CN102412980A - Method and system for processing resource management task - Google Patents

Method and system for processing resource management task Download PDF

Info

Publication number
CN102412980A
CN102412980A CN2010105296456A CN201010529645A CN102412980A CN 102412980 A CN102412980 A CN 102412980A CN 2010105296456 A CN2010105296456 A CN 2010105296456A CN 201010529645 A CN201010529645 A CN 201010529645A CN 102412980 A CN102412980 A CN 102412980A
Authority
CN
China
Prior art keywords
resource
node
task
resource management
management task
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2010105296456A
Other languages
Chinese (zh)
Other versions
CN102412980B (en
Inventor
彭永林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fengxian County science and Technology Development Service Station
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN201010529645.6A priority Critical patent/CN102412980B/en
Priority to PCT/CN2011/078779 priority patent/WO2012034473A1/en
Publication of CN102412980A publication Critical patent/CN102412980A/en
Application granted granted Critical
Publication of CN102412980B publication Critical patent/CN102412980B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)
  • Computer And Data Communications (AREA)
  • Information Retrieval, Db Structures And Fs Structures Therefor (AREA)

Abstract

The invention discloses a method and system for processing a resource management task. The method comprises the following steps of: storing the resource management task in an intermediate storage entity after issuing the resource management task to a target network by a management node; and when the service of the resource happens, obtaining the resource management task corresponding to the resource from the intermediate storage entity, and processing the task correspondingly. By adopting the technology for processing the resource management task, disclosed by the invention, the management node sets the resource management task on few managed nodes (only on resource storage nodes or resource service nodes), thus the process of broadcasting the resource management task to all the managed nodes is unnecessary, and the network load caused by broadcasting the resource management task is avoided.

Description

Realize the method and system that the resource management task is handled
Technical field
The present invention relates to the communications field, be specifically related to the method and system of realizing that the resource management task is handled.
Background technology
In networks such as telecommunications,, usually need dispose special network management system and come node and resource in the management service network in order to realize the controlled of business network.Said node mainly refers to realize the equipment or the functional entity of business function; Said resource mainly refers to the miscellaneous service data.For example in IP-based mediaphone system, node mainly comprises call session processing capacity agent node, call session processing capacity service node, home signature user server etc.; Resource mainly comprises contracted user's data etc.In the mediaphone system based on P2P, node comprises that mainly the user inserts peer node, user's responsible peer node, user's service peer node etc.; Resource mainly comprises user contracting data etc.In the Streaming Media download system based on P2P, node comprises that mainly the user inserts that peer node, user data are responsible for peer node, media content is responsible for peer node, download process service peer node etc.; Resource mainly comprises user contracting data, media data etc.Said node administration is meant the various management to the node entity, like node configuration, joint behavior monitoring ability etc.; Said resource management pointer is to the various management of business datum, in full according to observations, signaling tracing, operation flow tracking etc.
It is fairly simple that node is managed, and can also directly issue management role to it by the intended target node, and node is according to the management role reported data then.Resource is managed then relative complex,, but do not have fixed correspondence between resource management task many times and the node because the resource management task also need be issued on the node; So adopt the NMS of prior art to unify in some similar management systems, all be with the resource management task be published to resource carry out task when handling on each node of process.When business takes place, can search corresponding task from this node, whether decision carries out corresponding task processing according to the task matching condition then.
The flow process of the establishing resource management role of existing techniques in realizing is as shown in Figure 1, and flow process shown in Figure 1 may further comprise the steps:
Step 101: on management node, specify management target resource sign;
Step 102: set management role to this target resource, comprise information such as data report condition;
Step 103a: after the resource management task setting, management node is indicated to being sent resource management task creation request message by pipe node 1 according to the operator;
Step 104a: after being received resource management task creation request message, after necessarily handling this task is stored by pipe node 1;
Step 105a: after being received or handle this establishment request by pipe node 1, return response message to management node;
Step 103b is to step 105b: ask other by the process of pipe node establishing resource management role, its processing mode with 103a to step 105a;
Step 103c is to step 105c: request is by the process of pipe node N establishing resource management role, its processing mode with 103a to step 105a;
The flow process that the resource management task of existing techniques in realizing is handled is as shown in Figure 2, and flow process shown in Figure 2 may further comprise the steps:
Step 201: the business that certain resource has been taken place on the pipe node;
Step 202: the management role of being searched the professional resource of this generation by pipe node;
Step 203: judged by pipe node whether the business of current generation and the condition of the resource management task that finds mate, then do not carry out the task processing if match; If then carrying out that task data reports, coupling waits relevant task processing;
Step 204: reported the relevant data of resource management task to management node immediately or regularly by pipe node;
Step 205: after management node is received reported data, analyze this data, find its corresponding management role;
Step 206: management node carries out storage as required.
Need to prove that above-mentioned resource management mode only is applicable to the network that destination node is fewer, the destination node in managed network is (like peer-to-peer network) more for a long time, just need the resource management task be broadcast to whole network; Like this, will bring bigger burden, even produce network storm to network.
Summary of the invention
In view of this, main purpose of the present invention is the method and system of realizing that the resource management task is handled is provided, and effectively reduces network burden.
For achieving the above object, technical scheme of the present invention is achieved in that
A kind of method that realizes that the resource management task is handled, this method comprises: management node is stored in said resource management task in the intermediate storage entity after objective network down distributing resource management role; When the business of said resource takes place, obtain the pairing resource management task of said resource, and carry out corresponding task and handle from said intermediate storage entity.
Said intermediate storage entity comprises the service node of resource and/or the memory node of resource; Obtain said resource management task and carry out the process that corresponding task handles to comprise:, then whether carry out corresponding task and handle according to the condition judgment of the said resource management task of storage of this node or buffer memory if the professional occurrence node during professional the generation is exactly the service node of said resource; If professional occurrence node is not the said service node of said resource; Then in the time need obtaining resource-related data, obtain the resource management task, and whether carry out corresponding task according to the condition judgment of the resource management task that obtains and handle to the said memory node of said resource.
Said intermediate storage entity comprises the service node of resource and/or the memory node of resource; Obtain said resource management task and carry out the process that corresponding task handles to comprise: if the professional occurrence node during professional the generation is not the service node of said resource; Then in the time need obtaining resource-related data, obtain the resource management task of said resource and the access node information of corresponding management node thereof to the memory node of said resource; Afterwards, whether said resource occurrence node carries out corresponding task processing according to the condition judgment of the resource management task that obtains.
When being set at of resource management task needed reported data, this method further comprised: to said access node reported data.
Said intermediate storage entity comprises the service node of resource and/or the memory node of resource; Obtain said resource management task and carry out the process that corresponding task handles to comprise: if the professional occurrence node during professional the generation is not the service node of said resource; Then in the time need obtaining resource-related data, send business information, and obtain the resource management task of said resource and the access node information of corresponding management node thereof to the memory node of said resource to the memory node of said resource; Whether needs carry out corresponding task to the memory node of said resource handles according to the business that condition judgment took place of said resource management task, return judged result to said professional occurrence node afterwards; Said professional occurrence node and then whether carry out corresponding task according to judged result decision and handle.
Task is handled and being set at when needing reported data of resource management task confirming to carry out, and this method further comprises: by said professional occurrence node to said access node reported data.
It is business logic processing that said task is handled, or data are reported the operating process of the memory node or the management node of said resource; Wherein, said reporting is that real-time report or timing report; Or said professional occurrence node initiatively reports, or the active of the memory node of said resource or management node is obtained triggered passive and reported.
When said intermediate storage entity comprised the service node of memory node and resource of resource, the process that said resource management task is stored in the intermediate storage entity comprises: the memory node of receiving and store the said resource of resource management task initiatively was transmitted to said resource management task the service node of said resource; Perhaps, the memory node of said resource returns the service node of said resource to the access node of said management node, transmits said resource management task by said access node to the service node of said resource then.
A kind of system that realizes that the resource management task is handled, this system comprises intermediate storage maintenance unit, resource management task processing unit; Wherein, said intermediate storage maintenance unit is used at management node after objective network down distributing resource management role, and said resource management task is comprised the processing in being kept at; Said resource management task processing unit is used for when the business of said resource takes place, obtaining the pairing resource management task of said resource from said intermediate storage entity, and carries out corresponding task and handle.
Said intermediate storage entity comprises the service node of resource and/or the memory node of resource; Said resource management task processing unit is when obtaining said resource management task and carry out the corresponding task processing; Be used for:, then whether carry out corresponding task and handle according to the condition judgment of the said resource management task of storage of this node or buffer memory if the professional occurrence node during professional the generation is exactly the service node of said resource; If professional occurrence node is not the said service node of said resource; Then in the time need obtaining resource-related data, obtain the resource management task, and whether carry out corresponding task according to the condition judgment of the resource management task that obtains and handle to the said memory node of said resource.
Said intermediate storage entity comprises the service node of resource and/or the memory node of resource; Said resource management task processing unit is when obtaining said resource management task and carry out the corresponding task processing; Be used for: the professional occurrence node during as if professional the generation is not the service node of said resource; Then in the time need obtaining resource-related data, obtain the resource management task of said resource and the access node information of corresponding management node thereof to the memory node of said resource; Afterwards, whether carrying out corresponding task according to the condition judgment of the resource management task that obtains handles.
When being set at of resource management task needed reported data, said resource management task processing unit was further used for: to said access node reported data.
Said intermediate storage entity comprises the service node of resource and/or the memory node of resource; Said resource management task processing unit is when obtaining said resource management task and carry out the corresponding task processing; Be used for: the professional occurrence node during as if professional the generation is not the service node of said resource; Then in the time need obtaining resource-related data, send business information, and obtain the resource management task of said resource and the access node information of corresponding management node thereof to the memory node of said resource to the memory node of said resource; Whether needs carry out corresponding task handles according to the business that condition judgment took place of said resource management task, and whether decision is carried out corresponding task and handled according to judged result.
When confirming that need carry out being set at of task processing and resource management task needs reported data, said resource management task processing unit is further used for: to said access node reported data.
It is business logic processing that said task is handled, or data are reported the operating process of the memory node or the management node of said resource; Wherein, said reporting is that real-time report or timing report; Or said professional occurrence node initiatively reports, or the active of the memory node of said resource or management node is obtained triggered passive and reported.
When said intermediate storage entity comprised the service node of memory node and resource of resource, said intermediate storage entity is used for when said resource management task is preserved: the memory node of receiving and store the said resource of resource management task initiatively was transmitted to said resource management task the service node of said resource; Perhaps, the memory node of said resource returns the service node of said resource to the access node of said management node, transmits said resource management task by said access node to the service node of said resource then.
Said management node inserts said objective network through access node; When said intermediate storage entity comprises the service node of memory node and/or resource of resource; The memory node of said resource is the resource responsible node according to the algorithmic rule decision; Independent be provided with or close with said access node establish, and through reading configured in advance or reading buffer memory or Query Database or nslookup method of service obtain; The service node of said resource independently is provided with or closes with the memory node of said resource and establishes; Or close with said access node and to establish, and through reading configuration or reading buffer memory or Query Database or nslookup service or distributed hash algorithm or specified rule mode obtain;
Said resource management task processing node is arranged in the professional occurrence node, and perhaps independent the setting perhaps closed with said access node and established.
Said professional occurrence node also can be closed with said access node and established.
The realization resource management task Treatment Technology that adopts the present invention to propose; Management node is arranged on minority by (only on resource memory node or resource service node) on the pipe node with the resource management task; So need be to all by pipe node broadcast resource management role, thus the network burden of having avoided it to bring.In addition, professional occurrence node can be obtained the resource management task from the service node of resource or the memory node of resource, thereby determines the processing of business datum according to task condition.That is to say that this mode has realized the various management to resource with less network burden, like flow process tracking, data observation, signaling tracing etc.; Thereby realization is controlled to the target service network.
Description of drawings
Fig. 1 is the establishing resource management role flow chart of prior art;
Fig. 2 is the resource management task process chart of prior art;
Fig. 3 is that the resource management task of the embodiment of the invention is provided with and the handling principle sketch map;
Fig. 4 is the flow chart of the establishing resource management role mode one of the embodiment of the invention;
Fig. 5 is the flow chart of the establishing resource management role mode two of the embodiment of the invention;
Fig. 6 is the initiatively professional task process chart of resource of the embodiment of the invention;
Fig. 7 is the flow chart of task processing mode one of the resource passive service of the embodiment of the invention;
Fig. 8 is the flow chart of task processing mode two of the resource passive service of the embodiment of the invention;
Fig. 9 is the flow chart of task processing mode three of the resource passive service of the embodiment of the invention;
Figure 10 is the resource management task immigration flow chart of the embodiment of the invention;
Figure 11 is the cancellation resource management mission flow diagram of the embodiment of the invention;
Figure 12 is the general flow chart that the realization resource management task of the embodiment of the invention is handled;
Figure 13 is the system diagram that the realization resource management task of the embodiment of the invention is handled.
Embodiment
When practical operation, can the resource management task be published on resource memory node and the resource service node, if professional occurrence node is exactly the service node of this resource, then whether carries out corresponding task and handle according to the management role condition judgment of this node storage; If when this business occurrence node is not the service node of this resource, in the time of then need obtaining resource-related data, obtain the management role of this resource, and whether carry out corresponding task according to the management role condition judgment that obtains and handle at memory node from this resource.
A kind of embodiment of aforesaid operations thinking can have following characteristic:
A: management node is to objective network down distributing resource management role, and said objective network is stored said resource management task or be buffered in the memory node of said resource;
B: the service node of said resource obtains said resource management task, and storage or this resource management task of buffer memory;
C: when the business of said resource took place, professional occurrence node obtained said resource management task from the service node or the memory node of said resource, and carried out corresponding task according to the setting of the resource management task of being obtained and handle.
Need to prove that among the characteristic A, said management node can insert said objective network through access node, and then can send said resource management task to said objective network through said access node; And said objective network is with the storage of said resource management task or be buffered in the memory node of the resource that said resource management task is directed against; Have again; The memory node of said resource can be the resource responsible node according to certain rule (like distributed hash algorithm or other specified rule) decision; And can be same node, and can be through reading configured in advance or reading buffer memory or modes such as Query Database or nslookup service obtain with said access node.
Among the characteristic B, the service node of said resource can be same node with said resource memory node; And the service node of said resource can be through reading configuration or reading buffer memory or Query Database or nslookup service or modes such as distributed hash algorithm or other specified rule obtain; Have, the memory node of said resource can initiatively be transmitted to said resource management task the service node of said resource again; In addition, the memory node of said resource can return the service node of said resource to said access node, transmits said resource management task by said access node to the service node of said resource then.
Among the characteristic C, when the business of said resource takes place,, then whether carry out corresponding task and handle according to the condition judgment of the said resource management task of storage of this node or buffer memory if professional occurrence node is exactly the said service node of said resource; If professional occurrence node is not the said service node of said resource; Then can in the time need obtaining said resource-related data (like the said service node information of said resource etc.), obtain the resource management task, and whether carry out corresponding task according to the condition judgment of the resource management task that obtains and handle to the said memory node of said resource.
Have again; Among the characteristic C; When the business of said resource takes place; If professional occurrence node is not the said service node of said resource, then can be in the time need obtaining said resource-related data (like the said service node information of said resource etc.) to the said memory node of said resource, obtain the resource management task of said resource and the access node information of corresponding management node thereof; Afterwards, whether said resource occurrence node can carry out corresponding task according to the condition judgment of the resource management task that obtains is handled, can also be to said access node reported data when being set at of resource management task needs reported data.
Perhaps; Among the characteristic C; When the business of said resource takes place; If professional occurrence node is not the said service node of said resource, then can in the time need obtaining said resource-related data (like the said service node information of said resource etc.), sends business information by the memory node to said resource, and obtain the resource management task of said resource and the access node information of corresponding management node thereof to the said memory node of said resource.The memory node of said resource can whether needs carry out corresponding task handles according to the business that condition judgment took place of said resource management task, return judged result to said professional occurrence node afterwards.Said professional occurrence node and then can whether carry out corresponding task according to judged result decision and handle; And confirming to carry out task is handled and being set at when needing reported data of resource management task, by said professional occurrence node to said access node reported data.Said access node can be same node with said memory node or said service node or said professional occurrence node or said task processing node.
In addition, among the characteristic C, handling according to the task that the setting of resource management task is carried out, can be some business logic processing, also can be the operating process that data is reported the memory node or the management node of said resource.Wherein, described reporting can be that real-time report or timing report; Can be that said professional occurrence node initiatively reports, also can be that passive the reporting that (this initiatively obtains the notice that possibly come from said professional occurrence node) triggered obtained in the memory node of said resource or the active of management node.
Below, setting and the processing method that adopts resource management task of the present invention is described in detail.
The setting of resource management task and processing method:
Fig. 3 is the setting and the processing method sketch map of the resource management task that realizes of the present invention.Among Fig. 3; Objective network is made up of node 1, node 3, node 6, node 8, node 9, node 11, node 14, node 16, node 19, node 20 these nodes, and each node is formed concrete network topology structure (like IP-based mediaphone network topology structure, based on the mediaphone network topology structure of peer to peer technology etc.) according to business relations or other rule.Suppose that management node passes through node 1 and inserts objective network; Resource 1 is managed; Node 6 be resource 1 memory node (as in IP-based mediaphone network for home signature user server; At the mediaphone network based on peer to peer technology is the responsible node of user data); Node 9 is service nodes (as in IP-based mediaphone network, being calling session control server, being the node of carrying out CSCF at the mediaphone network based on peer to peer technology) of resource 1.During actual the realization, node 1 can be same node with node 6, and node 6 also can be same node with node 9, and node 1 also can be same node with node 9, and node 1 can also be same node with professional occurrence node.
Management node is published to the management role of resource 1 on the memory node 6 of resource through access node 1; Then node 6 initiatively or passive management role with resource 1 be transmitted to the service node 9 of resource; If the professional occurrence node of resource 1 (promptly professional current processing node) is exactly a node 9, then whether node 9 carries out corresponding task processing according to the management role condition judgment of self stored resource 1; If the professional occurrence node of resource 1 is not a node 9, when then node 9 need obtain resource-related data at the memory node 6 from resource 1, obtains the management role of resource 1, and whether carry out corresponding task according to the management role condition judgment that obtains and handle.
The setting of above-mentioned resource management task and processing thinking have realized the management to resource data and related procedure with lower performance cost.
Establishing resource management role mode one:
One of mode of establishing resource management role is: management node is issued the request of resource management task creation the memory node of this resource through access node; The memory node of resource sets after the management role service node that this task is transmitted to resource, and the service node of resource is provided with this management role too.Idiographic flow is as shown in Figure 4:
Step 401 to step 402: the target resource of on management node, specifying institute to manage identifies, and to this resource settings management role information, management role information comprises information such as task treatment conditions, task processing mode then;
Step 403: after the resource management task setting was good, management node sent to the request of resource management task creation from the access node in objective network;
Step 404: after access node is received the request of resource management task creation, obtain the communication information of memory node of the target resource of this task.The obtain manner of the said communication information can for: read configuration or buffer memory, domain name service query or distributed hash algorithm etc.;
Step 405: access node is transmitted the resource management task creation request that management node is sent according to the communication information of resource memory node to the memory node of resource;
Step 406 to step 408: after the memory node of resource received that access node is transmitted next resource management task creation request, at first in the storage of this node or this management role of buffer memory, the access node through management node returned response to management node then.
Step 409: the memory node of resource is obtained the communication information of the service node of this resource.The mode of obtaining the said communication information is: read configuration or buffer memory, domain name service query or distributed hash algorithm etc.;
Step 410: the memory node of resource is transmitted the resource management task creation request that access node is sent according to the communication information of resource service node to the service node of resource;
Step 411: after the service node of resource received that the memory node of resource is transmitted next resource management task creation request, in the storage of this node or this management role of buffer memory, the memory node to resource returned response then;
In addition, if when the memory node of resource receives the resource management task, the also unallocated service node of this resource, then step 409 to step 412 just execution after giving this resource allocation service node; The service node that step 409 to step 412 also can be transformed to by resource initiatively obtains the resource management mission bit stream from the memory node of resource.Have, the resource management task can be used as an additional information of resource information again, with the service resources information stores together; Also can store with the service resources unpack.
Establishing resource management role mode two:
The another kind of mode of establishing resource management role is: management node is issued the request of resource management task creation the memory node of this resource through access node; The memory node of resource sets after the management role the communication information from this resource service node to access node that return; And then this resource management task creation request being transmitted to the service node of this resource by access node, the service node of resource is provided with this management role too.Idiographic flow is as shown in Figure 5:
Step 501 to step 502: the target resource of on management node, specifying institute to manage identifies, and to this resource settings management role information, management role information comprises information such as task treatment conditions, task processing mode then;
Step 503: after the resource management task setting was good, management node sent to the request of resource management task creation from the access node in objective network;
Step 504: after access node is received the request of resource management task creation, obtain the communication information of memory node of the target resource of this task.The mode of obtaining the resource memory node communication information is: read configuration or buffer memory, domain name service query or distributed hash algorithm etc.;
Step 505: access node is transmitted the resource management task creation request that management node is sent according to the communication information of the resource memory node that obtains to the memory node of resource;
Step 506 to step 507: after the memory node of resource receives that access node is transmitted next resource management task creation request,, obtain the communication information of the service node of this resource then at first in the storage of this node or this management role of buffer memory.The mode of obtaining resource service node communication information is: read configuration or buffer memory, domain name service query or distributed hash algorithm etc.;
Step 508: the memory node of resource returns to access node with the communication information of the resource service node that obtains;
In addition, step 505 to step 508 also can have other mapping mode, like the memory node forward resource management task creation request of access node to resource, returns response after the storage of the memory node of resource or this management role of buffer memory.Access node is to the communication information of the memory node query resource service node of resource then, and the memory node of resource returns to access node after obtaining the resource service node.
Step 509: access node is to the service node forward resource management task creation request of resource;
Step 510: after the service node of resource receives that access node is transmitted next resource management task creation request, in the storage of this node or this management role of buffer memory;
Step 511 to step 412: the service node of resource returns response through the access node of management node to management node.
The initiatively professional task of resource is handled:
When corresponding resource professional takes place on the service node of resource; The service node of resource is searched the management role of this resource; Carry out the condition coupling then; As mate success and then carry out data collection according to task setting or task such as report to handle, in being transmitted to the service message of other node, carry the information or the sign of this task simultaneously.Idiographic flow is as shown in Figure 6:
Step 601: the active that this resource has taken place on the service node of resource is professional, initiates audio call or user's download media file etc. like the terminal use;
Step 602: the service node of resource is searched storage or is buffered in the local corresponding management role of this resource according to professional resource identification takes place;
Step 603: the service node of resource matees the business and the resource management task treatment conditions that take place;
Step 604a is to step 604b: if the business and the resource management task treatment conditions that take place are mated successfully, then the service node of resource carries out the inter-related task processing according to task setting, as to the access node reported data.Simultaneously, the service node of resource carries this resource management mission bit stream or reports sign in being transmitted to the service message of other node.Wherein, step 604b is an optional step;
In addition, the reported data mode here can also have multiple mapping mode, as reporting in real time, regularly reporting, can also be initiatively to be obtained by access node; Perhaps the service node notice access node by resource obtains data.
Step 605: the access node of management node is transmitted to management node with the reported data of receiving;
In addition, above-mentioned steps 604 is to step 605, and the service node that can be transformed to by resource directly reports management node with data, also can initiatively obtain data by management node, can also obtain data by the service node notice management node of resource;
Step 606 to step 607: after management node is received reported data, analyze this data, find corresponding management role, store this data when needs are stored reported data according to being set in of this management role.
The task processing mode one of resource passive service:
If the passive service of resource takes place, then professional occurrence node often is not the service node of this resource.One of task processing mode of this moment is: professional occurrence node is in the time need obtaining resource information from the memory node of this resource; Obtain the management role information of this resource simultaneously; Then current business and management role condition are mated; If mate successfully, then carry out corresponding task and handle, as business datum being reported the memory node of resource according to task setting.Idiographic flow is as shown in Figure 7:
Step 701: the passive service of this resource has taken place on the professional occurrence node, asked download etc. like called request generation of terminal use or media file;
Step 702: professional occurrence node is carried out other business logic processing according to service needed;
Step 703: when professional occurrence node according to business need, need when the memory node request resource information (like the resource service node) of this resource, then obtain the management role information of this resource simultaneously;
Step 704 to step 705: the memory node of resource is according to query requests, obtain the resource information such as service node and resource management task of resource after, return these information to professional occurrence node;
In addition, in step 703 to the step 705, when professional occurrence node was obtained resource information, management role information to the memory node of resource, the transmission of these request messages also can separate to be carried out; In like manner, corresponding response also can separate and carries out.
Step 706: professional occurrence node is mated the business and the resource management task treatment conditions that take place;
Step 707 to step 709: if the business and the resource management task treatment conditions that take place are mated successfully, then professional occurrence node is carried out the inter-related task processing according to task setting, as organizes reported data, then to the memory node reported data of resource.Simultaneously, professional occurrence node is carried this resource management mission bit stream or is reported sign in being transmitted to the service message of other node.Wherein, step 709b is an optional step;
In addition, the reported data mode here can also have multiple mapping mode, as reporting in real time, regularly reporting, can also be initiatively to be obtained by the resource memory node, perhaps obtains data by professional occurrence node notice resource memory node.
Step 710 to step 711: the memory node of resource is transmitted reported data through the access node of management node to management node;
Step 712 to step 713: after management node is received reported data, analyze this data, find corresponding management role, store this data when needs are stored reported data according to being set in of this management role.
The task processing mode two of resource passive service:
If the passive service of resource takes place, then professional occurrence node often is not the service node of this resource.The another kind of task processing mode of this moment is: professional occurrence node is in the time need obtaining resource information from the memory node of this resource; Obtain the management role information and the access node information of this resource simultaneously; Then current business and management role treatment conditions are mated; If mate successfully, then carry out corresponding task processing, as to the access node reported data according to task setting.Idiographic flow is as shown in Figure 8:
Step 801: the passive service of this resource has taken place on the professional occurrence node, asked download etc. like called request generation of terminal use or media file;
Step 802: professional occurrence node is carried out other business logic processing according to service needed;
Step 803: when professional occurrence node according to business need, need when the memory node request resource information (like the resource service node) of this resource, then obtain the management role information and the access node information of this resource simultaneously;
Step 804 to step 805: the memory node of resource is according to query requests, obtain resource informations such as resource service node and resource management task and access node information after, return these information to professional occurrence node;
In addition, in step 803 to the step 805, when professional occurrence node was obtained resource information, management role information, access node information to the memory node of resource, the transmission of these request messages can be separated from each other or combination in any is carried out; In like manner, response message also can handle accordingly.
Step 806: professional occurrence node is mated the business and the resource management task treatment conditions that take place;
Step 807 to step 809: if the business and the resource management task treatment conditions that take place are mated successfully, then professional occurrence node is carried out the inter-related task processing according to task setting, as organizes reported data, then to the access node reported data.Simultaneously, professional occurrence node is carried this resource management mission bit stream or is reported sign in being transmitted to the service message of other node.Wherein, step 809b is an optional step;
In addition, the reported data mode here can also have multiple mapping mode, as reporting in real time, regularly reporting, can also be initiatively to be obtained by access node, perhaps obtains data by professional occurrence node notice access node.
Step 810: the access node of management node is transmitted reported data to management node;
In addition, step 809a is to step 810: professional occurrence node also can be directly mutual with management node, to transmit reported data.Mapping mode is with the above.
Step 811 to step 812: after management node is received reported data, analyze this data, find corresponding management role, store this data when needs are stored reported data according to being set in of this management role.
The task processing mode three of resource passive service:
If the passive service of resource takes place, then professional occurrence node often is not the service node of this resource.Also have other task processing mode this moment: professional occurrence node is in the time need obtaining resource information from the memory node of this resource; Obtain the management role information and the access node information of this resource simultaneously; Then current business and management role treatment conditions are mated; If mate successfully, then carry out corresponding task processing, as to the access node reported data according to task setting.Idiographic flow is as shown in Figure 9:
Step 901: the passive service of this resource has taken place on the professional occurrence node, asked download etc. like called request generation of terminal use or media file;
Step 902: professional occurrence node is carried out other business logic processing according to service needed;
Step 903: when professional occurrence node according to business need; Need be when the memory node request resource information (like the resource service node) of this resource; Then obtain the corresponding management node access node information of management role information of this resource simultaneously, and in request, carry the business information of current generation;
Step 904 to step 906: the memory node of resource is according to query requests; After obtaining the access node information of resource information such as service node and resource management task and corresponding management node of resource; Business information and resource management task treatment conditions to receiving are mated, and return resource information, access node information and task treatment conditions matching result information to professional occurrence node then;
In addition, in step 903 to the step 906, when professional occurrence node was obtained the business information of resource information, access node information, the current generation of transmission to the memory node of resource, the transmission of these request messages can be separated from each other or combination in any is carried out; In like manner, response message also can handle accordingly.
Step 907 to step 909: if the business and the resource management task condition that take place mate successfully, then professional occurrence node is carried out the inter-related task processing according to task setting, as organizes reported data, then to the access node reported data.Professional occurrence node is carried in being transmitted to the service message of other node and is reported sign simultaneously.Wherein, step 909b is an optional step;
In addition, the reported data mode here can also have multiple mapping mode, as reporting in real time, regularly reporting, can also be initiatively to be obtained by access node, perhaps obtains data by professional occurrence node notice access node.
Step 910: the access node of management node is transmitted reported data to management node;
In addition, step 909a is to step 910: professional occurrence node can be directly mutual with management node, to transmit reported data.Mapping mode is with the above.
Step 911 to step 912: after management node is received reported data, analyze this data, find corresponding management role, store this data when needs are stored reported data according to being set in of this management role.
The resource management task immigration:
When the service node of resource switched owing to fault or planning or other reason, its storage or cached resources management role need be transferred to new service node.Idiographic flow is shown in figure 10:
Step 1001: owing to fault or other reason, switching has taken place in the service node of resource;
Step 1002: when the service node of resource switches, the memory node of resource initiatively or passive perceive this switching after, can upgrade the communication information of the service node in the resource information;
Step 1003: the management role of the memory node of resource from local search to the resource that the service node switching takes place;
Step 1004: the memory node of resource sends the management role of this resource to the existing service node of resource;
Step 1005 to step 1006: after the existing service node of resource is received the resource management task, under this locality storage or buffer memory, return response to the resource memory node then;
Step 1007: the memory node of resource sends the request of the management role of this resource of deletion to the former service node of resource;
Step 1008 to step 1009: the former service node of resource is deleted the respective resources management role of this locality storage or buffer memory or calcellation after receiving resource management task deletion request, and returns response to the memory node of resource;
In addition, in step 1008 to the step 1009: when the switching of service node is a former service node fault because of resource when causing, then the former service node of resource can't return the deletion response.
Cancellation resource management task:
After the resource management task is issued to the target service network, because the operator changes one's intention or service needed, can cancel the resource management task that some have been assigned sometimes.At this moment, just need be with the corresponding resource management task cancellation of storage or buffer memory on the service node of the memory node of resource and resource.Idiographic flow is shown in figure 11:
Step 1101: some the resource management task that need cancel appointment on the management node for some reason;
Step 1102: management node will be cancelled the access node that the resource management task requests sends to objective network.This is asked used protocol message can embody deletion or upgrades (being updated to calcellation, cancellation etc. like state);
Step 1103 to step 1104: access node is obtained the communication information of the memory node of resource according to configuration or algorithm or other specified rule etc., transmits the request of cancellation resource management task then to the memory node of resource;
Step 1105: after the memory node of resource is received the request of cancellation resource management task, deletion or cancel local storage or cached resources management role;
Step 1106 to step 1107: the memory node of resource is obtained the communication information of the service node of the corresponding resource of management role, transmits the request of cancellation resource management task then to the service node of resource;
Step 1108 to step 1109: after the service node of resource was received the request of cancellation resource management task, stored or the cached resources management role deletion or this locality of cancelling, and return the deletion response to the memory node of resource;
Step 1110 to step 1111: the memory node of resource returns the deletion response through the access node of management node to management node.
Can know that in conjunction with above each flow process the present invention realizes that the overall operation thinking that the resource management task is handled can represent shown in figure 12.Referring to Figure 12, Figure 12 is the general flow chart that the realization resource management task of the embodiment of the invention is handled, and this flow process may further comprise the steps:
Step 1210: management node is after objective network down distributing resource management role, and said objective network is stored in said resource management task in the intermediate storage entity.Said intermediate storage entity can be the memory node of resource, also can be the service node of resource.
Step 1220: when the business of said resource took place, the corresponding business occurrence node obtained the pairing resource management task of said resource from said intermediate storage entity, and carried out corresponding task and handle.
In order to guarantee that aforesaid operations can realize smoothly, can carry out setting shown in figure 13.Referring to Figure 13, Figure 13 is the system diagram that the realization resource management task of the embodiment of the invention is handled, and this device comprises continuous intermediate storage maintenance unit, resource management task processing unit.Wherein, the intermediate storage maintenance unit can be arranged in the service node of memory node or resource of resource; Also can be arranged in the service node of memory node and resource of resource, and the corresponding function entity in these two nodes is referred to as the intermediate storage maintenance unit; Certainly, the intermediate storage maintenance unit also can independently be provided with.The resource management task processing unit then can be arranged in the professional occurrence node, perhaps independent the setting.
During concrete the application, management node is after objective network down distributing resource management role, and said objective network can be stored in said resource management task in the intermediate storage entity; And when the business of said resource took place, corresponding resource management task processing unit then can obtain the pairing resource management task of said resource from said intermediate storage entity, and carried out corresponding task and handle.
Visible in sum; No matter be method or system; The realization resource management task Treatment Technology that adopts the present invention to propose; Management node is arranged on minority by (only on resource memory node or resource service node) on the pipe node with the resource management task, so need be to all by pipe node broadcast resource management role, thus the network burden of having avoided it to bring.In addition, professional occurrence node can be obtained the resource management task from the service node of resource or the memory node of resource, thereby determines the processing of business datum according to task condition.That is to say that this mode has realized the various management to resource with less network burden, like flow process tracking, data observation, signaling tracing etc.; Thereby realization is controlled to the target service network.
The above is merely preferred embodiment of the present invention, is not to be used to limit protection scope of the present invention, all any modifications of within spirit of the present invention and principle, being done, is equal to replacement and improvement etc., all should be included within protection scope of the present invention.

Claims (17)

1. method that realizes that the resource management task is handled is characterized in that this method comprises:
Management node is stored in said resource management task in the intermediate storage entity after objective network down distributing resource management role;
When the business of said resource takes place, obtain the pairing resource management task of said resource, and carry out corresponding task and handle from said intermediate storage entity.
2. method according to claim 1 is characterized in that, said intermediate storage entity comprises the service node of resource and/or the memory node of resource; Obtain said resource management task and carry out the process that corresponding task handles to comprise:
If the professional occurrence node during professional the generation is exactly the service node of said resource, then whether carries out corresponding task and handle according to the condition judgment of the said resource management task of storage of this node or buffer memory;
If professional occurrence node is not the said service node of said resource; Then in the time need obtaining resource-related data, obtain the resource management task, and whether carry out corresponding task according to the condition judgment of the resource management task that obtains and handle to the said memory node of said resource.
3. method according to claim 1 is characterized in that, said intermediate storage entity comprises the service node of resource and/or the memory node of resource; Obtain said resource management task and carry out the process that corresponding task handles to comprise:
If the professional occurrence node during professional the generation is not the service node of said resource, then in the time need obtaining resource-related data, obtain the resource management task of said resource and the access node information of corresponding management node thereof to the memory node of said resource; Afterwards, whether said resource occurrence node carries out corresponding task processing according to the condition judgment of the resource management task that obtains.
4. method according to claim 3 is characterized in that, when being set at of resource management task needed reported data, this method further comprised: to said access node reported data.
5. method according to claim 1 is characterized in that, said intermediate storage entity comprises the service node of resource and/or the memory node of resource; Obtain said resource management task and carry out the process that corresponding task handles to comprise:
If the professional occurrence node during professional the generation is not the service node of said resource; Then in the time need obtaining resource-related data, send business information, and obtain the resource management task of said resource and the access node information of corresponding management node thereof to the memory node of said resource to the memory node of said resource; Whether needs carry out corresponding task to the memory node of said resource handles according to the business that condition judgment took place of said resource management task, return judged result to said professional occurrence node afterwards; Said professional occurrence node and then whether carry out corresponding task according to judged result decision and handle.
6. method according to claim 5 is characterized in that, task is handled and being set at when needing reported data of resource management task confirming to carry out, and this method further comprises: by said professional occurrence node to said access node reported data.
7. according to each described method of claim 1 to 6, it is characterized in that it is business logic processing that said task is handled, or data are reported the operating process of the memory node or the management node of said resource;
Wherein, said reporting is that real-time report or timing report; Or said professional occurrence node initiatively reports, or the active of the memory node of said resource or management node is obtained triggered passive and reported.
8. according to each described method of claim 1 to 6, it is characterized in that when said intermediate storage entity comprised the service node of memory node and resource of resource, the process that said resource management task is stored in the intermediate storage entity comprised:
The memory node of receiving and store the said resource of resource management task initiatively is transmitted to said resource management task the service node of said resource; Perhaps,
The memory node of said resource returns the service node of said resource to the access node of said management node, transmits said resource management task by said access node to the service node of said resource then.
9. a system that realizes that the resource management task is handled is characterized in that this system comprises intermediate storage maintenance unit, resource management task processing unit; Wherein,
Said intermediate storage maintenance unit is used at management node after objective network down distributing resource management role, and said resource management task is comprised the processing in being kept at;
Said resource management task processing unit is used for when the business of said resource takes place, obtaining the pairing resource management task of said resource from said intermediate storage entity, and carries out corresponding task and handle.
10. system according to claim 9 is characterized in that, said intermediate storage entity comprises the service node of resource and/or the memory node of resource; Said resource management task processing unit is used for when obtaining said resource management task and carry out the corresponding task processing:
If the professional occurrence node during professional the generation is exactly the service node of said resource, then whether carries out corresponding task and handle according to the condition judgment of the said resource management task of storage of this node or buffer memory;
If professional occurrence node is not the said service node of said resource; Then in the time need obtaining resource-related data, obtain the resource management task, and whether carry out corresponding task according to the condition judgment of the resource management task that obtains and handle to the said memory node of said resource.
11. system according to claim 9 is characterized in that, said intermediate storage entity comprises the service node of resource and/or the memory node of resource; Said resource management task processing unit is used for when obtaining said resource management task and carry out the corresponding task processing:
If the professional occurrence node during professional the generation is not the service node of said resource, then in the time need obtaining resource-related data, obtain the resource management task of said resource and the access node information of corresponding management node thereof to the memory node of said resource; Afterwards, whether carrying out corresponding task according to the condition judgment of the resource management task that obtains handles.
12. system according to claim 11 is characterized in that, when being set at of resource management task needed reported data, said resource management task processing unit was further used for: to said access node reported data.
13. system according to claim 9 is characterized in that, said intermediate storage entity comprises the service node of resource and/or the memory node of resource; Said resource management task processing unit is used for when obtaining said resource management task and carry out the corresponding task processing:
If the professional occurrence node during professional the generation is not the service node of said resource; Then in the time need obtaining resource-related data, send business information, and obtain the resource management task of said resource and the access node information of corresponding management node thereof to the memory node of said resource to the memory node of said resource; Whether needs carry out corresponding task handles according to the business that condition judgment took place of said resource management task, and whether decision is carried out corresponding task and handled according to judged result.
14. system according to claim 13 is characterized in that, when confirming that need carry out being set at of task processing and resource management task needs reported data, said resource management task processing unit is further used for: to said access node reported data.
15., it is characterized in that it is business logic processing that said task is handled, or data are reported the operating process of the memory node or the management node of said resource according to each described system of claim 9 to 14;
Wherein, said reporting is that real-time report or timing report; Or said professional occurrence node initiatively reports, or the active of the memory node of said resource or management node is obtained triggered passive and reported.
16., it is characterized in that when said intermediate storage entity comprised the service node of memory node and resource of resource, said intermediate storage entity was used for when said resource management task is preserved according to each described system of claim 9 to 14:
The memory node of receiving and store the said resource of resource management task initiatively is transmitted to said resource management task the service node of said resource; Perhaps,
The memory node of said resource returns the service node of said resource to the access node of said management node, transmits said resource management task by said access node to the service node of said resource then.
17. according to each described system of claim 9 to 14, it is characterized in that,
Said management node inserts said objective network through access node;
When said intermediate storage entity comprises the service node of memory node and/or resource of resource; The memory node of said resource is the resource responsible node according to the algorithmic rule decision; Independent be provided with or close with said access node establish, and through reading configured in advance or reading buffer memory or Query Database or nslookup method of service obtain;
The service node of said resource independently is provided with or closes with the memory node of said resource and establishes; Or close with said access node and to establish, and through reading configuration or reading buffer memory or Query Database or nslookup service or distributed hash algorithm or specified rule mode obtain;
Said resource management task processing node is arranged in the professional occurrence node, and perhaps independent the setting perhaps closed with said access node and established.
Said professional occurrence node also can be closed with said access node and established.
CN201010529645.6A 2010-09-17 2010-10-20 Method and system for processing resource management task Active CN102412980B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201010529645.6A CN102412980B (en) 2010-09-17 2010-10-20 Method and system for processing resource management task
PCT/CN2011/078779 WO2012034473A1 (en) 2010-09-17 2011-08-23 Method and system for processing resource management tasks

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
CN2010102873127 2010-09-17
CN201010287312 2010-09-17
CN201010287312.7 2010-09-17
CN201010529645.6A CN102412980B (en) 2010-09-17 2010-10-20 Method and system for processing resource management task

Publications (2)

Publication Number Publication Date
CN102412980A true CN102412980A (en) 2012-04-11
CN102412980B CN102412980B (en) 2015-06-17

Family

ID=45830999

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010529645.6A Active CN102412980B (en) 2010-09-17 2010-10-20 Method and system for processing resource management task

Country Status (2)

Country Link
CN (1) CN102412980B (en)
WO (1) WO2012034473A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111178823A (en) * 2019-11-28 2020-05-19 泰康保险集团股份有限公司 Cancellation method and device for residence-related affairs

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103546569B (en) * 2013-10-28 2016-09-07 华为技术有限公司 Method for processing business based on Policies sharing, node and system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050228855A1 (en) * 2004-03-16 2005-10-13 Masahiro Kawato Acquisition system for distributed computing resources
CN1992607A (en) * 2005-12-30 2007-07-04 西门子通信技术(北京)有限公司 Communication application method of IP-based multimedia subsystem
CN101202761A (en) * 2007-12-04 2008-06-18 赵晓宇 System of distributed resource scheduling and method thereof
CN101340331A (en) * 2007-07-06 2009-01-07 中国电信股份有限公司 Method for executing system task by idle terminal in P2P network
CN101699436A (en) * 2009-10-20 2010-04-28 中兴通讯股份有限公司 Method, device and system for resource management

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050228855A1 (en) * 2004-03-16 2005-10-13 Masahiro Kawato Acquisition system for distributed computing resources
CN1992607A (en) * 2005-12-30 2007-07-04 西门子通信技术(北京)有限公司 Communication application method of IP-based multimedia subsystem
CN101340331A (en) * 2007-07-06 2009-01-07 中国电信股份有限公司 Method for executing system task by idle terminal in P2P network
CN101202761A (en) * 2007-12-04 2008-06-18 赵晓宇 System of distributed resource scheduling and method thereof
CN101699436A (en) * 2009-10-20 2010-04-28 中兴通讯股份有限公司 Method, device and system for resource management

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111178823A (en) * 2019-11-28 2020-05-19 泰康保险集团股份有限公司 Cancellation method and device for residence-related affairs
CN111178823B (en) * 2019-11-28 2023-06-16 泰康保险集团股份有限公司 Method and device for canceling residence related transaction

Also Published As

Publication number Publication date
WO2012034473A1 (en) 2012-03-22
CN102412980B (en) 2015-06-17

Similar Documents

Publication Publication Date Title
US9806983B2 (en) System and method for control flow management in software defined networks
US6263402B1 (en) Data caching on the internet
US9635107B2 (en) System and method for managing data delivery in a peer-to-peer network
KR101548021B1 (en) Method For Managing Network
CN103581245A (en) Content delivery method and system of content delivery network
US20110047272A1 (en) Dissemination of Network Management Tasks in a Distributed Communication Network
CN102045192A (en) Apparatus and system for estimating network configuration
CN104468648A (en) Data processing system and method
US20150146518A1 (en) Method and device for processing communication path
CN110324406A (en) A kind of method and cloud service system obtaining business datum
CN105450964A (en) Method, system and management node for carrying out cloud storage on picture recording data
CN102412980B (en) Method and system for processing resource management task
KR20130039652A (en) Method and apparatus for load balancing of content centric network
KR101469310B1 (en) Method and system for end-to-end QoS guaranteed content delivery on service overlay network
CN102316086A (en) Relay method for service data and relay node system
KR20140125223A (en) Method for collecting information with management interface in contents network based on information centric networking, content network management system, and node apparatus
CN108390899B (en) Software defined network-based method for content collaboration of two-layer switch
US9438469B2 (en) Auto-configuration server and management method of customer premises equipments
US20230164596A1 (en) Alarm log management system and method during failure in o-ran
CN113612735B (en) Secure storage system
CN105376275A (en) Software-defined network (SDN)-based data management method and system
CN112104888B (en) Method and system for grouping live broadcast users
CN102017568A (en) System for delivery of content to be played autonomously
CN113742416A (en) Data processing method, device, system and storage medium
WO2019242459A1 (en) Node switching method, network node, network system, and storage medium

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20171221

Address after: 221700 Xinhua lane, Fengxian County, Xuzhou, Jiangsu Province, No. 6

Patentee after: Fengxian County science and Technology Development Service Station

Address before: 518057 Guangdong Shenzhen city Nanshan District high tech Industrial Park, technology south road Zhongxing communication building A 5 Building Department of forensic affairs

Patentee before: ZTE Corporation

TR01 Transfer of patent right