CN102381600A - Device and method for elevator control operation - Google Patents

Device and method for elevator control operation Download PDF

Info

Publication number
CN102381600A
CN102381600A CN2011102481534A CN201110248153A CN102381600A CN 102381600 A CN102381600 A CN 102381600A CN 2011102481534 A CN2011102481534 A CN 2011102481534A CN 201110248153 A CN201110248153 A CN 201110248153A CN 102381600 A CN102381600 A CN 102381600A
Authority
CN
China
Prior art keywords
car
control
elevator
maintenance
control operation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011102481534A
Other languages
Chinese (zh)
Inventor
荒木崇弘
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Elevator and Building Systems Corp
Original Assignee
Toshiba Elevator Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Elevator Co Ltd filed Critical Toshiba Elevator Co Ltd
Publication of CN102381600A publication Critical patent/CN102381600A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Elevator Control (AREA)
  • Maintenance And Inspection Apparatuses For Elevators (AREA)
  • Cage And Drive Apparatuses For Elevators (AREA)

Abstract

Embodiments of the invention relate to a device and a method for elevator control operation. The device and the method for elevator control operation allow a maintenance man to easily perform desired control operation even when there is only one maintenance man. The device for elevator control operation comprises multiple control operation maintenance switches which are arranged in a maintenance switch box in an elevator car; a storage unit which stores software tools for control operation purpose; and an elevator control panel, which starts the software tools which are stored in the storage unit for control operation purpose so as to enable the maintenance of the elevator control operation when the control operation maintenance switches in the car are operated.

Description

The device and the method that are used for the control operation of elevator
The application is willing to the 2010-189779 (applying date: on August 26th, 2010) be the basis, enjoy from the preferential right of this application with the spy of Japanese patent application.The application comprises the full content of this application with reference to said application.
Technical field
Embodiment of the present invention relates to the device and the method for the control operation that is used for elevator.
Background technology
The control of elevator operation is different from common operation, is when presence of fire or earthquake etc., to receive under the situation of detection signal of predetermine level (level) from fire detector or seismic sensor the operation of carrying out according to fire or earthquake that is described below.That is to say; Control during fire operation (fire emergency operation) is following operational mode (mode): make car (elevator car) move to the floor of taking refuge (for example 1 layer) and stop; After Jiang Men (door) opens and put down the person of utilization, door is closed and stopped running.
In addition, the control operation (earthquake emergency operation) when earthquake takes place is following operational mode: make cage operation to floor recently and stop, after door being opened and put down the person of utilization, door is closed and stopped running.
The control of above that kind operation, not only when presence of fire or earthquake, when the periodic inspection of for example elevator or with needs corresponding suitable periods, also need suitably carry out various control operations to be used to that the maintenance man is overhauled.Operation is used in the maintenance that the such control of when overhauling, carrying out operation is called the control operation.
For operation is used in the maintenance of carrying out such control operation; Common in the past HMB (Hall Maintenance Box in top that is arranged at car or elevating road etc.; Ladder riding hall maintenance box) the inside; Installation is used to make the control operating maintenance of the switch (switch) type of control operation work use switch, perhaps will be used for implementing the memory storage that Software tool (software tool) that control moves is stored in the control board for elevator with CPU.
Use operation for the maintenance of carrying out the control operation, the person of needing repairing operation is connected the control operating maintenance and is used switch.But, as previously mentioned, be set at switch at the control operating maintenance under the situation on top of car, use switch in order the maintenance man to be operated connect the control operating maintenance, this maintenance man has to enter into car upper.And the maintenance man need take the running state of under the state of car upper, confirming the control operation.
Its result is under a people the situation the maintenance man, and this maintenance man is difficult to be used for the operation of control operation.In addition, this maintenance man need make car go up and down entering under the state of car upper.Because these situation also need take into full account aspect safety.
And such as previously mentioned the inside at HMB is equipped with the structure of control operating maintenance with Switch, need take off HMB from this elevating road, has cost formality and the problem of time.
Summary of the invention
The problem that the present invention will solve has provided a kind of device and method that is used for the control operation of elevator, even it is under a people the situation the maintenance man, also can simply implement the operation of the desirable control operation of this maintenance man.
The device of the control operation that is used for elevator of embodiment, have: a plurality of control operating maintenances are used switch, and it is arranged in the inspection switch box that in the car of elevator, is provided with; Memory storage, the Software tool of its storage control operation usefulness; And control board for elevator, under its situation that said control operating maintenance has been operated with switch in said car, the Software tool of the control operation usefulness that is stored in said memory storage is started, the maintenance of control operation of carrying out said car is with operation.
According to the device of the control operation that is used for elevator of said structure,, also can simply implement the operation of the desirable control operation of this maintenance man even the maintenance man is a people.
Description of drawings
Fig. 1 is the integral structure figure of elevator that has used the device that is used for control operation of embodiment.
Fig. 2 is the figure that observes the car reveal from cab interior.
Fig. 3 is mounted in the figure of the interior control operating maintenance of inspection switch box with an example of switch.
Fig. 4 is the diagram of circuit that the maintenance man's when moving job step is used in the maintenance of explanation control operation.
Fig. 5 is the diagram of circuit that the algorithm of the control board for elevator when moving is used in the maintenance of explanation control operation.
The specific embodiment
Below, describe with reference to the device and the method for accompanying drawing the control operation that is used for elevator of embodiment.
Fig. 1 is the integral structure figure of elevator that has used the device that is used for control operation of embodiment.
This elevator is to comprise the structure of constructing elevating road 1, up-coiler 2 and the main rope (main rope) 3 on building etc.Up-coiler 2 is arranged at the top of elevating road 1.Main rope 3 is wound on the pulley (sheave) of up-coiler 2.In addition, this elevator is the structure that comprises car 4, counterweight (counter weight) 5 and control board for elevator 6.Car 4 hangings are one distolateral in main rope 3.Counterweight 5 hangings are distolateral in another of main rope.
Control board for elevator 6 is provided with memory storage 7.Memory storage 7 storages are controlled relevant various data with the operation of elevator.In memory storage 7,, also store various control operations and use Software tool 7b except storing various computing parameters (parameter) at least the 7a.Various computing parameter 7a are used for for example speed command (velocity mode) that when the common operation of elevator, uses and the computing that moves control.
8 is car door.9 is the Room (platform) door.10 use energy disperser for counterweight.11 use energy disperser for car.12 is tail rope (tail cord).
The device that is used for the control operation of this embodiment is used switch at car 4 set inside control operating maintenances.Thus, even the maintenance man is a people, the maintenance man also can use switch by simple operations control operating maintenance.And as previously mentioned, this is used for the device of control operation, with control board for elevator 6 bonded assembly memory storages 7 in the various control operations of storage use Software tool 7b.This is used for the device of control operation, is being operated by the maintenance man under the situation of control operating maintenance with switch of having connected desirable control operation usefulness, the control operation is started and the maintenance of implementing the control operation is used and moved with Software tool 7b.
Fig. 2 is the figure when observing car doors 8 sides from car 4 is inner.
The sleeve plate 21 of one lateral side of the car door 8 of car 4 is provided with cage operating panel 22.Be provided with the inspection switch box (switch box) 23 of hole 23a with lock in the bottom of this cage operating panel 22 etc.In this inspection switch box 23, be equipped with a plurality of as shown in figure 3 control operating maintenances of example with switch 24 ....In example shown in Figure 3, the control operating maintenance that the control of the control operating maintenance of control when the control operating maintenance uses switch 24 as earthquake operation usefulness during with switch and fire moves usefulness is with switch etc.
Cage operating panel 22 possesses purpose floor call registration button 22a and display part 22b.Purpose floor call registration button 22a accepts to be used to represent the operation of the purpose floor call registration of the floor wanted.
That is, the operation change-over switch and the rising/decline switch in when maintenance maintenance and make the ventilating fan in the car, the switch of illumination equipment on/off (on/off) etc. is installed usually in inspection switch box 23.But, in this inspection switch box 23, newly be equipped with the control operating maintenance with switch 24 ....
To in inspection switch box 23, be provided with the control operating maintenance with switch 24 ... reason describe.The maintenance man inserted key among the lockhole 23a of inspection switch box 23 and with its unlatching in when maintenance maintenance, and described operation change-over switch etc. is carried out blocked operation.But the maintenance man can operate the control operating maintenance with switch 24 simultaneously concurrently at the blocked operation of same place in the car 4 of safety and operation change-over switch etc.Thus, even also operation easily of maintenance man, and also can guarantee the safety of operation, this be in inspection switch box 23, be provided with the control operating maintenance with switch 24 ... reason.
In addition, the control operating maintenance has used toggle switch shown in Figure 3 (toggle switch) with switch 24.But the control operating maintenance can certainly use for example button switch (push button switch), rocker switch (rocker switch) etc. with switch 24.
In Fig. 2,25 is car floor, and 26 is side plate (side panel), and 27 is a curtain plate, and 28 are car interior lighting device usefulness cover (cover).
Then, with reference to Fig. 4 and Fig. 5 the job step of implementing at the device that is used for the control operation of embodiment is described.
When the maintenance man move towards the elevator setting scene, during at operation ladder riding hall button such as benchmark floor (hall button), control board for elevator 6 should carry out the maintenance of control operation and call out benchmark floor (step S1) with the car 4 of operation.At this, car 4 arrives the benchmark floor through control board for elevator 6.Then, control board for elevator is opened ladder riding hall 9 and car door 8.
When door 8,9 was opened, the maintenance man got in the car 4.The maintenance box that the maintenance man will hold in advance inserts the lockhole 23a of inspection switch box 23 with key and it is opened, and opens the lid (step S2) of inspection switch box 23.
Under this state, the maintenance man presses the purpose floor call registration button (step S3) of the floor that expression wants from the purpose floor call registration button 22a that is disposed at cage operating panel 22.
Control board for elevator 6 receives because the purpose floor call is registered the purpose floor call sign that the push of button sends and called out registration.Then, the speed command that control board for elevator 6 uses when the common operation of car 4, be stored under the control of speed command (velocity mode) of the various computing parameter 6a in the memory storage 7 go (the step S4) of beginning car 4.At this moment; The control operating maintenance of the control operation usefulness when operating the for example earthquake of connecting in the inspection switch box 23 through the maintenance man is with switch 24, and this control operating maintenance control operating needs signal that the control during with earthquake moves usefulness with switch 24 sends to control board for elevator 6 (step S5).The control operation of the control operation usefulness when then, control board for elevator 6 makes the earthquake that is stored in the memory storage 7 starts with Software tool 7b.
At this, it is following operational mode that the operational mode of Software tool 7b after starting used in the control operation that control during earthquake operation is used: make car 4 move to nearest layer and stop, door is opened and put down after the person of utilization, door is closed and stopped running.
Before the making operation of control operating maintenance, in being arranged at the display part 22b of cage operating panel 22, show car current location (comprising floor) with switch 24.In addition, after the making operation of control operating maintenance, in being arranged at the display part 22b of cage operating panel 22, show the floor that stops of car 4 with switch 24.
Therefore; The maintenance man is based on the floor that stops that being shown in the car current location of display part 22b before the making operation of control operating maintenance with switch 24 and behind the making operation of control operating maintenance with switch 24, being shown in display part 22b, whether car 4 is moved stopped at nearest floor and overhaul.
In addition, the maintenance man is at the car 4 operation door 8 that stopped at nearest floor and self-opening, after 9, wait for and the person of utilization goes down the cooresponding time of used time of car, to whether SELF CL door 8,9 and become operation and end to overhaul.
On the other hand, control board for elevator 6 is carried out a series of processing shown in Figure 5.That is, control board for elevator 6 judges whether to receive control operating needs signal (step S11).Control board for elevator 6 is (" being " among the step S11) under being judged to be the situation that has received control operating needs signal; According to control operating needs content, the control operation of the control operation usefulness when from memory storage 7, reading earthquake is with Software tool 7b and start this Software tool (step S12).
Control board for elevator 6 is based on the current location of car 4, predetermined travel direction, regeneration service direction, as the floor of floor recently, confirms and the nearest floor of registration car 4, makes this car 4 go (step S13).
Control board for elevator 6 after car 4 begins to go, judges whether car has arrived registered nearest floor (step S14).Control board for elevator 6 is (" denying " among the step S14) under the situation of the nearest floor that elevator no show is still registered, and returns step S13 and continue going of car 4.
Control board for elevator 6 has arrived under the situation of nearest floor (" being " among the step S14) being judged to be car 4, the command signal of opening the door is sent to the door drive (not shown) (step S15) that is arranged at car upper.
Door drive is opened ladder riding hall 9 receiving when opening the door command signal with the unlatching interlock of car door 8 simultaneously.At this moment, whether control board for elevator 6 decision gates 8,9 these two sides have all become complete opening state (step S16).
Control board for elevator 6 is being judged to be door 8,9 these two sides when all having become the complete opening state (" being " among the step S16), for example car intraoral illumination lamp is extinguished and the door opening key in the car is lighted (step S17).Then, control board for elevator 6 judges whether to have passed through with the elevator person of utilization and goes down the used cooresponding preset time of time (step S18) of car 4.Control board for elevator 6 is (" being " among the step S18) under being judged to be the situation of having passed through above-mentioned preset time, and the command signal of will closing the door sends to door drive (step S19), closes door 8,9 these two sides.Control board for elevator 6 makes the operation of car 4 end (step S20) after having closed door 8,9 these two sides.
Therefore, according to above-described embodiment, the maintenance man needn't get into car 4 tops, but through open inspection switch box 23 in the car 4, and operation connect the control operating maintenance with switch 24, the control that just can carry out car 4 moves.Its result also can simply implement the maintenance that control moves even the maintenance man is a people.
In addition, because the maintenance man can carry out the control operation under the state of taking in car 4, so can guarantee the safety of the upkeep operation of control operation.
In addition, above-mentioned embodiment as wherein one the example and propose, do not limit the intention of invention scope.These new embodiments can be implemented with other various modes, in not breaking away from the scope of inventing main idea, can carry out various omissions, displacement, change.These embodiments and distortion thereof are included in invention scope and the main idea, and are included in invention that the scope of claim puts down in writing and the scope impartial with it.

Claims (2)

1. the device of a control operation that is used for elevator has:
A plurality of control operating maintenances are with switch (24), and it is arranged in the inspection switch box (23) that is provided with in the car (4) at elevator;
Memory storage (7), the Software tool (7b) of its storage control operation usefulness; With
Control board for elevator (6) under its situation that said control operating maintenance has been operated with switch in said car, starts the Software tool of the control operation usefulness that is stored in said memory storage, and the maintenance of control operation of carrying out said car is with operation.
2. a method that is used for the control operation of elevator is characterized in that,
Receive the operation's direction of ladder riding hall button, control board for elevator makes car go to calling out ladder riding hall,
After said car arrives said calling ladder riding hall; Unlatching is arranged at the inspection switch box in the said car; Registration purpose floor under the situation that the purpose floor call of the cage operating panel in being disposed at said car registration button has been operated; Said control board for elevator makes this car begin to go to the purpose floor of registration
After said car begins to go, follow to be arranged at the making operation of the interior control operating maintenance of said inspection switch box with switch, control operating needs signal is sent to said control board for elevator,
Receive at said control board for elevator under the situation of said control operating needs signal, said control board for elevator starts the Software tool of the control operation usefulness that is stored in memory storage, carries out the control operation of said car.
CN2011102481534A 2010-08-26 2011-08-26 Device and method for elevator control operation Pending CN102381600A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2010189779A JP2012046317A (en) 2010-08-26 2010-08-26 Apparatus and method for performing elevator operation for emergency
JP189779/2010 2010-08-26

Publications (1)

Publication Number Publication Date
CN102381600A true CN102381600A (en) 2012-03-21

Family

ID=45821509

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011102481534A Pending CN102381600A (en) 2010-08-26 2011-08-26 Device and method for elevator control operation

Country Status (2)

Country Link
JP (1) JP2012046317A (en)
CN (1) CN102381600A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114920106B (en) * 2022-06-01 2023-07-28 日立楼宇技术(广州)有限公司 Elevator door opening reminding system, elevator door opening reminding method and storage medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06156889A (en) * 1992-11-16 1994-06-03 Mitsubishi Denki Bill Techno Service Kk Elevator cage operating panel
JPH0986809A (en) * 1995-09-29 1997-03-31 Mitsubishi Denki Bill Techno Service Kk Elevator car operating panel
JP2004137010A (en) * 2002-10-16 2004-05-13 Mitsubishi Electric Corp Cage operation panel for elevator
JP2006256830A (en) * 2005-03-18 2006-09-28 Toshiba Elevator Co Ltd Elevator system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06156889A (en) * 1992-11-16 1994-06-03 Mitsubishi Denki Bill Techno Service Kk Elevator cage operating panel
JPH0986809A (en) * 1995-09-29 1997-03-31 Mitsubishi Denki Bill Techno Service Kk Elevator car operating panel
JP2004137010A (en) * 2002-10-16 2004-05-13 Mitsubishi Electric Corp Cage operation panel for elevator
JP2006256830A (en) * 2005-03-18 2006-09-28 Toshiba Elevator Co Ltd Elevator system

Also Published As

Publication number Publication date
JP2012046317A (en) 2012-03-08

Similar Documents

Publication Publication Date Title
US11560291B2 (en) Elevator arrangement to open the roof of an elevator car
KR20100098446A (en) Circuit for resetting an elevator safety chain
CN106904516B (en) Method and apparatus for elevator maintenance operations
CN100542933C (en) The storey door unlocking device of elevator
JP2011068428A (en) Elevator
JP2008074585A (en) Elevator operation control system
CN102381600A (en) Device and method for elevator control operation
JP2011098788A (en) Elevator system
JP2019085220A (en) Elevator
JP2010215318A (en) Elevator
JP2000318948A (en) Elevator device
JP2007217128A (en) Building with elevator
JP4262340B2 (en) Elevator control device
JP6036561B2 (en) Elevator system
JP2008239297A (en) Elevator device
KR20060040602A (en) Platform door unlocking device of elevator
JP2006248630A (en) Elevator car device
CN112824299B (en) Elevator system and recovery method
KR101022798B1 (en) Elevator having a small size machine room structure
JPH0295692A (en) Elevator for low storied building
JP2001106459A (en) Elevator car
JP6782201B2 (en) Group management elevator system
JP5995680B2 (en) Machine room-less elevator
JP6183952B2 (en) Device for canceling the operation of the door-opening travel protection device
JP2014118285A (en) Elevator apparatus having no machine room

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120321