CN102413079A - Initial fraction frequency offset estimation method used in downlink of 3<rd> generation partnership project long term evolution (3GPP-LTE) system - Google Patents
Initial fraction frequency offset estimation method used in downlink of 3<rd> generation partnership project long term evolution (3GPP-LTE) system Download PDFInfo
- Publication number
- CN102413079A CN102413079A CN201110354857XA CN201110354857A CN102413079A CN 102413079 A CN102413079 A CN 102413079A CN 201110354857X A CN201110354857X A CN 201110354857XA CN 201110354857 A CN201110354857 A CN 201110354857A CN 102413079 A CN102413079 A CN 102413079A
- Authority
- CN
- China
- Prior art keywords
- pss
- sequence
- frequency offset
- frequency deviation
- 3gpp
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Abstract
The invention belongs to the broadband wireless mobile communication technology field and discloses an initial fraction frequency offset estimation method used in downlink of a 3<rd> generation partnership project long term evolution (3GPP-LTE) system. The method comprises the following steps: acquiring a primary synchronization channel (SCH) signal (PSS) timing position of a reception baseband digit signal sequence and a cell identification group number; using two methods to carry out frequency offset estimation so as to acquire a candidate set of an initial fraction frequency offset value, wherein one method is to carry out a maximum likelihood (ML) algorithm based on a regular cycle prefix (CP) and the other method is to use the received PSS sequence and a local detected PSS sequence to perform correlation accumulation; in different SNR areas of the reception signal, through setting a frequency offset threshold, determining the final initial fraction frequency offset estimation value from the candidate set. In the invention, operation is simple. Compared to individually using PSS cross correlation and the ML algorithm based on the CP, using the method of the invention, mean square error performance is good.
Description
Technical field
The invention belongs to the wideband wireless mobile communication technical field, be specifically related to third generation partner program Long Term Evolution (3
RdGeneration Partnership Project Long Term Evolution, 3GPP-LTE) the initial score frequency deviation estimating method in the downlink synchronization process.
Background technology
Simultaneous techniques is a very important wireless mobile telecommunication technology, and synchronizing process mainly comprises time timing and Frequency Synchronization, is that any communication system all needs the primary process of accomplishing synchronously.In the 3G epoch of wireless mobile communications, there is very high requirement in system to synchronizing process, and the net synchronization capability direct relation quality and the two-forty of voice in the radio communication, data service, the digital multimedia application service of low delay.Yet, in the wireless environment of reality, stop, factor such as shade, multipath fading that signal has been caused very big interference, and this has also proposed stern challenge to simultaneous techniques.
Third generation partner program (3
RdGeneration partnership project 3GPP) will have begun Long Term Evolution (long term evolution, LTE) project in the end of the year 2004.The first step of the synchronizing process of 3GPP-LTE is to carry out downlink synchronization; It is Cell searching; As user (user equipment; UE) switch or need carry out Cell searching when initially inserting; UE need carry out synchronizing channel (synchronization channel; SCH) input, (primary SCH signal is PSS) with auxiliary synchronization channel signal (secondary SCH to be specially the primary synchronization channel signal; SSS) detect; To obtain numbering
in cell ID group number
and the cell ID group, read the broadcast channel information of this sub-district, in this process; UE need estimate separately timing error and original carrier frequency deviation (carrier frequent offset, CFO).The air interface of 3GPP-LTE system adopts the OFDM access at down link, and (this technology is with OFDM (orthogonal frequency division multiplexing for orthogonal frequency division multiple access, OFDMA) technology; OFDM) be the basis; Through whole channel being divided into a plurality of mutually orthogonal subchannels, the influence that can resist frequency-selective channel well can obtain the very high availability of frequency spectrum; But; OFDM is very high to synchronous requirement, and especially (carrier frequent offset CFO) compares sensitivity to carrier wave frequency deviation.Therefore in the PSS testing process, initial CFO estimates just to become the key factor that influences the LTE net synchronization capability.
The existing CFO algorithm for estimating that is used for ofdm system mainly is divided into pilot tone auxiliary (pilot aided, algorithm for estimating PA) and blind estimation (blind estimation, BE) algorithm.Specifically in the LTE system; A kind of algorithm that is based on pilot tone mainly is to utilize the cross-correlation that receives PSS time domain sequences and local PSS sequence, obtains a cross-correlation sequence, and the cross-correlation sequence is divided into two sections; Summation adds up respectively; Utilize the phase difference of two accumulated values to carry out the CFO estimation, the method for PSS cross-correlation has made full use of the good correlation properties of PSS sequence, and estimated performance is better; Another kind is an architectural feature of utilizing the OFDM symbol, and promptly (cyclic prefix CP) is the copy of OFDM tail data to Cyclic Prefix; Based on maximum likelihood (maximum likelihood; ML) criterion is utilized its autocorrelative phase place to carry out CFO and is estimated, can only estimate the frequency deviation of a number of sub-carrier at interval based on the ML method of CP; Estimated performance is subject to the influence of multipath channel in addition, but the ML method that is based on CP can realize in a plurality of OFDM symbol times.When carrying out the mark frequency offset estimating; In general, the frequency offset estimation accuracy of the method for PSS cross-correlation is superior to based on the estimation of the ML method of CP well, still; Under less frequency deviation region and high state of signal-to-noise, can be superior to the method for PSS cross-correlation based on the precision of the ML method of CP.S-SCH detection method with low complex degree.But prior LTE system initial score frequency deviation estimating method focuses mostly in independent employing PA algorithm or BE algorithm, lacks the initial score frequency deviation estimating method that can effectively unite PA algorithm and BE algorithm.
Summary of the invention
The objective of the invention is to propose the initial score frequency deviation estimating method in the downlink synchronization of a kind of 3GPP-LTE of being applicable to system, can effectively unite the PSS cross-correlation method and based on the ML method of CP.
The present invention proposes to be applicable to the initial score frequency deviation estimating method in the downlink synchronization of 3GPP-LTE system, and the baseband digital signal time domain sequences to receiving the steps include:
Step 1:Obtain the master sync signal PSS timing position and the interior numbering of cell ID group of receiving sequence
Step 2:To the PSS time domain sequences that obtains receiving through narrow band filter, according to what detect
Produce local PSS time-domain signal; The first half and the local PSS sequence first half conjugate multiplication of the PSS sequence that receives are added up; The latter half of the PSS sequence that receives and the latter half conjugate multiplication of local PSS sequence add up; Calculate the phase difference of two conjugate multiplication accumulated values, obtain the initial score frequency deviation
Step 3:To without the receiving sequence of crossing narrow band filter, adopt ML method to obtain the initial score frequency offset estimating based on CP
Step 4:Carry out the initial score frequency offset estimating, by above-mentioned steps, system has obtained Candidate Set
, note reception signal
SNRFor
, set one
SNRThreshold value
, under the low signal-to-noise ratio situation, when the normalization frequency deviation region is [0.5.0.5], be lower than the frequency offset estimating performance of the cross-correlation method of utilizing the PSS sampled signal based on the frequency offset estimating performance of the ML algorithm of CP, so low
SNRThe frequency offset estimating based on PSS is selected in the zone
, through emulation platform test, appropriate threshold
Scope is 0 ~ 5 dB, that is, when
The time, the initial frequency deviation value
, when
The time, through setting the frequency deviation threshold value
, wherein
,
The zone when less frequency deviation exists, is superior to utilizing the estimated performance of PSS cross-correlation method, threshold value based on the estimated performance of the ML method of CP
Concrete value count with CP and PSS signals sampling and to transmit radio channel state relevant, in practical implementation, threshold value
With
Setting, be based on employing
Step 2With
Step 3The comparison of the frequency offset estimating performance of two kinds of methods, when
The time, the initial frequency deviation value
, when
The time, if
The time,
, otherwise,
Thereby, obtain final initial score frequency offset estimating
Concrete testing process is as shown in Figure 4.Do further to introduce in the face of the concrete calculating of each step down:
Step 1:Obtain the master sync signal PSS timing position and the interior numbering of cell ID group that receive the baseband digital signal sequence
, it is following step by step:
Step by step 1.1: to received signal carry out time-domain sampling, obtain receiving sequence through narrowband low-pass filter, according to the time synchronization information that the time synchronized module is confirmed, obtain the thick regularly synchronized result of PSS, note receiving terminal PSS time-domain sampling sequence does
:
Wherein,
Represent normalized carrier wave frequency deviation (carrier frequency offset, CFO),
The time domain form of the main synchronous PSS sequence of expression,
Expression FFT FFT counts, when the LTE bandwidth is set to 20MHz,
,
(
) the expression channel impulse response, in LTE channel simulator model,
L=8,
The multiple Gaussian noise of expression additivity, its power spectral density does
Step by step 1.2: local PSS frequency domain sequence transforms to the PSS sequence of time domain through invert fast fourier transformation IFFT
,
,
, with receiving sequence
With local PSS sequence
, obtain three relevant episode, get the corresponding PSS of maximum related value, promptly
Wherein, * represent conjugate operation therefore, confirm numbering
in the cell ID group according to detected value
.
Step 2:The PSS sampled signal that arrives to local reception
With detect
It is relevant that pairing local PSS time domain sequences is carried out pointwise, obtains a correlated series, and then the correlated series that obtains being divided equally is two sections, obtains frequency deviation according to this phase difference of two sections
Step by step 2.1: according to the 3GPP-LTE agreement, the frequency domain sequence of master sync signal PSS is to adopt the Zadoff-Chu sequence, and numbering in the cell set
One by one corresponding to the radical exponent of Zadoff-Chu sequence
, through
Point IFFT, conversion obtains the PSS time domain sequences.
According to 3GPP TS 36.211 V8.5.0 agreements, 3GPP LTE adopts be 62 long Zadoff-Chu sequences as the primary synchronization channel signal, sequence signature is:
Wherein
is called the radical exponent of Zadoff-Chu sequence; Value is { 25; 29; 34}; Correspond respectively to sub-district in the LTE system represent to organize the value of interior numbering
0,1,2}.
Note exists
Step 1Obtain
Corresponding Zadoff-Chu sequence radical exponent very
, obtain local PSS frequency domain sequence
,
, according to the mapping relations of PSS sequence and subcarrier, through
NPoint IFFT conversion obtains local PSS time domain sequences
,
Step by step 2.2: will receive
With
Step by step 2.1Obtain
It is relevant to carry out pointwise, obtains a correlated series
,
, that is:
Step by step 2.3: with above-mentioned correlated series
Be divided into two sections, utilize the phase difference between two sections, estimate corresponding frequency deviation value.
Influence for further level and smooth distracter and noise item; Simultaneously in order to utilize the good autocorrelation performance of PSS sequence;
is divided into isometric two sections with correlated series; Each segment data is taked the method that adds up, obtains
and
:
If do not consider distracter and noise item, then
Observe following formula; Can see;
and
exists phase difference; Therefore; Relevant through
carried out conjugation with
; Can obtain the frequency offset estimating value; Be designated as
, that is:
,
Wherein,
AngleThe phase angle computing is asked in (.) expression.
Step 3: (cyclic prefix, method CP) is estimated the initial score frequency deviation value according to Cyclic Prefix.After preliminary timing through synchronizing signal PSS; Note
is without the receiving sequence of crossing narrow-band filtering, order:
Wherein
GThe length of expression CP adopts the maximum likelihood algorithm based on CP, can get the frequency offset estimating value, and note is done
, promptly
Through
Step 2With
Step 3The frequency offset estimating value that obtains is formed Candidate Set
, note reception signal
SNRFor
, relatively
Step 2With
Step 3The frequency offset estimating MSE performance of corresponding two kinds of methods is set one
SNRThreshold value
, when
The time, the initial frequency deviation value
, when
The time, through setting the frequency deviation threshold value
, wherein
, if
The time,
, otherwise,
Thereby, obtain final initial score frequency offset estimating
So far, initial score frequency deviation estimating method of the present invention is accomplished.
The characteristics of the inventive method:
(1) the present invention has united based on the PSS cross-correlation method of estimation of pilot tone with based on the ML maximum Likelihood of CP, has obtained frequency offset estimating least mean-square error (MSE) performance preferably.
(2) the present invention is provided with frequency offset estimating value threshold value through the SNR zone that receives signal at some, and existing popular this frequency deviation estimating method is joined together, and therefore, the selection of threshold value will be a key factor.
(3) the present invention is applicable to FDD and tdd frame structure, than under the condition of severe, still can keep satisfied MSE performance in noise and channel ratio.
Description of drawings
Fig. 1 is a FDD wireless frame structure sketch map in the 3GPP LTE system.
Fig. 2 is a TDD wireless frame structure sketch map in the 3GPP LTE system.
Fig. 3 is the mapping graph between synchronous channel SCH and the subcarrier in the 3GPP LTE system.
Fig. 4 is a detection method schematic flow sheet of the present invention.
Fig. 5 is applied to the MSE performance simulation result of experimental example 1 among the embodiment for the present invention.
Embodiment
Below will a kind of 3GPP of being used for LTE system down link initial score frequency deviation estimating method proposed by the invention be set forth in detail with reference to accompanying drawing and specific embodiment.
The invention provides the method for the down link initial score frequency offset estimating of a kind of 3GPP of being used for LTE system, basic principle is to utilize the ML principle earlier, and it is relevant to adopt the CP and the repeatability of initial data to carry out, and estimates frequency shift (FS)
, utilize reception signal and local PSS time domain sequences to carry out cross-correlation again, estimate frequency deviation
, obtain Candidate Set this moment
, and then divide the reception signal
SNRThe zone is through being provided with the frequency deviation threshold value
, selective system frequency offset estimating value from Candidate Set.
Consider that is realized a third generation partner program Long Term Evolution (3
RdGeneration Partnership Project Long Term Evolution, 3GPP LTE) downlink system, 3GPP has defined the frame structure of FDD and TDD in the current LTE standard; FDD is different duplex modes with TDD, but a lot of similarities are arranged on frame structure, and a radio frames time cycle is 10 ms; The time slot that comprises 20 0.5 ms, when using conventional CP, each time slot comprises 7 OFDM symbols; When using expansion CP, comprise 6 OFDM symbols, when concrete the realization; CP is the copy of initial data afterbody part data, can avoid the phase mutual interference between useful data, can resist the influence of multipath effectively.
Fig. 1 and Fig. 2 have provided the sketch map of FDD and tdd frame structure.In FDD frame structure shown in Figure 1, PSS is positioned at time slot # 0 and time slot # 10, and is arranged on last 1 OFDM symbol of these time slots, and SSS is positioned on the second-to-last OFDM symbol of PSS place time slot.Tdd frame structure shown in Figure 2, PSS is positioned at time slot # 2 and #12, and to be arranged in these time slot sequence numbers be that SSS is positioned at time slot # 1 and time slot # 11, and is arranged in last OFDM symbol of these time slots on 2 the OFDM symbol.Fig. 3 has shown in FDD frame and the tdd frame structure that PSS and SSS are positioned near 72 number of sub-carrier the DC component.
Fig. 4 has provided the method for estimation that is used for 3GPP LTE system down link initial score frequency deviation, with reference to accompanying drawing, below with the operating process of process in detail.
Based on the ML algorithm of CP, carry out auto-correlation to the baseband digital signal that the receives OFDM symbol of delaying time, in one embodiment, note
, wherein
nExpression time domain sequence number,
Be the time domain data of baseband digital signal,
GThe length of expression accumulator,
NThe sampling of an OFDM of expression is counted, and in the LTE of 20MHz system, can be set to conventional CP length 144 or littler numerical value,
N=2048, based on correlation
PPhase place, carry out fractional frequency and estimate, in an embodiment, adopt formula
Estimate the frequency shift (FS) of each sampled point, can average, be used to significantly improve through a plurality of OFDM symbols
Estimated accuracy.
The baseband digital signal that receives is carried out narrow-band low pass filtering.The PSS signal is positioned near 72 number of sub-carrier the DC component, carries out LPF and can not exert an influence to PSS, and in one embodiment, narrowband low-pass filter can keep near 62 number of sub-carrier data the DC component, i.e. PSS sequence.To carry out cross-correlation through the baseband digital signal of over-sampling and local candidate's PSS signal.Baseband signal after the note sampling does
, local candidate's PSS time domain sequences
, wherein
Interior numbering is represented to organize in the expression sub-district,
,
nExpression time domain sequences sequence number,
,
NThe sampling number of expression OFDM symbol.With time domain sequences
and local PSS sequence
; Obtain three relevant episode; Get the corresponding PSS of maximum related value, promptly
Wherein, * representes conjugate operation.Therefore, confirm numbering
in the cell ID group according to detected value
.
To local reception to PSS time domain sequences
and the pairing local PSS time domain sequences of detected value
to carry out pointwise relevant; Obtain a correlated series, wherein
correspondence and
that detect.In specific embodiment; Note correlated series
;
Where
and
denote the interference term and noise term.
is divided into two sections with above-mentioned correlated series; Obtain
and
, promptly
,
If do not consider distracter and noise item, then
So far, the LTE system has obtained the frequency deviation Candidate Set
, the note receiving baseband signal
SNRFor
, set one
SNRThreshold value
, when
The time, the initial frequency deviation value
, when
The time, through setting the frequency deviation threshold value
, wherein
, if
The time,
, otherwise,
, in simulation example, get
DB,
Thereby, obtain system's initial score frequency offset estimating
In order to verify the validity of this patent detection method, Computer Simulation has been carried out in following experiment.
Experimental example 1:Under multipath channel, initial score frequency offset estimating MSE performance of the present invention.
Consider one 8 footpath rayleigh fading channel model, wherein multipath channel is defined as the frequency selective fading of exponential power delay profile, and time-delay equals the sampling period between every footpath, and the average power in each footpath does
Fig. 5 has shown under the 8 footpath channels; In 3000 times the circulation emulation; The performance curve that the normalization MSE of frequency offset estimating algorithm changes with average received signal to noise ratio
, normalization MSE is defined as:
Wherein,
expression Monte Carlo simulation times; During the inferior emulation of
expression
; System's normalization mark frequency deviation value, frequency deviation estimated value during the inferior emulation of
expression
.On simulation parameter is provided with,
Obey evenly distribution, receiving baseband signal in interval [0.5,0.5]
SNRThreshold value is set to
0 dB, the frequency offset estimating threshold value is set to
0.3 the sampling number of an OFDM symbol does
N=2048, the sampling number of CP does
G=144.In Fig. 5; The frequency deviation estimating method of PSS cross-correlation is taked in " PSS corr. " expression; " CP based " expression is based on the ML method of CP; The method of estimation of " Proposed " expression this patent, can obtain: compare based on the ML algorithm of CP and the method for PSS cross-correlation, this method has MSE performance preferably.
Claims (4)
1. one kind is applicable to 3GPP-LTE system down link initial score frequency deviation estimating method, it is characterized in that concrete steps are following: to the baseband digital signal time domain sequences that receives,
Step 1:Obtain the master sync signal PSS timing position and the interior numbering of cell ID group of receiving sequence
Step 2:To the PSS time domain sequences that obtains receiving through narrow band filter, according to what detect
Produce local PSS time-domain signal; The first half and the local PSS sequence first half conjugate multiplication of the PSS sequence that receives are added up; The latter half of the PSS sequence that receives and the latter half conjugate multiplication of local PSS sequence add up; Calculate the phase difference of two conjugate multiplication accumulated values, obtain the initial score frequency deviation
Step 3:To without the receiving sequence of crossing narrow band filter, adopt ML method to obtain the initial score frequency offset estimating based on CP
Step 4:Carry out the initial score frequency offset estimating,, obtain Candidate Set by above-mentioned steps
, note reception signal
SNRFor
, set one
SNRThreshold value
, when
The time, the initial frequency deviation value
, when
The time, through setting the frequency deviation threshold value
, wherein
, if
The time,
, otherwise,
Thereby, obtain final initial score frequency offset estimating
2. the 3GPP-LTE system down link initial score frequency deviation estimating method that is applicable to according to claim 1 is characterized in that
Step 1Obtain the master sync signal PSS timing position and the interior numbering of cell ID group that receive the baseband digital signal sequence
, it is following step by step:
Step by step 1.1: to receiving the time-domain sampling that carries out of baseband digital signal, obtain receiving sequence through narrowband low-pass filter, according to the time synchronization information that the time synchronized module is confirmed, obtain the thick regularly synchronized result of PSS, the equivalent baseband sampling sequence of note receiving terminal PSS time domain does
:
Wherein,
representes normalized carrier wave frequency deviation; The time domain form of the main synchronous PSS sequence of
expression;
expression FFT FFT counts;
representes channel impulse response;
; The multiple Gaussian noise of
expression additivity, its power spectral density is
;
Step by step 1.2: local PSS frequency domain sequence transforms to the PSS sequence of time domain through invert fast fourier transformation IFFT
,
,
, with receiving sequence
With local PSS sequence
, obtain three relevant episode, get the corresponding PSS of maximum related value, that is:
3. the 3GPP-LTE system down link initial score frequency deviation estimating method that is applicable to according to claim 2 is characterized in that
Step 2Calculate initial score frequency deviation frequency deviation
Following step by step;
Step by step 2.1: according to the 3GPP-LTE agreement, the frequency domain sequence of master sync signal PSS adopts the Zadoff-Chu sequence, numbering in the cell set
One by one corresponding to the radical exponent of Zadoff-Chu sequence
, through
Point IFFT, conversion obtains the PSS time domain sequences;
According to 3GPP TS 36.211 V8.5.0 agreements, 3GPP LTE adopts the Zadoff-Chu sequence of 62 length as the primary synchronization channel signal, and sequence signature is:
Wherein,
is called the radical exponent of Zadoff-Chu sequence; Value is { 25; 29; 34}; Correspond respectively to sub-district in the LTE system represent to organize the value of interior numbering
0,1,2};
Note exists
Step 1Obtain
Corresponding Zadoff-Chu sequence radical exponent very
, obtain local PSS frequency domain sequence
,
, according to the mapping relations of PSS sequence and subcarrier, through
NPoint IFFT conversion obtains local PSS time domain sequences
,
Step by step 2.2: will receive
With
Step by step 2.1Obtain
It is relevant to carry out pointwise, obtains a correlated series
,
, that is:
Step by step 2.3: with above-mentioned correlated series
Be divided into two sections, utilize the phase difference between two sections, estimate corresponding frequency deviation value;
is divided into isometric two sections with correlated series; Each segment data is taked the method that adds up, obtains
and
:
Perhaps do not consider distracter and noise item, then:
Relevant through
carried out conjugation with
; Obtain the frequency offset estimating value; Be designated as
, that is:
,
Wherein,
AngleThe phase angle computing is asked in (.) expression.
4. the 3GPP-LTE system down link initial score frequency deviation estimating method that is applicable to according to claim 3 is characterized in that
Step 3The initial score frequency offset estimating
Be step by step: the method according to Cyclic Prefix (CP) is estimated the initial score frequency deviation value, through synchronizing signal PSS preliminary regularly after, note
Be receiving sequence, order without the mistake narrow-band filtering:
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110354857.XA CN102413079B (en) | 2011-11-10 | 2011-11-10 | Initial fraction frequency offset estimation method used in downlink of 3 generation partnership project long term evolution (3GPP-LTE) system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110354857.XA CN102413079B (en) | 2011-11-10 | 2011-11-10 | Initial fraction frequency offset estimation method used in downlink of 3 generation partnership project long term evolution (3GPP-LTE) system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102413079A true CN102413079A (en) | 2012-04-11 |
CN102413079B CN102413079B (en) | 2014-09-03 |
Family
ID=45914936
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110354857.XA Expired - Fee Related CN102413079B (en) | 2011-11-10 | 2011-11-10 | Initial fraction frequency offset estimation method used in downlink of 3 generation partnership project long term evolution (3GPP-LTE) system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102413079B (en) |
Cited By (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103259755A (en) * | 2013-04-08 | 2013-08-21 | 东南大学 | Main synchronization sequence design method for global covering multi-beam satellite LTE |
CN103312654A (en) * | 2013-05-23 | 2013-09-18 | 东南大学 | Master synchronization sequence detection method for full-domain coverage multi-beam satellite long term evolution (LTE) |
CN103731905A (en) * | 2012-10-11 | 2014-04-16 | 复旦大学 | Cell initial access method and device in TD-LTE system |
CN103780527A (en) * | 2012-10-18 | 2014-05-07 | 晨星软件研发(深圳)有限公司 | Frequency offset estimation method of multicarrier communication system, and correlation apparatus |
CN104717169A (en) * | 2015-01-19 | 2015-06-17 | 厦门特力通信息技术有限公司 | LTE-TDD frequency deviation correcting device and method |
WO2015139171A1 (en) * | 2014-03-17 | 2015-09-24 | 华为技术有限公司 | Synchronization method, receiving end, and sending end |
WO2015149199A1 (en) * | 2014-04-03 | 2015-10-08 | 中兴通讯股份有限公司 | Differential phase-based frequency offset estimation method and apparatus |
CN106961734A (en) * | 2016-01-11 | 2017-07-18 | 中兴通讯股份有限公司 | The transmission method and device of information |
CN107959922A (en) * | 2016-10-17 | 2018-04-24 | 深圳市中兴微电子技术有限公司 | The method and device of main sidelink synchronizing signals in a kind of detection D2D |
CN109194602A (en) * | 2018-10-25 | 2019-01-11 | 中国电力科学研究院有限公司 | User equipment downlink synchronous method in electric power wireless communication system |
CN109328452A (en) * | 2016-06-29 | 2019-02-12 | 瑞典爱立信有限公司 | Signal detection mode it is adaptively selected |
CN111083777A (en) * | 2019-12-10 | 2020-04-28 | 重庆邮电大学 | PSS timing synchronization method and system based on conjugate symmetry in 5G system |
CN111106924A (en) * | 2017-02-05 | 2020-05-05 | 肖慧 | Synchronization device in narrow-band wireless communication terminal |
CN111740929A (en) * | 2020-06-22 | 2020-10-02 | 河北远东通信系统工程有限公司 | TD-LTE frequency offset estimation method based on PSS sequence repeated cooperative detection |
CN112672403A (en) * | 2020-12-08 | 2021-04-16 | 复旦大学 | Initial cell discovery method suitable for 5G-NR millimeter wave communication system |
CN112910805A (en) * | 2021-01-18 | 2021-06-04 | 西安电子科技大学 | Frequency offset estimation method based on 5G new air interface system |
CN113612527A (en) * | 2021-09-08 | 2021-11-05 | 华力智芯(成都)集成电路有限公司 | Initial synchronization method for low-earth-orbit satellite mobile communication system |
CN114584447A (en) * | 2022-01-12 | 2022-06-03 | 华信咨询设计研究院有限公司 | 5G CFO estimation method based on offset noise |
CN115119298A (en) * | 2022-07-12 | 2022-09-27 | 上海应用技术大学 | Synchronization method suitable for 5G-V2X |
CN115150227A (en) * | 2021-03-30 | 2022-10-04 | 复旦大学 | Angle estimation method in point-to-point multi-antenna communication system |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1705302A (en) * | 2004-05-27 | 2005-12-07 | 华为技术有限公司 | OFDM time and frequency synchronization method |
US20090252246A1 (en) * | 2008-04-03 | 2009-10-08 | Samsung Electronics Co., Ltd. | Receiving apparatus and method for maximum likelihood in a single carrier system |
CN101827052A (en) * | 2010-04-14 | 2010-09-08 | 中国科学院计算技术研究所 | Method and device for time synchronization and frequency synchronization of LTE system |
US20100246730A1 (en) * | 2009-03-30 | 2010-09-30 | Tareq Al-Naffouri | Cyclic prefix-based enhanced data recovery method |
-
2011
- 2011-11-10 CN CN201110354857.XA patent/CN102413079B/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1705302A (en) * | 2004-05-27 | 2005-12-07 | 华为技术有限公司 | OFDM time and frequency synchronization method |
US20090252246A1 (en) * | 2008-04-03 | 2009-10-08 | Samsung Electronics Co., Ltd. | Receiving apparatus and method for maximum likelihood in a single carrier system |
US20100246730A1 (en) * | 2009-03-30 | 2010-09-30 | Tareq Al-Naffouri | Cyclic prefix-based enhanced data recovery method |
CN101827052A (en) * | 2010-04-14 | 2010-09-08 | 中国科学院计算技术研究所 | Method and device for time synchronization and frequency synchronization of LTE system |
Non-Patent Citations (2)
Title |
---|
LU WU等: "《A Closed-Form Blind CFO Estimator Based on Frequency Analysis for OFDM Systems》", 《IEEE TRANSACTIONS ON COMMUNICATIONS》 * |
WEN XU等: "《Robust Synchronization for 3GPP LTE System》", 《IEEE》 * |
Cited By (32)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103731905A (en) * | 2012-10-11 | 2014-04-16 | 复旦大学 | Cell initial access method and device in TD-LTE system |
CN103780527A (en) * | 2012-10-18 | 2014-05-07 | 晨星软件研发(深圳)有限公司 | Frequency offset estimation method of multicarrier communication system, and correlation apparatus |
CN103780527B (en) * | 2012-10-18 | 2017-02-15 | 晨星软件研发(深圳)有限公司 | Frequency offset estimation method of multicarrier communication system, and correlation apparatus |
CN103259755B (en) * | 2013-04-08 | 2016-02-10 | 东南大学 | A kind of universe covers the main synchronizing sequence method for designing of multi-beam satellite LTE |
CN103259755A (en) * | 2013-04-08 | 2013-08-21 | 东南大学 | Main synchronization sequence design method for global covering multi-beam satellite LTE |
CN103312654A (en) * | 2013-05-23 | 2013-09-18 | 东南大学 | Master synchronization sequence detection method for full-domain coverage multi-beam satellite long term evolution (LTE) |
CN105264784B (en) * | 2014-03-17 | 2017-11-28 | 华为技术有限公司 | Synchronous method, receiving terminal and transmitting terminal |
CN105264784A (en) * | 2014-03-17 | 2016-01-20 | 华为技术有限公司 | Synchronization method, receiving end, and sending end |
WO2015139171A1 (en) * | 2014-03-17 | 2015-09-24 | 华为技术有限公司 | Synchronization method, receiving end, and sending end |
US10225126B2 (en) | 2014-03-17 | 2019-03-05 | Huawei Technologies Co., Ltd. | Synchronization method, receive end, and transmit end |
CN104980375A (en) * | 2014-04-03 | 2015-10-14 | 中兴通讯股份有限公司 | Frequency offset estimation method and apparatus based on differential phase |
WO2015149199A1 (en) * | 2014-04-03 | 2015-10-08 | 中兴通讯股份有限公司 | Differential phase-based frequency offset estimation method and apparatus |
CN104717169A (en) * | 2015-01-19 | 2015-06-17 | 厦门特力通信息技术有限公司 | LTE-TDD frequency deviation correcting device and method |
CN104717169B (en) * | 2015-01-19 | 2018-03-09 | 厦门特力通信息技术有限公司 | A kind of LTE TDD frequency deviation correctors and method |
CN106961734A (en) * | 2016-01-11 | 2017-07-18 | 中兴通讯股份有限公司 | The transmission method and device of information |
CN106961734B (en) * | 2016-01-11 | 2023-05-30 | 中兴通讯股份有限公司 | Information transmission method and device |
CN109328452A (en) * | 2016-06-29 | 2019-02-12 | 瑞典爱立信有限公司 | Signal detection mode it is adaptively selected |
CN107959922A (en) * | 2016-10-17 | 2018-04-24 | 深圳市中兴微电子技术有限公司 | The method and device of main sidelink synchronizing signals in a kind of detection D2D |
CN111106924A (en) * | 2017-02-05 | 2020-05-05 | 肖慧 | Synchronization device in narrow-band wireless communication terminal |
CN111106924B (en) * | 2017-02-05 | 2022-03-04 | 吴洁 | Synchronous detection device applied to narrow-band wireless communication system terminal |
CN109194602A (en) * | 2018-10-25 | 2019-01-11 | 中国电力科学研究院有限公司 | User equipment downlink synchronous method in electric power wireless communication system |
CN109194602B (en) * | 2018-10-25 | 2023-08-25 | 中国电力科学研究院有限公司 | Terminal downlink synchronization method in power wireless communication system |
CN111083777A (en) * | 2019-12-10 | 2020-04-28 | 重庆邮电大学 | PSS timing synchronization method and system based on conjugate symmetry in 5G system |
CN111740929A (en) * | 2020-06-22 | 2020-10-02 | 河北远东通信系统工程有限公司 | TD-LTE frequency offset estimation method based on PSS sequence repeated cooperative detection |
CN112672403A (en) * | 2020-12-08 | 2021-04-16 | 复旦大学 | Initial cell discovery method suitable for 5G-NR millimeter wave communication system |
CN112910805A (en) * | 2021-01-18 | 2021-06-04 | 西安电子科技大学 | Frequency offset estimation method based on 5G new air interface system |
CN115150227B (en) * | 2021-03-30 | 2023-10-13 | 复旦大学 | Angle estimation method in point-to-point multi-antenna communication system |
CN115150227A (en) * | 2021-03-30 | 2022-10-04 | 复旦大学 | Angle estimation method in point-to-point multi-antenna communication system |
CN113612527A (en) * | 2021-09-08 | 2021-11-05 | 华力智芯(成都)集成电路有限公司 | Initial synchronization method for low-earth-orbit satellite mobile communication system |
CN114584447A (en) * | 2022-01-12 | 2022-06-03 | 华信咨询设计研究院有限公司 | 5G CFO estimation method based on offset noise |
CN114584447B (en) * | 2022-01-12 | 2023-10-20 | 华信咨询设计研究院有限公司 | Offset noise-based 5G CFO estimation method |
CN115119298A (en) * | 2022-07-12 | 2022-09-27 | 上海应用技术大学 | Synchronization method suitable for 5G-V2X |
Also Published As
Publication number | Publication date |
---|---|
CN102413079B (en) | 2014-09-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102413079B (en) | Initial fraction frequency offset estimation method used in downlink of 3 generation partnership project long term evolution (3GPP-LTE) system | |
CN102065048B (en) | Time-domain joint estimation method for synchronizing frames, frequencies and fine symbols for orthogonal frequency division multiplexing (OFDM) | |
EP2497223A1 (en) | Frequency and time synchronization methods and apparatus | |
CN105516045B (en) | A kind of OFDM training sequence structures and synchronous method | |
US9706480B2 (en) | Method for determining cell identification information | |
CN107086974A (en) | A kind of OFDM synchronous method under high dynamic environment | |
Huang et al. | Joint time and frequency offset estimation in LTE downlink | |
CN102461102A (en) | Process for estimating the channel from the pss signal in a lte communication network, and receiver for the same | |
CN107466462B (en) | Method and apparatus for accurate time offset estimation | |
Yu et al. | A novel time synchronization for 3GPP LTE cell search | |
Wung et al. | A robust scheme in downlink synchronization and initial cell search for 3GPP LTE system | |
CN108989259B (en) | Time offset estimation method and system for narrow-band physical uplink shared channel of wireless comprehensive measurement instrument | |
CN105791201A (en) | Blind synchronization method of uplink signal in LET/LTE-A system | |
Andreescu et al. | Long term evolution primary synchronization algorithms | |
KR20110123591A (en) | Method for transmitting sychronization signal and calculating correlation value thereof in wireless communication system | |
CN101741800B (en) | Synchronous searching method | |
TWI542233B (en) | Method and apparatus for cell search and synchronization in mobile communication | |
Silva et al. | Synchronization algorithms based on weighted CAZAC preambles for OFDM systems | |
CN101494634A (en) | Improved method based on Schmidl & Cox synchronization | |
US10212679B1 (en) | Method and apparatus for delay spread estimation | |
CN102369707B (en) | Method and device for eliminating co-channel interference on pilot frequency | |
CN107276953B (en) | Timing synchronization method, device and system | |
KR101421305B1 (en) | ractional frequency offset estimation method and receiver using the same | |
CN101674280B (en) | When detecting OFDM symbol partially and the method for frequency deviation | |
KR20110009552A (en) | The method of frame synchronization acquisition and the cell search method robust to a interference of multi-cell |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140903 Termination date: 20191110 |
|
CF01 | Termination of patent right due to non-payment of annual fee |