CN102409748A - 斜插井及施工方法 - Google Patents
斜插井及施工方法 Download PDFInfo
- Publication number
- CN102409748A CN102409748A CN2011102686375A CN201110268637A CN102409748A CN 102409748 A CN102409748 A CN 102409748A CN 2011102686375 A CN2011102686375 A CN 2011102686375A CN 201110268637 A CN201110268637 A CN 201110268637A CN 102409748 A CN102409748 A CN 102409748A
- Authority
- CN
- China
- Prior art keywords
- pipe
- oblique cutting
- well
- cutting well
- foundation ditch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
本发明涉及一种斜插井,设在填埋场旁用于填埋场施工中抽排地下水和渗滤液,泵设在斜插井下,用泵将积水通过排水管排出井外,其特中,采用PE管斜插基坑内代替集水井,PE管与基坑的基层紧密贴合,在PE管底部贴紧一闷板,PE管上方被井口结构固定,顶部设有井盖,在PE管与基层接触部位设有土工布层和进水孔,在基坑内铺填碎石至管底标高,其中,斜插井与水平面的坡度为1:2~1:5,所述的基坑至少底边坡度与斜插井坡度一致。采用PE管斜插井代替集水井,可降低成本在50%以上,减少了工程量,缩短了工期,从而提高了市场竞争力。
Description
技术领域
本发明涉及一种斜插井及施工方法,用于垃圾填埋场的施工中,抽排地下水和渗滤液。
背景技术
在填埋场施工中需要抽排地下水,传统的施工工艺就是使用集水井工艺,在填埋区旁边的地面大面积开挖,开设脚手架,费工费力,工程较大。
因此减小开挖面积是提高工程效率、降低成本的关键因素之一。
发明内容
本发明的目的在于提供一种斜插井,可以减小开挖面积,并可完成集水井的功能。
本发明的目的可通过下述技术方案实现:一种斜插井,设在填埋场旁用于垃圾填埋场施工中,抽排地下水和渗滤液,泵设在斜插井下,用泵将积水通过排水管排出井外,采用PE管斜插基坑内代替集水井,管道与基坑的基层紧密贴合,在管道底部贴紧一闷板,上方被井口结构固定,顶部设有井盖,在PE管(聚乙烯管)与基层接触部位设有土工布层和进水孔,在基坑内铺填碎石至管底标高,其中,斜插井与水平面的坡度为1:2~1:5,所述的基坑至少底边坡度与斜插井坡度一致。
所述PE管为直径600~1000mm的HDPE管(高密度聚乙烯管),在基坑上开口以下部位设有进水孔。
所述的PE管用卡箍卡紧。
所述的PE管上口部固定一链条,该链条一端连接泵,另一端与埋设在锚固沟内的铁件相连接。
所述的基坑为与斜插井坡度平行的直角边梯形,闷板设在垂直的直角边,斜边也为上开口,为标高地下8米的水平面,管底标高为9.5米。
所述的排水管为软管,方便卷绕和维护。
本发明的工作原理是:填埋场中的地下水和渗滤液沿基层和导水管进入斜插井内,斜插井底部的积水用抽水泵将积水沿软管排出斜插井至阀门井。
本发明提供一种斜插井的施工方法,依序按下述工序施工:
(一)斜卧井土方开挖,建立围堤形成边坡槽,使陂度为1:2~1:5;
(二)制作如上所述的PE管斜插井;
(三)井底施工:在管道与基坑层的接触部位加铺一层土工布,然后在基坑内铺填碎石至管底标高,在斜井管底部设置闷板,然后吊装管道;
(四)管道吊装到挖好的边坡槽内,管道与基层紧密贴合,且下口与闷板贴紧,上口达到设计标高,校验好轴线标高后,将坑底用石子填平;
(五)斜插井固定:PE管安装后立即进行固定,然后与预先埋设在锚固沟内的铁件相连,固定前应再次复核管道的位置及标高,固定完后应按设计要求将管四周的空隙填实;
(六)对斜插井口进行封闭施工,对斜插井口进行隐蔽覆盖。
在上述方案基础上,步骤(三)中基坑内自下而上依序为压实度大于或等于93%的基土层、密度为200g/m2的有纺土工布层、碎石导流层、密度为200~600g/m2的针刺长丝土工布层、粘土层,其中,在有纺土工布层和碎石导流层间设置导水管,该导水管将积水排入斜插井内,该导水管由有穿孔管与近斜插井处的实管组成。
在上述方案基础上,步骤(五)中在顶部用卡箍将井身卡紧。
本发明的优越性在于:采用PE管斜插井代替集水井,可降低成本在50%以上,较少了工程量,缩短了工期,从而提高了市场竞争力。
附图说明
图1为填埋场斜插井剖面示意图;
图中标号:
1—泵; 2—HDPE管; 3—闷板; 4—井盖;
5—基坑; 51—围堤; 52—基土层; 53—有纺土工布层;
54—碎石导流层; 55—针刺长丝土工布层; 56—粘土层;
57—导水管;571—穿孔管;572—实管;
6—卡箍; 7—链条; 8—锚固沟; 9—铁件; 10—增强软管。
具体实施方式
填埋场斜插井剖面示意图所示,为井深30米的斜插井,斜插井设在填埋场旁,泵1设在斜插井下,采用直径600~1000mm的HDPE管2斜插基坑5内代替集水井,HDPE管2与基层紧密贴合,在HDPE管2底部贴紧一闷板3,上方被高出地面0.5米的井口固定,顶部设有井盖4,在HDPE管2与基层接触部位设有土工布层和进水通孔,在基坑5内铺填碎石至管底标高地下9.5米处,本实施例斜插井与水平面的坡度为1:2~1:5,基坑5的底边坡度与斜插井坡度一致,在HDPE管2内一连接在泵1上的增强软管10将积水排出斜插井外至阀门井。
所述HDPE管2在基坑5上开口以下部位打若干排水通孔,方便积水进入斜插井下。
为了方便维护,所述的HDPE管2上口部固定一链条7,该链条7一端连接泵1,另一端与埋设在锚固沟8内的铁件9相连接,方便对泵1进行维护。
本实施例的基坑5为与斜插井坡度平行的直角边梯形,闷板3设在垂直的直角边,斜边为基坑5的上开口,处在标高地下8米的水平面处,HDPE管2底标高为9.5米。
本发明的斜插井的施工方法是:
(一)斜卧井土方开挖,建立由围堤51形成边坡槽,使陂度为1:2~1:5;
(二)制作如上所述的HDPE管2斜插井;
(三)井底施工:在HDPE管2与基坑5的基层或基土层的接触部位加铺一层土工布,然后在基坑5内铺填碎石至管底标高, HDPE管2底部紧贴闷板3,然后吊装HDPE管2;
(四)HDPE管2吊装到挖好的边坡槽内,HDPE管2与基层紧密贴合,且下口与闷板3贴紧,至HDPE管2底标高为地下9.5米,上口达到设计标高地上0.5米,校验好轴线标高后,将基坑5底用石子填平;
(五)斜插井固定:HDPE管2安装后立即进行固定,在顶部用卡箍6将井身卡紧,然后与预先埋设在锚固沟8内的铁件9相连,固定前应再次复核HDPE管2的位置及标高,固定完后应按设计要求将HDPE管2四周的空隙填实;
(六)对斜插井口进行封闭施工,HDPE管2的管口与井口齐平或略低,对斜插井口进行隐蔽覆盖,以防人员或其他物体不慎落入,机械不得在斜井上施工,及时报验,经验收合格后,立即进入下道工序的施工,对斜井进行隐蔽覆盖。
在上述方案基础上,步骤(三)中基坑5外填埋场自下而上依序为压实度大于或等于93%的基土层52、密度为200g/m2的有纺土工布层53、碎石导流层54、密度为200~600g/m2的针刺长丝土工布层55、粘土层56,其中,在有纺土工布层53和碎石导流层54间设置导水管57,该导水管57将积水排入斜插井内。
本实施例中,导水管57由有穿孔的HDPE穿孔管571与近斜插井处的HDPE实管572组成。
本发明试用在金湖生活垃圾填埋场工程、射阳生活垃圾填埋场工程、泗阳生活垃圾填埋场工程、宿迁二期生活垃圾填埋场工程。如金湖生活垃圾填埋场工程中30米的斜插井,由于斜插井工艺代替了集水井工艺,平均节约工期15天左右,节省成本至少3万元左右。
Claims (10)
1.一种斜插井,设在填埋场旁用于填埋场施工中抽排地下水和渗滤液,泵设在斜插井下,用泵将积水通过排水管排出井外,其特征在于:采用PE管斜插基坑内代替集水井,PE管与基坑的基层紧密贴合,在PE管底部贴紧一闷板,PE管上方被井口结构固定,顶部设有井盖,在PE管与基层接触部位设有土工布层和进水孔,在基坑内铺填碎石至管底标高,其中,斜插井与水平面的坡度为1:2~1:5,所述的基坑至少底边坡度与斜插井坡度一致。
2.根据权利要求1所述的斜插井,其特征在于:所述PE管为直径600~1000mm的HDPE管,在基坑上开口以下部位设有通孔。
3.根据权利要求1或2所述的斜插井,其特征在于:所述的PE管用卡箍卡紧。
4.根据权利要求1或2所述的斜插井,其特征在于:所述的PE管上口部固定一链条,该链条一端连接泵,另一端与埋设在锚固沟内的铁件相连接。
5.根据权利要求1所述的斜插井,其特征在于:所述的基坑为与斜插井坡度平行的直角边梯形,闷板设在垂直的直角边,斜边为上开口,为标高地下8米的水平面,管底标高为9.5米。
6.根据权利要求1所述的斜插井,其特征在于:所述的排水管为软管。
7.根据权利要求1至6之一所述的斜插井的施工方法,其特征在于依序按下述工序施工:
(一)斜卧井土方开挖,建立围堤形成边坡槽,使陂度为1:2~1:5;
(二)制作PE管斜插井;
(三)井底施工:在管道与基土层接触部位加铺一层土工布,然后在基坑内铺填碎石至管底标高,在斜井管底部设置闷板,然后吊装管道;
(四)管道吊装到挖好的边坡槽内,管道与基层紧密贴合,且下口与闷板贴紧,上口达到设计标高,校验好轴线标高后,将坑底用石子填平;
(五)斜插井固定:PE管安装后立即进行固定,然后与预先埋设在锚固沟内的铁件相连,固定前应再次复核管道的位置及标高,固定完后应按设计要求将管四周的空隙填实;
(六)对斜插井口进行封闭施工,对斜插井口进行隐蔽覆盖。
8.根据权利要求7所述的斜插井的施工方法,其特征在于:步骤(三)中基坑外填埋场自下而上依序为压实度大于或等于93%的基土层、密度为200g/m2的有纺土工布层、碎石导流层、密度为200~600g/m2的针刺长丝土工布层、粘土层,其中,在有纺土工布层和碎石导流层间设置导水管,该导水管将积水排入斜插井内。
9.根据权利要求7或8所述的斜插井的施工方法,其特征在于:步骤(五)中,在PE管顶部用卡箍将井身卡紧。
10.根据权利要求8所述的斜插井的施工方法,其特征在于:所述的导水管由有穿孔管与近斜插井处的实管组成。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011102686375A CN102409748A (zh) | 2011-09-13 | 2011-09-13 | 斜插井及施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011102686375A CN102409748A (zh) | 2011-09-13 | 2011-09-13 | 斜插井及施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102409748A true CN102409748A (zh) | 2012-04-11 |
Family
ID=45912062
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011102686375A Pending CN102409748A (zh) | 2011-09-13 | 2011-09-13 | 斜插井及施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102409748A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106121006A (zh) * | 2016-06-29 | 2016-11-16 | 上海浦东环保发展有限公司 | 一种用于垃圾填埋场渗滤液斜管收集井液位控制的设备 |
CN106193180A (zh) * | 2016-08-26 | 2016-12-07 | 上海外经集团控股有限公司 | 尾矿库取水系统及其取水方法 |
CN108526189A (zh) * | 2018-05-14 | 2018-09-14 | 镇江新区固废处置股份有限公司 | 一种用于固体废物填埋区域的防雨膜覆盖方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5197824A (en) * | 1990-08-17 | 1993-03-30 | Paurat F | System for protecting ground water under a dump |
CN1944811A (zh) * | 2006-10-30 | 2007-04-11 | 上海市政工程设计研究总院 | 一种渗沥液抽排侧管井及其设置方法 |
CN101148886A (zh) * | 2007-11-13 | 2008-03-26 | 中冶长天国际工程有限责任公司 | 未建或在建填埋场边坡地下水的疏排处理结构 |
CN102168582A (zh) * | 2011-05-12 | 2011-08-31 | 太原钢铁(集团)有限公司 | 斜井施工中地下水的排水方法 |
CN202248211U (zh) * | 2011-09-13 | 2012-05-30 | 上海环境工程技术有限公司 | 斜插井 |
-
2011
- 2011-09-13 CN CN2011102686375A patent/CN102409748A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5197824A (en) * | 1990-08-17 | 1993-03-30 | Paurat F | System for protecting ground water under a dump |
CN1944811A (zh) * | 2006-10-30 | 2007-04-11 | 上海市政工程设计研究总院 | 一种渗沥液抽排侧管井及其设置方法 |
CN101148886A (zh) * | 2007-11-13 | 2008-03-26 | 中冶长天国际工程有限责任公司 | 未建或在建填埋场边坡地下水的疏排处理结构 |
CN102168582A (zh) * | 2011-05-12 | 2011-08-31 | 太原钢铁(集团)有限公司 | 斜井施工中地下水的排水方法 |
CN202248211U (zh) * | 2011-09-13 | 2012-05-30 | 上海环境工程技术有限公司 | 斜插井 |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106121006A (zh) * | 2016-06-29 | 2016-11-16 | 上海浦东环保发展有限公司 | 一种用于垃圾填埋场渗滤液斜管收集井液位控制的设备 |
CN106193180A (zh) * | 2016-08-26 | 2016-12-07 | 上海外经集团控股有限公司 | 尾矿库取水系统及其取水方法 |
CN106193180B (zh) * | 2016-08-26 | 2018-10-23 | 上海外经集团控股有限公司 | 尾矿库取水系统及其取水方法 |
CN108526189A (zh) * | 2018-05-14 | 2018-09-14 | 镇江新区固废处置股份有限公司 | 一种用于固体废物填埋区域的防雨膜覆盖方法 |
CN108526189B (zh) * | 2018-05-14 | 2019-11-22 | 镇江新区固废处置股份有限公司 | 一种用于固体废物填埋区域的防雨膜覆盖方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103046565B (zh) | 超深岩基深基坑降排水方法 | |
CN102418347B (zh) | 一种深基坑内盲沟和集水井排水施工方法 | |
CN103953008B (zh) | 一种适用于尾矿库的改进型混合坝 | |
CN104386409B (zh) | 一种煤矿区地面钻孔引导水源蓄存采空区的保水方法 | |
CN109736338A (zh) | 一种水利工程基坑管井结合轻型井点降排水方法 | |
LU500273B1 (en) | New comprehensive dewatering and drainage method and drainage device for mudstone subway station | |
CN105178289A (zh) | 建筑基坑内预制降水管桩及其使用方法 | |
CN2887986Y (zh) | 渗透式雨水井 | |
CN110485436A (zh) | 工程泥浆和渣土互层回填矿坑地基结构及再造地基方法 | |
CN206448286U (zh) | 一种用于降低灰场坝体浸润线的辐射井系统 | |
CN104499560A (zh) | 组合型雨水渗井及施工方法 | |
CN102409748A (zh) | 斜插井及施工方法 | |
CN103343690B (zh) | 斜井大断面过含水层井筒防渗漏结构的施工方法 | |
CN114718101A (zh) | 一种截渗墙联合降水井的尾矿库截渗结构及其修筑方法 | |
CN109441355A (zh) | 粉土或沙层管井高压水冲快速成孔施工方法 | |
CN205875353U (zh) | 一种雨水转化地下水的海绵井导渗结构 | |
CN202248211U (zh) | 斜插井 | |
CN113026719A (zh) | 一种大面积软土地基电渗分离井点降水系统及其加固方法 | |
CN208219672U (zh) | 一种基于矿山复垦的雨水边坡 | |
CN202787289U (zh) | 管井封井降水装置 | |
CN215290068U (zh) | 一种大面积软土地基电渗分离井点降水系统 | |
CN100564702C (zh) | 一种稳定水量的矩形渗渠构筑方法 | |
CN108286259A (zh) | 一种软土地基基坑降水装置 | |
CN203654332U (zh) | 一种新型地下室防水疏水施工结构 | |
CN114250801A (zh) | 一种管井与轻型井点组合降水施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120411 |
|
WD01 | Invention patent application deemed withdrawn after publication |