CN102355190A - 电力系统电压调节器参数整定方法 - Google Patents

电力系统电压调节器参数整定方法 Download PDF

Info

Publication number
CN102355190A
CN102355190A CN2011102566759A CN201110256675A CN102355190A CN 102355190 A CN102355190 A CN 102355190A CN 2011102566759 A CN2011102566759 A CN 2011102566759A CN 201110256675 A CN201110256675 A CN 201110256675A CN 102355190 A CN102355190 A CN 102355190A
Authority
CN
China
Prior art keywords
voltage
system voltage
unit
voltage regulator
psvr
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011102566759A
Other languages
English (en)
Other versions
CN102355190B (zh
Inventor
陈新琪
俞鸿飞
卢嘉华
王超
顾益磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ELECTRIC POWER RESEARCH INSTITUTE OF ZHEJIANG ELECTRIC POWER Co
Zhejiang Electric Power Test And Research Institute Technical Service Center
State Grid Corp of China SGCC
Original Assignee
Electric Power Research Institute of State Grid Zhejiang Electric Power Co Ltd
Zhejiang Electric Power Test and Research Insititute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of State Grid Zhejiang Electric Power Co Ltd, Zhejiang Electric Power Test and Research Insititute filed Critical Electric Power Research Institute of State Grid Zhejiang Electric Power Co Ltd
Priority to CN 201110256675 priority Critical patent/CN102355190B/zh
Publication of CN102355190A publication Critical patent/CN102355190A/zh
Application granted granted Critical
Publication of CN102355190B publication Critical patent/CN102355190B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Control Of Eletrric Generators (AREA)

Abstract

本发明涉及一种电力系统电压调节器参数整定方法。目前,发电机励磁调节器都是以控制发电机机端电压为目标,在电网故障需要更多无功功率以提高系统电压稳定性方面存在不足。本发明引入系统电压,其通过电压调节器参与发电机励磁控制,所述的电压调节器由系统电压测量单元、系统电压给定单元、综合比较单元、超前滞后放大单元、输出限幅单元和投入退出控制单元组成,电压调节器参数整定的内容如下:相位补偿时间常数的整定、放大倍数KPSVR的整定和输出限幅值的整定。本发明充分发挥发电机的潜在无功功率,提高系统电压稳定性,提高电网电压质量,减少事故引发的稳定性破坏事故。

Description

电力系统电压调节器参数整定方法
技术领域
本发明涉及电力系统中的参数整定,具体地说是一种电力系统电压调节器参数整定方法。
背景技术
目前,发电机励磁调节器都是以控制发电机机端电压为目标,在电网故障需要更多无功功率以提高系统电压稳定性方面存在不足。若引入系统电压(如发电机主变高压侧电压)参与发电机励磁调节器的控制,以控制发电机机端外某一点(如高压母线或升压变压器某一内点)的电压为目标,可以补偿发电机升压变压器的电抗使发电厂高压侧母线电压(又称系统电压)维持在较高水平,增大发电机输出的无功功率极限值,达到提高电力系统电压稳定性的目的。
发明内容
本发明所要解决的技术问题是克服上述现有技术存在的问题,提供一种电力系统电压调节器参数整定方法,其将系统电压通过电压调节器参与发电机励磁调节器的控制,以达到提高电力系统电压稳定性的目的。
为此,本发明采用如下的技术方案:电力系统电压调节器参数整定方法,其特征在于所述的电压调节器由系统电压测量单元、系统电压给定单元、综合比较单元、超前滞后放大单元、输出限幅单元和投入退出控制单元组成,通过系统电压测量单元获得系统电压Us,通过系统电压给定单元获得的系统电压给定值Usgd,通过综合比较单元将系统电压Us与系统电压给定值Usgd作比较,得到电压差Usgd-Us,该电压差Usgd-Us经超前滞后放大单元后得到输出信号,再经输出限幅单元后输出限幅结果Upsvr,最后经投入退出控制单元后输出限幅结果Upsvr至励磁调节器控制励磁电流,使系统电压维持在稳定运行范围,系统电压通过电压调节器参与发电机励磁控制,用来提高系统电压的稳定性,电压调节器(以下简称PSVR)参数整定的内容如下:
1)相位补偿时间常数的整定
分别以发电机机端电压和系统电压(发电机主变高压侧母线电压)作为反馈测量对于PSS输出信号的频率响应特性,测量在有、无PSVR情况下励磁系统滞后特性,
通过调整PSVR和电力系统稳压器(简称PSS)相位补偿,使发电机振荡频率的力矩向量滞后Δω轴在0°~30°之间;在0.3~2.0Hz频率的力矩向量滞后Δω轴在超前20°~滞后45°之间;当有低于0.2Hz频率要求时,最大的超前角不得大于40°,同时PSVR投入或退出前后不应引起阻尼力矩明显削弱而导致阻尼比大幅减少;
2)放大倍数KPSVR的整定
在负载额定工况下,投入PSVR,逐渐增大KPSVR,当KPSVR接近临界放大倍数时,PSVR输出信号电压将发生持续振荡,PSVR放大倍数可取临界放大倍数的1/4~1/7;
3)输出限幅值的整定
电压调节器输出限幅值的范围为±0.05p.u.~±0.10p.u.。
本发明的PSVR参数整定是否恰当可以采用以下二种方法进行验证:
1)通过负载电压阶跃响应法来验证PSVR参数(包括放大倍数和相位补偿时间常数)整定是否恰当。
2)进行无功冲击和切除无功试验,在PSVR投入或退出情况下,观察发电机机端电压、无功功率和系统电压对扰动的响应,验证PSVR参数(包括放大倍数和相位补偿时间常数)整定是否恰当。
本发明用安全有效的方法完成电力系统电压调节器相位补偿时间常数、放大倍数和输出限幅值等参数的整定,充分发挥发电机的潜在无功功率,提高系统电压稳定性,提高电网电压质量,减少事故引发的稳定性破坏事故;并显著增加远距离输电系统的输电功率,提高电力系统静态稳定极限。
下面结合说明书附图和具体实施方式对本发明作进一步说明。
附图说明
图1为本发明含有电力系统电压调节器的励磁调节器数学模型图(上面的虚线框内表示电压调节器的模型,下面的虚线框内表示励磁调节器的模型)。
图2为本发明电压调节器的原理图。
图3为PSVR退出时机组无功功率响应曲线。
图4为PSVR投入时机组无功功率响应曲线。
图5为PSVR退出时机组系统电压(Us)响应曲线。
图6为PSVR投入时机组系统电压(Us)响应曲线。
图中,Ug-发电机电压,Ugd-发电机机端电压给定值,Us-系统电压,Usgd-系统电压给定值,UUEL-低励限制输出,V/Hz_out为V/Hz限制输出,Utc-调差环节输出,Utest-阶跃试验输入,USS-电力系统稳定器输出,UOEL-过励限制输出,UPSVR-电力系统电压调节器输出,Kavr-自动方式控制放大倍数,KPSVR-电力系统电压调节器放大倍数。S为复频变量,Ts1、Ts2、Ts3为电力系统电压调节器相位补偿时间常数,TA1、TA2、TA3、TA4为励磁调节器超前滞后时间常数。
具体实施方式
如图1-2所示,所述的电压调节器由系统电压测量单元1、系统电压给定单元2、综合比较单元3、超前滞后放大单元4、输出限幅单元5和投入退出控制单元6组成,通过系统电压测量单元获得系统电压Us,通过系统电压给定单元获得的系统电压给定值Usgd,通过综合比较单元将系统电压Us与系统电压给定值Usgd作比较,得到电压差Usgd-Us,该电压差Usgd-Us经超前滞后放大单元后得到输出信号,再经输出限幅单元后输出限幅结果Upsvr,最后经投入退出控制单元后输出限幅结果Upsvr至励磁调节器控制励磁电流,使系统电压维持在稳定运行范围。
电压调节器参数整定的具体内容如下:
1)相位补偿时间常数的整定
分别在有、无电压调节器情况下测量励磁控制系统的无补偿频率特性,无补偿频率特性为无PSS时励磁调节产生的力矩分量Te2对于PSS输出信号Us的频率响应特性ΔTe2/ΔUs,工程上常用机端电压Ut代替力矩分量Te2,即用ΔUt/ΔUs来表述。ΔUs为在PSS输出信号嵌入点加入的激励信号。
通过调整电压调节器和电力系统稳定器相位补偿参数,使发电机振荡频率的力矩向量滞后Δω轴在0°~30°之间;在0.3~2.0Hz频率的力矩向量滞后Δω轴在超前20°~滞后45°之间;当有低于0.2Hz频率要求时,最大的超前角不得大于40°,同时电压调节器投入或退出前后不应引起阻尼力矩明显削弱而导致阻尼比大幅减少;
2)放大倍数KPSVR的整定
在负载额定工况下,投入电压调节器,逐渐增大KPSVR,当KPSVR接近临界放大倍数时,电压调节器输出信号电压将发生持续振荡,电压调节器放大倍数取临界放大倍数的1/4~1/7;
3)输出限幅值的整定
电压调节器输出限幅值的范围为±0.05p.u.~±0.10p.u.。
图3~图6分别为系统电压变化0.2%情况下,PSVR退出与投入情况下机组无功功率和系统电压响应曲线,从图3和图4可知PSVR投入后#3~#6机组无功功率比PSVR退出情况下大幅减少,从图5和图6可知PSVR投入后系统电压更稳定。

Claims (2)

1.电力系统电压调节器参数整定方法,其特征在于所述的电压调节器由系统电压测量单元、系统电压给定单元、综合比较单元、超前滞后放大单元、输出限幅单元和投入退出控制单元组成,通过系统电压测量单元获得系统电压Us,通过系统电压给定单元获得的系统电压给定值Usgd,通过综合比较单元将系统电压Us与系统电压给定值Usgd作比较,得到电压差Usgd-Us,该电压差Usgd-Us经超前滞后放大单元后得到输出信号,再经输出限幅单元后输出限幅结果Upsvr,最后经投入退出控制单元后输出限幅结果Upsvr至励磁调节器控制励磁电流,使系统电压维持在稳定运行范围,电压调节器参数整定的内容如下:
1)相位补偿时间常数的整定
在有、无电压调节器情况下测量励磁调节器的滞后特性,
通过调整电压调节器和电力系统稳定器相位补偿,使发电机振荡频率的力矩向量滞后Δω轴在0°~30°之间;在0.3~2.0Hz频率的力矩向量滞后Δω轴在超前20°~滞后45°之间;当有低于0.2Hz频率要求时,最大的超前角≤40°,同时电压调节器投入或退出前后不应引起阻尼力矩明显削弱而导致阻尼比大幅减少;
2)放大倍数KPSVR的整定
在负载额定工况下,投入电压调节器,逐渐增大KPSVR,当KPSVR接近临界放大倍数,电压调节器输出信号电压发生持续振荡时,电压调节器放大倍数取临界放大倍数的1/4~1/7;
3)输出限幅值的整定
电压调节器输出限幅值的范围为±0.05p.u.~±0.10p.u.。
2.根据权利要求1所述的电力系统电压调节器参数整定方法,其特征在于通过负载电压阶跃响应法或进行无功冲击和切除无功试验方法,在电压调节器投入或退出情况下,观察发电机机端电压、无功功率和系统电压对扰动的响应,验证电压调节器参数整定是否恰当。
CN 201110256675 2011-09-01 2011-09-01 电力系统电压调节器参数整定方法 Active CN102355190B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110256675 CN102355190B (zh) 2011-09-01 2011-09-01 电力系统电压调节器参数整定方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110256675 CN102355190B (zh) 2011-09-01 2011-09-01 电力系统电压调节器参数整定方法

Publications (2)

Publication Number Publication Date
CN102355190A true CN102355190A (zh) 2012-02-15
CN102355190B CN102355190B (zh) 2013-03-13

Family

ID=45578709

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110256675 Active CN102355190B (zh) 2011-09-01 2011-09-01 电力系统电压调节器参数整定方法

Country Status (1)

Country Link
CN (1) CN102355190B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102857168A (zh) * 2012-09-21 2013-01-02 上海艾都能源科技有限公司 可连续调压的发电机
CN109390952A (zh) * 2018-11-08 2019-02-26 中国电力科学研究院有限公司 一种风电机组广域快速电压控制器及控制方法
CN110138295A (zh) * 2019-04-29 2019-08-16 中国电力科学研究院有限公司 一种测量自并励励磁系统电压控制环静态放大倍数的方法及系统
CN111585276A (zh) * 2020-05-18 2020-08-25 国网重庆市电力公司电力科学研究院 一种pss参数在线整定方法、装置及可读存储介质

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1080198A (ja) * 1996-09-06 1998-03-24 Hitachi Ltd 発電機励磁制御装置
US5977731A (en) * 1998-07-31 1999-11-02 Mitsubishi Denki Kabushiki Kaisha Power system stabilizer and power system stabilization method
CN101447670A (zh) * 2008-05-27 2009-06-03 中国电力科学研究院 一种电力系统稳定器参数整定算法
CN102157933A (zh) * 2011-03-02 2011-08-17 华北电力大学 一种电力系统稳定器设计方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1080198A (ja) * 1996-09-06 1998-03-24 Hitachi Ltd 発電機励磁制御装置
US5977731A (en) * 1998-07-31 1999-11-02 Mitsubishi Denki Kabushiki Kaisha Power system stabilizer and power system stabilization method
CN101447670A (zh) * 2008-05-27 2009-06-03 中国电力科学研究院 一种电力系统稳定器参数整定算法
CN102157933A (zh) * 2011-03-02 2011-08-17 华北电力大学 一种电力系统稳定器设计方法

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
刘杨名等: "《电力系统稳定器调参现状与研究》", 《华东电力》 *
李基成: "《电力系统电压调节器PSVR》", 《水电厂自动化》 *
王芳: "《洪江水电厂电力系统稳定器(PSS)的电厂试验及投入运行》", 《大电机技术》 *
赵斌等: "《机组PSS参数整定及其抑制系统低频振荡的效果》", 《云南水力发电》 *
陈新琪等: "《电力系统电压调节器参数整定》", 《中国电力》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102857168A (zh) * 2012-09-21 2013-01-02 上海艾都能源科技有限公司 可连续调压的发电机
CN109390952A (zh) * 2018-11-08 2019-02-26 中国电力科学研究院有限公司 一种风电机组广域快速电压控制器及控制方法
CN109390952B (zh) * 2018-11-08 2023-02-07 中国电力科学研究院有限公司 一种风电机组广域快速电压控制器及控制方法
CN110138295A (zh) * 2019-04-29 2019-08-16 中国电力科学研究院有限公司 一种测量自并励励磁系统电压控制环静态放大倍数的方法及系统
CN111585276A (zh) * 2020-05-18 2020-08-25 国网重庆市电力公司电力科学研究院 一种pss参数在线整定方法、装置及可读存储介质
CN111585276B (zh) * 2020-05-18 2021-08-17 国网重庆市电力公司电力科学研究院 一种pss参数在线整定方法、装置及可读存储介质

Also Published As

Publication number Publication date
CN102355190B (zh) 2013-03-13

Similar Documents

Publication Publication Date Title
DK178459B1 (en) System og fremgangsmåde til spændingsstyring af vindgeneratorer
AU2013289385B2 (en) Method for controlling an electric generator
KR101423212B1 (ko) 풍력발전단지의 계통연계점 전압 제어 시스템 및 방법
EP2267306B1 (en) Current control in a wind park
JP6181177B2 (ja) ウインドパークを制御する方法
US8401712B2 (en) Method for controlling distributed power sources
US9371821B2 (en) Voltage control for wind turbine generators
KR101727087B1 (ko) 이종 발전 장치 간의 병렬 운전 제어 방법 및 제어 시스템
CN102355190B (zh) 电力系统电压调节器参数整定方法
KR20120083848A (ko) 풍력 발전 설비의 출력 제어 방법 및 출력 제어 장치
KR102264862B1 (ko) 에너지 저장장치의 관성제어를 위한 장치 및 방법
US11515711B2 (en) Grid interconnection device and server
US20190055926A1 (en) Method and windfarm control stage for controlling a windfarm
CN110867821A (zh) 一种快速动态响应同步调相机保护整定计算模型
US20150014992A1 (en) Operating wind turbines as damping loads
US11990754B2 (en) Power-system stabilization system and power-system stabilization method
WO2006030183A1 (en) Control of a doubly-fed induction generator
CN102280887B (zh) 电力系统电压调节器投入退出方法
US20230417220A1 (en) Methods and systems for improving grid stability
CN108199382B (zh) 基于动态无功约束的双馈风电场风速波动紧急控制方法
Geis-Schroer et al. Modeling and analysis of weak grid considering phase locked loop and synchronous condenser effect on grid stability
CN109713664B (zh) 直流孤岛频率稳定的网源协调控制策略计算方法及系统
CN110011352B (zh) 一种含有新能源并网的电压跌落控制方法
Chen et al. STATCOM control for integration of wind farm to the weak grid
CN107171331B (zh) 一种基于逆变器等效阻抗的电压动态补偿方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: ZHEJIANG ELECTRIC POWER TESTING + RESEARCH INSTITU

Free format text: FORMER OWNER: ZHEJIANG ELECTRIC POWER TESTING + RESEARCH INSTITUTE TECHNOLOGY SERVICE CENTER

Effective date: 20121101

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: The eight district of Hangzhou city in Zhejiang province 310014 Huadian Zhaohui under No. 1 Lane

Applicant after: Electric Power Research Institute of Zhejiang electric power company

Applicant after: ZHEJIANG ELECTRIC POWER TEST AND Research Institute TECHNICAL SERVICE CENTER

Address before: The eight district of Hangzhou city in Zhejiang province 310014 Huadian Zhaohui under No. 1 Lane

Applicant before: ZHEJIANG ELECTRIC POWER TEST AND Research Institute

Applicant before: ZHEJIANG ELECTRIC POWER TEST AND Research Institute TECHNICAL SERVICE CENTER

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: ZHEJIANG ELECTRIC POWER TEST AND RESEARCH INSITITUTE TO: ZHEJIANG ELECTRIC POWER RESEARCH INSTITUTE OF ZHEJIANG ELECTRIC POWER CORPORATION

TA01 Transfer of patent application right

Effective date of registration: 20121101

Address after: The eight district of Hangzhou city in Zhejiang province 310014 Huadian Zhaohui under No. 1 Lane

Applicant after: Electric Power Research Institute of Zhejiang electric power company

Applicant after: ZHEJIANG ELECTRIC POWER TEST AND Research Institute TECHNICAL SERVICE CENTER

Applicant after: State Grid Corporation of China

Address before: The eight district of Hangzhou city in Zhejiang province 310014 Huadian Zhaohui under No. 1 Lane

Applicant before: Electric Power Research Institute of Zhejiang electric power company

Applicant before: ZHEJIANG ELECTRIC POWER TEST AND Research Institute TECHNICAL SERVICE CENTER

C14 Grant of patent or utility model
GR01 Patent grant