CN102427218A - 基于人工智能技术的变压器短期过载能力评估系统 - Google Patents
基于人工智能技术的变压器短期过载能力评估系统 Download PDFInfo
- Publication number
- CN102427218A CN102427218A CN2011103330353A CN201110333035A CN102427218A CN 102427218 A CN102427218 A CN 102427218A CN 2011103330353 A CN2011103330353 A CN 2011103330353A CN 201110333035 A CN201110333035 A CN 201110333035A CN 102427218 A CN102427218 A CN 102427218A
- Authority
- CN
- China
- Prior art keywords
- transformer
- artificial intelligence
- theta
- temperature
- parameter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000013473 artificial intelligence Methods 0.000 title claims abstract description 25
- 238000005516 engineering process Methods 0.000 title claims abstract description 14
- 238000004804 winding Methods 0.000 claims abstract description 15
- 238000000034 method Methods 0.000 claims abstract description 10
- 238000004088 simulation Methods 0.000 claims abstract description 5
- 238000012360 testing method Methods 0.000 claims description 6
- 238000011156 evaluation Methods 0.000 claims description 5
- 238000013528 artificial neural network Methods 0.000 claims description 4
- 238000004891 communication Methods 0.000 claims description 2
- 210000005036 nerve Anatomy 0.000 abstract 1
- 230000005540 biological transmission Effects 0.000 description 4
- 238000010586 diagram Methods 0.000 description 4
- 230000006870 function Effects 0.000 description 4
- 239000011810 insulating material Substances 0.000 description 4
- 238000004458 analytical method Methods 0.000 description 3
- 238000012549 training Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 238000005259 measurement Methods 0.000 description 2
- 238000012544 monitoring process Methods 0.000 description 2
- 230000001537 neural effect Effects 0.000 description 2
- 238000003062 neural network model Methods 0.000 description 2
- 230000003068 static effect Effects 0.000 description 2
- 238000004364 calculation method Methods 0.000 description 1
- 238000001816 cooling Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000013021 overheating Methods 0.000 description 1
- 230000001012 protector Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Abstract
Description
中文名 | 公式中表达式 | 模型中表达式 |
环境温度 | θa | x2 |
负载系数 | K | x4 |
负载电流 | l1,l2,l3 | x6 |
所考虑负载下的平均油温升 | Δθom | x19 |
开始本次计算时的顶层油温升 | Δθoi | x20 |
开始时热点温度对顶层油温的梯度 | Δθhi | x21 |
绕组热点温度计算值 | θh | |
绝缘材料寿命损失 | L | |
顶层油温计算值 | θo |
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110333035.3A CN102427218B (zh) | 2011-10-28 | 2011-10-28 | 基于人工智能技术的变压器短期过载能力评估系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110333035.3A CN102427218B (zh) | 2011-10-28 | 2011-10-28 | 基于人工智能技术的变压器短期过载能力评估系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102427218A true CN102427218A (zh) | 2012-04-25 |
CN102427218B CN102427218B (zh) | 2014-06-11 |
Family
ID=45961168
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110333035.3A Active CN102427218B (zh) | 2011-10-28 | 2011-10-28 | 基于人工智能技术的变压器短期过载能力评估系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102427218B (zh) |
Cited By (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103177288A (zh) * | 2013-03-05 | 2013-06-26 | 辽宁省电力有限公司鞍山供电公司 | 基于遗传算法优化神经网络的变压器故障诊断方法 |
CN103475090A (zh) * | 2013-08-20 | 2013-12-25 | 上海海能信息科技有限公司 | 一种变压器短期负荷智能预测系统及方法 |
CN103698033A (zh) * | 2013-12-17 | 2014-04-02 | 广西电网公司电力科学研究院 | 一种具备自适应功能的变压器绕组热点温度预测评估系统 |
CN104699890A (zh) * | 2015-01-07 | 2015-06-10 | 国家电网公司 | 一种城网配变重过载短期预警模型的建模方法 |
CN105404780A (zh) * | 2015-11-25 | 2016-03-16 | 国网山东省电力公司电力科学研究院 | 一种多参数综合分析的变压器过载能力评估方法 |
CN105550472A (zh) * | 2016-01-20 | 2016-05-04 | 国网上海市电力公司 | 一种基于神经网络的变压器绕组热点温度的预测方法 |
CN105675169A (zh) * | 2016-01-20 | 2016-06-15 | 国网上海市电力公司 | 一种油浸式电力变压器热点温度数据处理系统 |
CN106094694A (zh) * | 2016-08-16 | 2016-11-09 | 浙江群力电气有限公司 | 一种基于地下变电所的热监测方法 |
CN106771092A (zh) * | 2016-12-22 | 2017-05-31 | 西南交通大学 | 一种确定不同负载系数下变压器油时间常数的方法 |
CN106874534A (zh) * | 2016-12-28 | 2017-06-20 | 国网内蒙古东部电力有限公司检修分公司 | 一种变压器过载能力评估方法 |
CN107730061A (zh) * | 2016-08-11 | 2018-02-23 | 中国农业大学 | 一种配电网过载风险评估方法及装置 |
CN107843791A (zh) * | 2017-11-06 | 2018-03-27 | 西安交通大学 | 一种基于温升特性的变压器负荷能力评估方法 |
CN108090556A (zh) * | 2017-12-22 | 2018-05-29 | 国网江西省电力有限公司电力科学研究院 | 一种配电变压器热评估方法 |
CN108681625A (zh) * | 2018-04-25 | 2018-10-19 | 深圳凯达通光电科技有限公司 | 基于大数据技术的变压器短期过载能力智能评估系统 |
CN108761258A (zh) * | 2018-03-29 | 2018-11-06 | 深圳众厉电力科技有限公司 | 基于人工智能和大数据技术的变压器短期过载能力评估系统 |
CN110007182A (zh) * | 2019-03-22 | 2019-07-12 | 中国电力科学研究院有限公司 | 一种配电变压器的健康状态预警方法及装置 |
CN110411510A (zh) * | 2019-07-18 | 2019-11-05 | 国家电网有限公司 | 一种挖掘变压器运行潜力的计算方法 |
CN111767659A (zh) * | 2020-07-20 | 2020-10-13 | 湖北新石电力科技有限公司 | 一种配电变压器绕组材质无损检测评估系统 |
CN112378550A (zh) * | 2020-11-09 | 2021-02-19 | 广东电网有限责任公司佛山供电局 | 变压器温度遥测量的检验方法及装置 |
CN112711830A (zh) * | 2020-11-26 | 2021-04-27 | 广西电网有限责任公司电力科学研究院 | 一种控制变压器冷却的方法及系统 |
CN114111902A (zh) * | 2021-11-24 | 2022-03-01 | 保定天威保变电气股份有限公司 | 一种天然酯变压器智能监测系统 |
WO2022111841A1 (en) * | 2020-11-27 | 2022-06-02 | Hitachi Energy Switzerland Ag | Load forecasting for electrical equipment using machine learning |
TWI796047B (zh) * | 2021-12-13 | 2023-03-11 | 中華電信股份有限公司 | 變壓器分析及預測之系統、方法及其電腦程式產品 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1988004488A1 (en) * | 1986-12-12 | 1988-06-16 | Qualitrol Corporation | Multi-phase electronic temperature controller |
US6424266B1 (en) * | 2000-07-17 | 2002-07-23 | Nxtphase Technology Srl | Apparatus for preventing thermal damage to an electrical power transformer |
CN101701940A (zh) * | 2009-10-26 | 2010-05-05 | 南京航空航天大学 | 基于svm和dga的变压器在线故障诊断方法 |
CN101924348A (zh) * | 2010-02-05 | 2010-12-22 | 保定天威集团有限公司 | 一种判断换流变压器过载的控制方法 |
-
2011
- 2011-10-28 CN CN201110333035.3A patent/CN102427218B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1988004488A1 (en) * | 1986-12-12 | 1988-06-16 | Qualitrol Corporation | Multi-phase electronic temperature controller |
US6424266B1 (en) * | 2000-07-17 | 2002-07-23 | Nxtphase Technology Srl | Apparatus for preventing thermal damage to an electrical power transformer |
CN101701940A (zh) * | 2009-10-26 | 2010-05-05 | 南京航空航天大学 | 基于svm和dga的变压器在线故障诊断方法 |
CN101924348A (zh) * | 2010-02-05 | 2010-12-22 | 保定天威集团有限公司 | 一种判断换流变压器过载的控制方法 |
Cited By (31)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103177288A (zh) * | 2013-03-05 | 2013-06-26 | 辽宁省电力有限公司鞍山供电公司 | 基于遗传算法优化神经网络的变压器故障诊断方法 |
CN103475090A (zh) * | 2013-08-20 | 2013-12-25 | 上海海能信息科技有限公司 | 一种变压器短期负荷智能预测系统及方法 |
CN103698033A (zh) * | 2013-12-17 | 2014-04-02 | 广西电网公司电力科学研究院 | 一种具备自适应功能的变压器绕组热点温度预测评估系统 |
CN104699890A (zh) * | 2015-01-07 | 2015-06-10 | 国家电网公司 | 一种城网配变重过载短期预警模型的建模方法 |
CN105404780A (zh) * | 2015-11-25 | 2016-03-16 | 国网山东省电力公司电力科学研究院 | 一种多参数综合分析的变压器过载能力评估方法 |
CN105404780B (zh) * | 2015-11-25 | 2019-03-26 | 国网山东省电力公司 | 一种多参数综合分析的变压器过载能力评估方法 |
CN105550472A (zh) * | 2016-01-20 | 2016-05-04 | 国网上海市电力公司 | 一种基于神经网络的变压器绕组热点温度的预测方法 |
CN105675169A (zh) * | 2016-01-20 | 2016-06-15 | 国网上海市电力公司 | 一种油浸式电力变压器热点温度数据处理系统 |
CN107730061A (zh) * | 2016-08-11 | 2018-02-23 | 中国农业大学 | 一种配电网过载风险评估方法及装置 |
CN106094694A (zh) * | 2016-08-16 | 2016-11-09 | 浙江群力电气有限公司 | 一种基于地下变电所的热监测方法 |
CN106094694B (zh) * | 2016-08-16 | 2019-04-19 | 杭州电力设备制造有限公司 | 一种基于地下变电所的热监测方法 |
CN106771092A (zh) * | 2016-12-22 | 2017-05-31 | 西南交通大学 | 一种确定不同负载系数下变压器油时间常数的方法 |
CN106771092B (zh) * | 2016-12-22 | 2018-04-13 | 西南交通大学 | 一种确定不同负载系数下变压器油时间常数的方法 |
CN106874534A (zh) * | 2016-12-28 | 2017-06-20 | 国网内蒙古东部电力有限公司检修分公司 | 一种变压器过载能力评估方法 |
CN107843791A (zh) * | 2017-11-06 | 2018-03-27 | 西安交通大学 | 一种基于温升特性的变压器负荷能力评估方法 |
CN107843791B (zh) * | 2017-11-06 | 2020-08-18 | 西安交通大学 | 一种基于温升特性的变压器负荷能力评估方法 |
CN108090556A (zh) * | 2017-12-22 | 2018-05-29 | 国网江西省电力有限公司电力科学研究院 | 一种配电变压器热评估方法 |
CN108090556B (zh) * | 2017-12-22 | 2021-12-31 | 国网江西省电力有限公司电力科学研究院 | 一种配电变压器热评估方法 |
CN108761258A (zh) * | 2018-03-29 | 2018-11-06 | 深圳众厉电力科技有限公司 | 基于人工智能和大数据技术的变压器短期过载能力评估系统 |
CN108681625A (zh) * | 2018-04-25 | 2018-10-19 | 深圳凯达通光电科技有限公司 | 基于大数据技术的变压器短期过载能力智能评估系统 |
CN110007182A (zh) * | 2019-03-22 | 2019-07-12 | 中国电力科学研究院有限公司 | 一种配电变压器的健康状态预警方法及装置 |
CN110007182B (zh) * | 2019-03-22 | 2024-04-16 | 中国电力科学研究院有限公司 | 一种配电变压器的健康状态预警方法及装置 |
CN110411510A (zh) * | 2019-07-18 | 2019-11-05 | 国家电网有限公司 | 一种挖掘变压器运行潜力的计算方法 |
CN111767659A (zh) * | 2020-07-20 | 2020-10-13 | 湖北新石电力科技有限公司 | 一种配电变压器绕组材质无损检测评估系统 |
CN111767659B (zh) * | 2020-07-20 | 2024-03-26 | 湖北新石电力科技有限公司 | 一种配电变压器绕组材质无损检测评估系统 |
CN112378550A (zh) * | 2020-11-09 | 2021-02-19 | 广东电网有限责任公司佛山供电局 | 变压器温度遥测量的检验方法及装置 |
CN112711830A (zh) * | 2020-11-26 | 2021-04-27 | 广西电网有限责任公司电力科学研究院 | 一种控制变压器冷却的方法及系统 |
WO2022111841A1 (en) * | 2020-11-27 | 2022-06-02 | Hitachi Energy Switzerland Ag | Load forecasting for electrical equipment using machine learning |
CN114111902A (zh) * | 2021-11-24 | 2022-03-01 | 保定天威保变电气股份有限公司 | 一种天然酯变压器智能监测系统 |
CN114111902B (zh) * | 2021-11-24 | 2024-04-05 | 保定天威保变电气股份有限公司 | 一种天然酯变压器智能监测系统 |
TWI796047B (zh) * | 2021-12-13 | 2023-03-11 | 中華電信股份有限公司 | 變壓器分析及預測之系統、方法及其電腦程式產品 |
Also Published As
Publication number | Publication date |
---|---|
CN102427218B (zh) | 2014-06-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102427218A (zh) | 基于人工智能技术的变压器短期过载能力评估系统 | |
CN104484723B (zh) | 一种基于寿命数据的电力变压器经济寿命预测方法 | |
CN102663412B (zh) | 基于最小二乘支持向量机的电力设备载流故障趋势预测方法 | |
CN104037943B (zh) | 一种提高电网电压质量的电压监测方法及系统 | |
CN103683277B (zh) | 一种电力系统暂态稳定切负荷控制有效性评价指标计算方法 | |
CN101309009A (zh) | 基于层次分析法和德尔菲法建立的城市电网综合评价体系 | |
CN104573947A (zh) | 区域智能配电网低压台区综合评价方法 | |
CN106874534A (zh) | 一种变压器过载能力评估方法 | |
CN108256234A (zh) | 一种用于评估变压器直流偏磁影响的方法及系统 | |
CN110826228B (zh) | 一种地区电网运行品质极限评估方法 | |
CN113592128A (zh) | 一种大数据电网运行监测系统 | |
Seier et al. | Data-driven thermal modeling of residential service transformers | |
CN104218571A (zh) | 一种风力发电设备的运行状态评估方法 | |
CN103995967A (zh) | 基于多特征参量的电网设备寿命评估平台 | |
Kaplan et al. | Fault diagnosis of smart grids based on deep learning approach | |
Hou et al. | Spatial distribution assessment of power outage under typhoon disasters | |
CN117517908B (zh) | 一种变电站全站容性设备绝缘一体化监测系统 | |
CN107607820A (zh) | 一种基于生灭过程的变压器内部潜伏性故障率预测方法 | |
CN103886514B (zh) | 一种考虑经济性与安全性的电网发展评估方法 | |
CN117390944A (zh) | 一种变电站运行工况仿真系统 | |
Yuan et al. | Design of an intelligent decision model for power grid fault location and isolation based on topology analysis | |
Su | Engineering fault intelligent monitoring system based on Internet of Things and GIS | |
CN108123436A (zh) | 基于主成分分析和多元回归算法的电压越限预测模型 | |
CN104732101A (zh) | 电网调度操作中系统总有功失负荷值确定方法和系统 | |
Jin et al. | Optimization of sustainable land use management in water source area using water quality dynamic monitoring model |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: STATE ELECTRIC NET CROP. Free format text: FORMER OWNER: SUBSTATION MAINTENANCE CENTRAL WUHAN POWER SUPPLY CO., LTD. Effective date: 20130419 Owner name: HUBEI ELECTRIC POWER COMPANY WUHAN POWER SUPPLY CO Effective date: 20130419 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 430050 WUHAN, HUBEI PROVINCE TO: 100031 XICHENG, BEIJING |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20130419 Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing Applicant after: State Grid Corporation of China Applicant after: Wuhan Power Supply Company of Hubei Electric Power Company Applicant after: Beijing Huadian Wangtong S&T Co.,Ltd. Address before: 430050 No. 484, Hanyang Avenue, Wuhan, Hubei Applicant before: Substation Maintenance Central, Wuhan Power Supply Co.,Ltd. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |