CN102434162A - 盘区尾砂充填采矿法 - Google Patents
盘区尾砂充填采矿法 Download PDFInfo
- Publication number
- CN102434162A CN102434162A CN2011104433770A CN201110443377A CN102434162A CN 102434162 A CN102434162 A CN 102434162A CN 2011104433770 A CN2011104433770 A CN 2011104433770A CN 201110443377 A CN201110443377 A CN 201110443377A CN 102434162 A CN102434162 A CN 102434162A
- Authority
- CN
- China
- Prior art keywords
- stope
- panel
- tailing
- filling
- lower wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
一种盘区尾砂充填采矿法,包括采准、回采、充填,其中,在采准过程中,在脉内每个采场的下盘施工一条下盘联络道,各采场的下盘联络道相互连接贯通形成联络通道,每个采场内分别从矿体下盘向上施工一条充填天井用于下放材料。本方法采准工程量少,能短时间内形成生产能力,采矿成本低。
Description
技术领域
本发明涉及一种采矿方法。
背景技术
现有的采矿方法,通常采用下盘斜坡道与分段平巷联合采准、上向水平分层盘区尾砂充填采矿法,在采场内打网状交叉炮孔,留不规则的点柱支撑顶板,用铲运机出矿。这种采矿方法,在开采厚大破碎矿体时,存在脉外采准工程量大、生产效率低、损失贫化大、顶板易冒落等问题。
发明内容
本发明的目的是提供一种盘区尾砂充填采矿法,其采准工程量少,能短时间内形成生产能力,采矿成本低、贫损低。
为了实现上述方案,本发明的技术解决方案为:
本发明一种盘区尾砂充填采矿法,包括采准、回采、充填,其中,在采准过程中,在脉内每个采场的下盘施工一条下盘联络道,各采场的下盘联络道相互连接贯通形成联络通道,每个采场内分别从矿体下盘向上施工一条充填天井用于下放材料。
本发明盘区尾砂充填采矿法,其中,在所述回采过程中,各盘区同步回采,每个盘区分成三个采场,每个采场分为二个或三个进路,回采过程中按照各进路依次进行。
本发明盘区尾砂充填采矿法,其中,所述进路宽度为8-12m。
本发明盘区尾砂充填采矿法,其中,在回采过程中,每个盘区的三个采场中一个采场出矿、一个采场落矿、一个采场充填,循环进行,一个采场出矿后的尾砂用于另一采场的充填。
本发明盘区尾砂充填采矿法,其中,在回采过程中,扩底结束后采用光面控柱技术扩帮,使矿柱表面光滑平整,并在每个进路内形成拱形顶板。
采用上述方法后,本发明方法具有如下优点:
(1)由于采准过程中在脉内施工联络道、充填天井,因此采准工程量少,能短时间内形成生产能力,采矿成本低,盘区生产能力由原来的180吨/天提高到306吨/天、矿石损失率由原来的22.8%降至12.2%,年多回收矿石23.32万吨,采矿成本由70.25元/吨降至68.84元。
(2)每个采场分为二个或三个进路,减小了采场的暴露面积,保证了回采作业安全。
(3)采用光面控柱技术扩帮,使矿柱表面光滑平整,并在每个进路内形成拱形顶板,确保了顶板和矿柱的稳定性。
(4)各盘区同步进行回采,减小了盘区间条形间柱的损失。
(5)作业地点集中,管理方便。
附图说明
图1是本发明盘区尾砂充填采矿法中矿体的剖面图;
图2是图1的II-II向剖视图;
图3是图1中的矿体回采后的III-III向剖视图。
具体实施方式
如图1、2所示,本发明盘区尾砂充填采矿法包括以下步骤:
采准:在中段水平矿体下盘位置施工主运输巷6,再施工出穿脉巷道3,在出矿巷道路3矿体的下盘边界处向上施工溜矿短井4,溜矿短井4与拉底层水平贯通;每个采场内分别从矿体下盘施工一条充填天井1,充填天井1两端分别与上中段、下中段贯通,倾角为48度,充填天井1也用作设备天井,用于下放钢卷筒、电缆、充填管路等,同时解决盘区行人和通风问题;每个采场分别在脉内施工一条设备短井,设备短井与拉底层水平贯通,上口与采场扩底分层贯通,倾角为30度,铲运机经设备短井进入采场,铲运机进入采场后,设备短井的上口可用砼浇灌,改作人行泄水井;在脉内矿体下盘边界处向上施工人行泄水井5,人行泄水井5与拉底层水平贯通,倾角为90度;如图3所示,在每个采场的下盘施工一条下盘联络道,各采场的下盘联络道相互贯通横贯整个盘区形成联络通道9,作为铲运机的运行通道,采场的每个进路中,分别向上盘掘出一条切割穿。
回采:
在回采过程中,各盘区同步回采,如图3所示,每个盘区7分成第一采场71、第二采场72、第三采场73共三个采场,每个采场分为两个或三个进路,如第一采场71分为第一进路711、第二进路712、第三进路713,进路宽度为8-12m,回采过程中按照进路依次进行;盘区回采的过程中三个采场交替上升,最多相差一个分层,通过调整采场的采充顺序,形成一个采场出矿、一个采场落矿、一个采场充填的格局,一个采场出矿后的尾砂用于另一采场的充填,形成采、出、充良性循环,大大提高盘区生产能力。采场扩底:由下盘联络道向上盘施工穿脉,以切割穿为自由面按设计进路的宽度进行扩底工作,扩底高度不超过2.5m,每个进路间保留3m厚的条形间柱;采场落矿:扩底结束后盘区内每个采场落矿时,采用浅孔落矿,施工水平炮孔。盘区内每个采场落矿时,自采场下盘联络道处施工切割槽,然后分别沿每个进路向上盘落矿,分层高度为1.5-1.8m,施工水平钻孔落矿,孔深2.5m。爆破采用2#岩石炸药、导爆管起爆,落矿过程中采用“拱形控顶、光面控柱”控制爆破技术,保证采场顶板和矿柱8的稳定性,使矿柱8表面光滑平整,并在每个进路内形成拱形顶板。采场出矿:采用金岭铁矿生产的金铁-0.75型电动铲运机装运矿石,铲运机利用下盘联络道来回调度,将矿石铲入溜矿井,经振动放矿机放入矿车运出。采场充填:采场充填采用浓度60%的分级尾砂,工人直接在充填的尾砂面上作业,PVC充填管采用法兰盘连接,管路能架接到充填采场的任何地点。视泄水井位置决定充填的先后次序,先充填隔离墙处,防止充填水冲垮隔离墙而跑砂,然后由距人行泄水井远的地方向人行泄水井方向移动充填管头,使充填面上的水能畅通地流向泄水井。
本发明方法与现有的采矿方法主要技术经济指标比较如下表所示:
以上所述实施例仅仅是对本发明的优选实施方式进行描述,并非对本发明的范围进行限定,在不脱离本发明设计精神的前提下,本领域普通工程技术人员对本发明的技术方案作出的各种变形和改进,均应落入本发明的权利要求书确定的保护范围内。
Claims (5)
1.一种盘区尾砂充填采矿法,包括采准、回采、充填,其特征在于:在采准过程中,在脉内每个采场的下盘施工一条下盘联络道,各采场的下盘联络道相互连接贯通形成联络通道(9),每个采场内分别从矿体下盘向上施工一条充填天井(1)用于下放材料。
2.如权利要求1所述的盘区尾砂充填采矿法,其特征在于:在所述回采过程中,各盘区同步回采,每个盘区(7)分成第一、第二、第三(71、72、73)三个采场,每个采场分为二个或三个进路,回采过程中按照各进路依次进行。
3.如权利要求1所述的盘区尾砂充填采矿法,其特征在于:所述进路宽度为8-12m。
4.如权利要求1所述的盘区尾砂充填采矿法,其特征在于:在回采过程中,每个盘区的三个采场中一个采场出矿、一个采场落矿、一个采场充填,循环进行,一个采场出矿后的尾砂用于另一采场的充填。
5.如权利要求1所述的盘区尾砂充填采矿法,其特征在于:在回采过程中,扩底结束后采用光面控柱技术扩帮,使矿柱(8)表面光滑平整,并在每个进路内形成拱形顶板。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011104433770A CN102434162A (zh) | 2011-12-27 | 2011-12-27 | 盘区尾砂充填采矿法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011104433770A CN102434162A (zh) | 2011-12-27 | 2011-12-27 | 盘区尾砂充填采矿法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102434162A true CN102434162A (zh) | 2012-05-02 |
Family
ID=45982483
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011104433770A Pending CN102434162A (zh) | 2011-12-27 | 2011-12-27 | 盘区尾砂充填采矿法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102434162A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103075189A (zh) * | 2013-02-19 | 2013-05-01 | 山东黄金矿业股份有限公司新城金矿 | 一种薄壁中空结构人工点柱式上向水平分层尾砂胶充填方法 |
CN104234716A (zh) * | 2014-07-22 | 2014-12-24 | 长沙矿山研究院有限责任公司 | 袋装围堰充填采矿法 |
CN108104817A (zh) * | 2017-11-27 | 2018-06-01 | 西北矿冶研究院 | 一种上盘破碎倾斜薄-中厚矿体的开采方法 |
CN110939443A (zh) * | 2019-10-31 | 2020-03-31 | 甘肃省合作早子沟金矿有限责任公司 | 一种环形布置进路采矿方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101893415A (zh) * | 2010-04-20 | 2010-11-24 | 中矿金业股份有限公司 | 拱形控顶光面控柱爆破方法 |
US20100295359A1 (en) * | 2009-05-20 | 2010-11-25 | Mti Products Pty Ltd | Collapsible Cushion |
-
2011
- 2011-12-27 CN CN2011104433770A patent/CN102434162A/zh active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100295359A1 (en) * | 2009-05-20 | 2010-11-25 | Mti Products Pty Ltd | Collapsible Cushion |
CN101893415A (zh) * | 2010-04-20 | 2010-11-24 | 中矿金业股份有限公司 | 拱形控顶光面控柱爆破方法 |
Non-Patent Citations (1)
Title |
---|
路明福等: "厚大破碎矿体回采技术的对比研究", 《黄金科学技术》 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103075189A (zh) * | 2013-02-19 | 2013-05-01 | 山东黄金矿业股份有限公司新城金矿 | 一种薄壁中空结构人工点柱式上向水平分层尾砂胶充填方法 |
CN103075189B (zh) * | 2013-02-19 | 2015-04-22 | 山东黄金矿业股份有限公司新城金矿 | 一种薄壁中空结构人工点柱式上向水平分层尾砂胶充填方法 |
CN104234716A (zh) * | 2014-07-22 | 2014-12-24 | 长沙矿山研究院有限责任公司 | 袋装围堰充填采矿法 |
CN104234716B (zh) * | 2014-07-22 | 2016-08-24 | 长沙矿山研究院有限责任公司 | 袋装围堰充填采矿法 |
CN108104817A (zh) * | 2017-11-27 | 2018-06-01 | 西北矿冶研究院 | 一种上盘破碎倾斜薄-中厚矿体的开采方法 |
CN110939443A (zh) * | 2019-10-31 | 2020-03-31 | 甘肃省合作早子沟金矿有限责任公司 | 一种环形布置进路采矿方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102251773B (zh) | 适合于极复杂矿体开采的进路式上向水平分层充填采矿法 | |
CN103615285B (zh) | 一种利于充填接顶的采场进路布置方式及方法 | |
CN104806244B (zh) | 一种倾斜中厚矿体充填采矿方法 | |
CN109083644B (zh) | 一种缓倾斜中厚矿体安全高效采矿方法 | |
CN102619513B (zh) | 同在原岩中布置底部出矿结构的房柱式中深孔充填采矿法 | |
CN103089266B (zh) | 露天转地下过渡期无底柱分段空场崩落采矿方法 | |
CN105649631B (zh) | 一种缓倾斜薄矿体的机械化高效采矿方法 | |
CN103527200A (zh) | 无底柱分段菱形矿房嗣后充填采矿法 | |
CN110735639B (zh) | 一种露天转地下崩落法开采后露天坑回填方法 | |
CN110259451A (zh) | 一种缓倾斜中厚矿体预控顶高效采矿方法 | |
CN106121643A (zh) | 预留护壁矿两步骤嵌套组合充填采矿法 | |
CN105909247A (zh) | 无底柱分段胶结充填采矿方法 | |
CN104100270A (zh) | 一种缓倾斜矿脉无轨开采方法 | |
CN101725350A (zh) | 下盘沿脉凿岩穿脉进路出矿式崩落采矿法 | |
CN109339785B (zh) | 一种缓倾斜中厚矿体多单元组合集约化采矿方法 | |
CN102979526B (zh) | 中深孔分段采矿出矿堑沟充填法构筑工艺 | |
CN110295908A (zh) | 一种起伏分段巷的缓倾斜中厚矿体采矿方法 | |
CN103437768A (zh) | 一种不留顶底柱预置空间充填采矿法 | |
CN104989408A (zh) | 一种用于山区金属矿山安全高效的采矿方法 | |
CN102434162A (zh) | 盘区尾砂充填采矿法 | |
CN104612692B (zh) | 分段崩矿底部结构跟随形成连续充填采矿法 | |
CN103590832B (zh) | 矿柱预隔离分段条块充填采矿法及适用于该采矿法的矿体 | |
CN103244121B (zh) | 一种有轨与无轨耦合的底部出矿系统 | |
CN113803071A (zh) | 基于远程智能掘进机的薄矿体采矿法 | |
CN110905510B (zh) | 金属矿体水平矿柱的条块回采方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120502 |