CN102372213A - First rope adjusting device - Google Patents
First rope adjusting device Download PDFInfo
- Publication number
- CN102372213A CN102372213A CN2010102631575A CN201010263157A CN102372213A CN 102372213 A CN102372213 A CN 102372213A CN 2010102631575 A CN2010102631575 A CN 2010102631575A CN 201010263157 A CN201010263157 A CN 201010263157A CN 102372213 A CN102372213 A CN 102372213A
- Authority
- CN
- China
- Prior art keywords
- rope
- length
- head rope
- hoisting
- control apparatus
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
A first rope adjusting device is used for adjusting the length of a first rope in a multi-rope friction hoisting system, and can rapidly adjust the length of the first rope in a certain range to compensate for the length change of the first rope. When a multi-rope friction hoisting machine is used for double-hook hoisting, two hoisting containers can not arrive at fixed loading/unloading positions at the same time in general due to the continuous extension of the first rope during the hoisting, so that loading/unloading operations can not be carried out in the two containers at the same time, which results in long loading/unloading time and low hoisting efficiency. In order to solve the above problem, the first rope adjusting device (shown in figure 1) is arranged between the hoisting containers and a first rope hanging device according to the technical scheme adopted by the invention; and the length change of the first rope can be compensated by adjusting the length of the device, which is equivalent to adjust the length of the first rope, so that the two hoisting containers can accurately arrive at the loading/unloading positions to carry out loading/unloading operations at the same time, thereby improving the hoisting efficiency.
Description
1. affiliated technical field
The present invention relates to a kind of control apparatus of multi-rope friction hoisting head rope length; Quick adjustment head rope length within the specific limits; The variable quantity of compensation head rope is implemented in double hook and promotes two lifting containers and carry out while operation, is a kind of head rope control apparatus that can effectively improve double hook lifting efficient.
2. technical background
At present; Multirope friction winder system (as shown in Figure 1) is the constantly elongation of head rope length in operational process, when being used for the double hook lifting, because head rope length constantly changes; The relative position of two lifting containers also changes thereupon, and two containers generally can not accurately arrive fixing job position simultaneously.Therefore, can not cause winding interval long the operation simultaneously of two containers (after generally being to accomplish the loading of a container, begin another container unloading again, or sequence of events) in contrast to this in the lifting process, influence promotes efficient.
3. summary of the invention
Promote the head rope length variations for solving many rope double hooks, cause and can not reduce the problem that promotes efficient in the operation simultaneously of two lifting containers, the present invention provides a kind of head rope control apparatus, quick adjustment length within the specific limits, the variable quantity of compensation head rope length.
The technical scheme that the present invention adopts is that adding head rope control apparatus (as shown in Figure 2) is realized the adjustment (being equivalent to regulate head rope length) of relative position between two lifting containers through the length of regulating the head rope control apparatus between lifting container and head rope suspension gear.
The principle of head rope control apparatus is to utilize gusset piece and switching-over joint etc. a plurality of (generally equating with the head rope number) YXZ type head rope tension balance device to be connected in parallel composition head rope control apparatus.The principle of single frame tension balance device is as shown in Figure 3, oil cylinder elongation when to the oil cylinder oiling of tension balance device, and the length of tension balance device (L) shortens thereupon, and when the injection flow of minimizing oil cylinder, the length of device (L) is extended thereupon.The head rope control apparatus principle that is composed in parallel by many tension balance devices is identical therewith; The length of device is by the injection flow decision of oil cylinder; Increasing oil cylinder injection flow device length then shortens; Reducing oil cylinder injection flow device length then increases, and realizes head rope length relative adjustment through the injection flow of regulating oil cylinder.
The invention has the beneficial effects as follows; The relative position of two lifting containers (being equivalent to regulate head rope length) in the quick adjusting multi-rope friction hoist system within the specific limits; Make two containers can rest in the loading and unloading position simultaneously; Be convenient to carry out the loading and unloading operation at two containers simultaneously, reduce the loading and unloading production time, improve lifting efficient.
4. the specific embodiment
Fit of the present invention is that installation switching-over joint is connected in parallel many tension balance devices with gusset piece then, and the oil cylinder of every tension balance device is connected in parallel with cross over pipe on every tension balance device (YXZ type) top.The bottom and the lifting container of tension balance device link, and the top of gusset piece and head rope suspension gear link (as shown in Figure 4), and switching-over joint part figure sees Fig. 5, and the gusset piece detail drawing is seen Fig. 6.
When adjusting the length of head rope control apparatus; Start gig control apparatus is stopped at the ingate place; With quick coupling its cross over pipe and external hydraulic station (Hydraulic Station that tension balance device is supporting) are linked, the injection flow that starts the Hydraulic Station setting device makes device length reach setting value.After untiing the connecting of cross over pipe and Hydraulic Station, elevator system is recovered normal operation.
5. description of drawings
Fig. 1 is the multi rope winding system diagram.
Fig. 2 is a head rope control apparatus schematic diagram.
Fig. 3 is a YXZ type head rope tension balance device schematic diagram.
Fig. 4 is a head rope control apparatus assembly drowing.
Fig. 5 is switching-over joint part figure.
Fig. 6 is the gusset piece detail drawing.
Claims (5)
1. a head rope control apparatus is made up of YXZ type head rope tension balance device, switching-over head and gusset piece etc., is used to regulate the length of multi-rope friction hoisting head rope.It is characterized in that, be installed between lifting container and the head rope suspension gear its adjustable in length.
2. head rope control apparatus according to claim 1; It is characterized in that: be installed between lifting container and the head rope suspension gear; The principle of regulating head rope length is through regulating the length of this device, realize the adjusting of the relative position of two lifting containers, being equivalent to regulate head rope length.
3. head rope control apparatus according to claim 1; It is characterized in that: be formed in parallel by many YXZ type tension balance devices; The lower end and the lifting container of tension balance device link; The switching-over joint is installed in the upper end, many balancing devices is connected in parallel with gusset piece on the top of switching-over joint, and the head rope suspension gear is installed on the top of gusset piece.
4. head rope control apparatus according to claim 1 is characterized in that: the length that adopts the hydraulic ram control apparatus.
5. according to claims 1 described head rope control apparatus, it is characterized in that: between tension balance device and gusset piece, adopt the switching-over joint that reverses an angle of 90 degrees to link.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010102631575A CN102372213A (en) | 2010-08-26 | 2010-08-26 | First rope adjusting device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010102631575A CN102372213A (en) | 2010-08-26 | 2010-08-26 | First rope adjusting device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102372213A true CN102372213A (en) | 2012-03-14 |
Family
ID=45791541
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010102631575A Pending CN102372213A (en) | 2010-08-26 | 2010-08-26 | First rope adjusting device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102372213A (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102765649A (en) * | 2012-08-06 | 2012-11-07 | 吴江信谊精密五金有限公司 | Stable hoisting rope tension adjusting gear |
CN102765650A (en) * | 2012-08-06 | 2012-11-07 | 吴江信谊精密五金有限公司 | Tension adjusting device of elevator hoisting ropes |
CN102942088A (en) * | 2012-12-06 | 2013-02-27 | 枣庄矿业(集团)有限责任公司蒋庄煤矿 | Detection device for steel wire rope tension of friction type hoister |
CN104973484A (en) * | 2015-07-10 | 2015-10-14 | 上海爱登堡电梯集团股份有限公司 | Wire rope tension balancing device |
CN105151952A (en) * | 2015-08-31 | 2015-12-16 | 南京梅山冶金发展有限公司 | Lifter first-rope height difference judging method |
CN105600643A (en) * | 2014-11-21 | 2016-05-25 | 刘应国 | Multifunctional first rope adjustment device |
CN105819319A (en) * | 2016-06-06 | 2016-08-03 | 淮南矿业(集团)有限责任公司 | Main hoisting rope adjusting device of vertical shaft hoisting system and adjusting method of main hoisting rope adjusting device |
CN110255342A (en) * | 2019-06-28 | 2019-09-20 | 李聪 | Traction self-regulation elevator |
CN112219766A (en) * | 2020-10-13 | 2021-01-15 | 刘应国 | Artificial automatic marine ranch |
CN112357725A (en) * | 2020-11-26 | 2021-02-12 | 中国矿业大学 | Multi-rope tension balancing adjusting device and method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0881155A (en) * | 1994-09-12 | 1996-03-26 | Hitachi Building Syst Eng & Service Co Ltd | Main rope length adjusting device of hydraulic elevator |
CN1044998C (en) * | 1996-09-27 | 1999-09-08 | 中国矿业大学 | Automatic tension balancing and hanging device for steel wire rope |
CN2510459Y (en) * | 2001-11-29 | 2002-09-11 | 山东煤矿泰安机械厂 | First-rope equalising suspension linkage |
CN201089685Y (en) * | 2007-09-06 | 2008-07-23 | 江西铜业集团公司 | Device for automatically regulating nose cable of mechanical type multi-rope friction hoisting machine |
-
2010
- 2010-08-26 CN CN2010102631575A patent/CN102372213A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0881155A (en) * | 1994-09-12 | 1996-03-26 | Hitachi Building Syst Eng & Service Co Ltd | Main rope length adjusting device of hydraulic elevator |
CN1044998C (en) * | 1996-09-27 | 1999-09-08 | 中国矿业大学 | Automatic tension balancing and hanging device for steel wire rope |
CN2510459Y (en) * | 2001-11-29 | 2002-09-11 | 山东煤矿泰安机械厂 | First-rope equalising suspension linkage |
CN201089685Y (en) * | 2007-09-06 | 2008-07-23 | 江西铜业集团公司 | Device for automatically regulating nose cable of mechanical type multi-rope friction hoisting machine |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102765650B (en) * | 2012-08-06 | 2016-01-06 | 吴江信谊精密五金有限公司 | The tension-adjusting gear of elevator rope |
CN102765650A (en) * | 2012-08-06 | 2012-11-07 | 吴江信谊精密五金有限公司 | Tension adjusting device of elevator hoisting ropes |
CN102765649B (en) * | 2012-08-06 | 2015-02-18 | 吴江信谊精密五金有限公司 | Stable hoisting rope tension adjusting gear |
CN102765649A (en) * | 2012-08-06 | 2012-11-07 | 吴江信谊精密五金有限公司 | Stable hoisting rope tension adjusting gear |
CN102942088A (en) * | 2012-12-06 | 2013-02-27 | 枣庄矿业(集团)有限责任公司蒋庄煤矿 | Detection device for steel wire rope tension of friction type hoister |
CN105600643A (en) * | 2014-11-21 | 2016-05-25 | 刘应国 | Multifunctional first rope adjustment device |
CN104973484A (en) * | 2015-07-10 | 2015-10-14 | 上海爱登堡电梯集团股份有限公司 | Wire rope tension balancing device |
CN105151952A (en) * | 2015-08-31 | 2015-12-16 | 南京梅山冶金发展有限公司 | Lifter first-rope height difference judging method |
CN105819319A (en) * | 2016-06-06 | 2016-08-03 | 淮南矿业(集团)有限责任公司 | Main hoisting rope adjusting device of vertical shaft hoisting system and adjusting method of main hoisting rope adjusting device |
CN110255342A (en) * | 2019-06-28 | 2019-09-20 | 李聪 | Traction self-regulation elevator |
CN112219766A (en) * | 2020-10-13 | 2021-01-15 | 刘应国 | Artificial automatic marine ranch |
CN112357725A (en) * | 2020-11-26 | 2021-02-12 | 中国矿业大学 | Multi-rope tension balancing adjusting device and method |
CN112357725B (en) * | 2020-11-26 | 2021-09-03 | 中国矿业大学 | Multi-rope tension balancing adjusting device and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102372213A (en) | First rope adjusting device | |
CN106144896B (en) | A kind of pull-type carriage walking mechanism | |
CN104631329B (en) | A kind of suspension bridge continuous way cat road integral linear method of adjustment | |
CN101693502B (en) | Method for self-assembling and disassembling rear counterweight of crawler crane mainframe | |
CN105253732A (en) | Method for detecting balance coefficient of elevator | |
CN205419426U (en) | Tow wire rope tension balancing unit | |
CN105600689A (en) | Stretching lifting apparatus | |
CN105600643A (en) | Multifunctional first rope adjustment device | |
CN210825204U (en) | High-precision four-hoisting-point synchronous lifting appliance | |
CN103058069B (en) | Flat-arm tower crane | |
CN202245680U (en) | Lifting appliance with self-adapting width | |
CN204588375U (en) | Multi-functional first rope adjusting device | |
CN110436335A (en) | A kind of deck unit erection gantry installing mechanism and its application method | |
CN105947910B (en) | The hoisting of FPSO crane superstructures | |
CN109292600A (en) | Mine vertical shaft lifting device, mine vertical shaft lifting system and its control method | |
CN211004197U (en) | Lifting appliance for lifting flat strip steel coils | |
CN204751815U (en) | It is adjustable to heavy elevator | |
CN104803276B (en) | Hanging apparatus and hanging method for engineering equipment | |
CN106966286A (en) | The multifunctional hanging tool of crane gear | |
CN203319508U (en) | Hoisting auxiliary element for large thin-wall steel containment vessel | |
CN202379594U (en) | Lifting device capable of automatically adjusting lifting center | |
CN203272591U (en) | Loading mechanism | |
CN205820765U (en) | A kind of overlength chute of stretching drives structure | |
CN106865425B (en) | Hanging component mobile device and the offshore wind farm unit hoisting using the device | |
CN207645641U (en) | A kind of swing arm underhung crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20120314 |