CN102401739A - Air tunnel fast braking test system - Google Patents

Air tunnel fast braking test system Download PDF

Info

Publication number
CN102401739A
CN102401739A CN2010102755402A CN201010275540A CN102401739A CN 102401739 A CN102401739 A CN 102401739A CN 2010102755402 A CN2010102755402 A CN 2010102755402A CN 201010275540 A CN201010275540 A CN 201010275540A CN 102401739 A CN102401739 A CN 102401739A
Authority
CN
China
Prior art keywords
air
plenum chamber
fast braking
wind
control system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010102755402A
Other languages
Chinese (zh)
Inventor
单金华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUXI CITY JINHUA EXPERIMENT EQUIPMENT CO Ltd
Original Assignee
WUXI CITY JINHUA EXPERIMENT EQUIPMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUXI CITY JINHUA EXPERIMENT EQUIPMENT CO Ltd filed Critical WUXI CITY JINHUA EXPERIMENT EQUIPMENT CO Ltd
Priority to CN2010102755402A priority Critical patent/CN102401739A/en
Publication of CN102401739A publication Critical patent/CN102401739A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Aerodynamic Tests, Hydrodynamic Tests, Wind Tunnels, And Water Tanks (AREA)

Abstract

The invention relates to an air tunnel fast braking test system which is arranged in a test space and comprises an air door braking system, an air quantity control system, a fan, a static pressure chamber, a main air channel and a movable air door, wherein the air door control system is connected with the air quantity control system and the static pressure chamber respectively; the air quantity control system is connected with the fan; the fan, the static pressure chamber and the main air channel are sequentially arranged to form an airflow channel; the an air tunnel fast braking test system is characterized in that the air tunnel fast braking test system also comprises a secondary air channel which is communicated with the static pressure chamber; an air guide plate used for communicating the secondary air channel and the test space is arranged on an air outlet of the secondary air channel; the movable air door is arranged in the static pressure chamber; a supporting and adjusting mechanism used for supporting and adjusting the position of the movable air door is also arranged in the static pressure chamber; and an air quantity adjustor is arranged on an air outlet of the main air channel. The air tunnel fast braking test system is simple and convenient in operation and high in safety.

Description

A kind of wind-tunnel fast braking pilot system
Technical field
The present invention relates to a kind of pilot system of testing automobile performance, relate in particular to a kind of wind-tunnel fast braking pilot system.
Background technology
Referring to Fig. 1; Fig. 2; Wind-tunnel fast braking pilot system of the prior art comprises air door control system, air quantity control system, blower fan 1, plenum chamber 2, main air duct 3 and movable air door 4, and said air door control system is connected with plenum chamber 2 with air quantity control system respectively, and said air quantity control system also is connected with blower fan 1; Blower fan 1, plenum chamber 2 and main air duct 3 set gradually and form a gas channel, and movable air door 4 is arranged on the air outlet of main air duct 3.When carrying out the test of automobile fast braking; Be placed on automobile in the place ahead in movable air channel 4; The air-flow measured that is produced by blower fan 1 directly acts on test vehicle; When simulation test reaches automobile quick closedown activity air door 4 behind state under the high-speed cruising, the influence that is brought with simulating vehicle brake hard when running at high speed.Referring to Fig. 3; Because in the process that movable air door 4 is closed; Movable air door 4 will bear the blast (direction of arrow is airflow direction) of huge horizontal direction, is prone to cause the accident, and makes the safety coefficient of whole wind-tunnel fast braking pilot system low; All need the position of adjusting activity air door again, complex operation when changing the vehicle of testing at every turn.
Summary of the invention
The present invention is intended to overcome the deficiency of above prior art, and a kind of safe wind-tunnel fast braking pilot system is provided.
Technical solution problem of the present invention adopts following technical scheme:
A kind of wind-tunnel fast braking pilot system; Said wind-tunnel fast braking system places in the lab space; Said wind-tunnel fast braking system comprises air door control system, air quantity control system, blower fan, plenum chamber, main air duct and movable air door; Said air door control system is connected with plenum chamber with air quantity control system respectively, the aperture of the pressure control wind blocking door through control air quantity control system and plenum chamber, and said air quantity control system also is connected with blower fan; To regulate the airshed of blower fan; Said blower fan, plenum chamber and main air duct set gradually and form a gas channel, and be characterized in: said wind-tunnel fast braking pilot system also comprises the inferior air channel that is communicated with plenum chamber, and the air outlet in said air channel is provided with the wind deflector that is communicated with time air channel and lab space; So that import the air-flow in time air channel in the main air duct; Normal air flow in the simulated air, said movable air door is arranged in the plenum chamber, in plenum chamber, also is provided with the support governor motion of support and adjusting activity damper positions; The air outlet of said main air duct is provided with blast regulator, to regulate the airshed in movable air channel.
Further, said support governor motion is a piston cylinder.
Further, bump against in order to prevent movable air door and plenum chamber floor, the joint, floor of movable air door and plenum chamber is provided with anti-collision block in said plenum chamber.
Beneficial effect of the present invention is following:
Movable air door is arranged in the plenum chamber, and the cylinder of adjusting activity damper positions is set in plenum chamber, this wind-tunnel fast braking pilot system also is provided with the inferior air channel that communicates with plenum chamber.When simulated automotive high-speed cruising pattern, cylinder withstands movable air door and blocks time air channel, and air communication crosses plenum chamber and movable air channel acts on the automobile that is placed in the test space of opposite, movable air channel; When the simulated automotive braking mode; Block the passage that plenum chamber leads to main air duct through the tenesmus of cylinder drive activity air door, air-flow gets into time air channel, has reduced the suffered pressure of movable air door; Security improves greatly; And the air communication that imports time air channel is crossed wind deflector and is imported in the test space, so that normal air-flow to be arranged in the warranty test space, has simulated normal air flow in the car running process.In addition,, also need not to regulate the position of deep bead even change when testing vehicle, simple to operation.
Description of drawings
Fig. 1 is the FB(flow block) of wind-tunnel fast braking pilot system in the prior art;
Fig. 2 is the structural representation of wind-tunnel fast braking pilot system in the prior art;
Fig. 3 is the pressured state figure of the deep bead of wind-tunnel fast braking pilot system in the prior art;
Fig. 4 is the FB(flow block) of wind-tunnel fast braking pilot system among the present invention;
Fig. 5 is the structural representation of wind-tunnel fast braking pilot system among the present invention (simulated automotive run at high speed pattern);
The structural representation of wind-tunnel fast braking pilot system (simulated automotive braking mode) among Fig. 6 the present invention.
Mark among the figure: 1-blower fan, 2-plenum chamber, 3-main air duct, the movable air door of 4-, 5-air channel, 6-wind deflector, 7-piston cylinder, 8-blast regulator, 9-prevent collision block.
Embodiment
Referring to Fig. 4-6; A kind of wind-tunnel fast braking pilot system; Comprise air door control system, air quantity control system, blower fan 1, plenum chamber 2, main air duct 3 and movable air door 4, said air door control system is connected with plenum chamber 2 with air quantity control system respectively, and said air quantity control system also is connected with blower fan 1; Blower fan 1, plenum chamber 2 and main air duct 3 set gradually and form a gas channel; The air communication of blower fan 1 output is crossed plenum chamber 2 entering activity air channels 4, and said wind-tunnel fast braking pilot system also comprises the inferior air channel 5 that is communicated with plenum chamber 2, and the air outlet in inferior air channel 5 is provided with the wind deflector 6 that is communicated with time air channel 5 and test space; Movable air door 4 is arranged in the plenum chamber 2, in plenum chamber 2, also is provided with the piston cylinder 7 of support and adjusting activity air door 4 positions, through the piston rod support of piston cylinder 7 and the position of adjusting activity air door 4; The air outlet of main air duct 3 is provided with blast regulator 8.Movable air door 4 is provided with anti-collision block 9 with the joint, floor of plenum chamber 2 in the plenum chamber 2.The above is merely preferred embodiment of the present invention, is not to be used to limit protection scope of the present invention.

Claims (3)

1. wind-tunnel fast braking pilot system; Said wind-tunnel fast braking system places in the lab space; Said wind-tunnel fast braking system comprises air door control system, air quantity control system, blower fan, plenum chamber, main air duct and movable air door; Said air door control system is connected with plenum chamber with air quantity control system respectively, and said air quantity control system also is connected with blower fan, and said blower fan, plenum chamber and main air duct set gradually and form a gas channel; It is characterized in that: said wind-tunnel fast braking pilot system also comprises the inferior air channel that is communicated with plenum chamber, and the air outlet in said air channel is provided with the wind deflector that is communicated with time air channel and lab space; Said movable air door is arranged in the plenum chamber, in plenum chamber, also is provided with the support governor motion of support and adjusting activity damper positions; The air outlet of said main air duct is provided with blast regulator.
2. wind-tunnel fast braking pilot system according to claim 1 is characterized in that: said support governor motion is a piston cylinder.
3. wind-tunnel fast braking pilot system according to claim 1 is characterized in that: the joint, floor of movable air door and plenum chamber is provided with anti-collision block in said plenum chamber.
CN2010102755402A 2010-09-08 2010-09-08 Air tunnel fast braking test system Pending CN102401739A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102755402A CN102401739A (en) 2010-09-08 2010-09-08 Air tunnel fast braking test system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102755402A CN102401739A (en) 2010-09-08 2010-09-08 Air tunnel fast braking test system

Publications (1)

Publication Number Publication Date
CN102401739A true CN102401739A (en) 2012-04-04

Family

ID=45884169

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102755402A Pending CN102401739A (en) 2010-09-08 2010-09-08 Air tunnel fast braking test system

Country Status (1)

Country Link
CN (1) CN102401739A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104458196B (en) * 2014-10-31 2017-01-25 中南大学 Shutter type mechanism for generating horizontal shear airflow in conventional wind tunnel in simulation mode and method
CN108255207A (en) * 2018-01-02 2018-07-06 高砂建筑工程(北京)有限公司 Wind-tunnel idling and spout device and its control method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07277158A (en) * 1994-04-15 1995-10-24 Mitsubishi Heavy Ind Ltd Aerodynamic brake device
JP2000275136A (en) * 1999-03-26 2000-10-06 Mitsubishi Heavy Ind Ltd Circulation-type wind tunnel for experiment
US20030091394A1 (en) * 2001-10-31 2003-05-15 Yasuo Ide Covered highway structure with means for easy and quick access to tunnel interior
CN201780211U (en) * 2010-09-08 2011-03-30 无锡市锦华试验设备有限公司 Quick brake test system of wind tunnel

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07277158A (en) * 1994-04-15 1995-10-24 Mitsubishi Heavy Ind Ltd Aerodynamic brake device
JP2000275136A (en) * 1999-03-26 2000-10-06 Mitsubishi Heavy Ind Ltd Circulation-type wind tunnel for experiment
US20030091394A1 (en) * 2001-10-31 2003-05-15 Yasuo Ide Covered highway structure with means for easy and quick access to tunnel interior
CN201780211U (en) * 2010-09-08 2011-03-30 无锡市锦华试验设备有限公司 Quick brake test system of wind tunnel

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104458196B (en) * 2014-10-31 2017-01-25 中南大学 Shutter type mechanism for generating horizontal shear airflow in conventional wind tunnel in simulation mode and method
CN108255207A (en) * 2018-01-02 2018-07-06 高砂建筑工程(北京)有限公司 Wind-tunnel idling and spout device and its control method

Similar Documents

Publication Publication Date Title
CN203501398U (en) Air conditioner
CN205154221U (en) Tunnel ventilation system of track traffic shield door standard
CN109084991A (en) A kind of commercial vehicle air-pressure brake performance hardware is in ring test system and test method
CN105501021A (en) Automobile chassis height regulating and controlling device and control method thereof
CN113204880B (en) Optimal design method for wind resistance coefficient of automobile
CN104729825A (en) Auxiliary jet-flow system for controlling high speed wind tunnel transonic flow field
CN202764657U (en) Air flue distribution box applicable to a plurality of air distribution ratios
CN102401739A (en) Air tunnel fast braking test system
CN202216724U (en) Multipurpose device for measuring small air volume
KR20230165845A (en) System for detecting suspension system of maglev train
CN201780211U (en) Quick brake test system of wind tunnel
CN202216850U (en) Tire burst transient performance test apparatus
CN202582786U (en) Test device of aircraft engine bleed air system temperature sensor
CN202582867U (en) Test device for simulating locomotive traction motor ventilation flow and pressure
CN201859063U (en) Pneumatic actuated brake pedal device
CN203148648U (en) Real automobile piping test system for automobile air conditioner comprehensive performance test chamber
CN204439373U (en) A kind of automobile brake hardware-in―the-loop test testing table
CN204116008U (en) A kind of automobile collision simulation trolley device
CN203405729U (en) Testing device of rail transit brake control device
CN106762998B (en) A kind of straight reciprocating motion arrestment mechanism
CN104655434A (en) In-loop testing experiment method of automobile brake hardware
CN102507220B (en) High-speed train body guest room humiture and pressure fluctuation hybrid simulation system as well as application method
CN203191215U (en) Life testing mechanism of automatic stepping assembly of commercial automobile
CN210426946U (en) Flow field accurate control system of direct-current temporary-impulse type transonic wind tunnel
CN209101519U (en) Air outlet structure and air conditioner

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120404