CN102409644A - Multifunctional and multipurpose building method - Google Patents

Multifunctional and multipurpose building method Download PDF

Info

Publication number
CN102409644A
CN102409644A CN2011102274549A CN201110227454A CN102409644A CN 102409644 A CN102409644 A CN 102409644A CN 2011102274549 A CN2011102274549 A CN 2011102274549A CN 201110227454 A CN201110227454 A CN 201110227454A CN 102409644 A CN102409644 A CN 102409644A
Authority
CN
China
Prior art keywords
magnet
water
car
circle wheel
generator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011102274549A
Other languages
Chinese (zh)
Inventor
邓保荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011102274549A priority Critical patent/CN102409644A/en
Publication of CN102409644A publication Critical patent/CN102409644A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Abstract

The invention provides a multifunctional and multipurpose building method. The method is characterized in that water storage channels and flowing water channels as well as pedestrian underpasses are excavated underground, water protection dams are arranged on channel beds, flood control and water wheel mounting notches are arranged on the water protection dams, and the flood control notches are equipped with water gates which can be opened and closed automatically, wherein, electricity can be generated by means of flowing water; traffic roads, parking lots and public places are arranged on the channel beds, and grooves are arranged on road surfaces and are used for mounting generators, wherein, electricity can be generated by vehicle traveling; and houses are arranged on the traffic roads, cultivated lands are arranged on the top of the houses, and one of a barbed porcelain plate and natural slab stone arranged on a mould frame and a cross frame replaces a template for pouring reinforced concrete during construction. The multifunctional and multipurpose building method has the beneficial effects of ensuring that everyone can do farm work in land and culture fish in water and solving a plurality of problems such as land, greening, traffic, energy, drought control, flood control, air defense, heatstroke prevention, cold protection and the like; and more buildings obtained by the method can produce more beneficial effects for human living, and more than two hundred million additional people can live in China.

Description

The building method of multifunctional and multipurpose
What the building method of multifunctional and multipurpose of the present invention was involved is: the field of harnessing the river, field of traffic, field, house; The greening field, field, soil, hydroelectric generation field; The environmental protection field; The air defense field, the building method that the whole combinations in these fields of car walking power field fit together is for the target that will reach 10000 years theories in thousand designs.
In view of existing known building method all is that single usefulness 1,2,3 kind purposes combine design to do building, it designs to such an extent that what is better exactly, also still can not, do not solve root problem yet.The present end face in the house of building and all around under the insolation of the sun, sidewalk, traffic road are all under the insolation of the sun.This has more than 60 degree with regard to the surface of having caused maximum temperature, has also just caused the interior temperature in house very high, and city temperature is also high than natural temperature, and is also influential to global warming.Doing heat energy with a solar collector absorption part is to have practiced thrift the energy, but has covered another problem, and tellurian population only can increase; Go to do building according to present this method; Airborne oxygen can continue to reduce, and resembles with green blade and does the energy so do the energy with solar energy now, that is to say with solar energy and does the technological behavior that the energy is an excessive property; Root problem can not be solved, more use can not be on viridescent land for building, developed.Having as the Three Gorges in the Changjiang river has what to develop to the energy of its flow of estuary again, and how many energy of the flow in the big or small river in the whole nation has to develop, and each big river of the whole nation is used to control flood good soil that the flood wall piled accounts for what are can return and does the arable land; Manpower, financial resources that the whole nation is used for able to resisting flood and drought every year are a lot of wastes, and the loss of annual natural calamity will come in hundred million quantity, and the soil will calculate with 1,000,000 mu loss number every year; Forest every year also reduces to a large extent, and the discharge value of annual nitrogen dioxide will be calculated with hundred million tons, and oil extraction has only 30 years; The natural gas exploitation has only 50 years, and coal mining has only 150 years, till that time; What the mankind do the energy with, with what steel-refining and cement baking, the car of walking on the highway; The strength of train walking has all been wasted, and remains to be developed, and the resident that present this building method is lived in the city does not have the soil kind; There is not water to breed fish; Living water use also will be practiced thrift, and the living water use in city also can pollute or the like, and a lot of problems all are badly in need of and will be solved.
Task of the present invention is the problem that will solve water, is to want the transport solution problem, is to solve the house problem; Be to solve the greening problem; Being to solve the soil problem, is to solve energy problem, is to solve antiaircraft problem; Being to solve environmental issue, is to solve the problem that can not be exposed to the sun and rain when people and car are walked outside.
The invention is characterized in: the method for designing that harness the river, traffic, house, greening, soil, generating, environmental protection, air defense combines together; Harness the river and be characterised in that: design underground excavation retaining river course and active channel; But the retaining of retaining river course is taked precautions against drought; But flowing water flood control when flood comes, active channel is used for flowing water, and the power of the flowing water of active channel can be utilized it to load onto water wheels and generate electricity.Protect the sluice gate that dam is provided with automatic switch, laterally be designed with underground pedestrian walk down, the river course is designed with septic tank.Terrain surface specifications is: be set to traffic road and parking lot above the river course, utilize the power of the walking of car to generate electricity.Building is characterised in that: be set to house, public housing, factory above the traffic road; The end face in house is characterised in that: train the soil species plant of spreading manure; Each layer is characterised in that around the periphery in house: the training soil species plant of spreading manure, also can be used for the sidewalk, and flow on the distance at the interval between house and the house and be provided with the house of direct current to the same structure; Terrain surface specifications at interval is: the house, underground every building that is set to plough, plough is provided with 1 mouthful and uses well, is horizontally arranged with sidewalk, traffic road.
Implement the geography of model
Here taking my on-site geographical position, Cheng Shang township to do the model design implements.This ground is undulating topography, average 1650 millimeter of annual rainfall, roughly 103 meters of the upper reaches, open ground height above sea level; Roughly 95 meters of downstream height above sea level, roughly 28 kilometers long of this open river discharge areas, wide about 5 kilometers; There are 5 villagers' committees to live in roughly 8 kilometers long, 1.2 kilometers open locations that the left and right sides is wide.The about 0.01 cubic metre flow of per second of the arid river flowing water of meeting in 50 years one; This landslide, mountain area, ground is few and little, about 9 kilometers long of the area that river flowing water accounts for, and 0.08 kilometer is wide; Count 1800 mu; The resident lives and has accounted for about 2300 mu, and various waste states etc. have accounted for about 2200 mu, and this ground bare place stands in about 6300 mu altogether.
Underground architectural design scheme
This ground at first excavates a flowing water river up to river, downstream end from the open ground at the upper reaches, and the flowing water river is dark more than 3 meters, and is wide 32 meters; Finish 30 meters of slope wall back river face widths; The earthwork of digging when constructing a canal be transported to hollow place, the end the field, in go to smooth field, Yokogawa of the upper reaches, river mouth excavation, dark 0.3 meter to 0.5 meter of Yokogawa than flowing water river; Act on the sedimentary clay sandstone; Yokogawa length is excavated the retaining river mouth and is as the criterion, and the height that protects dam in flowing water river mouth maintains an equal level with the field of both sides, river and is as the criterion, and has brought up river like this and can freely flow in the field and go.The 1st road, just to close the height of water fair with dam for the sluice gate on the dam of protecting of river course mouth, can open 2 meters dark stream floods during its flood control; Dam is protected in per about the 400 meters settings of active channel together, and about 0.5 meters of per pass drops, first road protect dam height above sea level 102.5--103 rice; Protect about 94 meters of dam height above sea level at last together; Each whole roads protects and all is provided with 2 road breach on the dam, and the wide 3--5 rice of breach is equipped with the sluice gate of automatic switch on the breach.Protect the bottom position of the bottom of dam, be provided with 4 little overflow pipes respectively, the sedimentary clay, sand, the stone that are used to remove in the river bed are opened a sluice gate the incoming flow solid carbon dioxide, and mud can be transported to and go to smooth field in the field, both sides.Every is protected and is provided with a breach that water wheels can be installed on the dam, and breach is wide 3 meters, utilizes the power of flowing water to promote water wheels and drives generator and generate electricity.Protect the dam except that first, following protect dam than both sides field, in 1 meter at the end.The high 5.5--6 rice of the slope wall on both sides, river course, end face leaves ventilation opening.Slope wall is built into ratchel and reinforced concrete.Be provided with in 30 meters wide seats of entrance, river course and built 3 huge pillars; The slope wall on huge pillar height and the both sides line that maintains an equal level; Huge pillar is wide 0.7 meter, and big column length is upwards downwards each 4 meters of bottoms, the place, top of oblique height after 2 meters high; Being provided with per 0.15 meter high on the acclivity upwards is 1 platform, is used for the people and can stands in top cleaning branch and foreign material.The direction of the following current water of river course bed, every row adds and builds 4 huge pillars, adds between huge pillar and the huge pillar and builds 1 pillar; Add that to build the huge pillar length and width are square column of 0.7 meter, the pillar length and width are 0.3 meter square, highly are to flush with the slope wall on both sides; The same platform that has of 4 pillars of import department with huge pillar; All built generous pin after each big pillar bottom is excavated on the earth's crust, per 15 huge pillars of so just having made an one-tenth, the big body of wall on 48 pillars and both sides are 1 group house footing.Whenever build the footing in 1 group of house at a distance from 12 meters distances; Built 12 pillars on 12 meters the seat, 6 are 1 group and are built in by the slope wall both sides, and the height bag of big pillar is scraped crossbeam interior; The height of crossbeam is set to 1 meter between huge pillar and the huge pillar, 0 between pillar and the pillar.6 meters, the width of crossbeam is set to 0.4 meter between huge pillar and the huge pillar, between pillar and the pillar 0.3 meter, and the steel that post and beam use, cement are wanted to bear the ability that 50 tons of cars are walked in the above.Four jiaos of positions of the position in house, every building are provided with 1 septic tank, and each septic tank all protects waterwall, and it is to build sealing that first road protects waterwall; Only under drinking water, leave 0.2 meter wide together; 0.8 the hole that rice is high is used for the turnover of fish and water, septic tank takes up an area of 2-3 square metre; For the health of water, can add and build twice and protect waterwall.It is high 4 meters that second road protects waterwall, stays about 10 square metres of water storage levels, protects and leave 3 0.2 meter wide on the waterwall, and 0.8 meter high hole is under drinking water.It is high 4 meters that the 3rd road protects waterwall, stayed 3 0.25 meter wide on the wall, and 0.8 meter high hole all is the turnover that is used for fish and water under drinking water, but the 3rd road protects 15-20 square metre of the inside retaining of waterwall.
Excavate on the limit of open ground in retaining river, two retaining rivers of excavation, open ground (each 1 of both sides) from both sides, flowing water river, helps being higher than open effects such as field drought resisting.The river mouth in retaining river is the same with the flowing water river to be built, and has only lacked water wheels.Protecting dam and can build 12~16 on the retaining riverbed; Protecting dam and exceed about 0.3 meter of plane earth, be higher than the meaning that dam is the field in downstream, dam of protecting about 0.03 meter, is can not be higher than to hold the river; The field, both sides of riverbed institute occupy-place, water level is high helps arable land, both sides water.The flowing water mouth place that river in the hill hole on both sides, retaining river course adds all is provided with the facility of anti-foreign material and the reservoir of sedimentary clay sandstone.The retaining river course except that above explanation, other all be build the same with active channel.The per pass riverbed all has 15 huge pillars, and 48 pillars are 1 group house pilum, and distance is separated by about 12 meters between every group; Remove balcony and also have 6 meters rooms, when per pass riverbed flood came, riverbed, 3 road had 90 meters wide flowing water face; It is dark that but 1 meter in dam flowing water is protected in the safety flood control; Dark 4 meters of the storehouse bed flowing water in river course, flood control Automatic opening & closing valve door, but dark 1 meter of 6 road breach flowing water when opening; 90 meters * 1 meter+18 meters * 1 meter=* 7 meters flow velocity=756 cubic meters per seconds of safe like this flood control, it can prevent 500 years one floods of meeting.Have 0.4 meter and 0.8 meter because protect the dam drop, flow velocity is very big.Same house, Building 190 can be built for long 8 kilometers in the per pass riverbed, and the house that Building 570 take up an area of 900 square metres can be built in riverbed, 3 road, and a row build in underground with another row's People's Bank of China passageway; Can make genuine usefulness, genuine top is gone up and is kept soil layer thick more than 2 meters, can do air defense and use; Because of the groundwater table height helps house, every building excavation a bite living water use well, can, go in well in drawing water the top upper pool in house, and aqueduct is underground; Well is from riverbed more than 5 meters, respectively excavated 5 horizontal active channels on the distance and position between 3 riverbeds, and the river course is wide 4 meters-30 meters; Dark more than 3 meters, built two-layer reinforced concrete plate above the river course, make passage and use.
Also have the method for a kind of mountain area according to this kind building.Here take the Hunan Province to hack Cao Xiang and implement this kind building, this ground country government has general 50 * 50 meters big pools of a bite in front of the door, can on the earth's crust at the bottom of the pool, build the reinforced concrete post, builds the fairground on the capital.Build citizen's house above the fairground, ridging plantation plant on the roof, because of the land for building soil of hacking Cao Xiang approaches, with a varied topography; Can build the retaining pool according to what landform was fit to build the retaining pool, what be fit to build the retaining river builds the retaining river, and what be fit to build the flowing water river builds the flowing water river; Residential dormitory is built the backer side in than what build gully central authorities in, if having earthquake or landslide all to want dangerous a lot, that is to say; As long as leave massif certain distance is arranged, build the open location that there is certain width in gully central authorities in, safety is a lot.
The surface structures method
On the big pillar on the river course bed, build 50 tons the ground of car of to walk.Have the house of water wheels to set the feasible position of walking water wheels, on the underground seat that septic tank arranged, stay an eye, confession can be built a single washroom and used on ground.Huge pillar is with the 3 meters balconies of going out, and the spacing distance between house, every building and the house also has 6 meters rooms, and these 6 meters rooms comprise that the balcony both sides have built the passageway, and the centre is the room, has 6 pillar top power to live under the passageway.When building passageway cement, the seam crossing of cement board and house cement board places a plank in the passageway, can come crossing guidance tape and house plate branch, acts on anti-heat expansion shrinkage, and 6 meters room stays makes ventilation usefulness, builds up the mast safety net around the room.This simultaneously builds up a flowing water small ditch on the ground of slope wall, act on farming, water, face smooth one-tenth in arable land can be planted the land for growing field crops piece of paddy rice, for the machinery kind create conditions.The certain distance of position, house is outward that plantation can have the plant that can prevent or stop the damnous effect of prairie fire when prairie fire takes place.Built the reinforced concrete top above the passageway, can prevent exposing to the sun and rain on the passageway.Huge pillar of building on the ground and the mutual contraposition of the huge pillar on the river course, the distance between huge pillar and the huge pillar are to comprise that four sides, huge pillar position all is 7.5 meters, 25 huge pillars in house, every building, and having brought up so respectively has four 6.8 meters traffic road, room anyhow.Huge pillar be 0.7 meter square.The room is to give over to commons, can make passage, can make a passage, and 3 row cultures stop and use; Can make two passes usefulness, middle two row culture parking usefulness can be made passage in horizontal, straight four sides, and middle intercropping is stopped and used; Can all make the multiple usage of purposes such as commons, the place that needs is arranged, can stay some to make passage and public land in the 2nd buildings; Built railing on the interconnection, the kind of plant of can earthing up is climbed rattan.
The road body is installed the method that magnet circle wheel utilizes the power of car walking to generate electricity, and body per about 0.7 meter distance in road is installed a circle wheel (magnet wheel, steel iron tyre can) and is mounted to row's shape in the body groove of road, and the last top surface plane of circle wheel is higher than bottom land 6-15 millimeter.Groove on the body of road is arranged to dark about 0.08 meter, and about 0.12 meter of width is walked rectangle (magnet, the iron and steel) lines on the car in the groove.Circle wheel on the body of road has (magnet, the iron and steel) lines on the car to promote when car is walked and rotates.(be magnet, be that the power of scolding between magnet and the magnet is rotated) groove both sides are by placing ready-made bar bender's font, I-shaped two reinforcing bars with 22 to 30 mm dias up and down, the reinforcing bar of perpendicular usefulness 20 to 24 mm dias; Length is the same with ground; Perpendicular 0.35 meter long, bag scrapes 0.35 meter per 0.7 meter distance of long perpendicular reinforcing bar of following circle eye (the circle eye is used to install jack-post) and installs two, has pacified round wheel on the jack-post; One 0.14 to 0.2 rice diameter pinion has been installed simultaneously; The pinion pushing generator, the circle wheel is arranged to about 0.695 meter of diameter, about thickness 0.07-0.09 rice; Two I-shaped up and down reinforcing bar Baogang muscle positions are at interior 0.20 height, because of 0.2 meter of ground joints cement thick more than.The reinforcing bar of 2 20 mm dias is installed in the room of per 0.7 meter distance, and the reinforcing bar of 20 mm dias vertically the higher authorities welds under the abdomen of this root reinforcing bar on I-shaped; Below this head a hook is arranged, be hooked in I-shaped below under the abdomen of this root reinforcing bar, and weld.Simultaneously; When laying the ground reinforcing bar, per 0.35 meter apart under the Shen many carried out the hook eye position and supply the reinforcing bar shape in a row that generator is used can be installed, when laying transverse reinforcement; Whenever, laid 3 and pass I-shaped room, staying one, not pass be to stay the empty position that can walk round magnet wheel.This root reinforcing bar above I-shaped, laterally be the reinforcing bar that welds in the above, not passing is to leave a groove, groove installs with plank, dress is straight, dress just, watered cement after, just can remove plank in second day.After one month generating set can be installed.It is square that (magnet, iron and steel) on the car is arranged to the same long lines with car, but the lines iron on the car is designed into manpower and power operation, mention it so long; Car just can be walked level road; Car reaches on the road of groove, aims at ground slots to lines iron, compresses into the back and just can walk along groove.The line of rabbet joint on road surface is designed to 30 lines, 60 lines, 90 lines.30 lines are walked about a tonnage, the car that scanning frequency is about the 30 kilometers limit of keeping right, and 60 lines are walked the car of about 60 kilometers of car scanning frequencies about 20 tonnages in the centre, the 90 lines car on the left side of the following scanning frequency of 5-50 tonnage more than 90 kilometers that go.If doing circle wheel and lines iron with magnet, the magnet of the repulsion of car 80% can be arranged in the design and installation, the wheel on the car can reduce by 80% pressure like this, and car can reduce by 80% power and walks like this.Lines iron on the car is installed in the room in the middle of the two-wheeled.Car is 0.8 meter by the distance of two line iron, iron wire of dolly peace just can, what two-wire was walked on the road surface also is 0.8 meter distance, magnet does not need the place of ray to wrap NULL, makes ray concentrate ejaculation from both match.Installing hinge on the primary load bearing crossbeam of car with on the crossbeam that wheel is installed, upper prop is installed on the hinge, another section of post is also installed hinge; Install iron plate on the hypomere hinge of post, install square lines magnet on the iron plate, the width of magnet matches with the circle wheel on ground; Load onto the bullet semi-annular jade pendant on the post, be used for adjustment height, the dynamics of magnet is set to can scold whole car weight 80% for well; Because of the setting of the round wheel of lines square magnet on the car and ground magnet is coincideing of scolding, load onto the lever principle structure on the iron plate, utilize the lever principle backguy to spur certain distance to iron plate forward; Make perpendicular tiltedly or crosswise shape mention the groove that comes built on stilts about iron plate 0.20-0.30; It is to confirm according to the size of the wheel on the car that iron plate is left the several of groove, connects control stick and connects into one group at interior total 2-4 root lever, every car 1-5 group; (2 groups of above one control levers that have only connect how the group structures are mentioned iron plate); The magnet that iron plate can make iron plate get into to play in the ground slots on the iron plate to pusher matches with ground magnet and starts, and car has been walked, and ground circle wheel has also rotated and reached the purpose of generating electricity.The magnet lines on the car of iron plate entering ground and the details separate case application of the concrete mounting method of iron and steel lines; Because lines are provided with more piece, between the joint of every joint and the joint mobilizable joint is set, joint has multiple; Having a kind of is 2 to 6 contact pin; There is an axle centre, and another kind is the active joint that public female shape is stuck, and is used for feasible taking an unnecessary way.Because car has large, medium and small shape, all some details are can be not identical.Generator is installed 11-15 kilowatt of capacity generator, works every day with every generator and calculates in 3 hours, per hour every generator for electricity generation 10 degree.30 degree that generate electricity 3 hour every day of working, 1 year generator 10850 degree that can generate electricity.A generator is installed roughly about 3500 yuan, from above data, can be known 1 year and just be recoverable to cost.
Here explaining that two cars are collided can not break the method for car.On the main load straight beam post of car, about 0.13 meter of front and back double-ended vehicle filament length, dress lastblock top power plate; Load onto the bullet semi-annular jade pendant on the silk head, play semi-annular jade pendant and be fixed on the power plate of top, play long about 0.16 meter of semi-annular jade pendant; The dynamics that plays semi-annular jade pendant is designed into has enough dynamics when two cars are collided, can not kick-back bullet semi-annular jade pendant and beam column tail head maintain an equal level, and steel plate is installed in the other end that plays semi-annular jade pendant; Install certain thickness rubber on the steel plate, the rubber on the various large, medium and small cars is the same height, positive alignment when such two cars are collided; Can not break car, increase degree of safety.
The method of generator is installed on the rail road, and at first the electricity consumption square card of burn-oning under the plane abdomen of the room face between sleeper on the rail and the sleeper is installed a jack-post in the card.One of jack-post and card match, and one is equipped with round wheel, flywheel, generator.Under the jack-post abdomen pad is installed, the bullet semi-annular jade pendant is installed on the pad, play the dynamics 2 of semi-annular jade pendant very heavy about.When the lines iron on the train case is walked about on the circle wheel like this, can adjust height, the quantity of adjustment height is in 3 millimeters.It is to have half the (this head of generator) to change that the circle wheel is eaten this section of jack-post; Have half the (square this head) can not change, one that can not change manufactures about 0.1 meter of public column length, and size matches with female pipe; Public post Shen enters in female pipe and has gone; One that can rotate manufactures about 0.1 meter of female length of tube, and big or small and public post matches, and female pipe box has been lived public post.Circle wheel (magnet circle wheel or iron and steel circle wheel can be installed) diameter about 0.26; Between 0.08 to 0.1 meter of the circle wheel thickness; Each gets a number therein; Accomplish unified size; (be the circle wheel of magnet; Be designed to jack-post joint room in be semi-circular teeth; Also have the semi-circular teeth on an energy and the circle wheel to coincide on the jack-post, so just engage firmly, make the magnet circle take turns stressed can be not broken.So) road surface, the end below the abdomen of generator, also be plane on sleeper, the end so the frame of generator is installed.Installed generator with the combination prior art; The railway carriage both sides of train go out wheel outside, and the square lines iron of the square iron of line strip (the square iron of lines can use magnet, or iron and steel) is installed; The circle wheel thickness on width and ground and position match and are as the criterion; Length is shorter about 0.2 meter than body length, and the lines iron on both sides is set to when walking has the enough power of bearing, and the weight that can bear whole railway carriage is as the criterion.Outside the railway carriage wheel; A straight bearing beam has respectively been installed on both sides, load crossbeam hypogastrium place under the abdomen of railway carriage, and the iron wire bar of aiming at wheel is installed under the abdomen that plays force bearing plate at the bottom of the semi-annular jade pendant seat, is provided with a plurality of eye positions that mullion is installed on the bearing beam; Vertically one on post is installed in going out about 0.08 meter of straight bearing beam in the eyes; 0.08 rice has been installed an iron plate on the length, or the gong cap is used for perpendicular turning down to go down, vertically the post other end below install the square iron bar of straight line.Also will be equipped with various gong silks when the iron wire bar is installed and accomplish with reinforcing bar hand in hand, vertically in the beam of post and this section of the iron bar room bullet semi-annular jade pendant has been installed, adjustment is just during walking on the circle wheel to be used for iron bar; Be set to iron bar and circle like this and take turns when matching, between 0.1 to 2 millimeter on rail, the weight of whole like this railway carriage has been pressed on the wheel on ground the wheel on the railway carriage at most; The circle wheel will rotate and utilize the power of rotating to come pushing generator when train was walked about, and the iron wire bar is arranged to more piece shape, was provided with mobilizable joint between the joint of every joint and the joint; Joint has multiple; Having a kind of is the middle together joints that an axle is arranged of 2 to 6 tab engagement, and another kind is the joint that public female shape is stuck, and is used to the detour of walking; This electrification structure also prevents to derail to the compartment and has played the support effect, can reduce the compartment derailment accident.Need not destroy original railway like this is on original railway, to assemble generator, does not destroy original railway carriage like this, on original railway carriage, installs bearing beam and lines iron is just passable.Just servant's step will be reequiped on the passenger vehicle case, if with the circle wheel of magnet and the lines iron of magnet, be the power of being arranged to scold, can reduce the power of locomotive a lot of trailer casees so between the two.Every generator capacity is installed between 14-20 kilowatt.So not only simply but also economical and practical, every generator was worked 1.6 hours every day, per hour every generator 12 degree; 18 degree that generate electricity every day, annual generating 5970 degree, install a generator roughly 3500 yuan to 4500 yuans; By every kilometer 3000 generators are installed and are calculated, 50,000 kilometers 1.5 hundred million generators can be installed, 1 year 895500000000 degree that can generate electricity; Roughly 5,250 hundred million to 6,750 hundred million yuan altogether in generator is installed, visible roughly once being recoverable to cost to a year and a half.If on national railroad car and railway, all installed electrification structure, train many trailer boxs that can extend can be hung 50 to 100 joint railway carriage passenger vehicles and hang more than 50 joints.Car is hung more than 100 joints, can bring up to every generator work like this more than 3 hours.Train can generate electricity more than 16,000 hundred million degree in 1 year.Open from Beijing row 50 joint trains to the Kowloon one time, be exactly the empty wagons walking, its generating income also has profit.Above-mentioned two invention generation technologies are not mentioned and the place of explaining is to combine existing technology and technology to accomplish.
The building method in house
Built up generous pin under the huge pillar on the ground in house, every building, generous pin is high 0.5 meter, and each 1.1 meters of length and width are square, when acting on driving; Car goes above being difficult for running into huge pillar, and huge pillar is high 4 meters, and 1 meter on the crossbeam on the capital is high; 0.35 rice is wide, and is long 7.5 meters, goes out 3 meters of the beam lengths of balcony.The reinforced concrete design that post, top surface of the beam use can be born the quality of 7 layers of weight, only builds 4 layers and uses the room, has built highly bad, trains on the top, the wall wall is that light material is fitted up, without brick.So the house is very light, antidetonation is fine, and every layer residenter house is the cross envelope wall divider wall that the centerline anyhow at 1 layer at 4 families is built up the reinforced concrete porcelain plate.1 family of respectively living, the four corners of the world like this.Each household connects balcony has more than 324 square metre interior, has built the crossbeam of the face downstairs of envelope family divider wall and can not build, because divider wall is with the pillar one-time-concreting reinforced concrete of flooring.Crossbeam that also can every floor room is translated into the plane and is got on.16 families of can living, house, every building.Commerce is used, envelope next door, family wall is not built in house industrial, that unit uses.Connect ground and be open to traffic and add together that 6 layers of flat building all go out 3 meters balconies, be provided with little top power post on 3 meters balconies.On the balcony ridging 0.25 meter thick, near the 1.7 meters wide sidewalks that are set to of the inside.1.3 meters wide kind of plant near the outside.The sidewalk selects for use wherein a kind of to be placed on 0.08 meter square shape with cement board, porcelain plate, natural stone flitch, on the 0.25 meter high cement pillar, just can not step on tightly when the people walks about like this soil layer down, also is convenient to clean guarantee totally to help plant growing.The balcony periphery sets steel mesh reinforcement, is used for liana section plant and goes above can climbing, and sunshine can little irradiation go to the inside, house exactly.Make full use of sunshine like this, also reduced body of wall heating phenomenon.Remove the post on the underground riverbed, build outside the reinforced concrete with template below the back, place attractive in appearance all not want template and build reinforced concrete.The house all is provided with the uniform rules size.(decoration, mouldable, height, in, end shelves) is so template, mould bases, furniture etc. all can be unified.House like this, furniture all is high-quality, has also practiced thrift material for building the house, has also just reduced cost for building the house.The material that the wall wall in house uses is that glass, stainless (steel) wire, PLASTIC LAMINATED, coated plywood etc. are to use long material of life-span.The also available cloth in some place is done the wall wall, does the wall wall without brick.The weight and the cost in a lot of houses have so also been reduced.Also fine to anti-earthquake.Every little of the house all by the many places running water switch is arranged; All fine to life fire prevention, house inside and outside all by a plurality of electric lights are arranged, evening is also the same with daytime like this; Because of electric power is the waterpower of oneself and the power electricity of car walking; Water is the well water of oneself, so the residential electricity consumption water of living in does not here need saving, and also very easy.Annual charges for water and electricity are less than 300 yuan, and cook, cook, heating etc. all is electrified.Do not need other any energy.Only need various electrical appliances, the water route articles for use are all durable in use.The elevator in every house and People's Bank of China's stair be arranged on the house directly to both sides, there are two cover elevator and sidewalk stair in every house like this.
The building method of deck
After having built cement above the top in house, doing, carry out waterproof technology after, can earth up after doing 0.2 meter to 0.4 meter thick.Be used to plant plant, built a sidewalk staircase on the end face in house, an escalator, the pond that can hold about 16 cubic metres.Water supplies life usefulness, also can satisfy other water.Built the protection safety hurdle around the end face, floor mounted on from the pond to the top blowing water pipe, the sprinkling irrigation end face is ploughed, the solar energy major part is by plant absorbing like this, air has also just cleaned, and global warming has also been slowed down.
The waterpower water wheel power generating method
Water wheel power generating method has two kinds, and a kind of is circular water wheels, is set to 10 to 16 meters diameter.The water wheels on this ground are set to 12 meters diameter; Drinking water blade on the water wheels is provided with 40; Every blade is grown 3 meters, and it is wide 1.2 meters to be provided with moving vane, activity point of view 80 degree; Outwards to be that 8 () degree is reserved motionless for (flowing water top) degree of opening, and inwardly (flowing water below) guarantees when closing water and locating blades is in line motionless.Moving vane is arranged to bending, acts on the power that can increase flowing water power.Dark 2 meters of the breach of installation water wheels; The riverbed is protected dam and has blocked 0.3 to 1 meter in stagnant water dark (referring to protect the protruding position of the breach bottom of dam here) breach both sides and build up and protect waterwall, protect waterwall be provided with high 2 meters to 3.2 meters, 3.3 meters of wide leading portion water inlets of breach; 3 meters of tail end delivery ports; Concave-convex is arranged in the bottom of breach, and position, top, protruding position, the bottom of breach is arranged on vertical blade, also is upwards 3.5 meters at place of jack-post vertical curve.The bottom of the water inlet of breach is provided with than at 0.2 to 0.3 meter at the end, protruding position.Protruding place is oblique 1 to 0.5 the gradient outwards, becomes the walk about bottom line that coincide of position of moving vane to be as the criterion after dark 0.4 meter of the gradient, becomes horizon after 1.5 meters of the bottom line length of coincideing, and is the reservoir in downstream behind 5 meters long at the horizon.0.3 meter high of the horizontal height of protruding position water inlet also is that just in time locating blades can be gone over and is as the criterion, and blade is artificial has a mind to design some very little eyes, can flow through water and go to good, acts on increase blade power.The load place, two of the right cylinder on the water wheels is equipped with bearing ball; The gear of diameter 2 meters has been installed on the jack-post; 2 rice diameter gear wheels promote that 1.9 rice diameter gear wheels that rotate are synchronously arranged on next pinion of organizing 0.25 rice diameter, and the gear wheel of 1.9 rice diameters promotes the pinion of 1 group of 0.25 rice diameter down, and one the 1.8 synchronous gear wheel of rice diameter is arranged on the pinion; 1.8 the diameter gear wheel promotes next and organizes 0.25 rice diameter pinion; 0.25 the rice diameter pinion has the gear wheel of 1.9 rice diameters that rotate synchronously, 1.7 rice diameter gear wheels promote next 0.25 meter pinion, utilize the power of last this pinion to come the pushing generator generating; Water wheels each minute goes around, and this pinion can change 2944.47 at last changes.If the generated output revolution is not enough, can add one group of size of aggregate erection governor gear again increases revolution.Press the power calculation of 2 cubic meter water of per second stream; Water wheels have 8 leaf drinking water; Every leaf has 2 cubic meter water to get off to promote 10 meters of water wheels rotations from the hydraulic current of 0.5 meter eminence, and roughly 5 kw of power can be arranged, and also be to say: 2 flows roughly can promote to install the generator of 32 kw of power.Accurately number will arrive to have tested in the practice and confirm.The normal time of this ground can surpass the water level of 2 flows when minimum.The extreme draft amount of water wheels was about 63 cubic metres of per seconds when flood came.Calculate after this manner, generator 1000-10000 kilowatt hour generating set can roughly be installed, this is the generating sum of 20 water wheels.These electric power can supply this ground resident to use basically.Building method after this manner, but big or small river installed capacity 600,000,000 to the 1000000000 kilowatt hour generating sets in the whole nation.Another kind method is that water wheels are arranged to roughly the waterwheel shape as the manpower wooden car water in ancient times; Be installed on the breach that protects dam, waterwall is protected on the breach both sides, protects the high 1-6 rice of waterwall; The entrance height is arranged in the breach bottom; Afterbody is low, that is to say that the breach that waterwheel is installed just in time matches with the blade of waterwheel, protects between the long 11-32 rice of waterwall.The length of waterwheel is provided with between the 10-30 rice, and the width of waterwheel is provided with between the 1-20 rice.The blade of waterwheel is provided with between the height 1-6 rice, between the width of blade 1-20 rice, the distance about 1 meter is set between blade and the blade.Apart from the lining 2-10 root top power wooden stick is set between every blade and the blade, the size of rod is provided with as required, and the length of wooden stick just in time is two distances 0.5 between the blade, and the effect of wooden stick is reserving distance between two blades.Be with flexible pipe on the wooden stick, Shen of flexible pipe is gone among the blade of front, the length that the Shen is gone into be with blade when rotating; Under the situation of the ultimate range in the place of turning, can not release is as the criterion, and blade is installed on the chain of waterwheel, and two gear of the length that chain is arranged to be combined into and waterwheel itself is apart from matching; The length of chain itself is consistent with width of blade; The chain setting can have kinds of schemes, and explanation here is wherein a kind of, and distance is provided with 2-3 mobilizable central siphon about each rice; Each movable central siphon has 2-20 room, and the tooth on room and the gear matches.When being used for water and promoting blade movement, can make the blade promotion gear that moves back and forth, the jack-post on the gear is equipped with the gear that can promote motor.The length of pipe is that the distance that connects next bar central siphon matches.Between the gear at waterwheel two and the gear distance above be provided with a top power plate or a bar.Be used for being in line when blade is walked about, can not sink.The jack-post of waterwheel is arranged to make progress movable downwards.Movable length can be provided with as required, because flood will reach the requirement that also can generate electricity when coming.The size of gear, the size of tooth, the size of jack-post is provided with as required.Gear pushing generator on human use's jack-post generates electricity.Microscler waterwheel only can be used on the river course of the height of water more than 2 meters and protects on the dam.
The sluice gate building method of automatic switch
The sluice gate of automatic switch has 2 kinds; A kind of is sink-float power Automatic opening & closing valve door, and a kind of is the sluice gate of heavy and light power automatic switch, and the sluice gate of sink-float power automatic switch is characterized in that: be provided with 2 Zhi Lidian at the sluice gate front end; The sluice gate that the aspect ratio of Zhi Lidian is protected on the dam exceeds about 2 meters; Sluice gate closes behind the water and protects dam and maintain an equal level, and the pilum that sink-float usefulness is installed is far away than Zhi Lidian leaving water gate distance from the distance of Zhi Lidian, causes weak point of lever one head length.Also can select this long head of lever to install the sink-float thing as required for one of the lever weak point by loading onto the sink-float thing.The sink-float thing can be selected bamboo, timber for use, buoyant materials such as the Tire & Tube of car, balloon, and the weight of sink-float thing can make free up and down being as the criterion of sluice gate in the time of can being installed to the height of water level.Water level is high, and the sink-float thing up floats through the lever harrow sluice gate has subdued, and water will be gone over from the sluice gate upper reaches.Water level high what, sluice gate will sink what, water level is low, the sluice gate pass water that will rise, water level down how much, how many sluice gates will rise.Lever bob before and after lever is installed on the Zhi Lidian only, lever can not before and after slide.This short head of lever is installed in can the front and back activity on the sluice gate.Two levers on each sluice gate, two Zhi Lidian.This kind sink-float power Automatic opening & closing valve door.If before lever, or after add one group of lever, can be built into and upwards mention sluice gate and come the flowing water flood discharge, closed sluice gate downwards when falling.
Heavy and light power switch sluice gate has two kinds; It is characterized in that: a kind of is the Guan Shui that down comes behind the water of sluice gate pass; Down drive the sluice gate of flowing water, in the suitable place of dried up gate a Zhi Lidian is set, the Zhi Lidian height is more than 2 meters; The last lever of having installed of Zhi Lidian has been installed a connecting rod for one of lever.The other end of connecting rod is installed on the sluice gate, and the reinforcing bar screen frame has been installed in the other end of lever, and screen frame has been adorned stone, and the weight of stone installs to sluice gate pass water is as the criterion.Be provided with under the screen frame and installed one and play semi-annular jade pendant, as long as it is unrestricted to play 1 meter left and right sides of semi-annular jade pendant length. it is just passable to elongate the power that 500-1000 jin is arranged more than 3 meters, also can not need play semi-annular jade pendant.On the end face on the sluice gate platform has been installed, the width of platform is more than 0.5 meter, and is unrestricted; Baffle plate has been installed at platform outside and two; About 0.2 meter of the height of baffle plate, the seat that falls sluice gate are designed into not can sedimentary clay, sand, Shi Weihao, can guarantee that sluice gate falls flexibly.Water level one height like this, the platform on the sluice gate just has ponding, and sluice will be heavier than screen frame, the sluice gate flood discharge of coming that will down sink automatically; How much heavy, flow how much, and water is little; Sluice gate is light, and screen frame has weighed and added the support effect that plays semi-annular jade pendant, and sluice gate will up rise automatically and close water.
Second kind of sluice gate is characterized in that to the Automatic opening & closing valve door of the flowing water that falls down to come entirely under the dam: on a suitable seat of dried up gate, a Zhi Lidian is set, the plane when Zhi Lidian exceeds sluice gate pass water is more than 2 meters, and is unrestricted; Zhi Lidian is last to have installed a lever, one of lever connecting rod has been installed, and the other end of connecting rod is installed on the sluice gate; A reinforcing bar screen frame has been installed in the other end of lever; The reinforcing bar screen frame is put into stone, motionless the being as the criterion when weight of stone can install to sluice gate pass water, and the outer end safety has been adorned platform above the sluice gate top; Platform is wide about 0.5 meter; Unrestricted, watertight shutter has been installed at platform outside and two, and baffle plate is high unrestricted more than 0.3 meter.River water level is high like this, and the water level on the platform is also high, and the water level on the platform is high to having weighed than that stone of lever.The weight of stone is sluice gate incessantly surely just, and sluice gate will fall down downwards automatically, has opened the flowing water flood discharge next.When the little weight to sluice gate of current did not have stone heavy by the time, the weight of stone was ultra to can mention sluice gate the time, the sluice gate Guan Shui that will jump up automatically, and sluice gate is designed into and can tightly matches with breach, seldom leaks to good.Two, sluice gate lower end is provided with cylinder, and the sub-Shen of cylinder enters the going of both sides, lower end of breach in the eyes.Sluice gate leaves like this, can rotate flexibly during the pass.More than various automatic open and close sluice gates, can be based on various situation, choose reasonable is used.This several kinds of Automatic opening & closing valve doors have solved the problem of flood discharge sluice gate very important person management, have solved manpower and have kept an eye on unthoughtfully, have missed the problem of the best period of open and close.When these several kinds of Automatic opening & closing valve doors also can be used flood in the city and come; Want the throttle valve flood discharge in clear water river, to go; Want at ordinary times barrier gate door knob sewage to go, manpower management problem not in place will be installed Automatic opening & closing valve door of the present invention and solved with flowing to sewerage treatment.All build up this building method, do not had the branch in city and rural area.
Template is not as long as mould bases is built the method for reinforced concrete
Do not want template; As long as the method that mould bases is built reinforced concrete is characterized in that: concrete column is not wanted the method for template, on the seat of good at frame, as to tie reinforcing bar pillar, make frame (bag of symmetry is scraped length) with the carpenter of symmetry and put well then by the porcelain plate of putting symmetry well or natural stone flitch (one of them) in the above and prick silk like ladder; Put 2 No. 8 iron wires or 6 millimeters reinforcing bars again; Only use one of them, tighten again, hold up after tying erect good public female eye (the female eye of public post is arranged on the muscle on the frame) put just to put into and go to the back tightly just just can decide in the eyes with wood is sharp; Fixed just, it is good with regard to frame to have located this post.Do the method for crossbeam.At first reserve the top power trestle below the crossbeam, reserve big muscle on the post, put the frame as ladder of the ready-made symmetry of carpenter after big muscle is reserved again.After the wall stand on the underframe of beam and both sides locates, reserve, the location must not have loosening just can frame good, ties needed reinforcing bar.Porcelain plate that need, symmetry just can be installed, and the natural stone flitch has just been decided not stitched, and has just accomplished.The shut die method of flat-top flooring: at first reserve the flat-top pillar of the top power of face downstairs, reserve big horizontal bar on the pillar.Install on the big horizontal bar carpenter carry out one straight muscle; The number that 2 straight muscle of straight muscle installation are born a porcelain plate or blocks of natural stone is laid; Straight muscle has just placed can lay porcelain plate and natural stone slab; The seam crossing of porcelain plate or natural stone slab is a beneath straight muscle, and a plate is half the, and such porcelain plate or natural stone slab have been born power by three straight muscle exactly.Various framves as wooden ladder are that timber is done.Be what to have designed as required.Length, width length as required, few 0.05 meter of width guarantees quite spirit when form removal like this, does the timber of frame and makes big broadening 0.1-0.08 rice, thick 0.04-0.06 rice.The house is unified size like this, and mould bases also just can use repeatedly, has also practiced thrift shut die material and manual work for the son that builds a house like this.The reinforced concrete quality of building like this is fine, has saved difficult recruitment and the technologies of decorateing in back road more.The porcelain plate, the lithotome plate that use are supporting, custom-designed special use barb arranged, the eye position is arranged.
The porcelain plate that barb is arranged, the manufacturing approach of natural stone flitch
There is the natural stone flitch of a variety of manufacturing porcelain plates that the method for barb is arranged, a kind of manufacturing approach of porcelain plate is described here, it is characterized in that: the back side that is squeezed in porcelain plate when doing the porcelain plate ring with many triangle steel bars with soil; Make the back side of porcelain plate become convex concave, what spill was oblique inwards 2 to 4 millimeters asks, between 2 to 6 millimeters of the spill degree of depth; Make the section mouthful toothing at the porcelain plate back side like this, the peripheral four edges of porcelain plate is provided with two 7 font section actinal surfaces; The back side of porcelain plate is gone for 5 to 8 millimeters than positive indentation; Make the porcelain plate back side lack than frontal width, in construction during the joints cement oar, liquid cement comes into regard to streamer like this.7 font inclined plane grooves put in 2 to 5 millimeters inwards and go, and have so just caused barb, and the triangle steel bar can be arranged on the block plate; So just caused a steel plate that shaggy tooth is arranged, this face porcelain plate of shaggy tooth, this face of the back side under the earth have been arranged with steel plate; Push forward between 4 to 12 millimeters with forcing press and to go to compress, behind the positive pressure, start forcing press again and draw back; Withdraw from steel plate come, make steel bar can not destroy the hook groove, porcelain plate has just been processed has like this had down the porcelain plate of groove.Other technology of making porcelain plate is constant.A kind of in addition: as to use as the carpenter and do the method that plate lid handle is made the steel bar of scurrying the porcelain plate barb.
The lithotome plate is made the method for barb: the limit of removing to have sawed the lithotome plate with the diamond saw blade; After being sawn into the limit of 1 to 0.8 to 1 to 0.5 gradient to edges of boards earlier, saw again 2 times, once tiltedly saw 4 to 8 millimeters and go from the back side; Go between once tiltedly sawing 4 to 20 millimeters from the front; Be sawn into the plate limit and become the barb of 7 font section mouths, the back side of sawing the stone material plate more tiltedly many swage sets of saw forms barb, makes the back side that many barbs also arranged.Also have a kind of eye that to adorn hook of on 2 kinds of sheet materials, carrying out, got well with specialized designs then, after supporting hook has installed, just can water liquid cement, reserve hook in the reinforced concrete plate.Remove to water reinforced concrete with this have barb porcelain plate or lithotome plate of several kinds, it is durable in use, and is very attractive in appearance, and promptly the saving working hour is economized technology again, goes back the material saving, and this has just saved the cost of building.
The method that also has a kind of power of on existing highway, utilizing car to walk to generate electricity; It is characterized in that: it is rectangular at first below the bottom of car, to install magnet; On the beam muscle that magnet is rectangular in the middle of being installed in below the chassis of car; Every car is installed a microscler magnet strip, and the dynamics of magnet (dynamics be reprove power) is will be designed into the weight that can hold up car about 80% for well.The power of scolding that magnet is rectangular when being arranged in magnet circle wheel with ground and matching; Because utilize the repulsion of magnet; Car is being parked on the circle wheel of generator same axis post; Generator also can send electricity and come, and magnet is rectangular to be installed in and to be arranged to more piece on the car, and each joint becomes the structure as hinge with the mobilizable joint setting of joint between each saves.Be set to car when walking has the road surface of height, but the rectangular bottom of car and the place that the beam muscle bottom the car is had vacant position of being installed in of magnet contracted about 0.1 meter in the rectangular Shen of magnet; Rectangular with cylinder fished beam muscle and magnet; This jack-post is arranged to screw-shaped, and its nut will enlarge, because it is rectangular on the beam muscle to tangle magnet by nut; Magnet is being installed when rectangular, is being put the bullet semi-annular jade pendant again after at first inserting screw versatilely in the eye position from the beam muscle.Put to play and use behind the semi-annular jade pendant on the instrument spiral shell magnet rectangular again, if the rectangular height of adjustment magnet, available pad is realized; Can on screw, overlap Upper gasket; The rectangular height of magnetic stripe that has installed is under the sub-condition of empty wagons, just in time is combined into ground magnet circle wheel kissing, when having installed goods and materials, has increased the weight of car on the car; Magnet on the car is rectangular might be depressed downwards between 1 to 4 millimeter, at this moment has the bullet semi-annular jade pendant that is installed on the screw column to rebound this 1 to 4 millimeter and goes.The bullet semi-annular jade pendant that has overlapped on this cylinder is designed into, and the elastic force degree that plays semi-annular jade pendant plays the retraction degree that semi-annular jade pendant can have 2 millimeter when the dynamics that 1 ton of left and right sides weight is arranged is depressed, the degree of contracting of 4 millimeter was arranged in defeating in the following time that 2 tons of left and right sides weight are arranged; When the dynamics that the weight about 3 tons is arranged is depressed, the degree of contracting of 8 millimeter is arranged, when the dynamics that 4 tons of left and right sides weight are arranged was depressed, 10 millimeter can bounce back.What be worth explanation here is because the weight of car varies; The elastic force that plays semi-annular jade pendant on concrete every car will be provided with the elastic force degree that plays semi-annular jade pendant according to the actual weight and the actual conditions of car; The rectangular width of being arranged to about 0.2 meter of magnet; 0.2 the face of rice is to match with underground round wheel face, length is directly proportional to good with the length of car.Circular magnet wheel with ground matches car in when walking, and magnet circle wheel is installed on the in-line jack-post, and the in-line jack-post is the jack-post on the generator simultaneously, and to take turns be to be installed on the jack-post together with generator to the magnet circle like this.So when car promoted the rotation of circle wheel, generator had rotated simultaneously and has generated electricity.When the floor mounted generator, be with a day font iron plate generator is installed, a day font iron plate is that horizontal shape outward appearance is installed in cement, on the pitchy highway ground.Respectively install magnet circle wheel and generator in two rooms of day font iron plate.The ground of the occupation of land of circle wheel and generator will excavate that concavity just can be installed magnet circle wheel and generator gets on; Recess to open up dig just in time install magnet circle wheel and go after; Can reach when magnet circle wheel has promoted it when car walk and be bound to freely rotate be as the criterion, the recess of installation generator will be opened up to dig and install back one at generator and reach the volume bodily form that just in time recessed shape and bottom can push up generator firm surely and be as the criterion.Magnet circle wheel and the overhead size of generator will be provided with according to the height overhead of the chassis on the car; If design according to the height overhead of the chassis on the existing car, be chassis on the existing car minimum overhead have only 0.1 meter, such car can cause circle wheel and generator above ground level less than 0.1 meter; It is many that this will cause magnet circle wheel and generator to sit the body that is put in the recess of ground; This will cause recess to dig deep, and recess is will ponding many, will damage magnet circle wheel and generator like this; Strengthen the consequence of loss, also can cause the distance of wanting 0.55 meter that a generator just can be installed.If by my designing requirement, magnet circle wheel and generator 0.25 meter high possibility above ground level is proper.Reason is that magnet circle wheel and generator are above ground level too many, also causes a lot of cars will reinstall big wheel.Too low shortcoming has been talked in front.If directly be installed to ground to generator, do not dig recess on the ground, how high generator have so, is exactly overhead height, and this car that will make a lot of kinds will add big wheel.So concrete magnet circle wheel and generator are when mounted, and what size height is installed, and remain to be made a decision after comprehensive assessment and demonstration have been got well again; Installed on the position of generator, water silt slurry is building full water silt slurry in the room between generator and the generator, and the quality of joints cement sand slurry is: height and length that the height of sand slurry and width just in time are generator are as the criterion; Also wanting to influence magnet circle wheel freedom and flexibility rotates; The height that can not exceed generator is as the criterion, and after cement mortar had been done the jail by the time, generator just was fixedly mounted in ground very much; If generator will keep in repair like this; The saw blade of available saw stone cuts the room between generator and the generator, removes the cement on the generator with instrument again after cutting; Just can unclamp the screw of installation generator then, just can take down generator and repair with instrument.The origin of force of jack-post is installed on day font iron plate with bearing; The origin of force of jack-post installs the available day font iron plate in back with bearing and is placed on the plane on ground; Day font iron plate is being drilled with a plurality of positions with the anastomosis, ground; Plane earth with day font iron plate anastomosis be drilled with a plurality of positions simultaneously, both eye bit alignments after can inject tight power screw and gone after.Screw tight with instrument again, tight power screw adopt a kind of install the back also tool spiral shell pine come after, the quality function screw that can pull out acts on screw and can pull out and be convenient to demolition, installation and keep in repair.On the shell of generator with day the font iron plate place of matching installed iron plate; The quality that this iron plate is installed will match with the mouth limit of day on the font iron plate on ground; Be bonded on day plane of font iron plate after matching with the mouth limit; Be provided with eye or post on the iron plate that can install on the generator on day font iron plate, eye position and screw pillar can only be installed to two kinds and fit the jail iron plate being harmonious and be as the criterion with wherein a kind of, close that to fit the jail be to realize with normal screws.Day font iron plate is provided with a kind of eye position that matches with eye position, ground; The eye position that eye position that iron plate on another kind of and the generator matches or post coincide, with eye coincide on day font iron plate be screw column and post identical be to be arranged to nut eye position on day font iron plate.Magnet circle wheel is provided with wide about 0.2 meter; Can match with magnet strip and be as the criterion; The diameter that the diameter of magnet circle wheel is designed into than generator exceeds about 0.02 to 0.05 meter; Diameter than generator is little can to increase generated energy if magnet circle wheel is designed into, if magnet circle wheel is designed into when bigger than generator, the magnet strip on car is gone up through out-of-date from the circle wheel can reduce revolution.Also just reduced simultaneously generated energy, so when confirming magnet circle wheel big or small, accomplish on possible basis that as far as possible minimum magnet circle takes turns to well.Power between generator is installed 10 to 20 kilowatts.When on highway, generator being installed is to be set to be separated by 15 to 20 meters on per 2 to 3 kilometers ground, generator room need be installed; These ground, room that stay are to act on: the walking freely when going in the room but car is expert at; Rotate walking position,, can on vacant lot, handle fault well if also be under the situation that has car being out of order simultaneously; When on the single line highway in rural area and city generator being installed; The single line highway must be widened to the width road surface that two row's generators can be installed, and goes because will be designed into one the tunnel, and one tunnel ability of returning is effective.On the highway of broad, can install and how much arrange generator and just install how much arrange generator, install 2 rows, 3 rows, 4 rows, 5 rows, 6 rows can, generator is installed as much as possible because install how well more more, the quantity of generator is many more, the quantity of generating will be many more.Economically, economic effect can be good more.In energy-saving and emission-reduction, can reach energy-conservation many more, the effect that discharge capacity is few more.If every generator was on average worked 3 hours every day like this, 10 degree that per hour generate electricity just can be sent out 30 degree every day; A generator roughly can generate electricity about 11000 degree over a year, if on average worked every day 4 hours, 12 degree per hour generate electricity; 48 degree just can generate electricity in one day; Generator roughly can generate electricity about 17520 degree over a year, and a generator is installed, manual work and material and generator add together expense roughly the expense between 3500 yuan to 4000 yuan of the needs pay wages.11000 degree have only closed 3 jiaos of 2 fens 1 degree than 3500 yuan.4000 yuan of 17520 degree electricity ratios, this several of group have closed 0.3 yuan of 1 degree.From above numeral, can find out, just be recoverable to cost within 1 year, and this several trillion degree electric power sends without any need for power later at installation generator on the highway.When also having car on the highway that generator has been installed, to walk, wheel has reduced by 80% pressure, and wheel has also increased and prolonged a lot of application lifes like this.The road surface of highway has also increased certain application life, because there has been day font iron plate to bear the weight of car 80%.If the generator of 100,000 kilometers single line length is installed in the whole nation, according to per about 0.4 meter length a generator is installed, because density is close more good more, as long as it is just passable to dress up generator.100,000 kilometers single line length can be installed 2.5 hundred million generators.2.5 hundred million 2.5X11000=27500 trillion degree over a year; One group of 2.5 hundred million X17520 degree electricity in back=43,800 hundred million degree electricity sent out 3.4 degree electricity by 1 kilogram of coal and calculated, and can practice thrift 8088.22 hundred million kilograms of coals every year; To 12882.4 hundred million kilograms of coals, close 80.882 hundred million tons to 12.8824 hundred million tons coals.Generator is removed to install by existing highway in the whole nation, can have the single line road surface of 300,000 kilometers length to install generator, can send 82500 to 13,140,000,000,000 degree electricity like this, can practice thrift 22,500 ten thousand to 38,520 ten thousand tons of coals every year.The electricity that generator sends can be built the also website of 1 pinching electric power at 1 to 2 kilometer place, is transported to total circuit after electric power is incorporated into the power networks and gets on.The magnetic force automatic switch has been installed on generator, and the effect of magnetic force automatic switch is, sent when electric at generator; Electric power can be free be transported to and the electrical network point comes up through switch, and generator has stopped, and has not generated electricity; The magnetic force automatic switch will separate transmission line of electricity automatically, and the electricity that sends of other generator can not be lost on this generator that does not generate electricity like this, on the highway generator has been installed like this; Also can reduce the part traffic accident; Because car has been stipulated traffic route, car can not push way by shoving or bumping, and only requires that the driver drives to walk just passable along the generator circuit.
More than two kinds of methods that the power of utilizing car walking is generated electricity, implement with a kind of method wherein only in the whole nation because to reach Unified National also need to unite-installs electricity-generating method, it is best that effect just can reach.Utilize a kind of electricity-generating method in back relatively good on the present highway, if behind a regular time limit, all completed according to the building method building of multifunctional and multipurpose of the present invention in the whole nation, a kind of before just implementing.The method of generating is much better, because preceding a kind of electricity-generating method is to can't see generator on the road; Generator can not exposed to the sun and rain yet simultaneously, is on highway, to aim at the straight line sky that has installed generator, erects power transmission lines; Motor can be installed on car, (oil-burning machine on the car removes), the used for transmission line line on the motor ascends into the sky to arrive and is as the criterion after overhead transmission line of electricity matches; The electricity that makes car send with the power of oneself walking is walked, because the electricity that oneself sends is own exhaustless, also will have more a part; If utilize the power of car walking to generate electricity it is thus clear that implement to have completed in whole nation building, car is not wanted any fuel and is walked and can reach everybody and afford car, and everybody affords to use the effect of car; Car is also can reinforcement a lot of till that time, and car has increased, and generated energy has also increased simultaneously; Utilizing the electricity on the aerial transmission line of electricity to promote the car walking, is prior art, so each details is not just described in detail here.Each details that the electricity that sends will be incorporated into the power networks is a prior art, just needn't describe in detail here.
The explanation of accompanying drawing drawing:
Fig. 1 representes aerial 100 meters left and right sides eminences and about 300 meters distant place views;
Fig. 2 representes the crosspiece face view in house;
Fig. 3 representes the water wheels elevation cross-sectional view;
Fig. 4 representes then view of water wheels;
Fig. 5 representes microscler waterwheel crosspiece face sectional view;
Fig. 6 representes microscler waterwheel vertical surface view;
Fig. 7 representes the mould bases crosspiece face sectional view of house mullion;
Fig. 8 representes the mould bases elevation of house mullion;
Fig. 9 representes the mould bases of house crossbeam and the mould bases crosspiece face sectional view of flat-topped ridge face;
Figure 10 representes house long beam mould bases elevation;
Figure 11 represent to rise and fall sluice gate view of power automatic switch;
Figure 12 representes the sluice gate view of heavy and light power automatic switch;
Figure 13 representes train generating crosspiece sectional view;
Figure 14 representes the train generating, and the magnet long slab on the railway carriage is pressed in the view on the wheel;
Figure 15 representes automobile generating, crosspiece face sectional view;
Figure 16 representes automobile generating, and the microscler magnet plate on the car is pressed in the wheel top view;
Figure 17 representes to mention magnet plate and breaks away from the groove schematic views;
Figure 18 representes that the magnet iron bar on the car has been pressed in the elevation on the magnet circle wheel on ground;
Figure 19 representes that day font iron plate puts down surface-based vertical view;
Figure 20 representes generator and the surface-based elevation of magnet circle wheel;
Figure 21 representes that the magnet iron bar on the car has been pressed in the elevation on the magnet circle wheel on ground;
Figure 22 represent to change direction sectional view of facing directly of gear;
Figure 23 represent to change direction transverse sectional view of gear.
Figure 24 representes a family reference planes sketch map
Underground excavation 1.1 and 2.1 retaining river and active channels; Built 3.10 and 11.5 and 12.6 on the river course bed and protected dam, top 1.2 and 2.3 and 2.4 of river course bed is set to highway and garage parking, is set to 1.3 or 2.5 multilayer houses above the passage; Go up and balcony 1.4 or 2.6 kind of plant all around on house top; Every row's vacant lot between row and row 1.5 and 2.2 is soils, 2.4 expression garage parkings, 2.3 expression runways.
Protect being provided with 3.4 and 11.1 and 12.1 breach on the dam, 3.4 have installed water wheels on the breach, and water wheels 3.1 or 4.1 are installed on the 4.4 skill forces; 3.2 branching racks are supporting the drinking water blade on the water wheels, and blade has fixing and activity, the blade power that blocks water; Make water wheels rotate so utilize the dynamics of flowing water to impact blade, be provided with 3.10 and protected water and make the flowing water setting flow to the notch shock blade to make water wheels rotate to have promoted 4.8 and 4.3 governor gears, promoted 4.9 generators simultaneously and generated electricity; Flood level is on 3.7 and 3.8 lines the time, and generated energy is big, and flood level is higher than at 3.9 o'clock can be protected upper reaches, dam top from 3.10 and go over; Flood is big, and flow velocity is fast, and is inferior too fast if water wheels change; Can open 4.3 and generate electricity, whirlpool river bed, river bed, 3.5 expression downstream are gone up in 3.6 expressions.
Microscler waterwheel is that stream power impact 5.4 and 6.4 blades of flowing water are walked about; Blade has 5.6 and 6.6 location, and blade is that 5.3 and 6.3 jack-posts add Xiao Zi and are linked to be a blade chain, is simultaneously 5.2 and 6.2 to have protected water; Make flowing water formalize along waterwheel when dirty; The impact blade is walked about, make 5.1 and 6.1 jack-posts rotate simultaneously 5.8 generators generate electricity (be worth here explaining, 5.7 and 6.7 be on the jack-post tooth increased on the accompanying drawing stroke be for represent can figure on see clearly Chu; In fact when making waterwheel, do not need so long tooth, can make length according to actual needs).
Mould bases, post are 7.1 and 8.1 to enclose muscle and fixed 7.2 and 8.2, and frame is the done frame as ladder of carpenter, and ladder stay has protected 7.3 and 8.3 porcelain plates; Porcelain plate is special customized good supporting that barb is arranged; The mould bases of each post has been reserved 7.4 and 8.5 reinforcing bars, and each pillar is provided with 7.6 and 8.4 location, is just deciding, decides the jail, and enclosing muscle is 7.5 wood point clampings; The mould bases of crossbeam is that 9.5 and 10.4 vertical capitals have been lived 9.2 and 10.2 horizontal bars; 9.1 be placed on respectively on the horizontal bar with 10.1 ladder stays, 9.6 and 10.6 perpendicular ladder stays are 9.7 and 10.7 iron wires (dotted line and stain represent to connect firmly, even tightly, tighten), ladder stay protected 9.3 and 10.3 barb arranged porcelain plate; Erectting right cylinder has 10.5 hand in hand, and 9.4 reinforcing bars have been reserved on porcelain plate internal layer and porcelain plate top layer.
The retaining river protect dam height 11.5 and 12.6 than field, both sides face maintain an equal level or be lower than 1 meter with interior for good, 11.2 things that rise and fall can make 11.1 sluice gates open He Guanshui, 11.3 levers are seated on 11.4 branching racks; When 12.1 flood comes on 12.5 platforms above the sluice gate; Ponding is arranged on the platform, and sluice gate is just heavy, the flood discharge of heavily will falling down to come downstream to than 12.2 stone nets weight the time; Flood is little; Little to sluice gate when lighter than stone net, the stone net will be mentioned Guan Shui to sluice gate, and 12.3 lever seats drop on 12.4 forces and supporting.
It is that 13.2 and 14.2 microscler magnet strips are pressed on the 13.1 and 14.1 magnet circle wheel that the power of utilizing train to walk is generated electricity; The circle wheel rotated simultaneously when train case 13.6 was walked about; Circle wheel is fixedly mounted on 13.9 jack-posts, and the circle wheel has promoted 13.4 generators simultaneously when rotating and generated electricity, and magnet strip is 13.3 to be connected firm on the muscle beam of the bottom in compartment with 14.3 connecting rods; 13.5 Train wheels had left 13.7 rails, 1 to 4 millimeter when magnet strip was walked about on the circle wheel; So also can increase the stability in compartment, jack-post has 13.10 forces and iron plate to be fixedly mounted on 13.8 sleepers, the compartment of 14.4 expression trains; 14.5 supporting microscler magnet strip, making microscler magnet strip movable before and after not understanding.
Utilizing the power of automobile traveling to generate electricity is 15.3 and 16.3 and 17.3 microscler magnet strips, in 15.7 and 17.7 grooves on ground, walks, and walking has promoted 15.1 and 16.1 and 17.1 magnet gears in groove; Make 15.2 generators generate electricity; 15.3 be installed in support on the end muscle of car frame, 15.4 and 16.5 and 17.10 wheels are walked on plane, 15.6 and 16.4 and 17.6 ground, gear goes out between the bottom portion of groove 10-20 millimeter; Be fixed into a flat line with one of them number and install gear; Gear is 15.5 supports location and fixed jail, and when car need not be walked groove, the driver can grasp 17.2 control sticks to pulling at one's side; At this moment 17.3 microscler magnet plates will upwards be mentioned from groove through 17.2, and the effect after carrying is the position of accompanying drawing 17 dotted lines 17.4.Also can be provided with motor and mention and depress 17.3 magnet and come; Electricity consumption is set, and to mention plate be to have pierced into flexible steel cables in the middle of 17.5; Be to start 17.8 motor scrolling flexible steel cables to mention iron plate and depress the method that iron plate is gone again, iron plate is mentioned the back car and just can be walked at plane earth like this, and 17.6 represent highway planes; 17.7 expression groove floor; Mention and depress the method that rectangular magnet plate also can use for 17.9 (dotted line is represented) and implement, 17.11 expression location iron plates, it can make strip magnet car when walking forward, can not dig backward and leave gear.
The underground water of 1.1 expressions of Fig. 1 is flowing water and retaining, it be arranged on the traffic road under.The 1.2 expression traffic roads of Fig. 1, it be arranged on the riverbed above.The 1.3 expression houses of Fig. 1, it build in the traffic road above.The end face in the 1.4 expression houses of Fig. 1 is trained the soil species plant of spreading manure above.The 1.5 expression vacant lots of Fig. 1, it is to do field usefulness, plant on the kind.
2.1 expression active channel and the retaining river courses of Fig. 2, it be arranged on the traffic road below.The 2.2 expression soils of Fig. 2, it can plant plant, the 2.3 expression traffic roads of Fig. 2, it build in the river course above.The 2.4 expression parking lots of Fig. 2, it build in the riverbed above, be the centre in traffic road, the 2.5 expression houses of Fig. 2, it build in the traffic road above.The 2.6 expression plants of Fig. 2, it is planted on the periphery and balcony in house.
The 3.1 expression jack-posts of Fig. 3, it has installed water wheels, and the origin of force at its two is installed on 3.10 dam crests.The 3.2 expression water wheels of Fig. 3, it is installed on the jack-post, the 3.3 expression blades of Fig. 3, it is installed on the water wheel frame.Beneath dam on the 3.4 expression riverbeds of Fig. 3.The river bed in 3.5 expressions, 3.4 downstream of Fig. 3.The bottom, riverbed at 3.6 expressions, 3.4 upper reaches of Fig. 3.3.7,3.8, the 3.9 expression water levels of Fig. 3.
The 4.1 expression jack-posts of Fig. 4, it has installed water wheels and governor gear.It is installed in the 4.2 expression water wheels of Fig. 4 on the breach in riverbed.The governor gear that 4.3 expressions of Fig. 4 are slowed down.The point-supported car of 4.4 expression bearing pressures of Fig. 4 is by post.4.5 indication notch and the dykes and dams of Fig. 4.The dam crest of the bottom, 4.6 expression riverbeds of Fig. 4.The 4.7 expression frames of Fig. 4 are supporting generator.The 4.8 expression speed increasing gears of Fig. 4.The 4.9 expression generators of Fig. 4, it can send electricity and come when water wheels rotate.
The 5.1 expression jack-posts of Fig. 5, it has installed gear piece and generator.The outside framework of the 5.2 expression waterwheels of Fig. 5 has been installed the blade chain, the axle center post above it.Manage on the 5.3 expression blades of Fig. 5 and the axle center on the chain.Installed jack-post in the room of this pipe.The 5.4 expression blades of Fig. 5, it has used 5.3 to be linked to be a chain, and it leans on 5.3 places to leave the room that can insert gear piece.But the room of the position of fixed blade is installed in 5.6 expressions of Fig. 5, realizes with wooden stick.The 5.7 expression gear pieces of Fig. 5 are installed on the jack-post, and the chain that it can inject blade when water impulsion blade was walked about is left in its room and gone.The promotion jack-post rotates.The 5.8 expression generators of Fig. 5 when the blade on the waterwheel is walked about, have promoted it and have generated electricity.
Jack-post gear on the 6.1 expression waterwheels of Fig. 6, it is that it rotates simultaneously when blade is promoted by water.The peripheral protective water framework of the 6.2 expression waterwheels of Fig. 6, it has protected water, makes water location promote blade, and the 6.3 expression central siphons of Fig. 6 have been installed jack-post in its room, its flexible rotation on going to the gear at two time of blade chain.The 6.4 expression blades of Fig. 6, it has 6.3 to become chain in succession.The base plate of the 6.5 expression waterwheels of Fig. 6, its two and centre have Zhi Lidian supporting.It is supporting the blade chain simultaneously.The locating bar of 6.6 expressions on the blades of Fig. 6 acts on and can guarantee that blade is the same with distance between the blade.The tooth of 6.7 expressions on the jack-posts of Fig. 6, water promotes blade when walking about, and tooth inserts in the room on the blade chain, makes jack-post rotate and drives generator and generate electricity.
The framework in the fixed jail, periphery of the 7.1 expression pylons of Fig. 7, it has protected the frame as ladder.7.2 expressions of Fig. 7 are as the frame of ladder, and it outer is with 7.1 and protected firmly.Porcelain plate has been protected in its inside, the 7.3 expression porcelain plates of Fig. 7, and it is to have 7.2 to protect and just protect the jail.The 7.4 expression reinforcing bars of Fig. 7 are installed in the place that needs.The 7.5 expression wood points of Fig. 7, with its point tight 7.1.The peripheral positioning bar of 7.6 expressions of Fig. 7 is decided the positive definite jail to the mould bases of each pillar with it.
The peripheral pylon of 8.1 expressions of Fig. 8, it decides firm ladder stay around being installed in pylon.8.2 expressions of Fig. 8 are as the frame of ladder, and it outer is with 8.1 and protects the jail, and porcelain plate has been protected in its inside, the 8.3 expression porcelain plates of Fig. 8, and it has 8.2 to protect and just protect the jail.The 8.4 expression positioning bars of Fig. 8 are decided the mould bases of each post of positive definite jail with it.The 8.5 expression reinforcing bars of Fig. 8.
9.1 expressions of Fig. 9 are as the frame of ladder, and it has 9.2 horizontal bars to protect, its top porcelain plate of having installed.The 9.2 table mark horizontal bars of Fig. 9, it has 9.5 mullions to withstand, and has put 9.1 above it well.The 9.3 expression porcelain plates of Fig. 9, it has 9.1 to protect and just protect the jail.The 9.4 expression reinforcing bars of Fig. 9 are placed in the place that needs reinforcing bar.The vertical post of 9.5 expressions and the plate of leading along by hand of Fig. 9, it has withstood 9.2.The ladder stay of laying is erect in 9.6 expressions of Fig. 9, has protected the porcelain plate on the beam muscle with it.The 9.7 expression iron wires of Fig. 9 are fixed with it, reinforce, consolidate just as the same frame of ladder.
10.1 expressions of Figure 10 lie in the frame on 10.2 muscle, lay porcelain plate with it.The 10.2 expression horizontal bars of Figure 10 have been laid 10.1 above it.The 10.3 expression porcelain plates of Figure 10, it is placed on 10.1.Posts are erect in 10.4 expressions of Figure 10, with its jail, top withstood 10.2 horizontal bars.10.5 expressions of Figure 10 are plate hand in hand, leads with it and just leads jail 10.4, and the ladder stay that 10.6 expressions of Figure 10 are erect protects the porcelain plate on the risers with it.The head that the 10.7 expression iron wires of Figure 10 have been tightened links up the frame on opposite with it and to have tightened.
The 11.1 expression sluice gates of Figure 11, it is installed on the breach that protects dam, is lifted on the lever.11.2 expressions of Figure 11 can be floated thing; It is lifted on the lever, and its water level is high to make 11.1 sluice gates sink flood discharge downwards with regard to floating height, is installed on the Zhi Lidian in the middle of the 11.3 expression levers of Figure 11; Sluice gate in its lifting, the sink-float thing of knowing clearly is installed in the other end.The 11.4 expression Zhi Lidian of Figure 11 have installed lever above it.The 11.5 expression ground of Figure 11, it is higher than protects in 1 meter on the dam.
The 12.1 expression sluice gates of Figure 12, it is installed on the breach that protects dam and is lifted on the lever.The screen frame of stone has been filled in 12.2 expressions of Figure 12, and it is installed on the lever.The 12.3 expression levers of Figure 12, its centre is installed on the Zhi Lidian, and its peace has lifted screen frame, and the other end has lifted sluice gate.The 12.4 expression Zhi Lidian of Figure 12, it has installed lever.The platform of 12.5 expressions on the sluice gates of Figure 12 acted on flood, and water level is high, and ponding has been arranged on the platform, and that is nose heave than stone screen frame will to reach water, and sluice gate will fall down to open the flood discharge of coming downwards.Dam is protected in 12.6 expressions of Figure 12.
The 13.1 expression magnet circle wheels of Figure 13 are installed on the jack-post with generator, and it has wrapped resistance magnetic shell, has only stayed magnet circle wheel can penetrate the magnetic line of force with the rectangular anastomosis of magnet.The magnetic force ray of circle wheel is concentrated and is penetrated on the rectangular magnet plate like this.The magnet that 13.2 expressions of Figure 13 are installed on the railroad car is rectangular, has promoted 13.1 with it when train is walked about and has rotated.The rectangular post that is connected on the railway carriage of 13.3 expression magnet of Figure 13.The 13.4 expression generators of Figure 13,13.2 had promoted 13.1,13.1 and have promoted it and generate electricity when train was walked about.The wheel of 13.5 expressions on the railway carriages of Figure 13,13.2 were pressed in for 13.1 last times, and it has left 13.7 and has had between 1 to 4 millimeter.Beam muscle on the 13.6 expression railway carriages of Figure 13, its both sides have installed 13.3 and 13.2.The 13.7 expression rails of Figure 13 have been installed the jack-post on the generator under its outside abdomen.Sleeper on the 13.8 expression railways of Figure 13.The 13.9 expression jack-posts of Figure 13, its one is installed under 13.7 the abdomen, and the centre installs 13.1, also has jail, 13.10 top on its body.The 13.10 expression Zhi Lidian of Figure 13, it is supporting the jack-post on the generator, and the inside of its stress point is that public female post does not change with pipe 13.9 these heads, and 13.1 and 13.4 can rotate.
The 14.1 expression magnet circle wheels of Figure 14 are installed on the axle with generator.The 14.2 expression magnet of Figure 14 are rectangular, and when train was walked about, it had promoted 14.1 and has rotated to be installed on the railway carriage of train (it is rectangular magnet to be installed on the locomotive engine of traction motor-car case).13.3 connecting rod for indication of Figure 14, magnet is rectangular to be connected on the railway carriage with it.It is rectangular that magnet has been installed on both sides below the bottom of the 14.4 expression railway carriages of Figure 14, its bottom.14.5 connecting rod for indication of Figure 14, oblique being installed on the vertical connecting rod supported vertical connecting rod with it, making that magnet is rectangular can swing.
The 15.1 expression magnet gears of Figure 15,15.3 promote them rotates.The 15.2 expression generators of Figure 15,15.1 promotions are arranged, and it generates electricity.The 15.3 expression magnet of Figure 15 are rectangular, it be installed in the car frame under, when car was walked about, it was walked about simultaneously and has promoted 15.1 and rotate.The 15.4 expression wheels of Figure 15, it is walked on the ground on plane.The frame of magnet circle wheel and generator is installed in 15.5 expressions of Figure 15.It is installed under the flat-topped ridge abdomen that cement steel builds.The 15.6 expression ground line of Figure 15.The 15.7 expression grooves of Figure 15, its recessed position are on the plane beam that cement steel is built, and 15.3 magnet on the car that is used in the groove to walk are rectangular, magnet circle wheel have been installed, the jack-post on the circle wheel on the 15.8 expression generators of Figure 15 in the groove.
The 16.1 expression circle wheels of Figure 16, it is installed on the jack-post together with generator.The 16.3 expression magnet of Figure 16 are rectangular, are installed under the abdomen of car, and during the car walking, its walking has promoted 16.1 and rotated in the groove on ground.The 16.4 expression ground of Figure 16.The 16.5 expression wheels of Figure 16, it is walked on plane earth.
The 17.1 expression gears of Figure 17 have 17.3 to promote their rotations during the car walking.The jack-post of the 17.2 expression activities of Figure 17, when magnet is rectangular when walking about up and down, it can rotate.The 17.3 expression magnet of Figure 17 are rectangular, and it is installed under the abdomen of car, and when car was walked, it had promoted 17.1 rotations simultaneously and has reached the purpose of generating electricity.Magnet is rectangular has mentioned in 17.4 expressions of Figure 17, left groove after, car can be walked on plane earth.The position that 17.5 expressions of Figure 17 can be installed motor, also available motor mentions 17.3.The 17.6 expression plane earths of Figure 17.The bottom of the 17.7 expression grooves of Figure 17.Figure 17 17.8 the expression moving points, with hand climb 17.13 o'clock it can rotate.Another kind of 17.3 the scheme of mentioning of 17.9 expressions of Figure 17.The 17.10 expression wheels of Figure 17, it is walked on plane earth.Vertically upright muscle is supported in 17.11 expressions of Figure 17, is supporting with it that magnet is rectangular can not to shrink back.Under the abdomen of the 17.12 expression flat-topped ridges of Figure 17, it and the distance between 17.6 are the thickness of flat-topped ridge.The 17.13 expression control sticks of Figure 17, it is climbed at one's side with hand can mention 17.6.
The 18.1 expressions day font iron plate of Figure 18, it is installed in ground.The magnet that 18.2 of Figure 18 is illustrated under the car abdomen is rectangular, and it has been pressed on the magnet circle wheel.Car is when walking, and it has promoted 18.3 and has rotated.The 18.3 expression magnet circle wheels of Figure 18 have been wrapped resistance magnetic overcoat on the magnet circle wheel, have only stayed round wheel and the microscler magnet strip place of matching can penetrate the magnetic force ray, and the magnet ray that magnet is round takes turns like this can collect from the anastomosis and penetrates.Its room, center is on the semicircular shaggy tooth, and it is 18.2 to promote it and rotate.Beam muscle under the 18.4 expression cars of Figure 18, it is horizontal that the beam muscle is actually.This figure goes up just representing of picture.18.5 expressions of Figure 18 play semi-annular jade pendant and are sleeved on the screw column.Screw the higher authorities hang on the beam muscle of car, and following has loaded onto 18.2.The 18.6 expression hinge jack-posts of Figure 18, its connects, and magnet is rectangular to make magnet rectangular magnet is rectangular during walking on the highway that height is arranged can coincide with the height camber of highway.The 18.7 expression jack-posts of Figure 18, cover has been loaded onto magnet circle wheel on its semicircle shaggy tooth, and generator is installed in the other end of jack-post.The 18.8 expression cap nuts of Figure 18 are on the movable crossbeam muscle that is mounted on car.18.9 expressions of Figure 18 connect the jail frame hand in hand, act on when car walk, can not break electric generator structure if careless wheel has been run into the point of installation jack-post yet.
The room of magnet circle wheel is installed in 19.1 expressions of Figure 19.The room that generator is installed in 19.2 expressions of Figure 19.The 19.3 expression cap nuts of Figure 19, this screw column has gone down with being inserted into.The 19.4 expressions day font iron plate of Figure 19.Its paperback is connected tight with tight power screw on the ground with ground.
The Zhi Lidian of jack-post is installed in 20.1 expressions of Figure 20, and it is being installed on the jack-post on the Zhi Lidian with bearing holder (housing, cover) again, and this branching rack has 18.9 iron plates of Figure 18 to connect the jail.The 20.2 expression magnet circle wheels of Figure 20, it has installed resistance magnetic overcoat with being installed on the jack-post of generator on the magnet circle wheel, has only stayed round wheel anastomosis on rectangular with magnet can penetrate the magnetic force ray.The Zhi Lidian of jack-post is supported in 20.3 expressions of Figure 20.The 20.4 expression generators of Figure 20, it is installed in ground, and 20.2 when rotating, and it generates electricity with advancing to have rotated.The 20.5 expressions day font iron plate of Figure 20, its safety is contained in ground, inserts ground with tight power screw and has connected the jail.
21.1 expression magnet of accompanying drawing 21 are rectangular, and it is installed under the abdomen of car, and during the car walking, the 21.5 magnet circle wheel that promotes ground with it rotates.21.2 expression plays semi-annular jade pendant, it is installed on the screw column, acts on the rectangular height of adjustment magnet; 21.3 the expression nut, it is rectangular that it has tangled magnet, 21.4 expression generators; 21.5 when magnet circle wheel rotated, it rotated simultaneously and has sent electricity, 21.5 represent magnet circle wheel; It is to lean on that magnet is rectangular to be promoted its and rotate, 21.6 expression frames, the magnet circle wheel that acted on fix tightly.
22.1 expression magnet circle wheels of accompanying drawing 22, its centre is installed on the shaggy tooth wheel on 22.4 jack-posts, 22.2 expression generators; 22.3 represent nyctitropic tooth; Act on when the rotation of magnet circle wheel and rotate each other with 22.5, make 22.5 to become 90 degree directions in rotation, 22.4 expression central columns through it; The round wheel of the concavo-convex interface that can match with the room on the peripheral 22.1 magnet circle wheel has been installed above it; 22.5 one tooth on the jack-post of expression generator, it can match with the tooth on 22.3 magnet, and its rotation direction just in time is this one side of 90 degree of 22.3 rotation directions.
23.1 expression magnet circle wheels of accompanying drawing 23, the tooth on the jack-post on the 23.2 expression generators, it can match with the tooth on the 23.5 magnet circle wheel; 23.3 represent peripheral frame; Install resistance magnetic shell and fix magnet circle wheel with it, the jack-post on the 23.4 expression magnet circle wheels, it is installed on the frame; 23.5 the tooth on the expression magnet circle wheel, it can with 23.2 match.
Economic analysis
This ground is after what years, all building completed; Total cost " does not comprise car, road electricity generation material and management fee, tax revenue expense; cost just " between 4,000,000,000 to 4,500,000,000 yuans, the 9120 family residents that can live, and each household connects balcony to be had more than 324 square metre interior; The each household total cost is (each household is decorateed cost between 200,000 to 240,000 RMB, about 260,000 yuan of hair room cost each households) between 450,000 to 500,000 RMB.If country harness the river, subsidy to some extent in the measure of greening, the energy, environmental protection, traffic, air defense, that is exactly that a hair room cost can also descend.Living in the resident who does building like this has the soil kind, also has water to breed fish, and soil, crawl are to distribute by the room, do not need the resident to spend.Only need responsibility and plant it, support.
This piece land for building has had more roughly 6800 mu in cultivable soil like this; Repaiied 3 30 meters wide 8 kilometers long traffic road more; 3 30 meters wide 8 kilometers long river courses have been excavated more; Having built to live more does not take up an area of the house of skin more than 30,000 populations; Held cubic metre water more than 1,190,000 more, supported one jin of fish with per 2.5 cubic metres of water and calculate, these water can be breeded fish about 500,000 jin every year; Can be self-supporting, built the generator of 100 to 1000 kilowatt hours (10,000 kilowatt hours can be generated electricity about 25 days) more.Living in the resident does not here need other energy life, and this piece ground has not had flood and drought, takes precautions against drought simultaneously, the problem of heatstroke prevention solved, and the people who lives in does not here have the water pollution.These additional economy of amounting to go at last 10,000,000,000 yuans also to can't buy because people's excreta and washing water have gone (water of washing clothes must have been handled well and just can use) on all being utilized to and breeding fish.Have more above-mentioned this piece greatly to 6800 mu of ground; Can be on the basis in existing population and soil; Everyone bonus point is ground about 3 minutes, and about 1.2 ten thousand people of existing population divide like this and gone to 3600 mu of ground; Also have 3200 mu of ground can receive about 1000 people and settle down, can receive the population that stays in the hazardous location to here.
After state
In manual, whether mention with the explanation the place, all be prior art and method, implement just can construct to accomplish building so when embodiment of the present invention, will comprise some prior aries and method.Various and each number of in manual, being mentioned all is the number of this case row.In other local embodiment of the present invention, can number be set according to the geography and the various situation of locality.As: the Changjiang river embodiment of the present invention; Its every active channel is built generator and can be designed by the flow of 40 cubic meters at ordinary times; Every river flood is designed into 200 of safe traffic per seconds more than the cubic meter when coming, 100 active channels are set can flow 4000 cubes of meter per seconds at ordinary times.Because of often there is the flow of 4000 cubic meter water in the Changjiang river, so installing the breach of water wheels, its also wants big, to 6 to 20 meters width greatly, the locating blades of drinking water blade is also wanted wide to 12 to 5 meters width.Generator capacity is also wanted the installed capacity of big to 50 to 500 kilowatt hours, and (every generator) flood control breach also will be greatly to 6 to 20 meters wide.Build and build two retaining rivers and be equipped with a flowing water river there being the many local embodiment of the present invention of arid that excavation will be set, the water retention capacity in retaining river also will be deepened.Protect dam on flowing water riverbed and the retaining riverbed, also will according to circumstances design 0.2 meter of minimum be designed into drop.Ground be open to traffic with the limit on the arable land also design based on the situation of establishing.As: its channel deposits of the Yellow River is many; It will be designed into the arable land that ground is open to traffic on the channel ratio limit and exceed more than 2 meters; The silt that cleans out on the riverbed like this can be in a lot of years also can be smooth on the spot in the arable land to the limit; Smooth having gone in plough of silt also can be higher than the traffic on ground after a lot of years, and the arable land on both sides, river course is also comparable, and to protect dam high more than 2 meters, protects like this on the dam and also can not build sluice.After if completion is all built by the present invention to estuary in the basin, river course, can be from the estuary retaining riverbed that draws water, a joint one saves land and pumps up great damage caused by a drought and also can not suffer from drought.If building is done according to method of the present invention in the Changjiang river, build dark 5 meters of 200 retaining river retainings, 2 meters of flowing water river retainings are dark, and 2000 kilometers in the Changjiang river is long; But more than retaining 500 billion cubic meters, support one jin of fish with per 5 cubic metres of water and calculate, these water can be breeded fish 25,000,000,000 jin; The main river in the Changjiang river has more the soil and will calculate with hundred million quantity, has not had in local flood, the arid of having implemented building method of the present invention, and electric power can be self-supporting a lot; Highway is many, and everybody plants with having, and everybody has water to breed fish.If building is done according to the present invention in the Yellow River, it can also solve the problem that the riverbed exceeds than ground.If building is all done according to the present invention in the whole nation, can have more several hundred million mu of arable lands, Plain and open ground have not had flood and arid, the whole nation population more than 200,000,000 of can surviving, global embodiment of the present invention, the whole world 1,000,000,000 above populations of can surviving more more.
From manual, can find out, implement building method of the present invention, river course flowing water, retaining is not taken up an area of, and flood, arid have not had, and everybody has water to breed fish; Traffic is not taken up an area of, and traffic above-ground is many, has solved the problem that the traffic road will take up an area of; Build the house and how also not take up an area of, solved the problem that builds a house and to take up an area of; Move the soil to the roof kind that gets on, the retaining road is arranged, water is many has solved the problem that does not have the arable land on the water kind roof; The solar energy major part has been absorbed, air cleaner, solved the greening problem; People's excreta and living water use are utilized has breeded fish, and has solved the problem of eating fish.Protect the sluice gate of having built automatic switch on the dam, solved the manpower management sluice gate problem with waste of manpower not in place; The whole nation has had more soil more than several hundred million mu, and everybody has the soil kind, has solved the soil problem; Do the wall wall in house with light material, the brick that waters of soil is not done wall, and the house is attractive in appearance for a long time, has solved the problem of watering brick waste soil and coal with soil; The traffic road all under the house with underground, do not have the sun to shine and the sleet pouring, solved the ungetable problem of raining, snow; Replace template with porcelain plate or lithotome that barb is arranged and water the reinforcing bar bone cement, can disposable success, it is many to have solved the place that the son that builds a house will fit up, the problem that the house cost is high; Solved shut die, form removal difficulty simultaneously, the worker employed in a plant nursery spends the problem of material; The various constructions of line have been solved in the outdoor short problem in application life of being exposed to the sun and rain; Solved simultaneously and set up various circuits and will found the line bar, the problem that cost is high; Underground have a tunnel, solved antiaircraft problem; The power of utilizing car to walk is generated electricity and has been solved electrical problems, utilizes the buoyancy driving of magnet, has solved driving power and has wanted big problem; The capable tank circuit of car; Solved traffic safety problem, the building method of this kind multifunctional and multipurpose is built manyly more; The thing favourable to human survival is many more, and a lot of problems have obtained solution.
From manual, it can also be seen that and build about 900 yuan in one square metre of area hair room, the decoration that the resident lives is at interior about 1800 yuan.If annual country takes out 4 trillion yuan, local finance and citizen take out 4 trillion yuan and implement this building.Can know and in 20 years, have 160 trillion yuan construction funds; Bring up to 2000 yuan exactly and build one square metre of house, can be built into 80,000,000,000 square metres of houses, and do residential dormitory in 20 years with 60,000,000,000 square metres; Do factory building for 20,000,000,000 square metres, square metre dormitory about the average 40-50 in everyone whole nation of resident.Average 100,000 square metres of factories, factory building also can supply 2,000,000 factories to use, and how many workmans each factory needs; Be equipped with how many residential dormitories on the spot, that is to say workman's working of going to work on the spot, need arrive at a distance and go to work; Workman's working does not have traffic problems like this, comprises matter of time, the travelling expenses problem; Dynamical problem, energy problem.After 20 years the whole nation all solved flood, arid, water, soil, breeded fish, the energy, house, a lot of problems such as greening, traffic, earthquake.These problems leaders at different levels in daily life later on do not need to waste time and energy costly at work and worry about, and working work easily.The property of citizen's property and country has obtained very big safe and guarantee.Natural calamity also is solved.This building method has been implemented in the whole nation, and people have changed a kind of life style, can reach about 0.4 mu in the place that the soil is few per capita, and the place that the soil is many has more than 4 mu per capita; Factory working is implemented 4-6 class and is fallen system, working in everyone day 4-6 hour, and all the other times are kind of ground at home; That is to say that the citizen is the workman, is again the peasant, does not have the branch in city and rural area; The citizen does not have the soil battle, has also solved present village and village, the problem of person to person soil battle.
The present invention early implemented in the whole nation 1 year; The descendants who can be us in 1 year economizes on the use of funds more than 11,000 hundred million yuan; Because of existing this building method will spend more than 1 trillion yuan every year; The various natural calamities in the whole nation will be lost more than 1,000 hundred million yuan, also have existing this building method to build to such an extent that manyly also can give the more difficulties of later embodiment of the present invention increase, so the appealing policymaker are as early as possible in national embodiment of the present invention.

Claims (10)

1. the building method of multifunctional and multipurpose is characterized in that, and is underground: accompanying drawing 1.1 and 1.2 excavations are active channel and retaining river course, and the top accompanying drawing 1.2 of river course bed and 2.3 and 2.4 has been built highway and garage parking, and accompanying drawing 1.3 and 2.5 has been built multistoried building.The top, house is gone up accompanying drawing 1.4 and 1.6 and is trained the soil species plant of spreading manure, and the vacant lot accompanying drawing 1.5 and 2.2 between every row is set to the soil, has built accompanying drawing 3.10 on the active channel bed and has protected dam; Protect being provided with 3.4 breach on the dam, install Fig. 3 and Fig. 6 power generation hydraulic on the breach, be provided with Figure 11 on the retaining river course bed and Figure 12 protects dam; Protecting the sluice gate of having installed automatic switch on the dam, in construction, build reinforced concrete without template, is with Fig. 9 and Figure 10 mould bases; Be to replace template with porcelain plate and lithotome plate; Be provided with the feasible groove of walking car on the traffic road, be provided with wheel in the groove, utilize the power of car walking to promote wheel and generate electricity; Utilize the power of train walking to generate electricity the building method that above-mentioned these schemes all combine together on the railway.
2. active channel according to claim 1 and retaining river course; It is characterized in that, be provided with 15 of both sides slope wall and huge pillars on the river course bed, 60 of pillars are the pilum in 1 group house, Building 1; The both sides of river course bed are provided with the slope wall that combines with reinforced concrete and ratchel; Be provided with on the river course bed and protect dam, protect to be provided with under the dam and be used for mud, sand, the Shi Shikai of clean deposition on the riverbed little water pipe of water of draining off that comes, be provided with septic tank on the river course bed.
3. traffic according to claim 1 road; It is characterized in that: the flat building of on the top of the big pillar on the river course bed, having built the car of 50 tonnages of can walking is the traffic road; Traffic has been built the rest room on the road, has genuine and traffic road and flowing water river and retaining river on every soil between row and row.
4. house according to claim 1 is characterized in that on the traffic road, and the huge pillar of aiming on the river course bed has been built huge pillar; Be provided with generous pin under the huge pillar, big capital is provided with big needle beam, is set to flat building on the crossbeam; Repeat to build multi-storey building on the flat-topped ridge, the house frame shape, the outer enclosure wall in house is formed with the beneath one meter high frequency porcelain plate of branch spaced walls wall and cement, sandstone, reinforcing bar; Above the wall wall with steel mesh reinforcement, glass, coated plywood; Light materials such as sound deadening sheet are decorateed, and train the soil species plant of spreading manure around the house on the balcony, and kind of plant has the tap water spray on the end face in house; Be provided with on the end face and built reservoir, escalator, People's Bank of China's staircase, security guardrail.
5. power generation hydraulic according to claim 1 is characterized in that, protects and is provided with 3.4 and 11.1 and 12.1 breach on the dam;, Fig. 3 water wheels have been installed on 3.4 breach, water wheels 3.1 and 4.4 straight oblique crank Z posts are installed on 4.4 forces; 3.2 branching racks on the water wheels are supporting drinking water blade 3.3; The blade power that blocks water, be 3.10 protect from the dam water setting flow to breach, impact blade and make water wheels rotate; Having promoted 4.8 or 4.3 governor gears has simultaneously driven 4.9 generators simultaneously and has generated electricity; Another is that microscler waterwheel utilizes flowing water dynamic impact 5.4 and 6.4 blades to walk about, and blade has 5.6 and 6.6 location, and blade is that the connecting leg (structure of hinge appearance) on 5.3 and 6.6 jack-posts and connecting leg slip and the blade is linked to be a very long blade chain; Be 5.2 and 6.2 to protect water and make flowing water setting flow downward to impact blade and walk about, promoted 5.8 generators simultaneously when making the rotation of 5.1 and 6.1 jack-posts and generated electricity simultaneously along waterwheel.
6. the sluice gate of automatic switch according to claim 1; It is characterized in that: the soil that protects the aspect ratio two Bianba limits of dam 11.5 and 12.6 maintain an equal level to the end with 1 meter with interior for well, 11.2 rise and fall jack-up lever of the high end that things can be through water level and fall lever and make the height of 11.1 sluice gates and the end close water or flood discharge is when flood comes on 12.5 platforms on 12.1 sluice gates; Water level is high; It is just heavy just to have ponding on the platform, water level high to sluice gate than 12.2 stones that when nose heave, the flood discharge of will falling down to come downstream of the effect sluice gate through 12.3 levers; Flood is little; Sluice gate is light, and 12.2 stone nets have weighed, and sluice gate will be mentioned Guan Shui through the lever harrow sluice gate by that head of stone net.
7. do not want template when building reinforced concrete based on claim 1 is described; As long as mould bases; It is characterized in that: the mould bases of erectting post is that 7.1 and 8.1 peripheral muscle have fixed 7.2 and 8.2; This is the done frame as ladder of carpenter; Use 7.5 wood point points tight again, ladder stay has protected 7.3 and 8.3 porcelain plates or lithotome plate, and the mould bases of each post has been reserved; Tied 7.4 and 8.5 reinforcing bars, each post is provided with 7.6 and 8.4 muscle and trees are located, just deciding, deciding the jail; The crossbeam mould bases is to erect capital with 9.5 and 10.4 to have lived 9.2 or 10.2 horizontal bars; 9.1 be placed on the horizontal bar respectively with the frame of 10.1 ladder appearance; 9.6 and the ladder stay of 10.6 perpendicular morphemes is to connect to live with 9.7 and 10.7 iron wires; Even tightly, tighten; Ladder stay has protected 9.3 and 10.3 porcelain plates and lithotome plate; It is fixed hand in hand firm with 9.5 and 10.5 little planks to erect post, and horizontal bar beam and flat-topped ridge have all tied needed reinforcing bar.
8. porcelain plate according to claim 1 and lithotome plate is characterized in that: porcelain plate and lithotome plate are provided with 7.3 grooves overleaf; Laterally with vertically to all respectively being provided with a plurality of grooves; Make porcelain plate and lithotome backboard face look it is cancavo-convex barb in appearance; Section actinal surface outward appearance looks it is zigzag fashion, and the section face on the surrounding of porcelain plate and lithotome is arranged to 7 font barbs or semicircle barb; Also a kind of eye position that hook can be installed of on porcelain plate or lithotome plate, boring; Tangle porcelain plate or lithotome plate with a hook; The other end of hook reaches to link up with on the reinforcing bar face and can not surpass reinforced concrete flat-topped ridge height, just can be poured in the reinforced concrete plate and go just to have reserved.
9. the power of train walking of utilizing according to claim 1 is generated electricity, and it is characterized in that 13.2 and 14.2 microscler magnet have been pressed on the 13.1 and 14.1 circle wheels, and 14.4 and 13.6 railroad cars circle wheel when walking about rotates simultaneously; One of 13.9 jack-post that are fixedly mounted on the circle wheel are installed in below the cap of 13.7 rails, and the centre is installed on 13.10 forces, installs generator for one; Jack-post has promoted generator 13.4 when rotating and has generated electricity, and magnet strip is to be connected the jail with 13.3 on the muscle beam of the bottom of railway carriage with 14.3 connecting rods, is slapping connecting rod for 14.5; Make that magnet strip can swing; When magnet strip was walked about on the circle wheel, the wheel on 13.5 trains leaves rail had the 1-4 millimeter highly for well, has so also increased the stability of railway carriage and the durability of Train wheel; Jack-post firmly is installed on the sleeper with 13.10 rails; It is the power of scolding that magnet strip is pressed on the circle wheel, the circle wheel can manufacture magnet, also can manufacture iron and steel.
10. the power of automobile traveling of utilizing according to claim 1 is generated electricity, and it is characterized in that: 15.3 and 16.3 microscler magnet strips have promoted 15.1 and 16.1 gears or circle wheel when in the groove on ground, walking, and make 15.2 generators and generate electricity; 15.3 be installed on the bottom muscle frame of car with 16.3 and 17.3 microscler magnet strips; 15.4 or the walking of 16.5 or 17.10 wheels in ground flat on the ground, gear or circle are taken turns out height between the bottom portion of groove 10-20 millimeter, and the circle wheel is located with 15.5 supports; Fixed jail; When car need not be walked the groove road surface, the driver can grasp 17.4 control sticks and climb, and at this moment 17.3 strip magnet plates will just upwards be mentioned to walk and can be walked the level land through 17.2; 17.8 also motor, also available motor is mentioned or is depressed magnet plate.Also available 17.9 scheme is mentioned or is depressed magnet plate, it is the power of scolding that microscler magnet plate is pressed on gear or the circle wheel, circle wheel or gear can manufacture magnet, also can be made into into iron and steel; The method that also has a kind of power of utilizing car to walk to generate electricity; It is characterized in that: it is rectangular that a bar magnet is installed on the beneath beam muscle of car; Require big or small car to reach overhead unified height, on existing highway, use a day font iron plate again, install magnet circle wheel and generator; Utilize car when walking, the magnet circle wheel on the rectangular aligning of the magnet on car ground.Magnet circle wheel is gone up jacket and has been got well the resistance magnetic pack of having opened mouth; Opening part is arranged between the mm length of 2-8 forwards of magnet circle wheel and the rectangular anastomosis of magnet; The magnetic force ray will be concentrated from opening part and penetrate like this; Directive is penetrated on the magnet circle wheel in the rectangular the place ahead of magnet, makes magnet circle wheel ceaselessly rotate to the direction place of the rectangular walking of magnet.Generator has also rotated and has generated electricity simultaneously; The method that has a kind of power of utilizing car to walk to generate electricity again; With 21.7 or the day font iron plate straight shape represented of Figure 19 install 21.4 generators and 21.5 magnet circle wheel; With 21.6 frames fixing 21.4 and 21.5; It is rectangular to install 21.1 magnet with 21.2 bullet semi-annular jade pendants and 21.3 gong silks on the car, when car has been walked about, has the rectangular magnet circle wheel that promoted of magnet to rotate like this, and generator has rotated and sent simultaneously; Because utilize the power of car walking to generate electricity, stipulated the drawing lines of car walking, so the present invention has designed a kind of can the minimizing; Also can reduce the device of the generation of accident; It is characterized in that: on the girder muscle of two of car, require the same height of big or small car, install and play semi-annular jade pendant energetically and thick rubber strip stops the power when two cars collide; And reach minimizing, reduce the accident of car.
CN2011102274549A 2010-07-28 2011-07-28 Multifunctional and multipurpose building method Pending CN102409644A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011102274549A CN102409644A (en) 2010-07-28 2011-07-28 Multifunctional and multipurpose building method

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN201010241699.2 2010-07-28
CN201010241699 2010-07-28
CN2011102274549A CN102409644A (en) 2010-07-28 2011-07-28 Multifunctional and multipurpose building method

Publications (1)

Publication Number Publication Date
CN102409644A true CN102409644A (en) 2012-04-11

Family

ID=45911964

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011102274549A Pending CN102409644A (en) 2010-07-28 2011-07-28 Multifunctional and multipurpose building method

Country Status (1)

Country Link
CN (1) CN102409644A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104131728A (en) * 2014-07-03 2014-11-05 林章建 Building capable of achieving ecological balance and construction method thereof
CN106013939A (en) * 2016-07-07 2016-10-12 四川大学 Underground city

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104131728A (en) * 2014-07-03 2014-11-05 林章建 Building capable of achieving ecological balance and construction method thereof
CN106013939A (en) * 2016-07-07 2016-10-12 四川大学 Underground city

Similar Documents

Publication Publication Date Title
Aicher Guide to the aqueducts of ancient Rome
Jones Capena and the Ager Capenas: part II
CN103371069B (en) A kind of concatenation type pavement runoff collects the ecologic planting groove with purification utilization
CN207003363U (en) Barrier wall structure and channel revetment system
Chiotis et al. Water supply of Athens in the antiquity
Mackay The building of Manhattan
Dunnett et al. Rain gardens
CN106171831A (en) Mechanization of agriculture water-saving spray irrigation system
CN102409644A (en) Multifunctional and multipurpose building method
CN202718027U (en) Water storage and recharged permeable brick combination device
CN202090637U (en) Parking lot for city old residential areas
TW201311971A (en) Strata structure maintenance and underground water recharge/storage device
CN101967904A (en) Multifunctional multipurpose construction method
RU2449078C2 (en) Method to erect erosion-preventive structure of biopositive design
Macaulay Building big
Cragg Civil Engineering Heritage: Wales and West Central England
CN203588579U (en) Teaching simulation structural body of simply supported beam bridge
CN105019687A (en) Method for radically controlling desert
CN206189516U (en) A little water cellar for forest fire prevention
RU75404U1 (en) ROAD FILL WITH ARMOGROUND SUPPORT WALL
AU2019100921A4 (en) Improved North East Link
CN206034996U (en) Synthesize facility with six functions
CN211228535U (en) Highway side slope landslide prevention device
CN202209073U (en) Overhead garage group
Yuan et al. Application of ecological technology of concrete retaining wall in urban Dyke

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120411