CN102412980B - Method and system for processing resource management task - Google Patents

Method and system for processing resource management task Download PDF

Info

Publication number
CN102412980B
CN102412980B CN201010529645.6A CN201010529645A CN102412980B CN 102412980 B CN102412980 B CN 102412980B CN 201010529645 A CN201010529645 A CN 201010529645A CN 102412980 B CN102412980 B CN 102412980B
Authority
CN
China
Prior art keywords
node
resource
management tasks
resource management
described resource
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201010529645.6A
Other languages
Chinese (zh)
Other versions
CN102412980A (en
Inventor
彭永林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fengxian County science and Technology Development Service Station
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN201010529645.6A priority Critical patent/CN102412980B/en
Priority to PCT/CN2011/078779 priority patent/WO2012034473A1/en
Publication of CN102412980A publication Critical patent/CN102412980A/en
Application granted granted Critical
Publication of CN102412980B publication Critical patent/CN102412980B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Information Retrieval, Db Structures And Fs Structures Therefor (AREA)
  • Computer And Data Communications (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

The invention discloses a method and system for processing a resource management task. The method comprises the following steps of: storing the resource management task in an intermediate storage entity after issuing the resource management task to a target network by a management node; and when the service of the resource happens, obtaining the resource management task corresponding to the resource from the intermediate storage entity, and processing the task correspondingly. By adopting the technology for processing the resource management task, disclosed by the invention, the management node sets the resource management task on few managed nodes (only on resource storage nodes or resource service nodes), thus the process of broadcasting the resource management task to all the managed nodes is unnecessary, and the network load caused by broadcasting the resource management task is avoided.

Description

Realize the method and system of Resource management tasks process
Technical field
The present invention relates to the communications field, be specifically related to the method and system realizing Resource management tasks process.
Background technology
In the networks such as telecommunications, in order to realize the controlled of business network, usually needing to dispose special network management system and coming node in management service network and resource.Described node mainly refers to the equipment or the functional entity that realize business function; Described resource mainly refers to miscellaneous service data.Such as in IP-based multimedia telephone system, node mainly comprises call session processing capacity agent node, call session processing capacity service node, home signature user server etc.; Resource mainly comprises contracted user's data etc.Based in the multimedia telephone system of P2P, node mainly comprises user and accesses peer node, the responsible peer node of user, the service peer node etc. of user; Resource mainly comprises user contracting data etc.Based in the Streaming Media download system of P2P, node mainly comprises that user accesses peer node, user data is responsible for peer node, media content is responsible for peer node, download process service peer node etc.; Resource mainly comprises user contracting data, media data etc.Described node administration refers to the various management for node entities, as Joint Enterprise, joint behavior monitoring energy etc.; Described resource management pointer to the various management of business datum, as data observation, signaling tracing, operation flow tracking etc.
It is fairly simple for managing node, can intended target node issue management role directly to it, and then node is according to management role reported data.Then relative complex is managed to resource, because Resource management tasks also needs to be issued on node, but many times there is no fixed correspondence between Resource management tasks and node; So adopt the NMS of prior art to unify in some similar management systems, be all Resource management tasks to be published to when task process carried out to resource process each node on.When business occurs, from task corresponding to this node checks, then can determine whether carry out corresponding task process according to task matching condition.
As shown in Figure 1, shown in Fig. 1, flow process comprises the following steps the flow process of the establishing resource management role of existing techniques in realizing:
Step 101: specify management target resource identifier on management node;
Step 102: for this target resource setting management role, comprise the information such as data report condition;
Step 103a: after Resource management tasks setting, management node sends Resource management tasks request to create message according to operator's instruction to Managed node 1;
Step 104a: after Managed node 1 receives Resource management tasks request to create message, after necessarily processing, this task is stored;
Step 105a: Managed node 1 returns response message to management node after receiving or process this request to create;
Step 103b is to step 105b: the process of asking other Managed node establishing resource management roles, its processing mode with 103a to step 105a;
Step 103c is to step 105c: the process of request Managed node N establishing resource management role, its processing mode with 103a to step 105a;
As shown in Figure 2, shown in Fig. 2, flow process comprises the following steps the flow process of the Resource management tasks process of existing techniques in realizing:
Step 201: the business that Managed node there occurs certain resource;
Step 202: Managed node searches the management role of the resource of this generation business;
Step 203: whether the business that Managed node judges current generation mates with the condition of the Resource management tasks found, if do not mate, does not carry out task process; If coupling; would carry out that task data reports wait be correlated with task process;
Step 204: Managed node reports to management node the data that Resource management tasks is relevant immediately or regularly;
Step 205: after management node receives reported data, analyzes this data, finds the management role of its correspondence;
Step 206: management node carries out data storage as required.
It should be noted that, above-mentioned resource management mode is only applicable to the fewer network of destination node, when the destination node in managed network is more (as peer-to-peer network), just needs Resource management tasks to be broadcast to whole network; Like this, larger burden will be brought to network, even produce network storm.
Summary of the invention
In view of this, main purpose of the present invention is to provide the method and system realizing Resource management tasks process, effectively reduces network burden.
For achieving the above object, technical scheme of the present invention is achieved in that
Realize a method for Resource management tasks process, the method comprises: described Resource management tasks, after objective network down distributing resource management role, is stored in intermediate storage entity by management node; When the business of described resource occurs, obtain the Resource management tasks corresponding to described resource from described intermediate storage entity, and carry out corresponding task process.
Described intermediate storage entity comprises the service node of resource and/or the memory node of resource; The process obtaining described Resource management tasks and carry out corresponding task process comprises: if business generation node when business occurs is exactly the service node of described resource, then store according to this node or whether the condition judgment of described Resource management tasks of buffer memory carries out corresponding task process; If business generation node is not the described service node of described resource, the then Gains resources management role when needing the described memory node Gains resources related data to described resource, and whether carry out corresponding task process according to the condition judgment of the Resource management tasks obtained.
Described intermediate storage entity comprises the service node of resource and/or the memory node of resource; The process obtaining described Resource management tasks and carry out corresponding task process comprises: if business generation node when business occurs is not the service node of described resource, then when needing the memory node Gains resources related data to described resource, obtain the access node information of the Resource management tasks of described resource and the management node of correspondence thereof; Afterwards, whether described resource generation node carries out corresponding task process according to the condition judgment of the Resource management tasks obtained.
Resource management tasks be set as needing reported data time, the method comprises further: to described access node reported data.
Described intermediate storage entity comprises the service node of resource and/or the memory node of resource; The process obtaining described Resource management tasks and carry out corresponding task process comprises: if business generation node when business occurs is not the service node of described resource, then send business information when needing the memory node Gains resources related data to described resource to the memory node of described resource, and obtain the access node information of the Resource management tasks of described resource and the management node of correspondence thereof; The business that the memory node of described resource occurs according to the condition judgment of described Resource management tasks the need of carrying out corresponding task process, backward described business generation node return judged result; Described business generation node so according to judged result determine whether carry out corresponding task process.
Determine to need to carry out task process and Resource management tasks be set as needing reported data time, the method comprises further: by described business generation node to described access node reported data.
Described task process is business logic processing, or data is reported the memory node of described resource or the operating process of management node; Wherein, report described in is that real-time report or timing report; Or described business generation node active reporting, or passively reporting of triggering of the memory node of described resource or the active obtaining of management node.
When described intermediate storage entity comprises the service node of the memory node of resource and resource, the process that described Resource management tasks is stored in intermediate storage entity is comprised: to receive and described Resource management tasks is initiatively transmitted to the service node of described resource by the memory node storing the described resource of Resource management tasks; Or the memory node of described resource returns the service node of described resource to the access node of described management node, then forward described Resource management tasks by described access node to the service node of described resource.
Realize a system for Resource management tasks process, this system comprises intermediate storage maintenance unit, Resource management tasks processing unit; Wherein, described intermediate storage maintenance unit, at management node after objective network down distributing resource management role, described Resource management tasks is comprised and is kept at interior process; Described Resource management tasks processing unit, for when the business of described resource occurs, obtains the Resource management tasks corresponding to described resource from described intermediate storage entity, and carries out corresponding task process.
Described intermediate storage entity comprises the service node of resource and/or the memory node of resource; Described Resource management tasks processing unit is at the described Resource management tasks of acquisition and when carrying out corresponding task process, for: if business generation node when business occurs is exactly the service node of described resource, then to store according to this node or whether the condition judgment of described Resource management tasks of buffer memory carries out corresponding task process; If business generation node is not the described service node of described resource, the then Gains resources management role when needing the described memory node Gains resources related data to described resource, and whether carry out corresponding task process according to the condition judgment of the Resource management tasks obtained.
Described intermediate storage entity comprises the service node of resource and/or the memory node of resource; Described Resource management tasks processing unit is at the described Resource management tasks of acquisition and when carrying out corresponding task process, for: if business generation node when business occurs is not the service node of described resource, then when needing the memory node Gains resources related data to described resource, obtain the access node information of the Resource management tasks of described resource and the management node of correspondence thereof; Afterwards, corresponding task process whether is carried out according to the condition judgment of the Resource management tasks obtained.
Resource management tasks be set as needing reported data time, described Resource management tasks processing unit is further used for: to described access node reported data.
Described intermediate storage entity comprises the service node of resource and/or the memory node of resource; Described Resource management tasks processing unit is at the described Resource management tasks of acquisition and when carrying out corresponding task process, for: if business generation node when business occurs is not the service node of described resource, then send business information when needing the memory node Gains resources related data to described resource to the memory node of described resource, and obtain the access node information of the Resource management tasks of described resource and the management node of correspondence thereof; The business occurred according to the condition judgment of described Resource management tasks the need of carrying out corresponding task process, and determines whether carry out corresponding task process according to judged result.
Determine to need to carry out task process and Resource management tasks be set as needing reported data time, described Resource management tasks processing unit is further used for: to described access node reported data.
Described task process is business logic processing, or data is reported the memory node of described resource or the operating process of management node; Wherein, report described in is that real-time report or timing report; Or described business generation node active reporting, or passively reporting of triggering of the memory node of described resource or the active obtaining of management node.
When described intermediate storage entity comprises the service node of the memory node of resource and resource, when described intermediate storage entity is preserved described Resource management tasks for: to receive and described Resource management tasks is initiatively transmitted to the service node of described resource by the memory node storing the described resource of Resource management tasks; Or the memory node of described resource returns the service node of described resource to the access node of described management node, then forward described Resource management tasks by described access node to the service node of described resource.
Described management node accesses described objective network by access node; When described intermediate storage entity comprises the service node of the memory node of resource and/or resource, the memory node of described resource is the resource responsible node determined according to algorithmic rule, independent arrange or close with described access node establish, and by reading configured in advance or reading buffer memory or Query Database or the acquisition of nslookup method of service; The service node of described resource independently arranges or closes with the memory node of described resource and establishes, or to close with described access node and establish, and obtain by reading configuration or reading buffer memory or Query Database or nslookup service or distributed hash algorithm or specified rule mode;
Described Resource management tasks processing node is arranged in business generation node, or independent arranges, or closes with described access node and establish.
Described business generation node also can close with described access node and establish.
Adopt the technology realizing Resource management tasks process that the present invention proposes, Resource management tasks is arranged on (only on Resource Storage node or resource service node) on minority Managed node by management node, so just do not need to all Managed node broadcast resource management roles, thus avoid its network burden brought.In addition, business generation node from the memory node Gains resources management role of the service node of resource or resource, thus can determine the process of business datum according to task condition.That is this mode achieves various management for resource, as flow tracking, data observation, signaling tracing etc. with less network burden; Thus realize controlled to target service network.
Accompanying drawing explanation
Fig. 1 is the establishing resource management role flow chart of prior art;
Fig. 2 is the Resource management tasks process chart of prior art;
Fig. 3 is that the Resource management tasks of the embodiment of the present invention is arranged and handling principle schematic diagram;
Fig. 4 is the flow chart of the establishing resource management role mode one of the embodiment of the present invention;
Fig. 5 is the flow chart of the establishing resource management role mode two of the embodiment of the present invention;
Fig. 6 is the task process chart of the resource active business of the embodiment of the present invention;
Fig. 7 is the flow chart of the task processing mode one of the resource passive service of the embodiment of the present invention;
Fig. 8 is the flow chart of the task processing mode two of the resource passive service of the embodiment of the present invention;
Fig. 9 is the flow chart of the task processing mode three of the resource passive service of the embodiment of the present invention;
Figure 10 is the Resource management tasks migration flow chart of the embodiment of the present invention;
Figure 11 is the cancellation Resource management tasks flow chart of the embodiment of the present invention;
Figure 12 is the general flow chart realizing Resource management tasks process of the embodiment of the present invention;
Figure 13 is the system diagram realizing Resource management tasks process of the embodiment of the present invention.
Embodiment
When practical operation, Resource management tasks can be published on Resource Storage node and resource service node, if business generation node is exactly the service node of this resource, then whether the management role condition judgment stored according to this node carries out corresponding task process; If when this business generation node is not the service node of this resource, then need, when from the memory node Gains resources related data of this resource, to obtain the management role of this resource, and whether carry out corresponding task process according to the management role condition judgment obtained.
A kind of embodiment of aforesaid operations thinking can have following feature:
A: management node is to objective network down distributing resource management role, and described Resource management tasks stores or is buffered in the memory node of described resource by described objective network;
B: the service node of described resource obtains described Resource management tasks, and store or this Resource management tasks of buffer memory;
C: when the business of described resource occurs, business generation node obtains described Resource management tasks from the service node of described resource or memory node, and carries out corresponding task process according to the setting of obtained Resource management tasks.
It should be noted that, in feature A, described management node can access described objective network by access node, and then can send described Resource management tasks by described access node to described objective network; Further, described objective network described Resource management tasks is stored or is buffered in described Resource management tasks for the memory node of resource; Have again, the memory node of described resource can be the resource responsible node determined according to certain rule (as distributed hash algorithm or other specified rule), and can be same node with described access node, and can obtain by reading configured in advance or reading buffer memory or the mode such as Query Database or nslookup service.
In feature B, the service node of described resource can be same node with described Resource Storage node; Further, the service node of described resource can obtain by reading configuration or reading buffer memory or Query Database or nslookup service or the mode such as distributed hash algorithm or other specified rule; Further, described Resource management tasks initiatively can be transmitted to the service node of described resource by the memory node of described resource; In addition, the memory node of described resource can return the service node of described resource to described access node, then forwards described Resource management tasks by described access node to the service node of described resource.
In feature C, when the business of described resource occurs, if business generation node is exactly the described service node of described resource, then to store according to this node or whether the condition judgment of described Resource management tasks of buffer memory carries out corresponding task process; If business generation node is not the described service node of described resource, then can need to the described memory node of described resource obtain described resource-related data (as described in service node information as described in resource etc.) time Gains resources management role, and whether carry out corresponding task process according to the condition judgment of the Resource management tasks obtained.
Have again, in feature C, when the business of described resource occurs, if business generation node is not the described service node of described resource, then can need to the described memory node of described resource obtain described resource-related data (as described in service node information as described in resource etc.) time, obtain the access node information of the Resource management tasks of described resource and the management node of correspondence thereof; Afterwards, whether described resource generation node can carry out corresponding task process according to the condition judgment of the Resource management tasks obtained, can also Resource management tasks be set as needing reported data time to described access node reported data.
Or, in feature C, when the business of described resource occurs, if business generation node is not the described service node of described resource, then can need to the described memory node of described resource obtain described resource-related data (as described in service node information as described in resource etc.) time to as described in the memory node of resource send business information, and obtain the access node information of the Resource management tasks of described resource and the management node of correspondence thereof.The business that the memory node of described resource can occur according to the condition judgment of described Resource management tasks the need of carrying out corresponding task process, backward described business generation node return judged result.Described business generation node so can according to judged result determine whether carry out corresponding task process; And determine to need to carry out task process and Resource management tasks be set as needing reported data time, by described business generation node to described access node reported data.Described access node can be same node with described memory node or described service node or described business generation node or described task processing node.
In addition, in feature C, according to the task process that the setting of Resource management tasks is carried out, can be some business logic processing, also can be data are reported the memory node of described resource or the operating process of management node.Wherein, described reporting can be that real-time report or timing report; Can be described business generation node active reporting, also can be that passive that the memory node of described resource or the active obtaining (this active obtaining may come from the notice of described business generation node) of management node trigger reports.
Below, the setting and processing method that adopt Resource management tasks of the present invention are described in detail.
The setting of Resource management tasks and processing method:
Fig. 3 is setting and the processing method schematic diagram of the Resource management tasks that the present invention realizes.In Fig. 3, objective network is made up of node 1, node 3, node 6, node 8, node 9, node 11, node 14, node 16, node 19, these nodes of node 20, and each node is according to business relations or the concrete network topology structure of other rule compositions (as IP-based mediaphone network topology structure, mediaphone network topology structure etc. based on peer to peer technology).Assuming that management node accesses objective network by node 1, resource 1 is managed, node 6 be resource 1 memory node (as in IP-based mediaphone network for home signature user server, be the responsible node of user data at the mediaphone network based on peer to peer technology), node 9 is service nodes (as being calling session control server in IP-based mediaphone network, being the node performing CSCF at the mediaphone network based on peer to peer technology) of resource 1.Actual when realizing, node 1 and node 6 can be same node, and node 6 and node 9 also can be same node, and node 1 and node 9 also can be same node, and node 1 can also be same node with business generation node.
The management role of resource 1 is published on the memory node 6 of resource by access node 1 by management node, then node 6 active or the passive management role by resource 1 are transmitted to the service node 9 of resource, if the business generation node of resource 1 (i.e. the current processing node of business) is exactly node 9, then whether the management role condition judgment of resource 1 that node 9 stores according to self carries out corresponding task process; If the business generation node of resource 1 is not node 9, then node 9 needs when from the memory node 6 Gains resources related data of resource 1, the management role of Gains resources 1, and whether carries out corresponding task process according to the management role condition judgment obtained.
The setting of above-mentioned Resource management tasks and roadmap, achieve the management to resource data and related procedure with lower performance cost.
Establishing resource management role mode one:
One of mode of establishing resource management role is: Resource management tasks request to create is issued the memory node of this resource by management node by access node, after the memory node of resource sets management role, this task is transmitted to the service node of resource, the service node of resource arranges this management role too.Idiographic flow is as shown in Figure 4:
Step 401 is to step 402: on management node, specify the target resource identifier that will manage, then to this resource settings management role information, management role information comprises the information such as task treatment conditions, task processing mode;
Step 403: after Resource management tasks sets, Resource management tasks request to create sends to from the access node in objective network by management node;
Step 404: after access node receives Resource management tasks request to create, obtains the communication information of the memory node of the target resource of this task.The obtain manner of the described communication information can be: read configuration or buffer memory, domain name service query or distributed hash algorithm etc.;
Step 405: access node is according to the communication information of Resource Storage node, and the memory node to resource forwards the Resource management tasks request to create that management node is sent;
Step 406 is to step 408: the memory node of resource receives after access node forwards the Resource management tasks request to create come, and first stores or this management role of buffer memory at this node, then returns response by the access node of management node to management node.
Step 409: the memory node of resource obtains the communication information of the service node of this resource.The mode obtaining the described communication information is: read configuration or buffer memory, domain name service query or distributed hash algorithm etc.;
Step 410: the memory node of resource is according to the communication information of resource service node, and the service node to resource forwards the Resource management tasks request to create that access node is sent;
Step 411: after the memory node that the service node of resource receives resource forwards the Resource management tasks request to create come, store or this management role of buffer memory at this node, the memory node then to resource returns response;
In addition, if when the memory node of resource receives Resource management tasks, this resource is unallocated service node also, then step 409 just performs after giving this asset allocation service node to step 412; Step 409 to step 412 also can be transformed to by the service node of resource initiatively from the memory node Gains resources management role information of resource.Further, Resource management tasks as of a resource information additional information, can be stored together with service resources information; Also can store with service resources unpack.
Establishing resource management role mode two:
The another kind of mode of establishing resource management role is: Resource management tasks request to create is issued the memory node of this resource by management node by access node, return the communication information of this resource service node to access node after the memory node of resource sets management role, and then by access node, this Resource management tasks request to create being transmitted to the service node of this resource, the service node of resource arranges this management role too.Idiographic flow is as shown in Figure 5:
Step 501 is to step 502: on management node, specify the target resource identifier that will manage, then to this resource settings management role information, management role information comprises the information such as task treatment conditions, task processing mode;
Step 503: after Resource management tasks sets, Resource management tasks request to create sends to from the access node in objective network by management node;
Step 504: after access node receives Resource management tasks request to create, obtains the communication information of the memory node of the target resource of this task.The mode of the Gains resources memory node communication information is: read configuration or buffer memory, domain name service query or distributed hash algorithm etc.;
Step 505: access node is according to the communication information of the Resource Storage node obtained, and the memory node to resource forwards the Resource management tasks request to create that management node is sent;
Step 506 is to step 507: the memory node of resource receives after access node forwards the Resource management tasks request to create come, and first stores or this management role of buffer memory at this node, then obtains the communication information of the service node of this resource.The mode of the Gains resources service node communication information is: read configuration or buffer memory, domain name service query or distributed hash algorithm etc.;
Step 508: the communication information of the resource service node of acquisition is returned to access node by the memory node of resource;
In addition, step 505 also can have other mapping mode to step 508, and if access node is to the memory node forward resource management task creation request of resource, the memory node of resource stores or returns response after this management role of buffer memory.Then access node is to the communication information of the memory node query resource service node of resource, returns after the memory node Gains resources service node of resource to access node.
Step 509: access node is to the service node forward resource management task creation request of resource;
Step 510: the service node of resource receives after access node forwards the Resource management tasks request to create come, and stores or this management role of buffer memory at this node;
Step 511 is to step 412: the service node of resource, by the access node of management node, returns response to management node.
The task process of resource active business:
When the service node of resource there is the business of corresponding resource, the service node of resource searches the management role of this resource, then Condition Matching is carried out, the task process such as then carry out Data Collection according to task setting as the match is successful or report, carries information or the mark of this task simultaneously in the service message being transmitted to other node.Idiographic flow is as shown in Figure 6:
Step 601: the active business that the service node of resource there occurs this resource, as terminal use initiates audio call or user's downloads of media file etc.;
Step 602: the service node of resource is searched according to the resource identification of the business of generation and stored or be buffered in management role corresponding to this local resource;
Step 603: the service node of resource mates with Resource management tasks treatment conditions the business occurred;
Step 604a is to step 604b: if the match is successful for the business occurred and Resource management tasks treatment conditions, then the service node of resource carries out inter-related task process according to task setting, as to access node reported data.Meanwhile, the service node of resource carries this Resource management tasks information or reports mark in the service message being transmitted to other node.Wherein, step 604b is optional step;
In addition, reported data mode herein can also have multiple mapping mode, as real-time report, timing report, can also be by access node active obtaining; Or notify that access node obtains data by the service node of resource.
Step 605: the reported data received is transmitted to management node by the access node of management node;
In addition, above-mentioned steps 604 to step 605, can be transformed to and directly data be reported management node by the service node of resource, also by management node active obtaining data, can also notify that management node obtains data by the service node of resource;
Step 606 is to step 607: after management node receives reported data, analyzes this data, finds corresponding management role, needs to store this data when storing reported data according to being set in of this management role.
The task processing mode one of resource passive service:
If the passive service of resource occurs, then business generation node is not often the service node of this resource.One of task processing mode is now: business generation node is when needing the memory node Gains resources information from this resource, obtain the management role information of this resource simultaneously, then current business is mated with management role condition, if the match is successful, then carry out corresponding task process according to task setting, as business datum reported the memory node of resource.Idiographic flow is as shown in Figure 7:
Step 701: the passive service that business generation node there occurs this resource, request generation as called in terminal use or the requested download of media file etc.;
Step 702: business generation node carries out other business logic processing according to service needed;
Step 703: when business generation node is according to business need, when needing memory node request resource information (as the resource service node) to this resource, then obtains the management role information of this resource simultaneously;
Step 704 is to step 705: the memory node of resource, according to inquiry request, after the resource informations such as the service node of Gains resources and Resource management tasks, returns these information to business generation node;
In addition, in step 703 to step 705, when business generation node is to memory node Gains resources information, the management role information of resource, the transmission of these request messages also can be separated to be carried out; In like manner, corresponding response also can be separated and carry out.
Step 706: business generation node mates with Resource management tasks treatment conditions the business occurred;
Step 707 is to step 709: if the match is successful for the business occurred and Resource management tasks treatment conditions, then business generation node carries out inter-related task process according to task setting, as organized reported data, then to the memory node reported data of resource.Meanwhile, business generation node carries this Resource management tasks information or reports mark in the service message being transmitted to other node.Wherein, step 709b is optional step;
In addition, reported data mode herein can also have multiple mapping mode, as real-time report, timing report, can also be by Resource Storage node active obtaining, or notifies that Resource Storage node obtains data by business generation node.
Step 710 is to step 711: the memory node of resource forwards reported data by the access node of management node to management node;
Step 712 is to step 713: after management node receives reported data, analyzes this data, finds corresponding management role, needs to store this data when storing reported data according to being set in of this management role.
The task processing mode two of resource passive service:
If the passive service of resource occurs, then business generation node is not often the service node of this resource.Another kind of task processing mode is now: business generation node is when needing the memory node Gains resources information from this resource, obtain management role information and the access node information of this resource simultaneously, then current business is mated with management role treatment conditions, if the match is successful, then carry out corresponding task process according to task setting, as to access node reported data.Idiographic flow is as shown in Figure 8:
Step 801: the passive service that business generation node there occurs this resource, request generation as called in terminal use or the requested download of media file etc.;
Step 802: business generation node carries out other business logic processing according to service needed;
Step 803: when business generation node is according to business need, when needing memory node request resource information (as the resource service node) to this resource, then obtains management role information and the access node information of this resource simultaneously;
Step 804 is to step 805: the memory node of resource, according to inquiry request, after the resource informations such as Gains resources service node and Resource management tasks and access node information, returns these information to business generation node;
In addition, in step 803 to step 805, when business generation node is to memory node Gains resources information, management role information, the access node information of resource, the transmission of these request messages can be separated from each other or combination in any is carried out; In like manner, response message also can handle accordingly.
Step 806: business generation node mates with Resource management tasks treatment conditions the business occurred;
Step 807 is to step 809: if the match is successful for the business occurred and Resource management tasks treatment conditions, then business generation node carries out inter-related task process according to task setting, as organized reported data, then to access node reported data.Meanwhile, business generation node carries this Resource management tasks information or reports mark in the service message being transmitted to other node.Wherein, step 809b is optional step;
In addition, reported data mode herein can also have multiple mapping mode, as real-time report, timing report, can also be by access node active obtaining, or notifies that access node obtains data by business generation node.
Step 810: the access node of management node forwards reported data to management node;
In addition, in step 809a to step 810: business generation node also can with management node direct interaction, to transmit reported data.Mapping mode is same as above.
Step 811 is to step 812: after management node receives reported data, analyzes this data, finds corresponding management role, needs to store this data when storing reported data according to being set in of this management role.
The task processing mode three of resource passive service:
If the passive service of resource occurs, then business generation node is not often the service node of this resource.Now also has other task processing mode: business generation node is when needing the memory node Gains resources information from this resource, obtain management role information and the access node information of this resource simultaneously, then current business is mated with management role treatment conditions, if the match is successful, then carry out corresponding task process according to task setting, as to access node reported data.Idiographic flow is as shown in Figure 9:
Step 901: the passive service that business generation node there occurs this resource, request generation as called in terminal use or the requested download of media file etc.;
Step 902: business generation node carries out other business logic processing according to service needed;
Step 903: when business generation node is according to business need, when needing memory node request resource information (as the resource service node) to this resource, then obtain the management node access node information that the management role information of this resource is corresponding simultaneously, and carry the business information of current generation in the request;
Step 904 is to step 906: the memory node of resource is according to inquiry request, after the access node information of the management node of the resource informations such as the service node of Gains resources and Resource management tasks and correspondence, the business information received is mated with Resource management tasks treatment conditions, then returns resource information, access node information and task treatment conditions matching result information to business generation node;
In addition, in step 903 to step 906, business generation node to the memory node Gains resources information of resource, access node information, send the business information of current generation time, the transmission of these request messages can be separated from each other or combination in any is carried out; In like manner, response message also can handle accordingly.
Step 907 is to step 909: if the business occurred and the success of Resource management tasks Condition Matching, then business generation node carries out inter-related task process according to task setting, as organized reported data, then to access node reported data.Business generation node carries and reports mark in the service message being transmitted to other node simultaneously.Wherein, step 909b is optional step;
In addition, reported data mode herein can also have multiple mapping mode, as real-time report, timing report, can also be by access node active obtaining, or notifies that access node obtains data by business generation node.
Step 910: the access node of management node forwards reported data to management node;
In addition, in step 909a to step 910: business generation node can with management node direct interaction, to transmit reported data.Mapping mode is same as above.
Step 911 is to step 912: after management node receives reported data, analyzes this data, finds corresponding management role, needs to store this data when storing reported data according to being set in of this management role.
Resource management tasks moves:
When the service node of resource switches due to fault or planning or other reason, it stores or the Resource management tasks of buffer memory needs to transfer to new service node.Idiographic flow is as shown in Figure 10:
Step 1001: due to fault or other reason, the service node of resource there occurs switching;
Step 1002: when the service node of resource switches, the memory node of resource initiatively or passive perceive this switching after, the communication information of the service node in resource information can be upgraded;
Step 1003: the memory node of resource is from local search to the management role that the resource that service node switches occurs;
Step 1004: the memory node of resource sends the management role of this resource to the existing service node of resource;
Step 1005 is to step 1006: after the existing service node of resource receives Resource management tasks, stores or under buffer memory, then return response to Resource Storage node in this locality;
Step 1007: the memory node of resource sends the request of the management role of deleting this resource to the former service node of resource;
Step 1008 is to step 1009: after the former service node of resource receives Resource management tasks removal request, is stored this locality or the respective resources management role of buffer memory is deleted or cancels, and returns response to the memory node of resource;
In addition, in step 1008 to step 1009: when the switching of service node be cause because of the former service node fault of resource time, then the former service node of resource cannot return and delete response.
Cancel Resource management tasks:
After Resource management tasks is issued to target service network, sometimes because operator changes one's intention or service needed, the Resource management tasks that some have been assigned can be cancelled.Now, just need the corresponding Resource management tasks of storage on the memory node of resource and the service node of resource or buffer memory to cancel.Idiographic flow is as shown in figure 11:
Step 1101: need for some reason to cancel some Resource management tasks that management node is specified;
Step 1102: management node sends to the access node of objective network by cancelling Resource management tasks request.This request protocol message used can embody to be deleted or upgrades (if state updating is calcellation, cancellation etc.);
Step 1103 is to step 1104: access node obtains the communication information of the memory node of resource according to configuration or algorithm or other specified rule etc., and the memory node then to resource forwards the request cancelling Resource management tasks;
Step 1105: after the memory node of resource receives the request cancelling Resource management tasks, deletes or local storage or the Resource management tasks of buffer memory of cancelling;
Step 1106 is to step 1107: the memory node of resource obtains the communication information of the service node of the corresponding resource of management role, and the service node then to resource forwards the request cancelling Resource management tasks;
Step 1108 is to step 1109: after the service node of resource receives the request cancelling Resource management tasks, deletes or local storage or the Resource management tasks of buffer memory of cancelling, and returns to the memory node of resource and delete response;
Step 1110 is to step 1111: the memory node of resource, by the access node of management node, returns to management node and deletes response.
Known in conjunction with above each flow process, the overall operation thinking that the present invention realizes Resource management tasks process can represent as shown in figure 12.See the general flow chart realizing Resource management tasks process that Figure 12, Figure 12 are the embodiment of the present invention, this flow process comprises the following steps:
Step 1210: management node is after objective network down distributing resource management role, and described Resource management tasks is stored in intermediate storage entity by described objective network.Described intermediate storage entity can be the memory node of resource, also can be the service node of resource.
Step 1220: when the business of described resource occurs, corresponding business generation node obtains the Resource management tasks corresponding to described resource from described intermediate storage entity, and carries out corresponding task process.
In order to ensure that aforesaid operations can realize smoothly, can arrange as shown in fig. 13 that.See the system diagram realizing Resource management tasks process that Figure 13, Figure 13 are the embodiment of the present invention, this device comprises connected intermediate storage maintenance unit, Resource management tasks processing unit.Wherein, intermediate storage maintenance unit can be arranged in the memory node of resource or the service node of resource; Also can be arranged in the memory node of resource and the service node of resource, and the corresponding function entity in these two nodes is referred to as intermediate storage maintenance unit; Certainly, intermediate storage maintenance unit also can independently be arranged.Resource management tasks processing unit then can be arranged in business generation node, or independent setting.
During embody rule, management node is after objective network down distributing resource management role, and described Resource management tasks can be stored in intermediate storage entity by described objective network; And when the business of described resource occurs, corresponding Resource management tasks processing unit then can obtain Resource management tasks corresponding to described resource from described intermediate storage entity, and carry out corresponding task process.
Visible in sum, no matter be method or system, adopt the technology realizing Resource management tasks process that the present invention proposes, Resource management tasks is arranged on (only on Resource Storage node or resource service node) on minority Managed node by management node, so just do not need to all Managed node broadcast resource management roles, thus avoid its network burden brought.In addition, business generation node from the memory node Gains resources management role of the service node of resource or resource, thus can determine the process of business datum according to task condition.That is this mode achieves various management for resource, as flow tracking, data observation, signaling tracing etc. with less network burden; Thus realize controlled to target service network.
The above, be only preferred embodiment of the present invention, be not intended to limit protection scope of the present invention, and all any amendments done within the spirit and principles in the present invention, equivalent replacement and improvement etc., all should be included within protection scope of the present invention.

Claims (15)

1. realize a method for Resource management tasks process, it is characterized in that, the method comprises:
Described Resource management tasks, after objective network down distributing resource management role, is stored in intermediate storage entity by management node;
When the business of described resource occurs, obtain the Resource management tasks corresponding to described resource from described intermediate storage entity, and carry out corresponding task process;
Described intermediate storage entity comprises the service node of resource and/or the memory node of resource; The process obtaining described Resource management tasks and carry out corresponding task process comprises:
If business generation node when business occurs is exactly the service node of described resource, then to store according to this node or whether the condition judgment of described Resource management tasks of buffer memory carries out corresponding task process;
If business generation node is not the described service node of described resource, the then Gains resources management role when needing the described memory node Gains resources related data to described resource, and whether carry out corresponding task process according to the condition judgment of the Resource management tasks obtained.
2. method according to claim 1, is characterized in that, the process obtaining described Resource management tasks and carry out corresponding task process comprises:
If business generation node when business occurs is not the service node of described resource, then, when needing the memory node Gains resources related data to described resource, obtain the access node information of the Resource management tasks of described resource and the management node of correspondence thereof; Afterwards, whether described resource generation node carries out corresponding task process according to the condition judgment of the Resource management tasks obtained.
3. method according to claim 2, is characterized in that, Resource management tasks be set as needing reported data time, the method comprises further: to described access node reported data.
4. method according to claim 1, is characterized in that, described intermediate storage entity comprises the service node of resource and/or the memory node of resource; The process obtaining described Resource management tasks and carry out corresponding task process comprises:
If business generation node when business occurs is not the service node of described resource, then send business information when needing the memory node Gains resources related data to described resource to the memory node of described resource, and obtain the access node information of the Resource management tasks of described resource and the management node of correspondence thereof; The business that the memory node of described resource occurs according to the condition judgment of described Resource management tasks the need of carrying out corresponding task process, backward described business generation node return judged result; Described business generation node so according to judged result determine whether carry out corresponding task process.
5. method according to claim 4, is characterized in that, determine to need to carry out task process and Resource management tasks be set as needing reported data time, the method comprises further: by described business generation node to described access node reported data.
6. the method according to any one of claim 1 to 5, is characterized in that, described task process is business logic processing, or data is reported the memory node of described resource or the operating process of management node;
Wherein, report described in is that real-time report or timing report; Or described business generation node active reporting, or passively reporting of triggering of the memory node of described resource or the active obtaining of management node.
7. the method according to any one of claim 1 to 5, is characterized in that, when described intermediate storage entity comprises the service node of the memory node of resource and resource, the process that described Resource management tasks is stored in intermediate storage entity is comprised:
To receive and described Resource management tasks is initiatively transmitted to the service node of described resource by the memory node storing the described resource of Resource management tasks; Or,
The memory node of described resource returns the service node of described resource to the access node of described management node, then forwards described Resource management tasks by described access node to the service node of described resource.
8. realize a system for Resource management tasks process, it is characterized in that, this system comprises intermediate storage maintenance unit, Resource management tasks processing unit; Wherein,
Described intermediate storage maintenance unit, at management node after objective network down distributing resource management role, described Resource management tasks is comprised and is kept at interior process;
Described Resource management tasks processing unit, for when the business of described resource occurs, obtains the Resource management tasks corresponding to described resource from described intermediate storage entity, and carries out corresponding task process;
Described intermediate storage entity comprises the service node of resource and/or the memory node of resource; Described Resource management tasks processing unit at acquisition described Resource management tasks and when carrying out corresponding task process, for:
If business generation node when business occurs is exactly the service node of described resource, then to store according to this node or whether the condition judgment of described Resource management tasks of buffer memory carries out corresponding task process;
If business generation node is not the described service node of described resource, the then Gains resources management role when needing the described memory node Gains resources related data to described resource, and whether carry out corresponding task process according to the condition judgment of the Resource management tasks obtained.
9. system according to claim 8, is characterized in that, described Resource management tasks processing unit at acquisition described Resource management tasks and when carrying out corresponding task process, for:
If business generation node when business occurs is not the service node of described resource, then, when needing the memory node Gains resources related data to described resource, obtain the access node information of the Resource management tasks of described resource and the management node of correspondence thereof; Afterwards, corresponding task process whether is carried out according to the condition judgment of the Resource management tasks obtained.
10. system according to claim 9, is characterized in that, Resource management tasks be set as needing reported data time, described Resource management tasks processing unit is further used for: to described access node reported data.
11. systems according to claim 8, is characterized in that, described intermediate storage entity comprises the service node of resource and/or the memory node of resource; Described Resource management tasks processing unit at acquisition described Resource management tasks and when carrying out corresponding task process, for:
If business generation node when business occurs is not the service node of described resource, then send business information when needing the memory node Gains resources related data to described resource to the memory node of described resource, and obtain the access node information of the Resource management tasks of described resource and the management node of correspondence thereof; The business occurred according to the condition judgment of described Resource management tasks the need of carrying out corresponding task process, and determines whether carry out corresponding task process according to judged result.
12. systems according to claim 11, is characterized in that, determine to need to carry out task process and Resource management tasks be set as needing reported data time, described Resource management tasks processing unit is further used for: to described access node reported data.
System described in 13. any one of according to Claim 8 to 12, it is characterized in that, described task process is business logic processing, or data is reported the memory node of described resource or the operating process of management node;
Wherein, report described in is that real-time report or timing report; Or described business generation node active reporting, or passively reporting of triggering of the memory node of described resource or the active obtaining of management node.
System described in 14. any one of according to Claim 8 to 12, is characterized in that, when described intermediate storage entity comprises the service node of the memory node of resource and resource, when described intermediate storage entity is preserved described Resource management tasks for:
To receive and described Resource management tasks is initiatively transmitted to the service node of described resource by the memory node storing the described resource of Resource management tasks; Or,
The memory node of described resource returns the service node of described resource to the access node of described management node, then forwards described Resource management tasks by described access node to the service node of described resource.
System described in 15. any one of according to Claim 8 to 12, is characterized in that,
Described management node accesses described objective network by access node;
When described intermediate storage entity comprises the service node of the memory node of resource and/or resource, the memory node of described resource is the resource responsible node determined according to algorithmic rule, independent arrange or close with described access node establish, and by reading configured in advance or reading buffer memory or Query Database or the acquisition of nslookup method of service;
The service node of described resource independently arranges or closes with the memory node of described resource and establishes, or to close with described access node and establish, and obtain by reading configuration or reading buffer memory or Query Database or nslookup service or distributed hash algorithm or specified rule mode;
Described Resource management tasks processing node is arranged in business generation node, or independent arranges, or closes with described access node and establish;
Described business generation node also can close with described access node and establish.
CN201010529645.6A 2010-09-17 2010-10-20 Method and system for processing resource management task Active CN102412980B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201010529645.6A CN102412980B (en) 2010-09-17 2010-10-20 Method and system for processing resource management task
PCT/CN2011/078779 WO2012034473A1 (en) 2010-09-17 2011-08-23 Method and system for processing resource management tasks

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
CN201010287312 2010-09-17
CN2010102873127 2010-09-17
CN201010287312.7 2010-09-17
CN201010529645.6A CN102412980B (en) 2010-09-17 2010-10-20 Method and system for processing resource management task

Publications (2)

Publication Number Publication Date
CN102412980A CN102412980A (en) 2012-04-11
CN102412980B true CN102412980B (en) 2015-06-17

Family

ID=45830999

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010529645.6A Active CN102412980B (en) 2010-09-17 2010-10-20 Method and system for processing resource management task

Country Status (2)

Country Link
CN (1) CN102412980B (en)
WO (1) WO2012034473A1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103546569B (en) * 2013-10-28 2016-09-07 华为技术有限公司 Method for processing business based on Policies sharing, node and system
CN111178823B (en) * 2019-11-28 2023-06-16 泰康保险集团股份有限公司 Method and device for canceling residence related transaction

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1992607A (en) * 2005-12-30 2007-07-04 西门子通信技术(北京)有限公司 Communication application method of IP-based multimedia subsystem
CN101202761A (en) * 2007-12-04 2008-06-18 赵晓宇 System of distributed resource scheduling and method thereof
CN101340331A (en) * 2007-07-06 2009-01-07 中国电信股份有限公司 Method for executing system task by idle terminal in P2P network
CN101699436A (en) * 2009-10-20 2010-04-28 中兴通讯股份有限公司 Method, device and system for resource management

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005266917A (en) * 2004-03-16 2005-09-29 Nec Corp Distributed resource acquisition system, distributed resource acquisition method and program for distributed resource acquisition

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1992607A (en) * 2005-12-30 2007-07-04 西门子通信技术(北京)有限公司 Communication application method of IP-based multimedia subsystem
CN101340331A (en) * 2007-07-06 2009-01-07 中国电信股份有限公司 Method for executing system task by idle terminal in P2P network
CN101202761A (en) * 2007-12-04 2008-06-18 赵晓宇 System of distributed resource scheduling and method thereof
CN101699436A (en) * 2009-10-20 2010-04-28 中兴通讯股份有限公司 Method, device and system for resource management

Also Published As

Publication number Publication date
CN102412980A (en) 2012-04-11
WO2012034473A1 (en) 2012-03-22

Similar Documents

Publication Publication Date Title
CN111200657B (en) Method for managing resource state information and resource downloading system
US9465819B2 (en) Distributed database
CN102907065A (en) System and method for managing data delivery in a peer-to-peer network
CN111901705B (en) OMCI function virtualization system of OLT equipment
JP2016001922A (en) Communication system, controller, communication method, and program
US10462048B2 (en) Virtual cluster establishment method and network device
CN111757353B (en) Network data processing method and device in 5G core network
CN113542058B (en) Data source returning method, server and storage medium
CN103095587B (en) A method for registration service, network group center control nodes and system
CN111741508B (en) Method, controller, forwarding device, device and medium for establishing communication connection
CN110324406A (en) A kind of method and cloud service system obtaining business datum
CN105450964A (en) Method, system and management node for carrying out cloud storage on picture recording data
CN102412980B (en) Method and system for processing resource management task
CN101771557A (en) Method for managing object instance and alias and equipment
CN111314899A (en) Message processing method, related device and system
CN104737505A (en) Routing method based on cache and route node
US9348847B2 (en) Data access control apparatus and data access control method
KR101469310B1 (en) Method and system for end-to-end QoS guaranteed content delivery on service overlay network
CN113612735B (en) Secure storage system
CN112104888B (en) Method and system for grouping live broadcast users
CN105376275A (en) Software-defined network (SDN)-based data management method and system
CN102017568A (en) System for delivery of content to be played autonomously
CN103795810A (en) Data distribution system and method and central server of data distribution system
CN110099208B (en) Method and device for cross-level and cross-domain upgrading of camera in video monitoring system
CN113742416A (en) Data processing method, device, system and storage medium

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20171221

Address after: 221700 Xinhua lane, Fengxian County, Xuzhou, Jiangsu Province, No. 6

Patentee after: Fengxian County science and Technology Development Service Station

Address before: 518057 Guangdong Shenzhen city Nanshan District high tech Industrial Park, technology south road Zhongxing communication building A 5 Building Department of forensic affairs

Patentee before: ZTE Corporation

TR01 Transfer of patent right