CN102364303A - Route reservation planning result synchronizing system and method - Google Patents

Route reservation planning result synchronizing system and method Download PDF

Info

Publication number
CN102364303A
CN102364303A CN2011101813458A CN201110181345A CN102364303A CN 102364303 A CN102364303 A CN 102364303A CN 2011101813458 A CN2011101813458 A CN 2011101813458A CN 201110181345 A CN201110181345 A CN 201110181345A CN 102364303 A CN102364303 A CN 102364303A
Authority
CN
China
Prior art keywords
program results
path
reservation program
information
original route
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN2011101813458A
Other languages
Chinese (zh)
Inventor
施林
赵锰
沈坚
范为
肖晨
熊安永
吴日赐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Huihan Microelectronic Co., Ltd.
Original Assignee
FUJIAN FLAIRCOMM TECHNOLOGIES Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUJIAN FLAIRCOMM TECHNOLOGIES Inc filed Critical FUJIAN FLAIRCOMM TECHNOLOGIES Inc
Priority to CN2011101813458A priority Critical patent/CN102364303A/en
Publication of CN102364303A publication Critical patent/CN102364303A/en
Withdrawn legal-status Critical Current

Links

Images

Landscapes

  • Navigation (AREA)

Abstract

The invention provides a route reservation planning result synchronizing method and system, wherein the route reservation planning result synchronizing method comprises the following steps of: receiving a route reservation planning result correction request which at least carries unique identification information of an original route reservation planning result and the correction information different from the original route reservation planning result or the corrected route reservation planning result; searching the original route reservation planning result according to the unique identification information of the original route reservation planning result in the route reservation planning result correction request; and correcting or replacing the original route reservation planning result according to the correction information different from the original route reservation planning result or the corrected route reservation planning result in the route reservation planning result correction request so as to update the original route reservation planning result.

Description

Path reservation program results synchro system and method
Technical field
The present invention relates to a kind of path planning technology, especially relate to a kind of path reservation program results synchro system and method.
Background technology
At present, the vehicle spreading speed is very fast, and the required traffic capacity of the vehicle in nearly all city all surpasses the actual increase-volume amount of urban transportation, and the traffic congestion phenomenon is of common occurrence.
And, the lasting raising of sustained and rapid development of economy and people's living standard, the speedup of all trades and professions and privately owned vehicle is also more and more faster, and is also increasingly high to the requirement of the path planning of trip.It is fewer and feweri that yet development of city causes can be used for the land used that urban transportation builds, also increasing with the contradiction that the traffic dilatation is actual required, certainly will cause more serious and more frequent traffic congestion phenomenon.
The phenomenon of traffic congestion not only can reduce the efficient of logistics greatly, wastes people's great amount of time, influences people's mood, causes accident to take place frequently, and also can waste a large amount of energy, discharges a large amount of tail gas, and contaminated environment causes various adverse consequencess.
The application that planning technology is preengage in a kind of emerging path will effectively improve the service efficiency with the balance urban traffic road, can effectively reduce the frequency and the seriousness of traffic congestion.This path main function of reservation planning technology is that all types of user or industry can be preengage a preferable driving path that can arrive the destination from starting point in advance according to plan, and the path reservation program results that this reserve route is corresponding is mainly calculated through the current total amount of road, existing path reservation program results and other traffic informations according to the path by specific server and forms.
This emerging path reservation planning technology is dynamically updating of support path reservation program results also, and the reservation program results is generated between the actual use because special circumstances cause this path reservation program results correspondence driving path from the starting point to the destination is not the situation of a more optimal way in the path with the reply traffic information.
But when reality was used the navigation of path reservation program results, Actual path was very possible because running into special circumstances such as accident changes, so that to preengage the corresponding path of program results different actual and path.
Summary of the invention
The technical matters that the present invention solves is to provide a kind of path reservation program results synchro system and method, can let actual driving path be consistent with the corresponding path of reservation program results, path.
A kind of path reservation program results method for synchronous that embodiment of the present invention provides comprises: RX path reservation program results correction request; At least carry the unique identification information of original route reservation program results in the said path reservation program results correction request, and update information different with original route reservation program results or revised path reservation program results; Unique identification information according to the original route reservation program results in the said path reservation program results correction request is searched original route reservation program results; According to update information different or the revised path reservation program results in the said path reservation program results correction request with original route reservation program results, revise or replacement original route reservation program results, upgrade original route reservation program results.
Also comprise: be prime information and the information of revising according to the information that changes in actual driving process pair and the original route reservation program results with the different update information of original route reservation program results in the said path reservation program results correction request, comprise that actual travel path and original route are preengage prime information such as the different highway section of program results and/or running time and/or road section traffic volume situation and fresh information contrasts; Said revised path reservation program results is to carry out corrected path reservation program results according to actual going to preengaging the information that changes in the program results with original route.
Comprise that also said path reservation program results correction request is in using path reservation program results navigation procedure, send out in real time during according to actual travel path and original route reservation program results generation difference.
Comprise that also said path reservation program results correction request is after using the navigation of path reservation program results, send out in real time during according to actual travel path and original route reservation program results generation difference.
Also comprise: the authentication information that receives the user; Receive user's path reservation program results download request; Based on said path reservation program results download request, obtain associated pathway reservation program results; Receive to adopt said path reservation program results in navigation, to preengage program results correction request based on the path that the difference of actual travel path and said path reservation program results sends out.
Subscriber identity information is also carried in said path reservation program results correction request.
Said correction original route reservation program results also comprises the relevant information in the related information of revising between subscriber identity information and the original route reservation program results.
Embodiment of the present invention also provides a kind of path reservation program results synchro system, comprising: the path planning database is used to road condition predicting reservation program results in path is provided; Server is used for RX path reservation program results correction request, and described request comprises the unique identification information of original route reservation program results at least, and update information different with original route reservation program results or revised path reservation program results; Preengage program results or directly replace original route reservation program results according to described request correction original route.
Also comprise: the customer account management database, be suitable for coupling with said server, be used to store the path planning precedence information of subscriber identity information and correspondence thereof and the relevant information that program results is preengage in the path related with the user; Said path reservation program results synchronously in, when revising original route reservation program results, also comprise revising and correspondingly with subscriber identity information in the customer account management database preengage the related relevant information of program results with original route.
Said path planning database part is deployed in server this locality and perhaps and between the server realizes alternately through network; Said customer account management database part is deployed in server this locality and perhaps and between the server realizes alternately through network.
Compare with prior art; The path reservation program results synchro system of embodiment of the present invention and the beneficial effect of method are: reservation program results corresponding path in path is consistent with actual driving path; Help preserving valuable transport information; For newly-built path reservation planning provides the most real transport information, work out optimum driving plan, have to utilize and reduce driving planned time cost and financial cost; Also can provide the truest valuable transport information for dredging of urban transportation; Can also the truest valuable reference data, the design of optimizing urban traffic route be provided for Urban Traffic Planning.
Description of drawings
Fig. 1 is the synchronous system schematic of a kind of path reservation program results of the path reservation program results method for synchronous of embodiment of the present invention;
Fig. 2 is the synoptic diagram of a kind of embodiment of path reservation program results method for synchronous of the present invention.
Embodiment
The application that planning technology is preengage in a kind of emerging path will effectively improve the service efficiency with the balance urban traffic road, can effectively reduce the frequency and the seriousness of traffic congestion.This path main function of reservation planning technology is that all types of user or industry can be preengage a preferable driving path that can arrive the destination from starting point in advance according to plan, and the path reservation program results that this reserve route is corresponding is mainly calculated through the current total amount of road, existing path reservation program results and other traffic informations according to the path by specific server and forms.
This emerging path reservation planning technology is dynamically updating of support path reservation program results also, and the reservation program results is generated between the actual use because special circumstances cause this path reservation program results correspondence driving path from the starting point to the destination is not the situation of a more optimal way in the path with the reply traffic information.
But when reality was used the navigation of path reservation program results, Actual path was very possible because running into special circumstances such as accident changes, so that to preengage the corresponding path of program results different actual and path.
The path synchronous system and method for reservation program results of embodiment of the present invention can remedy the defective that planning technology is preengage in said emerging path, guarantees that reservation program results corresponding path in path is consistent with actual driving path.
With reference to figure 1, be the synchronous system schematic of a kind of path reservation program results of the synchronous method of the path reservation program results of embodiment of the present invention.
In the said path reservation program results synchro system, comprise access device 101, server 102 and path planning database 103 and customer account management database 104.
Wherein, can connect through diverse network between access device 101 and the server 102, realize data communication.Said network can adopt existing diverse network technology to implement, and this does not give unnecessary details.During practical implementation, can adopt B/S (Browse/Server) or C/S (Client/Server) framework between said access device 101 and the server 102.
Said path planning database 103 provides the path planning record for server 102, and server 102 is revised the path planning record of path planning database 103 where necessary, reaches the synchronous purpose of path reservation program results.
Said customer account management database 104 provides customer data for server 102, and server 102 is revised the relevant information of customer data record in the customer account management data 104 where necessary, and auxiliary said server 102 realizing routes reservation program results is synchronous.
In the embodiment of the present invention; Said path reservation program results is meant synchronously; Access device 101 is through server 102 authentications success back login system; In the process of using the navigation of path reservation program results,, just revise path reservation program results if revised actual driving path according to real-time traffic; And to server 102 transmit paths reservation program results update information; Server 102 is revised relevant record in associated pathway planning database 103 and the customer account management database 104 after receiving from the path of access device 101 reservation program results update information, make the driving path of corresponding path of path reservation program results and reality synchronous.
Access device 101 is used to realize receive mutual with the user user's operational order and present the result to the user; Realize with server 102 between communicate by letter, send request to server 102, the data that processing receives from server 102.
In concrete the realization, access device 101 can be the electronic equipment that possesses data processing and communication function, in-vehicle navigation apparatus terminal for example, PC terminal and portable terminal etc.
Server 102 realizations are mutual with access device 101, are responsible for receiving the request that access device 101 sends; Realization is obtained related data from path planning database 103 and customer account management database 104, upgrade the relative recording in path planning database 103 and the customer account management database 104 according to the relevant information in the described request.
Path planning database 104 and customer account management database can be accepted the operations such as inquiry, deletion, interpolation, statistics and backup of server 102.The operator that said each database can be a server 102 is owned, can be deployed in this locality of server 102, also can be deployed in far-end, and can realize mutual between the server 102 through network.
Wherein, the path reservation program results that generates before the storage in the path planning database 103.In concrete the realization, can adopt the mode of path planning record to store said path reservation program results.For saving resource, improve data processing efficiency, can only store the current path planning record that remains valid.
Usually, in the paths plan record, information such as starting point, destination, zero-time can be comprised, information such as running time, average velocity and expense can also be comprised.In addition; The multistage route programming result information that can also comprise intermediate point in the path planning record; Comprise interim point information, segmentation speed per hour, segmentation running time and sectional charge etc., segmentation speed per hour, segmentation running time and sectional charge are that item is informed in optional requirement.
The deletion of path planning record can be adopted automatic mode, also can adopt manual type.For example, path planning record path plan record lost efficacy to after date in its planning time, can automatic or manual it be deleted from database; The user also can initiatively cancel and delete current effective path planning record.
The interpolation of path planning record can be carried out when generation pass is preengage program results in real time, also can after the user confirms, carry out at this path reservation program results.
The client manages database 104 and is used to deposit client identity information and the path reservation planning information related with it, supplies user inquiring, backup and statistics.
Usually, in customer data record, can include but not limited to the information etc. of the mobile unit of user name, password, priority, historical paths record, general routes record, current effective paths record, correspondence; Wherein, can store complete path planning record, also can be one with the path planning database in the related simple record of corresponding record, and concrete path planning record leaves in the path planning database.
In the implementation process of path reservation program results method for synchronous; Generally be that the access device 101 that the user operates carries out authentication through server 102; After the success login system; Access device 101 obtains path reservation program results through server 102 and navigates from path planning database 103; When access device has been changed actual driving path according to real-time traffic in navigation procedure, revise path reservation program results, and to server 102 transmit paths reservation program results update information; Server 102 is revised the relative recording in path planning database 103 and the customer account management database 104 according to the path reservation program results update information of receiving, realizing route reservation program results is synchronous with actual driving path.
With reference to figure 2, a kind of embodiment of said route programming result method for synchronous.
Step S101, access device 101 sends user's logging request to server 102.
Carry necessary username and password information in the said logging request.
Step S102; Whether server 102 inquiry customer account management databases 104 have the username and password coupling in the logging request that information recorded and the access device that receives 101 send, if the record of coupling is arranged; Authentication success, otherwise authentication failure.
Step S103, server 102 sends the authentication result to access device 101, and buffer memory checking result and identity information.
After access device 101 is received the checking result, judge whether authentication is successful.If authentication is unsuccessful, then execution in step S101, S102 and S103 again initiate authentication once more.If the authentication success, execution in step S104.
Step S104, access device 101 is to server 102 transmit paths reservation program results download request.
Can carry information such as destination, starting point, start time and/or intermediate point in the said path reservation program results query requests, or the unique identifier of path reservation program results, in order to the download condition of sign path reservation plan record.
The information of said path reservation program results download request all can be imported by the user; When access device 101 is that the information of starting point also can be the various satellite navigation standard information of navigator, like standard information such as GPS, Galileo and the Big Dippeves when possessing the equipment of satellite navigation receiving function.
Step S105; Server 102 is according to the path reservation program results download request of receiving; From customer account management database 104 and/or path planning database; Inquiry and the path reservation program results that the path download condition in the program results download request of preengaging is complementary send to access device 101 with Query Result.
Step S106, access device 101 navigates according to the path reservation program results of receiving.
Step S107, access device 101 is implemented driving path, the update information of generation pass according to real-time traffic correction.
The implementation method of the driving path that the real-time traffic correction of said foundation is implemented can be: when using said path reservation program results to navigate; Because of the actual traffic situation has been adjusted driving path; So that different in actual driving path and the path reservation program results, at this moment path modification information can be the highway section in replacing path and the information in former highway section; Also can be that the highway section has traffic and makes running time that variation to a certain degree arranged, at this moment path modification information can be the actual travel time in highway section, or the actual traffic situation, like other states of expression traffic level such as unobstructed, crowded or obstructions.
Step S108, access device 101 is according to the update information correction current path reservation program results of said driving path, and generation pass is preengage the program results update information.
The implementation method of said generation pass reservation program results update information can be: based on said path modification information; Generate update information and prime information contrast table; Road section information and original route like actual driving path are preengage former road section information corresponding in the program results; Running time is predicted in corresponding former highway section in the actual travel time in highway section and the original route reservation program results, corresponding former highway section predict traffic conditions in the actual traffic situation in highway section and the original route reservation program results.
Step S109; Access device 101 is to server 102 transmit paths reservation program results correction request; Can carry in the described request and can preengage the information of program results and real-time path reservation program results update information or revised path reservation program results by the unique identification original route.
Access device 101 can send real-time path reservation program results update information or send revised path reservation program results to server 102 in real time after revise path reservation program results; Also can be after this task of going be accomplished, to the total update information or the revised total path reservation program results of server 102 transmit paths reservation program results.
Step S110; Server 102 is according to the information searching original route reservation program results of unique identification original route reservation program results in the path reservation program results correction request of receiving; According to real-time route reservation program results update information or the revised path reservation program results in the path reservation program results correction request of receiving; Relative recording in correction and/or replacement path planning database 103 and the customer account management database 104 is realized the synchronous of actual travel path and path reservation program results.
Said implementation method according to the relative recording in path reservation program results correction path planning database 103 and the customer account management database 104 can be: according to path reservation program results update information; Preengage the relevant field of program results corresponding record with original route in correction path planning database 103 and the customer account management database 104; Like former road section information with correspondence in the road section information replacement original route reservation program results in actual travel path; With corresponding former highway section prediction running time in the actual travel time replacement original route reservation program results in highway section, with corresponding former highway section predict traffic conditions in the actual traffic situation replacement original route reservation program results in highway section; Perhaps, directly replace the corresponding path reservation plan record of original route reservation program results according to revised path reservation program results.
Among the said step S105; If the record of the customer data in the customer account management database 104 has only been stored path planning and has been recorded in the position in the path planning database 103; Server 102 obtains current client from customer account management database 104 path planning is recorded in the memory location in the path planning database 103; All path planning records of the current client of traversal from path planning database 103, choose with the request of path planning record queries in the path planning record that is complementary of querying condition as Query Result.
Among the said step S105; If the record of the customer data in the customer account management database 104 has not only been stored path planning and has been recorded in the position in the path planning database 103; Also stored the key message of path planning record; Like information such as destination, starting point, start time and intermediate points; Just can from current client's customer data record, directly mate the querying condition in the request of path planning record queries, obtain required path planning and be recorded in the memory address in the path planning database 103, directly from path planning database 103, obtain required path planning record afterwards as Query Result.
Among the said step S105; If the record of the customer data in the customer account management database 104 is not to have stored path planning to be recorded in the position in the path planning database 103; But stored complete path planning record; Just can from current client's customer data record, directly mate the querying condition in the request of path planning record queries, obtain required path planning record as Query Result.
Among the said step S110; If the record of the customer data in the customer account management database 104 has only been stored path planning and has been recorded in the position in the path planning database 103; Just only need to revise the information of relative recording in the path planning database, need not revise the customer data record in the customer account management database.
Among the said step S110; If the customer data recording storage in the customer account management database 104 key message of path planning record; Like information such as destination, starting point, start time and intermediate points, need revise the relevant information of the customer data record in the customer account management database according to the actual information that revise in the path.
Among the said step S110, if the customer data recording storage in the customer account management database 104 complete path planning record, the associated pathway plan record corresponding in the direct modification customer account management database with customer data record.
It will be appreciated by those skilled in the art that; Above-mentioned embodiment is similar; The user can use when having downloaded path reservation program results in advance and navigating, and it is synchronous to carry out path reservation program results, and after needn't at first passing through authentication as above-mentioned embodiment; Download path reservation program results is used for navigation again, and it is synchronous to carry out path reservation program results again.Corresponding therewith; The user is when the reservation program results sends to server 102 in the update information of the path being preengage program results or corrected path; Also need carry information in order to the ability unique identification path reservation program results of searching path reservation program results; And the corresponding road strength plan record of original route reservation program results in the footpath planning database 103 of only repairing the roads, the method for correction is similar with above-mentioned embodiment, and this does not give unnecessary details.
It will be appreciated by those skilled in the art that; Above-mentioned embodiment is similar; The user can use when having downloaded path reservation program results in advance and navigating, and it is synchronous to carry out path reservation program results, and after needn't at first passing through authentication as above-mentioned embodiment; Download path reservation program results is used for navigation again, and it is synchronous to carry out path reservation program results again.Corresponding therewith; The user is when the reservation program results sends to server 102 in the update information of the path being preengage program results or corrected path; Also need carry in order to the subscriber identity information of the identity of confirming the user and the authority that can revise path reservation program results with in order to search the path and preengage the information of the ability unique identification path reservation program results of program results; Other path reservation program results corrections and method for synchronous are all similar with above-mentioned embodiment, and this does not give unnecessary details.
Though the present invention through the preferred embodiment explanation as above, these preferred embodiments are not in order to limit the present invention.Those skilled in the art is not breaking away from the spirit and scope of the present invention, should have the ability various corrections and additional are made in this preferred embodiment, and therefore, protection scope of the present invention is as the criterion with the scope of claims.And the implication of the term of using among the present invention, words and claim can not only limit to its literal and common implication and go to understand, and also should comprise the implication and the notion that conform to technology of the present invention.

Claims (10)

1. the synchronous method of path reservation program results is characterized in that, comprising:
RX path reservation program results correction request;
At least carry the unique identification information of original route reservation program results in the said path reservation program results correction request, and update information different with original route reservation program results or revised path reservation program results;
Unique identification information according to the original route reservation program results in the said path reservation program results correction request is searched original route reservation program results; According to update information different or the revised path reservation program results in the said path reservation program results correction request with original route reservation program results, revise or replacement original route reservation program results, upgrade original route reservation program results.
2. path reservation program results method for synchronous as claimed in claim 1 is characterized in that, also comprises:
Be prime information and the information of revising according to the information that changes in actual driving process pair and the original route reservation program results with the different update information of original route reservation program results in the said path reservation program results correction request, comprise that actual travel path and original route are preengage prime information such as the different highway section of program results and/or running time and/or road section traffic volume situation and fresh information contrasts;
Said revised path reservation program results is to carry out corrected path reservation program results according to actual going to preengaging the information that changes in the program results with original route.
3. according to claim 1 or claim 2 path reservation program results method for synchronous; It is characterized in that; Also comprise; Said path reservation program results correction request is in using path reservation program results navigation procedure, sends out in real time during according to actual travel path and original route reservation program results generation difference.
4. according to claim 1 or claim 2 path reservation program results method for synchronous; It is characterized in that; Also comprise; Said path reservation program results correction request is after using the navigation of path reservation program results, sends out in real time during according to actual travel path and original route reservation program results generation difference.
5. according to claim 1 or claim 2 path reservation program results method for synchronous is characterized in that, also comprises:
Receive user's authentication information;
Receive user's path reservation program results download request;
Based on said path reservation program results download request, obtain associated pathway reservation program results;
Receive to adopt said path reservation program results in navigation, to preengage program results correction request based on the path that the difference of actual travel path and said path reservation program results sends out.
6. according to claim 1 or claim 2 path reservation program results method for synchronous is characterized in that subscriber identity information is also carried in said path reservation program results correction request.
7. path reservation program results method for synchronous as claimed in claim 6 is characterized in that said correction original route reservation program results also comprises the relevant information in the related information of revising between subscriber identity information and the original route reservation program results.
8. a path reservation program results synchro system is characterized in that, comprising:
The path planning database is used to road condition predicting reservation program results in path is provided;
Server is used for RX path reservation program results correction request, and described request comprises the unique identification information of original route reservation program results at least, and update information different with original route reservation program results or revised path reservation program results; Preengage program results or directly replace original route reservation program results according to described request correction original route.
9. path reservation program results synchro system as claimed in claim 8 is characterized in that, also comprises:
The customer account management database is suitable for coupling with said server, is used to store the path planning precedence information of subscriber identity information and correspondence thereof and the relevant information that program results is preengage in the path related with the user;
Said path reservation program results synchronously in, when revising original route reservation program results, also comprise revising and correspondingly with subscriber identity information in the customer account management database preengage the related relevant information of program results with original route.
10. preengage the program results dynamic update systems like claim 8 or 9 described paths, it is characterized in that, said path planning database part is deployed in server this locality and perhaps and between the server realizes alternately through network; Said customer account management database part is deployed in server this locality and perhaps and between the server realizes alternately through network.
CN2011101813458A 2011-06-30 2011-06-30 Route reservation planning result synchronizing system and method Withdrawn CN102364303A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011101813458A CN102364303A (en) 2011-06-30 2011-06-30 Route reservation planning result synchronizing system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011101813458A CN102364303A (en) 2011-06-30 2011-06-30 Route reservation planning result synchronizing system and method

Publications (1)

Publication Number Publication Date
CN102364303A true CN102364303A (en) 2012-02-29

Family

ID=45690883

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011101813458A Withdrawn CN102364303A (en) 2011-06-30 2011-06-30 Route reservation planning result synchronizing system and method

Country Status (1)

Country Link
CN (1) CN102364303A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104406602A (en) * 2014-12-03 2015-03-11 百度在线网络技术(北京)有限公司 Navigation route pushing method and device and navigation route generating method and device
CN106525060A (en) * 2015-09-11 2017-03-22 中兴通讯股份有限公司 Information correction method, intelligent terminal, server and system
CN108492558A (en) * 2018-03-27 2018-09-04 深圳大学 A kind of highway reservation traveling method, storage medium and terminal
CN108986459A (en) * 2018-07-06 2018-12-11 华南理工大学 A kind of highway crowded leading method current based on reservation

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104406602A (en) * 2014-12-03 2015-03-11 百度在线网络技术(北京)有限公司 Navigation route pushing method and device and navigation route generating method and device
CN104406602B (en) * 2014-12-03 2017-11-24 百度在线网络技术(北京)有限公司 Navigation way method for pushing and device, navigation way generation method and device
CN106525060A (en) * 2015-09-11 2017-03-22 中兴通讯股份有限公司 Information correction method, intelligent terminal, server and system
CN108492558A (en) * 2018-03-27 2018-09-04 深圳大学 A kind of highway reservation traveling method, storage medium and terminal
CN108492558B (en) * 2018-03-27 2021-08-17 深圳大学 Expressway travel reservation method, storage medium and terminal
CN108986459A (en) * 2018-07-06 2018-12-11 华南理工大学 A kind of highway crowded leading method current based on reservation

Similar Documents

Publication Publication Date Title
CN102353380A (en) Road condition prediction and query system and method
US8131675B2 (en) Map data delivering device, communication terminal, and map delivering method
CN102364304A (en) Path reserving and planning method and system
CN105210119B (en) The location data points provided by computing device determine the number of pass cost
CN102230805A (en) System and method for dynamic update of path reservation and planning result thereof
US20050159889A1 (en) Adaptive route guidance
CN105976038A (en) Shuttle bus customization system based on user requirements
CN102080961A (en) Navigation system for updating partly map layers, and method for the same
CN104620296A (en) On-demand vehicle operation management device, on-demand vehicle operation management method, and on-demand vehicle operation management system
CN102364506A (en) Path reservation planning system and method
KR20160143741A (en) Route planning method and device for navigation system and storage medium
KR20080017610A (en) Method for updating the terminal's map information based on route area and server therefor
US6757609B2 (en) Vehicle navigation server for obtaining traffic information for mesh unit on travel route
CN106197438A (en) A kind of method of map data update, device and server
US20040068525A1 (en) Information control system, server for information control system, and information terminal for information control system
CN102364303A (en) Route reservation planning result synchronizing system and method
CN103136298A (en) Electronic equipment and information presentation method thereof
CN102364505A (en) Industry application path appointment planning system and method thereof
US8437953B2 (en) Navigation apparatus and route distribution server
JP2010237444A (en) Map distribution apparatus, map distribution method and computer program
CN116698075B (en) Road network data processing method and device, electronic equipment and storage medium
US9510265B2 (en) Routing method and a unit for communication between vehicles
CN102354445A (en) Path appointment planning result inquiry, cancellation, modification and downloading system and method thereof
JP2005160046A (en) Operating environment setting system for mobile communication terminal
US20130093604A1 (en) Logistical management of field work

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
ASS Succession or assignment of patent right

Owner name: FUJIAN HUIHAN MICROELECTRONICS CO., LTD.

Free format text: FORMER OWNER: FUJIAN FLAIRCOMM TECHNOLOGIES INC.

Effective date: 20120223

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 350015 FUZHOU, FUJIAN PROVINCE TO: 350000 FUZHOU, FUJIAN PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20120223

Address after: 350000 6G, room 14, fast extension area, Mawei District, Fuzhou, Fujian

Applicant after: Fujian Huihan Microelectronic Co., Ltd.

Address before: 350015 Fujian province Fuzhou Mawei District Riverside East Road No. 116, No. 1 building three layer 3A-2

Applicant before: Fujian Flaircomm Technologies Inc.

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C04 Withdrawal of patent application after publication (patent law 2001)
WW01 Invention patent application withdrawn after publication

Open date: 20120229