, No. 2, Keji South 12th Road, South District, high tech Industrial Park, Yuehai street, Nanshan District, Shenzhen

Patentee before: Shenzhen Kingdee middleware Limited by Share Ltd.

CP03 Change of name, title or address