CN102425192A - Pile foundation inclination real-time monitoring and prewarning system - Google Patents

Pile foundation inclination real-time monitoring and prewarning system Download PDF

Info

Publication number
CN102425192A
CN102425192A CN2011102846158A CN201110284615A CN102425192A CN 102425192 A CN102425192 A CN 102425192A CN 2011102846158 A CN2011102846158 A CN 2011102846158A CN 201110284615 A CN201110284615 A CN 201110284615A CN 102425192 A CN102425192 A CN 102425192A
Authority
CN
China
Prior art keywords
pile foundation
monitoring
inclination
real
sensor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011102846158A
Other languages
Chinese (zh)
Inventor
葛彬杰
冯晓星
王新安
王金泊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN SILIANG MICROSYSTEM CO Ltd
Original Assignee
SHENZHEN SILIANG MICROSYSTEM CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN SILIANG MICROSYSTEM CO Ltd filed Critical SHENZHEN SILIANG MICROSYSTEM CO Ltd
Priority to CN2011102846158A priority Critical patent/CN102425192A/en
Publication of CN102425192A publication Critical patent/CN102425192A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Testing Or Calibration Of Command Recording Devices (AREA)

Abstract

The invention discloses a system scheme for monitoring pile foundation inclination in real time and providing prewarning. In the scheme, an inclination measurement sensor and a gyroscope sensor (2) are arranged on a pile foundation (1) and driven underground together with the pile foundation as well as led outside through leads (3) and connected to a signal acquirer (4). According to the system, real-time monitoring on the pile foundation inclination can be realized, and an accurate inclination angle and an accurate inclination direction are obtained. The system has two functions of being capable of accurately judging piling quality of the pile foundation in a process of building a building and monitoring safety of the pile foundation in real time in the process of using the building and providing a prewarning signal immediately and sending a monitoring result through wired and wireless modes.

Description

Pile foundation inclination real-time system for monitoring and pre-warning
Technical field
The present invention relates to building safety, relate in particular to the piling quality and the actual time safety monitoring of pile foundation.
Background technology
Pile foundation is as a large amount of deep foundation forms that adopt in the engineering construction at present; Relate to the important component part of structural safety; The quality of pile foundation is directly connected to the safety of whole building (structure), also is related to the people's life, property safety, therefore strengthens pile foundation and detects significant.The detection method of current pile foundation quality is mainly following.
1. static load test: by the function of stake; Apply step by step on stake top respectively axial compression, axially uplift force, absolute altitude is consistent in the pile foundation support table bottom surface locates to apply horizontal force; The sedimentation of the respective detection point generation of observation stake, on pull out displacement or horizontal movement, judge the test method of corresponding single pile vertical resistance pressure bearing capacity, single-pile vertical orientation anti-pulling capacity or horizontal bearing capacity of single pile according to the relation of load and displacement.The significant advantage of this method is that stress condition is relatively more approaching actual, is simple and easy to usefulness, and it is that people understand and acceptance that result of the test intuitively is easy to; But experimental scale and expense are relatively large.
2. bore the core detection method: with geological drilling rig core boring sampling along its length on pile body, through a quality of the observation of core and test being confirmed.But this method can only reflect the fraction concrete quality in the boring scope; And equipment huge, time-consuming, cost an arm and a leg, should not be as the large tracts of land detection method, and can only be used for sampling check; 3~5% of the total stake amount of general sampling observation, or as nondestructive testing result's check means.
3. low strain detecting: apply low-energy transient state or stable state exciting at the stake end face, make stake in elastic range, do elastic vibration, and produce the stress wave longitudinal propagation thus, utilize fluctuation and Theory of Vibration that the integrality of pile body is made evaluation simultaneously.This method testing equipment is simply light, and detection speed is fast, cost is low, is the excellent means of pile quality integrality generaI investigation.But low Strain Method can not directly obtain the deduction of bearing capacity on principle, but is calculated by the correction of actual measurement dynamic stiffness and quiet moving contrast, therefore has very big regional experience and human factor.
4. high Strain Method: knock through implementing weight on the stake top, make pile body produce moving displacement, all ground resistances of stake are given full play to.High Strain Method explicit physical meaning, accuracy in detection is higher relatively; But the influence of problems such as present examined personnel's level and Pile Soil interaction model, this method still has bigger limitation, still can not replace static load test fully and the design considerations of the definite vertical allowable load capacity of single pile of conduct.
Shortcomings such as said method exists respectively that monitoring equipment is huge, process is complicated, excessive cycle, costly, diminishes detection, and the examined personnel's experience influence of testing result is bigger, and the fatal shortcoming that has the small scale sampling observation and can not monitor in real time.Present building trade press for develop have real-time monitoring, automatically, comprehensively, the electronic supervisory system of fast monitored carries out comprehensive and accurate safety monitoring to pile foundation.
Summary of the invention
The inclination of pile foundation is the key factor that influences pile foundation quality, especially as far as preformed pile.Its holding capacity of preformed pile that building is selected for use generally greater than the requirement of building, leaves nargin.When pile foundation angle when squeezing into produces, will cause the stressed off-axis of pile foundation to, simultaneously in the building use, the moving pile foundation skew vertical direction that also can make gradually of underground partial water soil mud.Pile foundation tilts will cause its unbalance stress, causes the pile foundation damage easily, therefore need monitor in real time the inclination of pile foundation.
This patent discloses a kind of real-time monitoring pile foundation and has tilted, and the system schema of early warning is provided.In this scheme (see figure 1), deviational survey sensor and gyro sensor (2) are installed on the pile foundation (1) and pile foundation is driven underground together, and draw through lead (3), are connected on the signal picker (4).Can realize real-time monitoring through this system to the pile foundation inclination, and the definite angle and direction that obtains tilting.This system has two big functions, in the architecture construction process, can accurately judge the piling quality of pile foundation; In architectural process, can monitor the safety of pile foundation in real time, early warning signal in time is provided, and monitoring result is sent through wired and wireless mode.
Description of drawings
Fig. 1 is the pile foundation inclination real-time system for monitoring and pre-warning that the present invention describes;
Fig. 2 is a pile foundation inclination sketch map;
The specific embodiment
Combine accompanying drawing that the present invention is done further explain through the specific embodiment below.
This scheme is described below: deviational survey sensor and gyro sensor (2) are installed on the pile foundation (1) and pile foundation is driven underground together, and draw through lead (3), are connected on the signal picker (4).The track and the direction of sensor in real time sensing pile foundation, signal picker then convert the primary signal of sensor to the angle of inclination and the direction of pile foundation, and send out through wired and wireless mode.
In pile foundation shown in Figure 2 tilted signal, the angle of pile foundation off-vertical was θ, and the defence line of departing from is an east by south ψ degree.Can above-mentioned monitoring result be reflected in real time through native system.
Above content is to combine concrete embodiment to the further explain that the present invention did, and can not assert that practical implementation of the present invention is confined to these explanations.For the those of ordinary skill of technical field under the present invention, under the prerequisite that does not break away from the present invention's design, can also make some simple deduction or replace, all should be regarded as belonging to protection scope of the present invention.

Claims (8)

1. pile foundation inclination real-time system for monitoring and pre-warning; It is characterized in that, go up in pile foundation (1) deviational survey sensor and gyro sensor (2) are installed, and draw through lead (3); Be connected on the signal picker (4), reach the function of real-time monitoring pile foundation angle of inclination and direction.
2. pile foundation inclination real-time system for monitoring and pre-warning as claimed in claim 1 is characterized in that said sensor is acceleration transducer and gyro sensor, but does not limit other can carry out the sensor of inclination measurement and orientation measurement.
3. pile foundation inclination real-time system for monitoring and pre-warning as claimed in claim 1 is characterized in that said sensor is the MEMS sensor, but does not limit other can carry out optical fiber, piezoelectricity, the vibrating wire sensor of inclination measurement and orientation measurement.
4. pile foundation inclination real-time system for monitoring and pre-warning as claimed in claim 1 is characterized in that, said pile foundation comprises that preformed pile and scene record stake.
5. pile foundation inclination real-time system for monitoring and pre-warning as claimed in claim 1 is characterized in that said pile foundation comprises the building construction pile foundation, also comprises other construction work foundation piles such as highway, railway, bridge.
6. pile foundation inclination real-time system for monitoring and pre-warning as claimed in claim 1; It is characterized in that; Said sensor is placed on the pile foundation, comprises that being embedded in the neutralization of pile foundation concrete is fixed on the inner reinforcing bar dual mode of pile foundation, but does not limit other with sensor and the fixing mode of pile foundation.
7. pile foundation inclination real-time system for monitoring and pre-warning as claimed in claim 1 is characterized in that said system can monitor in real time, also can be set to regular detection on request.
8. pile foundation inclination real-time system for monitoring and pre-warning as claimed in claim 1 is characterized in that, the monitoring result of said system can be transferred to through wired mode on the monitoring host computer, also can send on the designated terminal through wireless mode.
CN2011102846158A 2011-09-22 2011-09-22 Pile foundation inclination real-time monitoring and prewarning system Pending CN102425192A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011102846158A CN102425192A (en) 2011-09-22 2011-09-22 Pile foundation inclination real-time monitoring and prewarning system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011102846158A CN102425192A (en) 2011-09-22 2011-09-22 Pile foundation inclination real-time monitoring and prewarning system

Publications (1)

Publication Number Publication Date
CN102425192A true CN102425192A (en) 2012-04-25

Family

ID=45959218

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011102846158A Pending CN102425192A (en) 2011-09-22 2011-09-22 Pile foundation inclination real-time monitoring and prewarning system

Country Status (1)

Country Link
CN (1) CN102425192A (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103147466A (en) * 2013-03-08 2013-06-12 中国地质大学(武汉) Automatic inclination measurement device for precast pile with rectangular or hollow rectangular cross section
CN103195106A (en) * 2013-03-08 2013-07-10 中国地质大学(武汉) Automatic synchronous inclination measuring device for precast pile with circular or circular ring shaped cross section
CN103195107A (en) * 2013-03-08 2013-07-10 中国地质大学(武汉) Portable folding-type inclination survey device for precast pile with round or ring-shaped cross section
CN103215974A (en) * 2013-04-19 2013-07-24 浙江华东工程安全技术有限公司 Foundation pile deflection measurement method based on distributed fiber sensing technique
CN103215975A (en) * 2013-04-19 2013-07-24 浙江华东工程安全技术有限公司 Inbuilt method for distributed type sensing cable in foundation pile
CN103471655A (en) * 2013-09-09 2013-12-25 山河智能装备股份有限公司 Device for protecting inclination of stand column
CN104018506A (en) * 2014-06-06 2014-09-03 中交上海三航科学研究院有限公司 Pile-forming process dynamic testing device for underwater sand compaction pile
CN104480976A (en) * 2014-11-21 2015-04-01 云南省建筑科学研究院 Visual long-distance wireless monitoring system of pile foundation static loading test
CN104818735A (en) * 2015-04-20 2015-08-05 交通运输部公路科学研究所 Exploring drill bit and method for detecting pile foundation by using exploring drill bit
CN108221962A (en) * 2018-01-10 2018-06-29 重庆大学 A kind of friction pile that more monitorings can be achieved and preparation method thereof
CN108877177A (en) * 2018-07-05 2018-11-23 同济大学 A kind of fixed wireless inclination monitoring early warning system
CN112761142A (en) * 2020-12-24 2021-05-07 黄志生 Building pile with built-in detection sensing equipment
CN113483736A (en) * 2021-07-20 2021-10-08 上海力擎地质仪器有限公司 Gyro inclinometer and detection positioning method thereof
CN114993557A (en) * 2022-08-03 2022-09-02 聊城市宝丰机电科技有限公司 Static balance testing device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58123921A (en) * 1982-01-20 1983-07-23 Tonan Kiso Kogyo Kk Inspecting device for hardness of soil at time when foundation pile is pressed in after excavation
CN2250422Y (en) * 1995-12-29 1997-03-26 地质矿产部探矿工艺研究所 Piezoelectric gyroscope inclinometer for drill
CN101003976A (en) * 2006-08-22 2007-07-25 邓业灿 Test method of pile skew simulation of straight pile
CN101570974A (en) * 2009-03-26 2009-11-04 浙江省建筑科学设计研究院有限公司 Method for detecting quality of existing building foundation piles with parallel seismic method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58123921A (en) * 1982-01-20 1983-07-23 Tonan Kiso Kogyo Kk Inspecting device for hardness of soil at time when foundation pile is pressed in after excavation
CN2250422Y (en) * 1995-12-29 1997-03-26 地质矿产部探矿工艺研究所 Piezoelectric gyroscope inclinometer for drill
CN101003976A (en) * 2006-08-22 2007-07-25 邓业灿 Test method of pile skew simulation of straight pile
CN101570974A (en) * 2009-03-26 2009-11-04 浙江省建筑科学设计研究院有限公司 Method for detecting quality of existing building foundation piles with parallel seismic method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
梁志全等: "利用钻芯孔测斜法对工程桩倾斜率测试的分析", 《山西建筑》 *

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103195106A (en) * 2013-03-08 2013-07-10 中国地质大学(武汉) Automatic synchronous inclination measuring device for precast pile with circular or circular ring shaped cross section
CN103195107A (en) * 2013-03-08 2013-07-10 中国地质大学(武汉) Portable folding-type inclination survey device for precast pile with round or ring-shaped cross section
CN103195107B (en) * 2013-03-08 2013-10-09 中国地质大学(武汉) Portable folding-type inclination survey device for precast pile with round or ring-shaped cross section
CN103147466B (en) * 2013-03-08 2013-11-20 中国地质大学(武汉) Automatic inclination measurement device for precast pile with rectangular or hollow rectangular cross section
CN103195106B (en) * 2013-03-08 2013-11-27 中国地质大学(武汉) Automatic synchronous inclination measuring device for precast pile with circular or circular ring shaped cross section
CN103147466A (en) * 2013-03-08 2013-06-12 中国地质大学(武汉) Automatic inclination measurement device for precast pile with rectangular or hollow rectangular cross section
CN103215974A (en) * 2013-04-19 2013-07-24 浙江华东工程安全技术有限公司 Foundation pile deflection measurement method based on distributed fiber sensing technique
CN103215975A (en) * 2013-04-19 2013-07-24 浙江华东工程安全技术有限公司 Inbuilt method for distributed type sensing cable in foundation pile
CN103471655A (en) * 2013-09-09 2013-12-25 山河智能装备股份有限公司 Device for protecting inclination of stand column
CN104018506B (en) * 2014-06-06 2015-11-25 中交上海三航科学研究院有限公司 Underwater sand compaction pile formation of pile dynamic checkout unit
CN104018506A (en) * 2014-06-06 2014-09-03 中交上海三航科学研究院有限公司 Pile-forming process dynamic testing device for underwater sand compaction pile
CN104480976A (en) * 2014-11-21 2015-04-01 云南省建筑科学研究院 Visual long-distance wireless monitoring system of pile foundation static loading test
CN104480976B (en) * 2014-11-21 2016-04-13 云南省建筑科学研究院 A kind of visual dead load test on pile foundation remote wireless monitoring system
CN104818735A (en) * 2015-04-20 2015-08-05 交通运输部公路科学研究所 Exploring drill bit and method for detecting pile foundation by using exploring drill bit
CN108221962A (en) * 2018-01-10 2018-06-29 重庆大学 A kind of friction pile that more monitorings can be achieved and preparation method thereof
CN108877177A (en) * 2018-07-05 2018-11-23 同济大学 A kind of fixed wireless inclination monitoring early warning system
CN112761142A (en) * 2020-12-24 2021-05-07 黄志生 Building pile with built-in detection sensing equipment
CN113483736A (en) * 2021-07-20 2021-10-08 上海力擎地质仪器有限公司 Gyro inclinometer and detection positioning method thereof
CN114993557A (en) * 2022-08-03 2022-09-02 聊城市宝丰机电科技有限公司 Static balance testing device
CN114993557B (en) * 2022-08-03 2022-11-22 聊城市宝丰机电科技有限公司 Static balance testing device

Similar Documents

Publication Publication Date Title
CN102425192A (en) Pile foundation inclination real-time monitoring and prewarning system
CN102409705A (en) System for monitoring and pre-warning pile foundation damage in real time
CN104631519A (en) Pile foundation bearing characteristic model test device and method under complicated load effect
CN102393354B (en) Intelligent soil engineering shear rheometer
CN201068574Y (en) Heave hand hammer large long pile strain detection device
CN102943493A (en) Method for measuring internal force and deformation of precast pile
CN105067435A (en) Soil in-suit boring shearing testing device
CN204401664U (en) A kind of castinplace pile pile bottom sediment and pile end groundwork checkout gear
CN108871946A (en) Great burying cavern hard rock rock burst calamity grade appraisal procedure
AU2015101608A4 (en) Rock acoustic wave detection transducer
CN104749023A (en) Testing device and testing method for simulating hydrodynamic pressure action in rock fracture
CN103774700A (en) Method for detecting integrity of high flat bed pile under existing building through overtone response function method
CN104897321B (en) Wall shearing stress method of testing in a kind of pre-formed members concrete tubular pile pile body
CN104278984B (en) Micrometric displacement indicator for beam pumper
CN204903300U (en) Testing arrangement is cuted in drilling of soil body normal position
CN102830050A (en) Oscillation testing system for determining permeability coefficient tensor in fractured rock mass
CN203551275U (en) Portable in-service electric pole concrete compressive strength field measuring instrument
CN206656855U (en) A kind of device for laboratory measurement flexible cable frequency and the vibration shape
CN204988572U (en) Skin friction testing arrangement in prefabricated opening concrete pipe pile pile body
CN106088171B (en) Combined testing method for horizontal displacement of pile top and stress of pile body of precast pile
CN207019819U (en) A kind of realization device of cable force measurement technology
CN111413131A (en) Suspension tunnel anchor rope inefficacy and dynamic response test device that collapses in succession
CN205062789U (en) Portable T type sounding appearance
CN103674833A (en) Simple shearing test method and device for rock-concrete cement face
CN203672311U (en) Landslide deep displacement monitoring system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120425