CN102418173B - Spinning machinery - Google Patents
Spinning machinery Download PDFInfo
- Publication number
- CN102418173B CN102418173B CN201110261221.0A CN201110261221A CN102418173B CN 102418173 B CN102418173 B CN 102418173B CN 201110261221 A CN201110261221 A CN 201110261221A CN 102418173 B CN102418173 B CN 102418173B
- Authority
- CN
- China
- Prior art keywords
- mentioned
- spinning
- suction catheter
- yarn
- unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009987 spinning Methods 0.000 title claims abstract description 321
- 239000000835 fiber Substances 0.000 claims abstract description 19
- 230000032258 transport Effects 0.000 claims abstract description 17
- 238000007383 open-end spinning Methods 0.000 claims description 16
- 238000004804 winding Methods 0.000 claims description 13
- 230000015572 biosynthetic process Effects 0.000 claims description 5
- 238000005755 formation reaction Methods 0.000 claims description 5
- 238000005728 strengthening Methods 0.000 claims description 5
- 238000003379 elimination reaction Methods 0.000 description 9
- 230000002787 reinforcement Effects 0.000 description 8
- 210000001503 Joints Anatomy 0.000 description 4
- 230000000875 corresponding Effects 0.000 description 3
- 238000005520 cutting process Methods 0.000 description 3
- 238000011144 upstream manufacturing Methods 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 230000000994 depressed Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 235000008331 Pinus X rigitaeda Nutrition 0.000 description 1
- 235000011613 Pinus brutia Nutrition 0.000 description 1
- 241000018646 Pinus brutia Species 0.000 description 1
- 238000005276 aerator Methods 0.000 description 1
- 230000000903 blocking Effects 0.000 description 1
- 239000000969 carrier Substances 0.000 description 1
- 230000002493 climbing Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 238000007667 floating Methods 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 230000000414 obstructive Effects 0.000 description 1
- 230000002093 peripheral Effects 0.000 description 1
- 238000011176 pooling Methods 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Abstract
The present invention provides a kind of spinning machinery, and the spinning frame as spinning machinery has multiple spinning unit, adapter trolley and the 1st suction catheter.Multiple spinning units arrange along the 1st direction, generate spinning from fibre bundle.Adapter trolley can carry out sub operation along the 1st direction running to some in multiple spinning units.At least some of of 1st suction catheter is configured at least some position in position higher than the upper surface of adapter trolley in the short transverse of spinning unit (2) and the position lower than lower surface along the 1st direction.1st suction catheter attracts and transports the yarn bits that adapter trolley has carried out producing during sub operation.
Description
Technical field
The present invention relates to spinning machinery, particularly relate to pay to fibre bundle twist with the fingers to generate spinning, wind quilt
The spinning generated forms the spinning machineries such as the spinning frame of package.
Background technology
Conventional spinning machinery has multiple spinning unit, the unified multiple lists supporting multiple spinning units
Unit framework, (day can be see, for example along the Mobile workbench of the sub operation that multiple spinning units move
This JP 2010-77577 publication).Multiple spinning units are paid to fibre bundle and are twisted with the fingers to generate spinning,
Wind the spinning generated and generate package.Multiple spinning units are arranged side-by-side along the 1st direction.At unit
The suction catheter of the yarn bits etc. attracting sub operation to produce it is configured with on framework.Suction catheter is single along multiple spinning
1st direction configuration of unit.The suction catheter of Mobile workbench is arranged in the position becoming Mobile workbench rear
On.
In conventional spinning machinery, owing to the rear at Mobile workbench is configured with suction catheter, therefore depth
The length in direction.Therefore there is the problem that the depth direction of whole spinning machinery is elongated.
Summary of the invention
The problem of the present invention seeks to shorten as much as possible the length of spinning machinery depth direction.
The multiple form of following description is as the means being used for the problem that solves.These forms can be as required
And combination in any.The spinning machinery of one viewpoint of the present invention possess multiple spinning unit, adapter trolley and
1st suction catheter.Multiple spinning units arrange along the 1st direction, generate spinning from fibre bundle.Joint platform
Car can carry out sub operation along the 1st direction running to spinning unit.At least the one of 1st suction catheter
Part is configured in the short transverse of spinning unit the upper table than adapter trolley along above-mentioned 1st direction
At least some position in position that face is high and the position lower than lower surface.1st suction catheter attracts also
Conveyance adapter trolley has carried out the yarn bits produced during sub operation.1st suction catheter in this spinning machinery
It is configured in the short transverse of spinning unit upper than adapter trolley along the 1st direction at least partially
At least some position in position that surface is high and the position lower than lower surface.Thus, the 1st attracts
Pipe is not configured in the space of adapter trolley reverse side.As a result, it is possible to shorten spinning as much as possible
The length of machinery depth direction.
Above-mentioned spinning machinery can also have multiple secondary suction catheters and multiple connecting tube.Secondary suction catheter is by many
In individual spinning unit, the spinning unit of every specified quantity along the 1st direction and is arranged on relative to connecing
On the position of caster bed car and the 1st suction catheter opposite side.Multiple connecting tubes connect the 1st suction the most respectively
Skirt and multiple secondary suction catheter.The yarn bits produced when adapter trolley has carried out sub operation are attracted by pair
Pipe and connecting tube are transported in the 1st suction catheter.Thus, the 1st suction catheter is configured in ratio joint platform
On the position (or position lower than lower surface) that the upper surface of car is high, secondary suction catheter is configured in ratio
On the position (or position higher than upper surface) that the lower surface of adapter trolley is low.That is, the 1st suction catheter
Clip adapter trolley with secondary suction catheter and be arranged in mutually opposite side.As a result, it is possible to contract as much as possible
The length of the depth direction of short spinning machinery, and can effectively attract and transport to be entered by adapter trolley
The yarn bits that the sub operation of row produces.
1st suction catheter can also be arranged under the lower surface of adapter trolley, attracts air stream by from the 1st
Suction catheter is supplied directly to adapter trolley.Thus, the 1st suction catheter shortens with the distance of adapter trolley,
Reducing the pressure loss attracting air stream in above-mentioned spinning machinery, above-mentioned spinning machinery can be inhaled effectively
Draw yarn bits.
Above-mentioned spinning machinery can also possess and is configured in the short transverse of spinning unit along the 1st direction
2nd suction catheter of the position higher than the upper surface of adapter trolley.The position that 2nd suction catheter produces at yarn bits
Attract and transport the yarn bits of spinning near putting.Thereby, it is possible to attract to spin near the position that yarn bits produce
The yarn bits produced when yarn cuts off.As a result, it is possible to shorten the length of the depth direction of spinning machinery as much as possible
Degree, and the yarn bits produced when spinning machinery can attract and transport spinning cut-out effectively.
Above-mentioned spinning machinery can also possess and is configured in the short transverse of spinning unit along the 1st direction
The 2nd suction catheter relative to adapter trolley Yu the 1st suction catheter opposite side.2nd suction catheter attracts also
The yarn bits that conveyance spinning produces when cutting off.Thus, it is arranged in below adapter trolley at the 1st suction catheter
In the case of, the 2nd suction catheter is arranged in the top of adapter trolley;In the opposite case, the 2nd attracts
Pipe is arranged in the lower section of adapter trolley.Therefore, though configuration the 2nd suction catheter, due to the 1st suction catheter
Clip adapter trolley with the 2nd suction catheter to configure up and down, therefore, it is possible to shorten spinning machinery as much as possible
The size of depth direction.
Multiple spinning units are each respectively provided with drawing-off portion and open-end spinning portion.Drawing-off portion drawn fiber bundle.
Open-end spinning portion utilizes the fibre bundle twisting that turn air-flow is drawn through to drafted portion, thus generates spinning.
Drawing-off portion and open-end spinning portion are configured in the top of spinning unit.Above-mentioned spinning machinery is also equipped with along the 1st
Direction and be arranged in the 3rd suction catheter on top of multiple spinning unit.3rd suction catheter attracts also
Transport the yarn bits produced by drawing-off portion and open-end spinning portion.
Thereby, it is possible to what the yarn that the 3rd suction catheter is configured to produced by drawing-off portion and open-end spinning portion was considered to be worth doing
Produce proximal site.Accordingly, it is capable to enough 3rd suction catheters effectively attract and transport by drawing-off portion gentle
The yarn bits that stream spinning portion produces.
Above-mentioned spinning machinery can also possess supporting spinning unit and the unit framework of adapter trolley.3rd
Suction catheter doubles as the structure member of unit framework.Thus, even making the dimensional structure of depth direction tight
The unit framework gathered, it is also possible to the 3rd suction catheter is doubled as structure member.Therefore, even depth side
It also is able to maintain unit framework desired intensity to the spinning machinery of compact conformation.
Above-mentioned spinning machinery can also possess the strengthening part at above-below direction reinforcement unit framework.Thus,
Even the spinning machinery of depth direction compact conformation, it is also possible to unit framework is maintained with strengthening part
In desired intensity.
Spinning unit can also have the spinning that winding is generated, the winding forming package by open-end spinning portion
Portion.Adapter trolley has the 1st towards the yarn road formed by open-end spinning portion and winder, and
It is arranged on the 2nd with the 1st opposite side.Unit framework has and leads to the 2nd of adapter trolley
Peristome.Thereby, it is possible to carry out from the 2nd face of peristome butt joint chassis maintaining or from
Peristome takes out adapter trolley.Therefore, spinning machinery entirety is made to stop in order to maintain adapter trolley
Time only shortens, it is possible to increase the work efficiency of spinning machinery.
Adapter trolley can also have the 1st guide portion, the 2nd guide portion and connector portions.1st guide portion
Attract when spinning is cut off and guide the yarn end from the spun spinning in open-end spinning portion.2nd guide portion exists
Spinning attracts when cutting off and guides the yarn end of spinning of winder side.Connector portions will be by the 1st guide portion
With 2 yarn end connectors that the 2nd guide portion guides the spinning come.Thus, possessing utilization attraction air
In the spinning machinery of the adapter trolley flow guiding spinning, carrying out joint with piecing devices, due to as above-mentioned
It is configured with suction catheter like that, therefore, it is possible to shorten the length of spinning machinery depth direction as much as possible.
The effect of invention: if using the present invention, suction catheter is not configured in adapter trolley reverse side
Space in.As a result, it is possible to shorten the length of spinning machinery depth direction as much as possible.
Accompanying drawing explanation
Fig. 1 is the integrally-built front view of the spinning frame representing one embodiment of the present invention;
Fig. 2 is the sectional view of spinning frame;
Fig. 3 is the front perspective view of spinning frame;
Fig. 4 is the back perspective view of spinning frame;
Fig. 5 is the sectional view of the spinning frame of variation.
Detailed description of the invention
The spinning frame (spinning machinery) of one embodiment of the present invention is described with reference to the accompanying drawings.It addition,
So-called in this manual " upstream " and " downstream " refers to the upstream of the travel direction of yarn during spinning
And downstream.
The spinning frame 1 as spinning machinery shown in Fig. 1 possesses the multiple spinning units 2 being arranged side by side.
Spinning frame 1 possess adapter trolley (yarnjoining cart) 3, the chassis that doffs (doffing cart) 4,
Bellows 80, headstock (motor box) 5, unit framework 6 and bar-like member 16.And, as
Shown in Fig. 2, spinning frame 1 also has the 1st suction catheter the 17, the 2nd suction catheter the 18 and the 3rd suction catheter
19。
Multiple spinning units 2 are along length direction (left and right directions of Fig. 1) the i.e. the 1st side of spinning frame 1
To being arranged side-by-side on unit framework 6.Each spinning unit 2 is formed and has wound spinning of specific length respectively
The package 45 of yarn 10.Such as 8 spinning units 2 can be installed on one unit framework 6.It addition,
The quantity of the spinning unit 2 being arranged on a unit framework 6 has no particular limits.Further, one
Individual spinning frame 1 is provided with one or more unit framework 6.
As it is shown in figure 1, each spinning unit 2 have configure successively toward downstream from upstream drawing-off portion 7, spin
Yarn portion 9, Yarn relaxation elimination portion (yarn slack eliminating section) 12, winder (winding
Section) 13 as primary structure.Drawing-off portion 7 is arranged on the upper end of the unit framework 6 of spinning frame 1
Near.Drawing-off portion 7 drawing-off sliver 15 makes it become fibre bundle 8.Spinning portion 9 is by utilizing turn gas
Stream pays the open-end spinning of sth. made by twisting to the fibre bundle 8 come from drawing-off portion 7 conveying, spins spinning 10.From spinning
The spun spinning in yarn portion 9 10 is fed to Yarn relaxation elimination portion 12 after yarn clearer 52, is wound
Portion 13 winds, and is consequently formed package 45.Thus, from the spinning portion 9 of each spinning unit 2 to winder
13 along spinning unit 2 above-below direction formed yarn road LP (Fig. 2).It addition, yarn clearer 52 detection is spun
The thickness of yarn 10 have without exception and/or spinning 10 in or without comprising foreign body.
Yarn relaxation elimination portion 12 has pays the tension force of regulation to spinning 10 and pulls out from spinning portion 9
Function, and make when carrying out joint by adapter trolley 3 to be detained from the spun spinning in spinning portion 9 10,
Eliminate the lax function of spinning 10.Yarn relaxation elimination portion 12 has makes opening of winder 13 side
The variation of power is not transferred to the pooling feature of side, spinning portion 9.
As in figure 2 it is shown, winder 13 has is swung shaking of freely carry around support shaft 70
Boom 71 and winding drum 72.Reel cage arm 71 can support bobbin rotatably in order to wind spinning 10
48.The outer peripheral face that winding drum 72 is arranged on before unit framework 6 with bobbin 48 or package 45 connects
Touch, rotate with the winding speed of regulation and drive.
Adapter trolley 3 can be along the 1st direction at the 1st running rail 81 being arranged on unit framework 6
Upper traveling.Adapter trolley 3 is configured so that the spinning unit 2 driving to need joint when yarn cuts off
Position, enable the upper yarn of side, spinning portion 9 and the lower yarn joint of winder 13 side.Although figure
Depict only 1 adapter trolley 3 in 1, but whole spinning frame 1 is provided with multiple stage.Such as Fig. 1 and Fig. 2
Shown in, the piecing devices (joint that each adapter trolley 3 has chassis portion 41, is arranged in chassis portion 41
One example in portion) 43, suction pipe (example of the 1st guide portion) 44, suction nozzle (example of the 2nd guide portion)
46 and attract air supply pipe 47 (Fig. 2).
Chassis portion 41 has the front 41a towards yarn road LP, is arranged on and front 41a opposite side
Back side 41b and be vertically connected with the upper surface 41c and lower surface 41d of front 41a and back side 41b.
Front 41a and back side 41b is identical in the projected area of depth direction (left and right directions of Fig. 2).On
Surface 41c and lower surface 41d projected area in the vertical direction is the most identical.
Chassis portion 41 has 2 travelings along the configuration of travel direction interval at the two ends in the 1st direction
Wheel 41e.It is respectively arranged with a pair deflector roll 41f in top and the bottom in chassis portion 41.The deflector roll on top
41f is guided by guide rail 41g.Suction pipe 44 rotates around trunnion axis, catches and is positioned at the upper of spinning portion 9
Yarn end, is directed to piecing devices 43.Suction nozzle 46 rotates around trunnion axis, catches and is positioned at winder 13
Lower yarn end, be directed to piecing devices 43.Piecing devices 43 carry out the joint of upper yarn and lower yarn.
Attract air supply pipe 47 that the attraction air stream from the 1st suction catheter 17 is supplied to joint platform
Car 3.Air supply pipe 47 is attracted to be arranged on the upper surface 41c in chassis portion 41.Secondary attraction described later
Pipe 17b is from the 1st suction catheter 17 branch.Corresponding with each spinning unit 2 at secondary suction catheter 17b
Shutter 95 it is provided with on position.Attract this shutter 95 of air supply pipe 47 opening and closing.Thus, from
Secondary suction catheter 17b attracts air stream to respectively piecing devices 43, suction pipe 44 and suction nozzle 46 supply.
As shown in Figure 1, Figure 2 and Figure 3, the chassis 4 that doffs can be arranged in spin along the 1st direction running
The side, front of yarn unit 2.When in spinning unit 2, package 45 becomes full volume, the chassis 4 that doffs exists
Drive to this spinning unit 2 on 2nd running rail 82, stop at here.As shown in Figures 1 and 2,
The chassis 4 that doffs has chassis housing 85.Be provided with suction pipe 88 on chassis housing 85, bare bobbin supplies
To parts 89 and reel cage motion arm 90.
Chassis housing 85 has 2 the traveling wheel 85a being arranged in the 1st two ends, direction.Travel wheel 85a
It is arranged in the side away from spinning unit 2 of the lower surface of chassis housing 85.Therefore, doff chassis 4
Guided by the 2nd running rail 82 in the side away from spinning unit 2.The aspect ratio of chassis housing 85
The height of spinning unit 2 is low.Specifically, the yarn pine of the aspect ratio spinning unit 2 of chassis housing 85
The position in relaxation elimination portion 12 is slightly lower.
Chassis housing 85 covers from above aftermentioned package mounting portion 21 ground being arranged on unit framework 6
Formed.Therefore, the chassis 4 that doffs in this embodiment is configured in the outermost of spinning frame 1.Chassis
What the section view that bar-like member 16 can pass through that has housing 85 caved in into " C " font passes through depressed part.
It is formed on the face relative with spinning unit 2 by depressed part, has except bar-like member 16 external support rod
The size that the supporting member 96 of shape parts 16 also can be passed through.
Suction pipe 88 can stretch and can swingingly be arranged on chassis housing 85.Suction pipe 88 is towards spinning
Attraction limit, limit of advancing, yarn portion 9 catches the upper yarn end of spinning 10 sent from spinning portion 9.Further, suction pipe
88 retrogressing limit, limits swing the bobbin 48 being directed to the spinning 10 captured be arranged in winder 13.
Scope GL of the guiding action of suction pipe 88 is the scope that in Fig. 2, double dot dash line represents.Bare bobbin supplies
Parts 89 are arranged on chassis housing 85 rotatably mountedly, and empty bobbin 48 is supplied to winder 13.
Reel cage motion arm 90 is mounted freely on chassis housing 85 by swing, makes the reel cage arm of winder 13
71 swing and can pull down package 45.
1st suction catheter the 17, the 2nd suction catheter the 18 and the 3rd suction catheter 19 is connected bellows 80
On.It is used for making these the 1st suction catheter the 17, the 2nd suction catheters and the 3rd suction catheter 19 produce attraction
The not shown aerator of air stream is mounted in bellows 80.
Unit framework 6 is the shaped as frame parts being such as provided with 8 spinning units 2.Unit framework 6 has
The package mounting portion have the main frame 20 installing spinning unit 2, being arranged in the side, front of main frame 20
21, pedal 22 and tiptoe resettlement section 23.
Main frame 20 is the parts constituted by assembling steel.As shown in Figures 2 and 3, at main frame
The front upper of frame 20 be formed the drawing-off portion 7 for supporting spinning unit 2 and spinning portion 9, incline
Oblique support 20a.The tilt angle alpha of support 20a is such as more than 50 °, less than 70 °
Angular range.Thus, configuration more to be holded up than conventional spinning frame by drawing-off portion 7 and spinning portion 9.Knot
Really, from operation path to drawing-off portion 7 and the Distance Shortened in spinning portion 9, become easy operator maintenance
Maintenance drawing-off portion 7 and spinning portion 9.
At the front central part of main frame 20, depression is formed with the traveling space that adapter trolley 3 travels
20c.1st running rail 81 of adapter trolley 3 is arranged on along the 1st direction and travels space 20c's
Bottom.
As used shown in double dot dash line in Fig. 4, the back side of main frame 20 is formed with peristome 20b.Opening
Portion 20b is formed with leading to the back side 41b of adapter trolley 3, for can be from the reverse side of main frame 20
Take out the size of adapter trolley 3.Specifically, peristome 20b is than the back of the body in the chassis portion 41 of adapter trolley
Face 41b is big.Be in more detail, peristome 20b than front 41a and back side 41b in the throwing of depth direction
Shadow area is big.
In the both sides in the 1st direction of peristome 20b, it is provided with a pair reinforcement component 20d strengthened
With beam 20e.Reinforcement component 20d from the connection bottom, top of main frame 20, the 1st direction
The length of a length of bottom that end is risen is longer than top.Beam 20e is from the top of main frame 20
Configure to sloped-end to the 1st direction of bottom.At this pair reinforcement component 20d and beam
Peristome 20b is formed between 20e.Reinforcement component 20d and beam 20e is to prevent because arranging
Peristome 20b and make the intensity of main frame 20 reduce and arrange.
At the side of the peristome 20b at main frame 20 back side, it is configured with unit power supply box 31.At opening
The top of portion 20b is configured with unit power conduit (duct) 32.Unit power supply box and unit power conduit
It was arranged in the rear of adapter trolley 3 in the past.
In the lower backside of main frame 20, it is formed with the back side pedal used as the horse block of operator
20f.Back side pedal 20f use when operator carries out operation from reverse side.Back side pedal 20f's
The pedal 22 of aspect ratio spinning frame 1 face side somewhat highland sets.
As shown in Figures 2 and 3, package mounting portion 21 becomes full volume for being positioned in winder 13
The place of package 45.Package mounting portion 21 is by the truncated cone cut-off with mounting head the most turningly
For the purpose of the package 45 of shape, concave shape become section view polygonal shape.As it is shown in figure 1, package mounting
Portion 21 configures along the 1st direction endlong across whole spinning frame 1.Package mounting portion 21 has such as
The package delivery section of ribbon conveyer form.The package 45 of mounting is transported to the 1st side by package delivery section
To end side (such as bellows 80 side) or another side.
Package guide portion 28 it is provided with between package mounting portion 21 and winder 13.Package guide portion
28 are used when the chassis 4 that doffs doffs package 45.Package guide portion 28 will be wound with spinning 10
Package 45 be directed to package mounting portion 21.Package guide portion 28 have top from winder 13 towards
Inclined plane 28a that package mounting portion 21 declines.
By arranging between winder 13 and package mounting portion 21, there is such inclined plane 28a
Package guide portion 28, the package 45 in winding is not done with the package 45 being arranged in package mounting portion 21
Relate to.Therefore, winder 13 can be unrelated with the situation of the package 45 being positioned in package mounting portion 21
Ground carries out the winding operation of package 45.Therefore, it is possible to improve the spinning efficiency of spinning frame 1.
Pedal 22 is arranged in the worker passage side (left surface of Fig. 2) of package mounting portion 21.Step on
The horse block that plate 22 is maintained spinning unit 2 as operator and used uses.Pedal 22 is by smooth
Face is constituted.Upper surface at pedal 22 is configured with the 2nd running rail 82 that the chassis 4 that doffs travels.The
2 running rails 82 are the metal plate-shaped member of lower thickness.It is configured with use in the inside of pedal 22
Make to supply electric power, the communication carrying out various signal and the cloth of compressed-air actuated supply to the chassis 4 that doffs
The cable carrier pipe (cable bear) 26 of line and pneumatic pipeline flexible pipe process.Pedal 22 away from spinning
The outside of unit 2 is worker passage.
As in figure 2 it is shown, tiptoe resettlement section 23 has the tiptoe portion of the shoes that can house operator
Space.Tiptoe resettlement section 23 is formed with entering the lower section of package mounting portion 21.Such by arranging
Tiptoe resettlement section 23, standing in the operator on pedal 22 can be closer to spinning unit 2.Thus, when
When operator carries out the operations such as the maintenance of spinning frame 1, it is possible to increase working performance.
Bar-like member 16 has the function as handrail and the merit of the guide member as the chassis 4 that doffs
Energy.Bar-like member 16 is the duct member of such as rustless steel, is disposed substantially away from the position of spinning unit 2
On.Thus, when such as spinning unit 2 being carried out the operations such as maintenance, operator can be by hands
It is placed on bar-like member 16 or health is rested on bar-like member 16 and carry out operation.Therefore, i.e.
Making to carry out operation towards spinning unit 2, operator also is able to carry out with making stable posture operation.Such as Fig. 2
Shown in, the guide reel 85c of the chassis 4 that doffs and two side contacts of the length direction of bar-like member 16.As
Shown in Fig. 1, bar-like member 16 configures along the 1st direction.As in figure 2 it is shown, bar-like member 16 configures
In scope GL of guiding action of the suction pipe 88 than the chassis 4 that doffs further from the side of spinning unit 2.
Bar-like member 16 is arranged between yarn road LP and pedal 22.So, doff the drawing of chassis 4
Turned on the 2nd running rail 82 and bar-like member 16 was carried out.By guiding with bar-like member 16
The top of yarn chassis 4, the bottom of the chassis 4 that doffs with the 2nd running rail 82 guiding, doff chassis 4
Improve relative to the positional precision of spinning unit 2.Therefore, the chassis 4 that doffs can enter from position of doffing
The doffing operation that row precision is good.
Bar-like member 16 is supported by the multiple supporting members 96 along the 1st direction interval configuration.?
Bearing member 96 the most every 4 spinning unit 2 ground configuration.Supporting member 96 is fixed on main frame 20
Front.Supporting member 96 is the tabular component that wall thickness is thick, and inside has with the 2nd suction catheter 18 even
Logical attraction channel (not shown).Such as turn with make position at open position on the top of attraction channel
Move and the attraction lid 96a as suction unit is freely installed.Open position is turned to when making attraction lid 96a
Time, it is possible to open attraction channel, it is possible to attract yarn bits etc..Thereby, it is possible to from attracting lid 96a to discard
The yarn bits the like waste that operator collects in maintenance operation etc..
As shown in figures 1 and 3, it is configured with stopping in the lower section of bar-like member 16 along bar-like member 16
Operating portion 29.Be formed with in the bottom, top of supporting member 96 that the portion of stopping operation 29 can pass through is logical
Hole 96a.Stop operation portion 29 and have the cord-like component of emergency stop push button 30 for one end connection.Stop behaviour
Make portion 29 and be configured so that when stopping operation portion 29 to the direction pulling away from supporting member 96, with
Equally spinning frame 1 emergent stopping action during pressing operation emergency stop push button 30.Thus, operator
If the front of spinning frame 1, no matter where can promptly carry out the tight of spinning frame 1
Suddenly stop operation.The lower section of bar-like member 16, therefore operator it is arranged in owing to stopping operation portion 29
It is not easy maloperation and stops operation portion 29.
Shown in as shown in Figure 2, Figure 3 and Figure 4, the 1st suction catheter 17 reclaims adapter trolley 3 and carries out joint work
Bellows 80 is considered and be transported to the yarn produced during industry to be worth doing.2nd suction catheter 18 reclaims because of the cut-out of spinning 10
Bellows 80 is considered and be transported to the yarn produced before and after the sub operation carried out to be worth doing.Yarn catcher 35 is connected to
On 2nd suction catheter 18.The top of yarn catcher 35 at the upper opening in Yarn relaxation elimination portion 12,
Root is connected on the 2nd suction catheter 18.Yarn catcher 35 produces when sucking spinning 10 cut-out
The effect of the suction port of yarn bits.3rd suction catheter 19 reclaims the dirt produced in the drafting process in drawing-off portion 7
Angstrom and floating fiber, spinning portion 9 carry out the dust that produces in spinning process and yarn bits etc. and be transported to drum
Bellows 80.
The 1st conventional suction catheter and the 2nd suction catheter are positioned at the rear of adapter trolley 3.Therefore, operation
Person the back side 41b of butt joint chassis 3 can not carry out operation.1st suction catheter 17 of this embodiment exists
Low for the lower surface 41d Shangdi, position than adapter trolley 3 it is arranged in the short transverse of spinning unit 2
It is arranged in main frame 20.2nd suction catheter 18 is arranged in higher than the upper surface 41c of adapter trolley 3
Shangdi, position be arranged in main frame 20.3rd suction catheter 19 is arranged in drawing-off portion 7 and spinning portion 9
Rear be arranged in main frame 20.Therefore, in this embodiment, operator can butt joint chassis
The back side 41b of 3 carries out operation.
1st suction catheter the 17, the 2nd suction catheter the 18 and the 3rd suction catheter 19 is consecutively provided in spinning frame
In each main frame 20 of 1.Connected by connecting tube 17c on 1st suction catheter 17 and have secondary suction catheter
17b.It is arranged on each main frame 20 to the blocking of secondary suction catheter 17b two ends.Connecting tube 17c is by the 1st
Suction catheter 17 connects with secondary suction catheter 17b.Secondary suction catheter 17b is arranged on the 2nd suction catheter 18 times
On side, the position higher than the upper surface 41c of adapter trolley 3.Secondary suction catheter 17b is by often specifying number
Spinning unit 2 and arrange, every that is each unit framework of 8 spinning units 2 in this embodiment
6 split and arrange.The two ends of secondary suction catheter 17b are blocked.The each unit framework of connecting tube 17c 6
It is provided with such as 1.On the position that the lower surface of secondary suction catheter 17b is corresponding with spinning unit 2
It is provided with shutter 95.The traveling opening and closing accordingly of shutter 95 and adapter trolley 3.Thus, give
The adapter trolley 3 stopping at spinning unit 2 provides attraction air stream.
The cross section of the 1st suction catheter the 17 and the 2nd suction catheter 18 is circular.1st suction catheter 17 and the 2nd
Suction catheter 18 is fixed in main frame 20, but is not directly connected with main frame 20.Therefore, the 1st inhales
Skirt the 17 and the 2nd suction catheter 18 does not has the function of the structure member as main frame 20.3rd attracts
Pipe 19 has the special-shaped pentagonal section of the shape at the turning cutting away square-section.3rd suction catheter
19 are connected to main frame 20, have the function of structure member as main frame 20.Therefore,
3 suction catheters 19 are additionally operable to improve the intensity of main frame 20.
The spinning frame 1 of this structure, in the case of the maintenance operation carrying out adapter trolley 3, makes
Adapter trolley 3 stops at the position of the peristome 20b towards main frame 20 of hithermost unit framework 6
Put.In this state, adapter trolley 3 can intactly be taken out through peristome 20b.
Now, owing to adapter trolley 3 can be taken out from the reverse side of main frame 20, spin thus without obstruction
The spinning action of yarn unit 2.Therefore, if the taking-up end of job of adapter trolley 3, even if in dimension
Repair in maintenance operation and also be able to proceed spinning action.
When the maintenance operation carrying out spinning unit 2, operator climbs up pedal 22.Work as operator
When climbing up pedal 22, it is possible to the tiptoe of shoes is configured in tiptoe resettlement section 23.Owing to tiptoe is received
Appearance portion 23 is positioned at the lower section of package mounting portion 21, and therefore operator can be positioned as close to spinning list
Unit 2.Therefore, it is possible to improve the working performance of operator.And, bar-like member 16 is single towards spinning
Unit 2 pro configures along the 1st direction.Therefore, operator can be by hand steered on bar-like member 16
Or health is rested on and carries out on bar-like member 16 maintaining operation.Thereby, it is possible to carry further
The working performance of high operator.
In above-mentioned embodiment, the secondary suction being arranged in each unit framework 6 by connecting tube 17c
Skirt 17b is connected to along the 1st suction catheter 17 of the whole length formation of spinning frame 1.Inhale the 1st
Skirt 17 and secondary suction catheter 17b configuration are in the short transverse of spinning unit 2 than adapter trolley 3
On position that lower surface 41d is low and the position higher than upper surface 41c.It addition, in the following description
The structure different from above-mentioned embodiment is only described.
As it is shown in figure 5, the lower surface 141d in the chassis portion 141 of variation center tap chassis 103 is not with
The plane having step is constituted.1st suction catheter 117 is arranged in lower than the lower surface 141d in chassis portion 141
Position be specially and take turns on the low position of 41e than travelling.Lower surface 141d in chassis portion 141
On be provided with attraction air supply pipe 147.1st suction catheter 117 is the tubulose of such as square-section.The
1 suction catheter 117 is different from above-mentioned embodiment, provides attraction air stream directly to adapter trolley 103.
On the position that the upper surface of the 1st suction catheter 117 is corresponding with spinning unit 2, it is provided with opening and closing
Device 195.The traveling opening and closing accordingly of shutter 195 and adapter trolley 103.Thus, air is attracted
Stream is directly supplied to stop at the adapter trolley 103 of spinning unit 2 from the 1st suction catheter 117.As a result,
The yarn bits produced when adapter trolley 103 has carried out sub operation is directly attracted by the 1st suction catheter 117 with
Conveyance.Even if in such a configuration, being arranged in than adapter trolley 103 due to the 1st suction catheter 117
Position low for lower surface 141d on, therefore, it is possible to as much as possible shorten spinning frame 1 entirety depth side
To length.
Above-mentioned embodiment can show as described below.
Spinning frame 1 as spinning machinery possesses multiple spinning unit 2, adapter trolley the 3 and the 1st attraction
Pipe 17.Multiple spinning units 2 arrange along the 1st direction, generate spinning 10 from fibre bundle 8.Joint platform
Car 3 can carry out sub operation along the 1st direction running to spinning unit 2.1st suction catheter 17
It is in the short transverse of spinning unit 2 than adapter trolley 3 along the 1st direction configuration at least partially
In position that upper surface 41c is high and the position lower than lower surface 41d at least on some.1st inhales
Skirt 17 attracts and transports the yarn bits that adapter trolley 3 has carried out producing during sub operation.At this spinning frame
In 1, at least some of of the 1st suction catheter 17 (or 117) is spinning unit along the 1st direction configuration
Position higher than the upper surface 41c (or 141c) of adapter trolley 3 in the short transverse of 2 and compare lower surface
In the position that 41d (or 141d) is low at least on some.Thus, the 1st suction catheter 17 (or 117)
It is not arranged in the space of back side 41b (or 141d) side of adapter trolley 3.As a result, it is possible to the greatest extent
Shorten the length of the depth direction of spinning frame 1 possibly.
Spinning frame 1 also has multiple secondary suction catheter 17b and multiple connecting tube 17c.Secondary suction catheter 17b
Arrange along the 1st direction by the spinning unit 2 of specified quantity every in multiple spinning units 2, and phase
For adapter trolley 3 be arranged on on the position of the 1st suction catheter 17 opposite side.Multiple connecting tubes 17c
Connect the 1st suction catheter 17 and multiple secondary suction catheter 17b respectively.Adapter trolley 3 has carried out sub operation
Time the yarn bits that produce be transported to the 1st suction catheter 17 by secondary suction catheter 17b and connecting tube 17c.By
This, the 1st suction catheter 17 be arranged in the position higher than the upper surface 41c of adapter trolley 3 (or than under
The position that surface 41d is low) on, secondary suction catheter 17b is arranged in the lower surface 41d than adapter trolley 3
On low position (or position higher than upper surface 41c).That is, the 1st suction catheter 17 and secondary attraction
Pipe 17b clips adapter trolley 3 and is arranged in mutual opposition side.As a result, it is possible to shorten thin as much as possible
The length of the depth direction of yarn machine 1, and spinning frame 1 can effectively attract and transport adapter trolley 3
Carry out the yarn bits of generation during sub operation.
1st suction catheter 117 is arranged in the lower section of the lower surface 41d of adapter trolley 103, attracts air
Stream is provided directly to adapter trolley 103 from the 1st suction catheter 117.Thus, the 1st suction catheter 117
Shorten with the distance of adapter trolley 3, decrease the pressure loss attracting air stream in spinning frame 1,
Spinning frame 1 can attract yarn to consider to be worth doing effectively.
Spinning frame 1 is also equipped with being arranged in ratio joint platform in the short transverse of spinning unit 2 along the 1st direction
The 2nd suction catheter 18 on the position high for upper surface 41c of car 3.2nd suction catheter 18 produces at yarn bits
Position near attract spinning 10 cut-out time produce yarn consider to be worth doing and transport.Thus, spinning frame 1 energy
Enough yarn bits attracting to produce during spinning 10 cut-out near the position that yarn bits produce.As a result, it is possible to the greatest extent may be used
Energy ground shortens the length of the depth direction of spinning frame 1.And, spinning frame 1 can effectively attract with
And the yarn bits produced during conveyance spinning 10 cut-out.
Spinning frame 1 is also equipped with in the short transverse of spinning unit 2 relative to adapter trolley 3 and the 1st
Suction catheter 17 opposite side, the 2nd suction catheter 18 configured along the 1st direction.2nd suction catheter 18 is inhaled
The yarn bits produced when drawing and transport spinning 10 cut-out.Thus, join at the 1st suction catheter 17 (or 117)
Putting in the case of the lower section of adapter trolley 3 (or 103), the 2nd suction catheter 18 is arranged in joint platform
The top of car 3 (or 103).The 1st suction catheter 17 (or 117) be arranged in adapter trolley 3 (or
103), in the case of top, the 2nd suction catheter is arranged in the lower section of adapter trolley 3 (or 103).Cause
This, though configuration the 2nd suction catheter 18, due to the 1st suction catheter 17 (or 117) and the 2nd suction catheter
18 clip adapter trolley 3 and configure up and down, therefore, it is possible to shorten entering of spinning frame 1 more as much as possible
Deep size.
Multiple spinning units 2 are respectively provided with drawing-off portion 7 and spinning portion 9.Drawing-off portion 7 drawn fiber bundle 8.
Spinning portion 9 turn air-flow gives the fibre bundle twisting of drafted portion 7 drawing-off, spins by so generating
Yarn 10.Drawing-off portion 7 and spinning portion 9 are arranged in the top of spinning unit 2.Spinning frame 1 also has edge
1st direction and be arranged in the 3rd suction catheter 19 on top of multiple spinning unit 2.3rd suction catheter
The 19 yarn bits attracting and transporting drawing-off portion 7 and spinning portion 9 generation.
Thereby, it is possible to the 3rd suction catheter 19 is arranged in drawing-off portion 7 and yarn bits that spinning portion 9 produces
Produce proximal site.Accordingly, it is capable to enough 3rd suction catheters 19 effectively attract and transport drawing-off portion 7 He
The yarn bits that spinning portion 9 produces.
Spinning frame 1 is also equipped with supporting spinning unit 2 and the unit framework 6 of adapter trolley 3 (or 103).
3rd suction catheter 19 doubles as the structure member of unit framework 6.Thus, even making the chi of depth direction
The compact unit framework 6 of very little mechanism also is able to the 3rd suction catheter 19 is also used as structure member.Therefore,
Even the spinning frame 1 of depth direction compact conformation also is able to maintain desired by unit framework 6
Intensity.
Spinning frame 1 also has the reinforcement as the strengthening part of reinforcement unit framework 6 in the vertical direction
Rib component 20d and beam 20e.Thus, even the spinning frame 1 of depth direction compact conformation, also
With reinforcement component 20d and beam 20e, unit framework 6 can be maintained desired intensity.
Spinning unit 2 also has the spinning 10 that generated by spinning portion 9 of winding and forms the volume of package 45
Around portion 13.Adapter trolley 3 (103) has towards the yarn road formed by spinning portion 9 and winder 13
The front 41a (or 141a) of LP and being arranged on and the back side of front 41a (or 141a) opposite side
41b (or 141b).Unit framework 6 have lead to adapter trolley 3 (or 103) back side 41b (or
Peristome 20b 141b).Thereby, it is possible to from peristome 20b butt joint chassis 3 (or 103)
Back side 41b (or 141b) maintains, or from peristome 20b take out adapter trolley 3 (or
103).Therefore, whole spinning frame 1 is made to stop in order to maintain adapter trolley 3 (or 103)
Time shortens, it is possible to increase the work efficiency of spinning frame 1.
Adapter trolley 3 (or 103) has suction pipe 44, suction nozzle 46 and piecing devices 43.Suction pipe 44
Attract when spinning 10 cut-out and guide the yarn end from the spun spinning in spinning portion 9 10.Suction nozzle 46 exists
Attract and guide the yarn end of spinning 10 of winder 13 side during spinning 10 cut-out.Piecing devices 43
2 the yarn end connectors of spinning 10 that will be guided by suction pipe 44 and suction nozzle 46.Thus, possessing utilization
Attraction air stream guides the adapter trolley 3 (or 103) of spinning 10, use piecing devices 43 joint
In spinning frame 1, owing to being configured with the 1st suction catheter 17 as described above, therefore, it is possible to contract as much as possible
The length of the depth direction of short spinning frame 1.
Although being explained above multiple embodiments of the present invention, but the invention is not limited in above-mentioned reality
Execute form, without departing from carrying out all changes in the range of invention objective.Especially in this specification
Multiple embodiments of narration and variation can combination in any as desired.
Although from the most square resultant yarn road of spinning frame 1 in above-mentioned embodiment and variation, but
The present invention can also be used in the spinning machinery in the most square resultant yarn road.
In above-mentioned embodiment and variation, the 2nd suction catheter 18 has been arranged in adapter trolley 3 (or 103)
Top, the 1st suction catheter 17 be arranged in the lower section of adapter trolley 3 (or 103).Can also take
And instead of, the 1st suction catheter 17 is configured to the top of adapter trolley 3 (or 103), inhales the 2nd
Skirt 18 is configured to the lower section of adapter trolley 3 (or 103).In this case, it is also possible to from the 2nd
Suction catheter 18 each configuration attraction pipeline to multiple spinning portions 9.
Although in above-mentioned embodiment and variation, the 3rd suction catheter 19 doubles as the structure of unit framework 6
Parts but it also may at least one in the 1st suction catheter the 17 and the 2nd suction catheter 18 doubles as structural portion
Part.In the case of unit framework 6 can maintain prescribed strength, it is also possible to the 1st suction catheter the 17, the 2nd
Suction catheter the 18 and the 3rd suction catheter 19 does not the most double as structure member.
Although in above-mentioned embodiment and variation with Yarn relaxation elimination portion 12 from spinning portion 9 pull-out spin
Yarn 10, but the invention is not limited in this.For example, it is also possible to use well-known being configured with to send
Roller and niproll, with 2 roller clamping spinning 10 rotated, from the structure of spinning portion 9 pull-out spinning 10
Replace Yarn relaxation elimination portion 12.In this case, for the spinning produced when eliminating coiling action
10 relax, it is also possible to configure Yarn relaxation elimination portion 12 in the downstream of outlet roller and niproll.
In above-mentioned embodiment and variation, the 1st suction catheter 17 (or 117) is arranged in joint
The lower section of chassis 3 (or 103).The invention is not limited in this, the 2nd suction catheter 18 is being configured
In the case of the lower section of adapter trolley 3, it is also possible to the 1st suction catheter 17 is configured to adapter trolley 3
The top of (or 103).
In above-mentioned embodiment and variation, whole 1st suction catheter 17 (or 117) is arranged in
The lower section of adapter trolley 3 (or 103).The invention is not limited in this, it is also possible to utilize and make the 1st to inhale
A part of confrontation unit framework 6 of skirt 17 loads and unloads the structure freely maybe can kept out of the way, and attracts the 1st
A part for pipe 17 is arranged in the 41b side, the back side of adapter trolley 3.Now, by from unit framework
Pull down a part for the 1st suction catheter 17 being arranged in 41b side, adapter trolley 3 back side on 6 or make it
Keep out of the way, it is possible to see the whole back side 41b of adapter trolley 3.Thereby, it is possible to dock from peristome 20b
The back side 41b of caster bed car 3 maintains, or takes out adapter trolley 3 from peristome 20b.
Industrial Availability
The present invention can be widely applied for the spinning machinery with suction catheter.
Claims (16)
1. a spinning machinery, possesses:
Multiple spinning units, along the 1st direction arrangement, generate spinning from fibre bundle;
Unit framework, above-mentioned multiple spinning units are arranged at this unit framework along above-mentioned 1st direction
On;
Adapter trolley, it is possible to along above-mentioned 1st direction running, is used for above-mentioned spinning unit is carried out joint
Operation;And
1st suction catheter, is configured at above-mentioned spinning unit along above-mentioned 1st direction at least partially
In position higher than the upper surface of above-mentioned adapter trolley in short transverse and the position lower than lower surface extremely
A few position, reclaims and transports the yarn bits that above-mentioned adapter trolley has carried out producing during sub operation.
2. spinning machinery as claimed in claim 1, is also equipped with: multiple secondary suction catheters, as above-mentioned many
In individual spinning unit, the spinning unit of every specified quantity is positioned along above-mentioned 1st direction and relatively
On the above-mentioned adapter trolley position with above-mentioned 1st suction catheter opposite side;And
Multiple connecting tubes, connect above-mentioned 1st suction catheter and above-mentioned multiple secondary suction catheter the most respectively;
The yarn bits produced when above-mentioned adapter trolley has carried out sub operation are by above-mentioned secondary suction catheter and above-mentioned
Connecting tube is transported in above-mentioned 1st suction catheter.
3. spinning machinery as claimed in claim 1, above-mentioned 1st suction catheter is configured in above-mentioned joint
Under the lower surface of chassis;Air stream is attracted to be supplied directly to above-mentioned joint from above-mentioned 1st suction catheter
Chassis.
4. the spinning machinery as described in any one in claims 1 to 3, is also equipped with the 2nd suction catheter,
2nd suction catheter is configured in the short transverse of above-mentioned spinning unit on ratio along above-mentioned 1st direction
State the position that the upper surface of adapter trolley is high, on above-mentioned yarn is considered to be worth doing and reclaimed and transport near the position produced
State the yarn bits produced when spinning is cut off.
5. the spinning machinery as described in any one in claims 1 to 3, is also equipped with the 2nd suction catheter,
2nd suction catheter is configured in the short transverse of above-mentioned spinning unit along above-mentioned 1st direction relatively
In the side that above-mentioned adapter trolley is contrary with above-mentioned 1st suction catheter, reclaim and transport above-mentioned spinning and cut off
Time produce yarn bits.
6. the spinning machinery as described in any one in claims 1 to 3, above-mentioned multiple spinning units
Each it is respectively provided with: drawing-off portion, the above-mentioned fibre bundle of drawing-off;And
Open-end spinning portion, utilizes turn air-flow to twist to the above-mentioned fibre bundle by above-mentioned drawing-off portion drawing-off,
Thus generate above-mentioned spinning;
Above-mentioned drawing-off portion and said flow spinning portion are configured in the top of above-mentioned spinning unit;
Also having the 3rd suction catheter, the 3rd suction catheter is along above-mentioned 1st direction and is configured in above-mentioned many
The top of individual spinning unit, reclaims and transports the yarn produced by above-mentioned drawing-off portion and said flow spinning portion
Bits.
7. spinning machinery as claimed in claim 4, above-mentioned multiple spinning units are each respectively provided with:
Drawing-off portion, the above-mentioned fibre bundle of drawing-off;And
Open-end spinning portion, utilizes turn air-flow to twist to the above-mentioned fibre bundle by above-mentioned drawing-off portion drawing-off,
Thus generate above-mentioned spinning;
Above-mentioned drawing-off portion and said flow spinning portion are configured in the top of above-mentioned spinning unit;
Also having the 3rd suction catheter, the 3rd suction catheter is along above-mentioned 1st direction and is configured in above-mentioned many
The top of individual spinning unit, reclaims and transports the yarn produced by above-mentioned drawing-off portion and said flow spinning portion
Bits.
8. spinning machinery as claimed in claim 5, above-mentioned multiple spinning units are each respectively provided with:
Drawing-off portion, the above-mentioned fibre bundle of drawing-off;And
Open-end spinning portion, utilizes turn air-flow to twist to the above-mentioned fibre bundle by above-mentioned drawing-off portion drawing-off,
Thus generate above-mentioned spinning;
Above-mentioned drawing-off portion and said flow spinning portion are configured in the top of above-mentioned spinning unit;
Also having the 3rd suction catheter, the 3rd suction catheter is along above-mentioned 1st direction and is configured in above-mentioned many
The top of individual spinning unit, reclaims and transports the yarn produced by above-mentioned drawing-off portion and said flow spinning portion
Bits.
9. spinning machinery as claimed in claim 6, is also equipped with supporting above-mentioned spinning unit and above-mentioned connects
The unit framework of caster bed car;Above-mentioned 3rd suction catheter doubles as the structure member of said units framework.
10. spinning machinery as claimed in claim 9, is also equipped with strengthening said units at above-below direction
The strengthening part of framework.
11. spinning machineries as claimed in claim 9, above-mentioned spinning unit also has winding by above-mentioned
The above-mentioned spinning of open-end spinning portion generation, the winder of formation package;
Above-mentioned adapter trolley has towards the yarn road formed by said flow spinning portion and above-mentioned winder
1st, and be arranged on and the 2nd of above-mentioned 1st opposite side;
Said units framework has the peristome of above-mentioned 2nd that leads to above-mentioned adapter trolley.
12. spinning machineries as claimed in claim 10, above-mentioned spinning unit also has winding by above-mentioned
The above-mentioned spinning of open-end spinning portion generation, the winder of formation package;
Above-mentioned adapter trolley has towards the yarn road formed by said flow spinning portion and above-mentioned winder
1st, and be arranged on and the 2nd of above-mentioned 1st opposite side;
Said units framework has the peristome of above-mentioned 2nd that leads to above-mentioned adapter trolley.
13. spinning machineries as claimed in claim 9, above-mentioned spinning unit also has winding by above-mentioned
The above-mentioned spinning of open-end spinning portion generation, the winder of formation package;
Above-mentioned adapter trolley has:
1st guide portion, attracts when above-mentioned spinning is cut off and guides from said flow spinning portion spun
The yarn end of above-mentioned spinning;
2nd guide portion, attracts when above-mentioned spinning is cut off and guides above-mentioned the above-mentioned of winder side to spin
The yarn end of yarn;And
Connector portions, by by above-mentioned 1st guide portion and the 2 of the above-mentioned spinning of above-mentioned 2nd guide portion guiding
Individual yarn end connector.
14. spinning machineries as claimed in claim 10, above-mentioned spinning unit also has winding by above-mentioned
The above-mentioned spinning of open-end spinning portion generation, the winder of formation package;
Above-mentioned adapter trolley has:
1st guide portion, attracts when above-mentioned spinning is cut off and guides from said flow spinning portion spun
The yarn end of above-mentioned spinning;
2nd guide portion, attracts when above-mentioned spinning is cut off and guides above-mentioned the above-mentioned of winder side to spin
The yarn end of yarn;And
Connector portions, by by above-mentioned 1st guide portion and the 2 of the above-mentioned spinning of above-mentioned 2nd guide portion guiding
Individual yarn end connector.
15. spinning machineries as claimed in claim 11, above-mentioned adapter trolley has:
1st guide portion, attracts when above-mentioned spinning is cut off and guides from said flow spinning portion spun
The yarn end of above-mentioned spinning;
2nd guide portion, attracts when above-mentioned spinning is cut off and guides above-mentioned the above-mentioned of winder side to spin
The yarn end of yarn;And
Connector portions, by by above-mentioned 1st guide portion and the 2 of the above-mentioned spinning of above-mentioned 2nd guide portion guiding
Individual yarn end connector.
16. spinning machineries as claimed in claim 12, above-mentioned adapter trolley has:
1st guide portion, attracts when above-mentioned spinning is cut off and guides from said flow spinning portion spun
The yarn end of above-mentioned spinning;
2nd guide portion, attracts when above-mentioned spinning is cut off and guides above-mentioned the above-mentioned of winder side to spin
The yarn end of yarn;And
Connector portions, by by above-mentioned 1st guide portion and the 2 of the above-mentioned spinning of above-mentioned 2nd guide portion guiding
Individual yarn end connector.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2010202658A JP2012057274A (en) | 2010-09-10 | 2010-09-10 | Spinning machine |
JP202658/2010 | 2010-09-10 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102418173A CN102418173A (en) | 2012-04-18 |
CN102418173B true CN102418173B (en) | 2016-12-14 |
Family
ID=
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2520383B2 (en) * | 1988-09-07 | 1996-07-31 | 豊和工業株式会社 | How to hang a full bobbin |
CN1165879A (en) * | 1996-05-16 | 1997-11-26 | 村田机械株式会社 | Connecting method and device of spinning machinery |
CN1651622A (en) * | 2004-02-06 | 2005-08-10 | 村田机械株式会社 | Textile machinery |
CN101403150A (en) * | 2007-10-04 | 2009-04-08 | 村田机械株式会社 | Dust collecting and processing system in textile machine |
CN101429690A (en) * | 2007-11-09 | 2009-05-13 | 欧瑞康纺织有限及两合公司 | Method and device for operating spinning machine with free end rotor |
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2520383B2 (en) * | 1988-09-07 | 1996-07-31 | 豊和工業株式会社 | How to hang a full bobbin |
CN1165879A (en) * | 1996-05-16 | 1997-11-26 | 村田机械株式会社 | Connecting method and device of spinning machinery |
CN1651622A (en) * | 2004-02-06 | 2005-08-10 | 村田机械株式会社 | Textile machinery |
CN101403150A (en) * | 2007-10-04 | 2009-04-08 | 村田机械株式会社 | Dust collecting and processing system in textile machine |
CN101429690A (en) * | 2007-11-09 | 2009-05-13 | 欧瑞康纺织有限及两合公司 | Method and device for operating spinning machine with free end rotor |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102534878B (en) | Heart yearn feedway and possess the spinning machinery of heart yearn feedway | |
CN102995175B (en) | Yarn winding unit, Yarn winding apparatus and cradle apparatus | |
CN101994176A (en) | Spinning machine | |
CN1530478A (en) | Spinning machines | |
CN103014956B (en) | Yarn processing device, spinning unit and spinning machine | |
CN103014962B (en) | Spinning machine | |
CN202401190U (en) | Spinning machine | |
CN202401191U (en) | Spinning machine | |
JP2010236102A (en) | Fiber machine and removable material-sucking and separating device for fiber machine | |
CN104828649A (en) | Yarn catching device and yarn winding machine | |
CN102418173B (en) | Spinning machinery | |
CN102400251B (en) | Spinning machinery | |
JP2014009052A (en) | Textile machine | |
JP2013067896A (en) | Draft device and spinning machine | |
CN202245548U (en) | Spinning machinery | |
CN105568453B (en) | Yarn guide, heart yarn feedway and spinning machinery | |
CN103849959B (en) | Cleaning device, drafting system and the spinning machinery of drafting system | |
EP3153613A1 (en) | Drafting device, spinning machine, and method of spinning technical field | |
CN209098881U (en) | Spinning machine | |
CN105274664B (en) | Heart yarn feed unit, heart yarn feedway, spinning machine and heart yarn supply method | |
CN1205102C (en) | Texturing machine for texturing and taking up thread | |
JP2013253360A (en) | Spinning machine | |
CN105734741A (en) | Textile machine | |
CN206256228U (en) | A kind of spinning frame | |
CN103484989B (en) | Spinning machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant |