CN102359122A - Method for installing buttress under assistance of buoyant boxes - Google Patents

Method for installing buttress under assistance of buoyant boxes Download PDF

Info

Publication number
CN102359122A
CN102359122A CN2011103155481A CN201110315548A CN102359122A CN 102359122 A CN102359122 A CN 102359122A CN 2011103155481 A CN2011103155481 A CN 2011103155481A CN 201110315548 A CN201110315548 A CN 201110315548A CN 102359122 A CN102359122 A CN 102359122A
Authority
CN
China
Prior art keywords
counterfort
buoyancy tank
buttress
installation
buoyancy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011103155481A
Other languages
Chinese (zh)
Inventor
沈迪州
沈任重
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011103155481A priority Critical patent/CN102359122A/en
Publication of CN102359122A publication Critical patent/CN102359122A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a method for installing a buttress under assistance of buoyant boxes. In the method, installation equipment and the buoyant boxes are adopted for jointly installing the buttress, the buoyant boxes are arranged above a buttress bottom plate of the buttress and are connected onto a buttress structure through buoyant box suspension cables, and the buoyant boxes provided with water/air inlet/outlets and control switches; and in a buttress installation process, the buoyant boxes are partially or completely submerged in water to generate buoyancy so as to make the buttress in place for installation, and the buoyant boxes are recovered for latter use after the buttress is installed. A crane ship, a positioning ship or an anchor cable can be adopted to serve as the installation equipment. During installation of the buttress, the buoyant boxes can be fixed on a planimetric position by adopting a fixing platform and a fastening rope. Accordingly, the application of the buttress structure can be promoted, the advantage of reducing the work amount of concrete and reinforcing steel bars for a buttress wharf is exerted, and the purpose of reducing engineering cost is achieved.

Description

A kind of auxiliary method that counterfort is installed of buoyancy tank of utilizing
Technical field
The present invention relates to a kind of mounting method of counterfort.
Background technology
Gravity retaining structures engineering on the water is used widely, and the gravity retaining structures of water project usually adopts prefabricated reinforced concrete dust block body, installs on the underwater bedding, and the backfill filler forms soil-baffling structure behind the dust block body.The dust block body has counterfort, caisson, hollow square, L shaped retaining wall, closed square etc.Under many circumstances, " hollow square " is called as " little caisson ".
Utilizing partly dives refutes transportation, the installation of carrying out caisson, has solved rising of Large Caisson and has re-mounted a difficult problem, and Large Caisson is widely used.
The reasonable stress of buttressed quay wall, material savings has economic advantages.The counterfort structure is because installation question, is restricted in the application of large pier.Solve the installation question of counterfort, have remarkable economic efficiency.
For this reason; We propose to utilize the auxiliary method that counterfort is installed of buoyancy tank; Consider to utilize the buoyancy of buoyancy tank overcome counterfort from gravity, thereby realize utilizing small-sized crane ship that large-scale counterfort is installed, perhaps counterfort is under the situation of floating state at buoyancy tank buoyancy; Utilize anchorage cable stretching that counterfort is located, utilize tidewater to descend or buoyancy tank is poured water to sink to realizing the in place of counterfort and install.
Buoyancy tank can adopt the steel buoyancy tank, also can adopt the glass fiber reinforced plastic buoyancy tank, and many productions that produce are arranged at present.Buoyancy tank is provided with intake-outlet and air inlet/outlet, and gauge tap is set.Structure and anti-collision structure that buoyancy tank setting is connected with counterfort.Buoyancy tank can adopt single buoyancy tank or a plurality of buoyancy tank, and buoyancy tank also can adopt the combination buoyancy tank that is connected to form one by a plurality of independent buoyancy tanks.In the process that counterfort is installed, the filled water amount of each buoyancy tank can be controlled respectively.Buoyancy tank can recycle.
Utilize the auxiliary flow process that counterfort is installed of buoyancy tank: before (1) counterfort was installed, buoyancy tank was fixed on the counterfort structure, under counterfort, before the water, buoyancy tank is inflated certain pressure, and closed Inlet and outlet water, turnover air cock; (2) in the counterfort sinking process, buoyancy tank progressively sinks to getting in the water, and buoyancy progressively increases, and counterfort sinks to desired location, and the buoyancy of buoyancy tank performance reaches the designing requirement that counterfort is installed; (3) utilize the auxiliary counterfort of slinging of crane ship, counterfort is installed on the bedding, or utilizes anchorage cable stretching that counterfort is located, utilize tidewater to descend or buoyancy tank poured water to make counterfort sink to be installed on the bedding; (4) after counterfort is installed, open the water inlet of buoyancy tank water inlet, make the gravity of buoyancy tank and buoyant equilibrium be in floating state, open being connected of buoyancy tank and bearing pin, buoyancy tank is towed out between the counterfort floor, leave subsequent use place in.Accomplishing counterfort thus installs.
Buoyancy tank can be accomplished in several ways with being connected of counterfort structure.Buoyancy tank can be fixed on the floor of counterfort, and buoyancy tank also can be fixed on the base plate of counterfort, and buoyancy tank can also be separately fixed on the different component of counterfort, specifically can design according to requirement of engineering.
Buoyancy tank and counterfort structure be connected with multiple mode: mode one, the buoyancy tank hoist cable is connected on the bearing pin, bearing pin is installed in the lifting hole(eyelet) of floor of counterfort; Mode two is connected the buoyancy tank hoist cable on the bearing pin, and bearing pin is installed in the bearing pin base on the counterfort base plate; Mode three is connected the buoyancy tank hoist cable on the suspension rod, and suspension rod injects in the lifting hole(eyelet) box and turn 90 degrees.
Being provided with on the base plate of counterfort under the situation of underframe longitudinal member, also can buoyancy tank be connected on the underframe longitudinal member.Under the situation of special-shaped caisson, also can buoyancy tank be connected on the withe of special-shaped caisson.
Between the counterfort installation period, can adopt fixedly buoyancy tank of temporary structure, overcome the external force such as wave, current of construction period buoyancy tank, the plan-position and the upright position of control buoyancy tank.
After the counterfort installation, preformed hole, the built-in fitting installed are handled according to engine request.
Utilize buoyancy tank can also assist structures such as special-shaped caisson, large cylinder are installed, its method is similar with the auxiliary installation of buoyancy tank counterfort.For the ease of describing, we conclude special-shaped caisson in the special-shaped counterfort and describe.
Utilize buoyancy tank that counterfort is installed, can promote the application of counterfort structure, the advantage of performance buttressed quay wall is saved concrete and steel project, under usable condition, has significant comprehensive benefit.
For this reason, we propose to utilize the auxiliary method that counterfort is installed of buoyancy tank to water project.
Summary of the invention
Advantage, the reduction engineering cost that application, performance buttressed quay wall concrete and the steel project of counterfort structure are saved installed, promoted to counterfort for ease, and the present invention provides a kind of auxiliary method that counterfort is installed of buoyancy tank of utilizing.
In order to achieve the above object, the technical scheme that the present invention adopts is to adopt erection equipment and buoyancy tank that counterfort is installed jointly, and buoyancy tank is installed in the top of the counterfort base plate of counterfort; Buoyancy tank is connected on the counterfort structure through the buoyancy tank hoist cable, and buoyancy tank is provided with the import and export and the gauge tap of water and air, in the counterfort installation process; Buoyancy tank partly or entirely is submerged in and produces buoyancy in the water; Realize the in place of counterfort and installation, behind the counterfort installation in position, buoyancy tank water-filling exhaust reducing buoyancy reclaims subsequent use.Realize promoting the advantage of application, performance buttressed quay wall concrete and the steel project saving of counterfort structure, the purpose of reduction engineering cost thus.
Buoyancy tank can adopt single buoyancy tank or a plurality of buoyancy tank, and buoyancy tank also can adopt the combination buoyancy tank of being made up of one a plurality of independent buoyancy tanks.
Erection equipment can adopt crane ship, station keeping ship or anchor hawser.
Buoyancy tank and counterfort structure be connected with three kinds of modes: mode one, the buoyancy tank hoist cable is connected on the bearing pin, bearing pin is installed in the lifting hole(eyelet) of floor of counterfort; Mode two is connected the buoyancy tank hoist cable on the bearing pin, and bearing pin is installed in the bearing pin base on the counterfort base plate; Mode three is connected the buoyancy tank hoist cable on the suspension rod, and suspension rod injects in the lifting hole(eyelet) box and turn 90 degrees.
Being provided with on the base plate of counterfort under the situation of underframe longitudinal member, also can buoyancy tank be connected on the underframe longitudinal member.Under the situation that special-shaped counterfort is installed, also can buoyancy tank be connected on the withe of special-shaped counterfort.
Between the installation period of counterfort, can adopt fixed platform and fastening rope that buoyancy tank is fixed.
Adopt the auxiliary method that counterfort is installed of buoyancy tank of utilizing of the present invention; Utilize small-sized erection equipment just large-scale counterfort can be installed; Can promote the application of counterfort structure, the advantage of performance buttressed quay wall is saved concrete and steel project, under usable condition, has significant comprehensive benefit.
Beneficial effect of the present invention makes things convenient for counterfort that the application that can promote the counterfort structure is installed, and the advantage of performance buttressed quay wall is saved concrete and steel project, under usable condition, has significant comprehensive benefit.
Description of drawings
Below in conjunction with accompanying drawing the present invention is further specified.Among the figure to arrange 2 buoyancy tanks between counterfort two floors, the floor, to adopt that crane ship is auxiliary to be installed as typical case and to describe.Counterfort has 2 above floors, buoyancy tank to adopt situation one or more, that counterfort installation employing anchor hawser is auxiliary, counterfort is installed the situation that adopts station keeping ship to assist, the installation of special-shaped counterfort only to draw representative graph, and the figure of other installation situation beyond the representative situation and explanation can be with reference to the figure and the explanations of representative graph and typical case.
Fig. 1 is the buttressed quay wall profile;
Fig. 2 is counterfort plan view (the two ribs of counterfort);
Fig. 3 adopts crane ship that the counterfort elevational schematic view is installed;
Fig. 4 adopts crane ship that the counterfort floor map is installed;
Fig. 5 adopts buoyancy tank that counterfort elevational schematic view (mode one) is installed;
Fig. 6 adopts buoyancy tank that counterfort floor map (mode one) is installed;
Fig. 7 adopts buoyancy tank that counterfort side schematic view (mode one) is installed;
Fig. 8 adopts buoyancy tank that counterfort elevational schematic view (mode two) is installed;
Fig. 9 adopts buoyancy tank that counterfort elevational schematic view (mode three) is installed;
Figure 10 adopts buoyancy tank that counterfort floor map (mode three) is installed;
Figure 11 is the floating box structure generalized section;
Figure 12 adopts buoyancy tank that counterfort elevational schematic view (mode four) is installed;
Figure 13 adopts buoyancy tank that counterfort elevational schematic view (mode five) is installed;
Figure 14 adopts buoyancy tank that counterfort floor map (counterfort three ribs) is installed;
Figure 15 adopts buoyancy tank that counterfort elevational schematic view (special-shaped counterfort) is installed;
Figure 16 is installation site, the lower end sketch map one of hoist cable and buoyancy tank hoist cable;
Figure 17 is installation site, the lower end sketch map two of hoist cable and buoyancy tank hoist cable;
Figure 18 is bearing pin and lifting hole(eyelet) sketch map;
Figure 19 is a bearing pin base front surface sketch map;
Figure 20 is a bearing pin base side schematic view;
Figure 21 is the fixing sketch map of buoyancy tank hoist cable at the bearing pin base;
Figure 22 is the plan position fixing elevational schematic view between the buoyancy tank installation period;
Figure 23 is the plan position fixing floor map between the buoyancy tank installation period;
Figure 24 is the fixing elevational schematic view in upright position between the buoyancy tank installation period;
Figure 25 is the upright position fixed pan sketch map between the buoyancy tank installation period.
Among the figure: 1. counterfort, 2. breastwork, 3. bedding, 4. filler, 5. ground, 6. counterfort riser, 7. counterfort base plate; 8. counterfort floor, 9. excavation line, 10. harbour end face line, 11. waterlines, 12. lifting hole(eyelet)s, 13. hoist cables, 14. suspension brackets; 15. crane ship, 16. bearing pins, 17. buoyancy tanks, 18. buoyancy tank hoist cables, 19. buoyancy tank panels, 20. buoyancy tank girders, 21. buoyancy tank internal overarm supports; 22. the buoyancy tank protected apron, 23. air inlet/outlets and switch, 24. paddle holes and switch, 25. buoyancy tank hoist cable fixed points, 26. operation platforms, 27. anchor hawsers, 28. special-shaped counterforts; 29. preceding compartment structure, 30. back compartment structures, 31. station keeping ships, 32. erection equipments, 33. bearing pin bases, 34. fixed platforms, 35. fastening ropes.
The specific embodiment
Fig. 1 and Fig. 2 represent the buttressed quay wall structure chart.Buttressed quay wall is made up of counterfort (1), breastwork (2), bedding (3), filler (4), ground (5).Counterfort (1) is made up of counterfort riser (6), counterfort base plate (7), counterfort floor (8), adopts concrete structure.Counterfort (1) has 2 counterfort floors (8).Breastwork (2) adopts concrete structure.Bedding (3) adopts piece stone.Filler (4) adopts piece stone or sand material.Excavation line (9), harbour end face line (10), waterline (11) are as shown in the figure.
Fig. 3 and Fig. 4 represent to adopt crane ship that counterfort sketch map (the two ribs of counterfort) is installed.Erection equipment (32) adopts crane ship (15).Counterfort (1) has 2 counterfort floors (8).Crane ship (15) is through sling counterfort (1) and being installed on the bedding (3) of suspension bracket (14), hoist cable (13), bearing pin (16).Suspension bracket (14) and bearing pin (16) adopt steel work, and hoist cable (13) adopts wire rope, and the two ends of hoist cable (13) are provided with connector, so that be connected with bearing pin (16) with suspension bracket (14), connector can adopt snap close, latch, suspension ring or steel work.The two ends of hoist cable (13) are separately fixed on suspension bracket (14) and the bearing pin (16), can connect fixing through adopting binding connection, snap close connection or perforation.Lifting hole(eyelet) (12) is arranged on the counterfort floor (8), and aperture 150~300mm can locate to bury underground steel pipe in lifting hole(eyelet) (12) and improve the peripheral stressed of lifting hole(eyelet) (12).Bearing pin (16) is installed in the lifting hole(eyelet) (12).Hoist cable (13) is arranged in the both sides of bearing pin (16).Situation when illustrating counterfort (1) installation in position among the figure, installation process is omitted, and Fig. 2 omits crane ship (15) and suspension bracket (14).The system of casting anchor of crane ship among the figure (15) omits.Other explanations are referring to Fig. 1 and Fig. 2.
Fig. 5, Fig. 6 and Fig. 7 represent to adopt buoyancy tank that counterfort sketch map (mode one) is installed.Two buoyancy tanks, the two ribs of counterfort, the auxiliary installation drawing of crane ship are adopted in expression among the figure.Erection equipment (32) adopts crane ship (15).Counterfort (1) has 2 counterfort floors (8).Buoyancy tank (17) is arranged between the counterfort floor (8), between two counterfort floors (8), arranges 2 buoyancy tanks (17).The quantity of buoyancy tank (17) and size can be confirmed according to requirement of engineering.Buoyancy tank (17) is connected on the bearing pin (16) through buoyancy tank hoist cable (18); Bearing pin (16) is installed in the lifting hole(eyelet) (12); The both sides of bearing pin (16) or a side are arranged buoyancy tank hoist cable (18); Buoyancy tank hoist cable (18) adopts wire rope to make or adopts reinforcing pull rod, and the size of buoyancy tank hoist cable (18) and length design according to the installation needs.The two ends of buoyancy tank hoist cable (18) are provided with connector, so that be connected with bearing pin (16) with buoyancy tank hoist cable fixed point (25), connector can adopt snap close, latch, suspension ring or steel work.The two ends of buoyancy tank hoist cable (18) are separately fixed on buoyancy tank hoist cable fixed point (25) and the bearing pin (16), can connect fixing through adopting binding connection, snap close connection or perforation.Buoyancy tank (17) is made up of buoyancy tank panel (19), buoyancy tank girder (20), buoyancy tank internal overarm support (21), adopts structure steel fabrication, also can adopt glass fiber reinforced plastic to make.Buoyancy tank protected apron (22), air inlet/outlet and switch (23), paddle hole and switch (24), buoyancy tank hoist cable fixed point (25) are set on the buoyancy tank (17), realize buoyancy tank (17) inflation exhaust, water inlet draining, crashproof, fastness function.Before the installation; Bearing pin (16) is installed in the lifting hole(eyelet) (12); Adopt buoyancy tank hoist cable (18) that buoyancy tank (17) is connected on the bearing pin (16), make paddle hole and switch (24) be in closed condition, reach design air pressure for buoyancy tank (17) inflation; Make air inlet/outlet and switch (23) be in closed condition, utilize the auxiliary installation of crane ship (15).During installation; Along with progressively strengthening the buoyancy that buoyancy tank (17) produces, the drinking water of the following elevator chamber (17) of counterfort (1) also progressively increases; Buoyancy tank (17) buoyancy, crane ship (15) lifting force, counterfort (1) from gravity, when external force of environment is in equilibrium state, counterfort (1) is installed on the bedding (3).After the installation, the lifting force that discharges crane ship (15) makes counterfort (1) stable, makes paddle hole and switch (24) be in opening; Make air inlet/outlet and switch (23) be in opening, progressively give buoyancy tank (17) water-filling, venting, reduce the buoyancy of buoyancy tank (17); Be under the situation of equilibrium state at the buoyancy of buoyancy tank (17) with from gravity; Buoyancy tank hoist cable (18) is thrown off from bearing pin (16), with buoyancy tank (17) haul subsequent use place deposit appropriate, in order to recycling.Adopt the auxiliary operating instruction that counterfort (1) is installed of crane ship (15) referring to Fig. 3 and Fig. 4.Other explanations are referring to Fig. 1 and Fig. 2.
Fig. 8 representes to adopt buoyancy tank that counterfort elevational schematic view (mode two) is installed.Single buoyancy tank, the auxiliary installation drawing of crane ship are adopted in expression among the figure.Erection equipment (32) adopts crane ship (15).Buoyancy tank (17) is arranged between the counterfort floor (8), between two counterfort floors (8), arranges 1 buoyancy tank (17).Other explanations are referring to Fig. 5, Fig. 6 and Fig. 7.
Fig. 9 and Figure 10 represent to adopt buoyancy tank that counterfort elevational schematic view (mode three) is installed.Many buoyancy tanks, the auxiliary installation drawing of crane ship are adopted in expression among the figure.Erection equipment (32) adopts crane ship (15).Counterfort (1) has 2 counterfort floors (8).Buoyancy tank (17) is arranged between the counterfort floor (8), between two counterfort floors (8), arranges 2 buoyancy tanks (17).Buoyancy tank (17) also is arranged on the place ahead of counterfort riser (6) and is fixed on the counterfort base plate (7) through buoyancy tank hoist cable (18) and bearing pin base (33).Bearing pin base (33) can adopt the steel work base, and bearing pin base (33) also can adopt lifting hole(eyelet) box structure, and bearing pin base (33) is buried underground and is anchored on the counterfort base plate (7).The concrete figure of bearing pin base (33) slightly.Be arranged among buoyancy tank (17) figure in the place ahead of counterfort riser (6) and be expressed as 1, concrete quantity can be definite according to requirement of engineering with position.Other explanations are referring to Fig. 5, Fig. 6 and Fig. 7.Buoyancy tank (17) is arranged on the figure and the explanation of other situation in the place ahead of counterfort riser (6), can scheme with reference to this, and concrete figure slightly.
Figure 11 representes the floating box structure sectional drawing.Buoyancy tank (17) is made up of buoyancy tank panel (19), buoyancy tank girder (20), buoyancy tank internal overarm support (21), adopts structure steel fabrication, also can adopt glass fiber reinforced plastic to make.Buoyancy tank protected apron (22), air inlet/outlet and switch (23), paddle hole and switch (24), buoyancy tank hoist cable fixed point (25) are set on the buoyancy tank (17), realize buoyancy tank (17) inflation exhaust, water inlet draining, crashproof, fastness function.The size of the size of buoyancy tank (17) and member thereof and layout are confirmed according to requirement of engineering.
Figure 12 representes to adopt buoyancy tank that counterfort elevational schematic view (mode four) is installed.The single buoyancy tank of expression, the auxiliary installation situation of anchor hawser among the figure.Erection equipment (32) adopts anchor hawser (27).Operation platform (26) is installed in the top of counterfort (1), and operation platform (26) is gone up functions (figure slightly) such as arranging realization such as the equipment that stirs cable machine band cable, loose cable.Utilize the buoyancy of buoyancy tank (17) that counterfort (1) is floated and be in floating state; Through stretch-draw or loosen anchor hawser (27); It is in place to move counterfort (1), and buoyancy tank (17) is poured water or utilized drawdown that counterfort (1) is seated on the bedding (3), removes operation platform (26); Remove buoyancy tank (17), just accomplish the installation of counterfort (1).Operation platform (26) adopts structure steel fabrication, and anchor hawser (27) adopts wire rope to make, an end under water of anchor hawser (27) be fixed on anchorage structure such as anchor, on the ox.The operation of the installation process of counterfort (1), buoyancy tank (17) is referring to Fig. 5, Fig. 6 and Fig. 7.
Figure 13 representes to adopt buoyancy tank that counterfort elevational schematic view (mode five) is installed.The single buoyancy tank of expression, the auxiliary situation of installing of station keeping ship among the figure.Erection equipment (32) adopts station keeping ship (31).Station keeping ship (31) casts anchor and is positioned at the place ahead of counterfort (1).Utilize the buoyancy of buoyancy tank (17) that counterfort (1) is floated and be in floating state; Through station keeping ship (31) pushing tow or to pull mobile counterfort (1) in place; Buoyancy tank (17) is poured water or utilized drawdown that counterfort (1) is seated on the bedding (3); Remove station keeping ship (31), remove buoyancy tank (17), just accomplish the installation of counterfort (1).The system of casting anchor of station keeping ship among the figure (31) omits.The operation of the installation process of counterfort (1), buoyancy tank (17) is referring to Fig. 5, Fig. 6 and Fig. 7.
Figure 14 representes to adopt buoyancy tank that counterfort floor map (counterfort three ribs) is installed.The installation situation of signal three rib counterforts among the figure.Erection equipment (32) adopts crane ship (15).Counterfort (1) has 3 counterfort floors (8).Buoyancy tank (17) is arranged between the counterfort floor (8), between 3 counterfort floors (8), arranges 4 buoyancy tanks (17).The quantity of buoyancy tank (17) and size can be confirmed according to process need.Crane ship among the figure (15) omits.Have counterfort (1) the different deployment scenarios, erection equipment (32) of 3 counterfort floors (8), buoyancy tank (17) adopt the installation drawing of anchor hawser (27) or station keeping ship (31) can be referring to Fig. 5~Figure 13.The installation situation that the counterfort floor (8) of counterfort (1) reaches more than 3 can be joined see this drawing, and concrete figure slightly.
Figure 15 representes to adopt buoyancy tank that counterfort elevational schematic view (special-shaped counterfort) is installed.Erection equipment (32) adopts crane ship (15).Abnormity counterfort (28) is made up of preceding compartment structure (29), back compartment structure (30), adopts concreting.Preceding compartment structure (29) and back compartment structure (30) are made up of base plate, partition wall.Buoyancy tank (17) is installed in the top of back compartment structure (30), and special-shaped counterfort (28) is in the sinking process, and buoyancy tank (17) produces buoyancy.Water level is lower than water level out of my cabin in preceding compartment structure (29) control cabinet; Make preceding compartment structure (29) produce buoyancy; Under the acting in conjunction of the lifting force of the buoyancy of the buoyancy of buoyancy tank (17), preceding compartment structure (29), crane ship (15), realize the in place of special-shaped counterfort (28) and install.Adopting anchor hawser (27) or station keeping ship (31) that special-shaped counterfort (28) is installed can scheme with reference to this, and concrete figure slightly.
Figure 16 representes installation site, the lower end sketch map one of hoist cable and buoyancy tank hoist cable.The lower end of hoist cable (13) is fixed on the below of the lower end of buoyancy tank hoist cable (18), and lifting hole(eyelet) (12) is arranged on the counterfort floor (8).The lower end of hoist cable (13) also can be installed in the top of the lower end of buoyancy tank hoist cable (18), and concrete figure slightly.
Figure 17 representes installation site, the lower end sketch map two of hoist cable and buoyancy tank hoist cable.The lower end of hoist cable (13) and buoyancy tank hoist cable (18) is fixed on the counterfort base plate (7), and bearing pin base (33) is arranged on the counterfort base plate (7).Bearing pin base (33) can adopt the steel work base, and bearing pin base (33) also can adopt lifting hole(eyelet) box structure, and bearing pin base (33) is buried underground and is anchored on the counterfort base plate (7).Adopt at bearing pin base (33) under the situation of lifting hole(eyelet) box structure, lifting hole(eyelet) box structure is embedded in the concrete of counterfort base plate (7), and the lower end of buoyancy tank hoist cable (18) is provided with suspension rod, suspension rod is injected just to turn 90 degrees in the lifting hole(eyelet) box suspension rod is fixed in the lifting hole(eyelet) box structure.Lifting hole(eyelet) box structure is specifically schemed slightly.The lower end of hoist cable (13) and buoyancy tank hoist cable (18) can be separately fixed on counterfort base plate (7), counterfort floor (8), counterfort longeron, the special-shaped caisson withe, and concrete figure slightly.
Figure 18 representes bearing pin and lifting hole(eyelet) sketch map.Lifting hole(eyelet) (12) is arranged on the counterfort floor (8), and aperture 150~300mm can locate to bury underground steel pipe in lifting hole(eyelet) (12) and improve the peripheral stressed of lifting hole(eyelet) (12).Bearing pin (16) is installed in the lifting hole(eyelet) (12).Buoyancy tank hoist cable (18) or hoist cable (13) are arranged in the both sides of bearing pin (16).Illustrate bearing pin (16) both sides that the situation of hoist cable is arranged among the figure.
Figure 19 and Figure 20 represent bearing pin understructure sketch map.Bearing pin base (33) is made up of base, riser, anchorage bolt, latch, adopts steel work.Riser is reserved with the jack of latch.
Figure 21 representes the fixing sketch map of buoyancy tank hoist cable at the bearing pin base.Buoyancy tank hoist cable (18) is fixed on the latch of bearing pin base (33).
Figure 22 and Figure 23 represent the plan position fixing sketch map between the buoyancy tank installation period.Before counterfort (1) is installed, fixed platform (34) is installed in the top of counterfort (1), two sections tops that are separately fixed at fixed platform (34) and buoyancy tank (17) of fastening rope (35) through stretch-draw or loosen fastening rope (35), are fixed on buoyancy tank (17) on the plan-position.In counterfort (1) installation process, can be through stretch-draw or the plan-position of loosening fastening rope (35) control or adjustment buoyancy tank (17).Fixed platform (34) can adopt formed steel construction, and fastening rope (35) can adopt wire rope configuration stretcher realization stretch-draw and loosen, and concrete figure slightly.
Figure 24 and Figure 25 represent the fixing elevational schematic view in upright position between the buoyancy tank installation period.Before counterfort (1) is installed, fixed platform (34) is installed in the top of counterfort (1), two sections tops that are separately fixed at fixed platform (34) and buoyancy tank (17) of fastening rope (35) through stretch-draw or loosen fastening rope (35), are fixed on buoyancy tank (17) on the upright position.In counterfort (1) installation process, can be through stretch-draw or the upright position of loosening fastening rope (35) control or adjustment buoyancy tank (17).Fixed platform (34) can adopt formed steel construction, and fastening rope (35) can adopt wire rope configuration stretcher realization stretch-draw and loosen, and concrete figure slightly.

Claims (1)

1. one kind is utilized the auxiliary method that counterfort is installed of buoyancy tank; Adopt erection equipment and buoyancy tank that counterfort is installed jointly; It is characterized in that: buoyancy tank is installed in the top of the counterfort base plate of counterfort, and buoyancy tank is connected on the counterfort structure through the buoyancy tank hoist cable, and buoyancy tank is provided with the import and export and the gauge tap of water and air; In the counterfort installation process, buoyancy tank partly or entirely is submerged in the water.
CN2011103155481A 2011-10-17 2011-10-17 Method for installing buttress under assistance of buoyant boxes Pending CN102359122A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011103155481A CN102359122A (en) 2011-10-17 2011-10-17 Method for installing buttress under assistance of buoyant boxes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011103155481A CN102359122A (en) 2011-10-17 2011-10-17 Method for installing buttress under assistance of buoyant boxes

Publications (1)

Publication Number Publication Date
CN102359122A true CN102359122A (en) 2012-02-22

Family

ID=45584497

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011103155481A Pending CN102359122A (en) 2011-10-17 2011-10-17 Method for installing buttress under assistance of buoyant boxes

Country Status (1)

Country Link
CN (1) CN102359122A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103382712A (en) * 2012-05-02 2013-11-06 中交第三航务工程勘察设计院有限公司 Counterforted foundation bulkhead wall structure and construction method thereof
CN103452133A (en) * 2012-05-28 2013-12-18 上海市政工程设计研究总院(集团)有限公司 Connection method for main structure and accessory structure in wholly-covered water-proof underground structure
CN104495618A (en) * 2014-12-01 2015-04-08 中国葛洲坝集团第六工程有限公司 Method for installing underwater overweight member by using small-sized hoisting equipment
CN110130438A (en) * 2019-05-27 2019-08-16 中国水利水电第八工程局有限公司 A kind of surface water water intake well
CN112298474A (en) * 2020-10-13 2021-02-02 武汉船舶职业技术学院 Flood-fighting and emergency-rescuing engineering ship and flood-fighting and emergency-rescuing method

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103382712A (en) * 2012-05-02 2013-11-06 中交第三航务工程勘察设计院有限公司 Counterforted foundation bulkhead wall structure and construction method thereof
CN103382712B (en) * 2012-05-02 2015-09-30 中交第三航务工程勘察设计院有限公司 Buttress type foundation quay wall structure and construction method thereof
CN103452133A (en) * 2012-05-28 2013-12-18 上海市政工程设计研究总院(集团)有限公司 Connection method for main structure and accessory structure in wholly-covered water-proof underground structure
CN103452133B (en) * 2012-05-28 2016-12-14 上海市政工程设计研究总院(集团)有限公司 Method of attachment between agent structure and accessory structure in full bag waterproof underground structure
CN104495618A (en) * 2014-12-01 2015-04-08 中国葛洲坝集团第六工程有限公司 Method for installing underwater overweight member by using small-sized hoisting equipment
CN104495618B (en) * 2014-12-01 2016-09-21 中国葛洲坝集团第六工程有限公司 Method for installing underwater overweight member by using small-sized hoisting equipment
CN110130438A (en) * 2019-05-27 2019-08-16 中国水利水电第八工程局有限公司 A kind of surface water water intake well
CN112298474A (en) * 2020-10-13 2021-02-02 武汉船舶职业技术学院 Flood-fighting and emergency-rescuing engineering ship and flood-fighting and emergency-rescuing method
CN112298474B (en) * 2020-10-13 2021-08-17 武汉船舶职业技术学院 Flood-fighting and emergency-rescuing engineering ship and flood-fighting and emergency-rescuing method

Similar Documents

Publication Publication Date Title
CN101774422B (en) Novel offshore installation construction resource-combined type pontoon barge
CN105926628B (en) One kind is floated, fixed convertible pile foundation in water construction platform device
CN102359122A (en) Method for installing buttress under assistance of buoyant boxes
CN102677694B (en) Offshore wind power submersible foundation structure and complete fan installation construction method thereof
CN106677258B (en) A kind of mounting process of power plant sea water intake caisson
JP2022521716A (en) Manufacturing method of suction anchor and suction anchor
CN107600326A (en) A kind of releasable formula gravity anchor system for deep ocean buoy
CN102936899A (en) Method for installing steel cofferdam by the aid of pier supporting frame
CN114086592A (en) Fabricated offshore wind power floating foundation structure and construction method thereof
CN214401781U (en) Gripping mechanism suitable for large-tonnage underwater steel pipe pile clearing device
CN206512730U (en) It is a kind of to realize the box that box wall body is used in turn
JPH0986485A (en) Manufacturing work method and repair work method for large structure, and barge used for execution of the methods
CN100535251C (en) Earth pit for prefabricating members for use in hydraulic engineering, float transferring device therefore, and their using method
CN202642027U (en) Floating fitting-out device
CN102206938A (en) Novel method for installing upper part block of offshore platform
KR20090022587A (en) Floating gate dock and vessel construction method thereof
JP2012077578A (en) Work scaffolding and method for constructing the same
CN216892499U (en) Assembled offshore wind power floating foundation structure
CN202298649U (en) Buttress structure with longitudinal beams
CN112609695B (en) Large-tonnage underwater steel pipe pile removing device and construction method
JP5738642B2 (en) Installation method of offshore wind power generation equipment
CN210126614U (en) Immersed tube combined type transportation and installation equipment
CN105648996A (en) Lifting ballasting barge applicable to installation of simple wellhead platform and mounting method thereof
CN103963931A (en) Large component semi-submersible water transport installation system and construction method
CN101362008B (en) Floating bag mounting method of fire-fighting pump armor tube on offshore platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120222