CN102347613A - Method for automatically selecting on-line strategy and off-line strategy of transient security and stability emergency control of electrical power system - Google Patents
Method for automatically selecting on-line strategy and off-line strategy of transient security and stability emergency control of electrical power system Download PDFInfo
- Publication number
- CN102347613A CN102347613A CN2011102799477A CN201110279947A CN102347613A CN 102347613 A CN102347613 A CN 102347613A CN 2011102799477 A CN2011102799477 A CN 2011102799477A CN 201110279947 A CN201110279947 A CN 201110279947A CN 102347613 A CN102347613 A CN 102347613A
- Authority
- CN
- China
- Prior art keywords
- line
- control strategy
- strategy
- transient
- security
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110279947.7A CN102347613B (en) | 2011-09-21 | 2011-09-21 | Method for automatically selecting on-line strategy and off-line strategy of transient security and stability emergency control of electrical power system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110279947.7A CN102347613B (en) | 2011-09-21 | 2011-09-21 | Method for automatically selecting on-line strategy and off-line strategy of transient security and stability emergency control of electrical power system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102347613A true CN102347613A (en) | 2012-02-08 |
CN102347613B CN102347613B (en) | 2015-05-13 |
Family
ID=45545990
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110279947.7A Active CN102347613B (en) | 2011-09-21 | 2011-09-21 | Method for automatically selecting on-line strategy and off-line strategy of transient security and stability emergency control of electrical power system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102347613B (en) |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102638040A (en) * | 2012-04-16 | 2012-08-15 | 中国南方电网有限责任公司 | Online setting method of safety and stability emergency control fixed value of electric power system |
CN102664463A (en) * | 2012-05-16 | 2012-09-12 | 北京四方继保自动化股份有限公司 | Realization method for online control strategies of security control device with self-adaption running modes |
CN102662663A (en) * | 2012-03-28 | 2012-09-12 | 国网电力科学研究院 | Realization method for configurable decision software of stability control device |
CN102664464A (en) * | 2012-05-16 | 2012-09-12 | 北京四方继保自动化股份有限公司 | On-line control strategy switching method for security control device by using strategy effective conditions |
CN104809512A (en) * | 2014-12-18 | 2015-07-29 | 国电南瑞科技股份有限公司 | Rapid assessment method for performance indexes of different emergency control measures in electric power system |
CN105098763A (en) * | 2014-05-16 | 2015-11-25 | 国家电网公司 | Transient voltage stable on-line assessment method based on WAMS and EMS |
CN105141029A (en) * | 2015-06-19 | 2015-12-09 | 国电南瑞科技股份有限公司 | Power system security and stability adaptive emergency control system and method |
CN105139075A (en) * | 2015-05-04 | 2015-12-09 | 国电南瑞科技股份有限公司 | Electric power system safety stabilization prevention control rolling decision method in consideration of real-time plan |
CN106100918A (en) * | 2016-08-30 | 2016-11-09 | 国网山东省电力公司滨州供电公司 | A kind of substation data based on EMS system does not refresh detection method |
CN107069699A (en) * | 2016-11-23 | 2017-08-18 | 国电南瑞科技股份有限公司 | A kind of optimal emergency control policy method for fast searching of power system |
CN107342588A (en) * | 2017-07-18 | 2017-11-10 | 国电南瑞科技股份有限公司 | The adaptive emergency control method of mains frequency of meter and transmission cross-section limit |
CN107832915A (en) * | 2017-10-12 | 2018-03-23 | 国网安徽省电力公司 | A kind of E formatted file automatic generation methods of stability control strategy |
CN106033888B (en) * | 2015-03-19 | 2018-10-09 | 国家电网公司 | Alternating current circuit failure based on prompt drop DC sensitivities pacifies control amount online evaluation method |
CN112039074A (en) * | 2020-09-25 | 2020-12-04 | 贵州电网有限责任公司 | Online safety and stability emergency control strategy mode word generation method |
CN114156934A (en) * | 2021-11-04 | 2022-03-08 | 云南电网有限责任公司 | Wind-water coordination active real-time control method based on online dynamic quota adjustment |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3677668B2 (en) * | 1997-12-12 | 2005-08-03 | 株式会社日立製作所 | Power system stabilization system and power system stability monitoring system |
JP2007189840A (en) * | 2006-01-13 | 2007-07-26 | Toshiba Corp | Power system stabilizing apparatus |
CN101299533A (en) * | 2007-11-08 | 2008-11-05 | 国网南京自动化研究院 | Reliability design method for large electric network safety steady cooperativeness defensive system |
CN101299539A (en) * | 2007-11-08 | 2008-11-05 | 国网南京自动化研究院 | Large electric network on-line preventing control method based on static state and transient safety steady mode |
CN101807798A (en) * | 2010-04-20 | 2010-08-18 | 国网电力科学研究院 | Section data integration method for power system safety and stability online analysis |
-
2011
- 2011-09-21 CN CN201110279947.7A patent/CN102347613B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3677668B2 (en) * | 1997-12-12 | 2005-08-03 | 株式会社日立製作所 | Power system stabilization system and power system stability monitoring system |
JP2007189840A (en) * | 2006-01-13 | 2007-07-26 | Toshiba Corp | Power system stabilizing apparatus |
CN101299533A (en) * | 2007-11-08 | 2008-11-05 | 国网南京自动化研究院 | Reliability design method for large electric network safety steady cooperativeness defensive system |
CN101299539A (en) * | 2007-11-08 | 2008-11-05 | 国网南京自动化研究院 | Large electric network on-line preventing control method based on static state and transient safety steady mode |
CN101807798A (en) * | 2010-04-20 | 2010-08-18 | 国网电力科学研究院 | Section data integration method for power system safety and stability online analysis |
Non-Patent Citations (2)
Title |
---|
周良松等: "电力系统暂态稳定控制策略表的应用研究", 《电网技术》 * |
薛禹胜等: "暂态电压稳定性及电压跌落可接受性", 《电力系统自动化》 * |
Cited By (26)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102662663A (en) * | 2012-03-28 | 2012-09-12 | 国网电力科学研究院 | Realization method for configurable decision software of stability control device |
CN102638040B (en) * | 2012-04-16 | 2014-07-02 | 中国南方电网有限责任公司 | Online setting method of safety and stability emergency control fixed value of electric power system |
CN102638040A (en) * | 2012-04-16 | 2012-08-15 | 中国南方电网有限责任公司 | Online setting method of safety and stability emergency control fixed value of electric power system |
CN102664463A (en) * | 2012-05-16 | 2012-09-12 | 北京四方继保自动化股份有限公司 | Realization method for online control strategies of security control device with self-adaption running modes |
CN102664464A (en) * | 2012-05-16 | 2012-09-12 | 北京四方继保自动化股份有限公司 | On-line control strategy switching method for security control device by using strategy effective conditions |
CN102664464B (en) * | 2012-05-16 | 2014-09-17 | 北京四方继保自动化股份有限公司 | On-line control strategy switching method for security control device by using strategy effective conditions |
CN102664463B (en) * | 2012-05-16 | 2015-02-25 | 北京四方继保自动化股份有限公司 | Realization method for online control strategies of security control device with self-adaption running modes |
CN105098763B (en) * | 2014-05-16 | 2018-01-19 | 国家电网公司 | A kind of Transient Voltage Stability online evaluation method based on WAMS and EMS |
CN105098763A (en) * | 2014-05-16 | 2015-11-25 | 国家电网公司 | Transient voltage stable on-line assessment method based on WAMS and EMS |
CN104809512A (en) * | 2014-12-18 | 2015-07-29 | 国电南瑞科技股份有限公司 | Rapid assessment method for performance indexes of different emergency control measures in electric power system |
CN106033888B (en) * | 2015-03-19 | 2018-10-09 | 国家电网公司 | Alternating current circuit failure based on prompt drop DC sensitivities pacifies control amount online evaluation method |
CN105139075B (en) * | 2015-05-04 | 2019-07-05 | 国电南瑞科技股份有限公司 | Consider that the power system security planned in real time stablizes prevention and control Rolling decision method |
CN105139075A (en) * | 2015-05-04 | 2015-12-09 | 国电南瑞科技股份有限公司 | Electric power system safety stabilization prevention control rolling decision method in consideration of real-time plan |
WO2016201840A1 (en) * | 2015-06-19 | 2016-12-22 | 国电南瑞科技股份有限公司 | Security and stability adaptive emergency control system and method for power system |
CN105141029A (en) * | 2015-06-19 | 2015-12-09 | 国电南瑞科技股份有限公司 | Power system security and stability adaptive emergency control system and method |
CN106100918A (en) * | 2016-08-30 | 2016-11-09 | 国网山东省电力公司滨州供电公司 | A kind of substation data based on EMS system does not refresh detection method |
CN107069699A (en) * | 2016-11-23 | 2017-08-18 | 国电南瑞科技股份有限公司 | A kind of optimal emergency control policy method for fast searching of power system |
CN107069699B (en) * | 2016-11-23 | 2020-05-19 | 国电南瑞科技股份有限公司 | Rapid search method for optimal emergency control strategy of power system |
CN107342588A (en) * | 2017-07-18 | 2017-11-10 | 国电南瑞科技股份有限公司 | The adaptive emergency control method of mains frequency of meter and transmission cross-section limit |
CN107342588B (en) * | 2017-07-18 | 2020-05-19 | 国电南瑞科技股份有限公司 | Power grid frequency self-adaptive emergency control method considering power transmission section quota |
CN107832915A (en) * | 2017-10-12 | 2018-03-23 | 国网安徽省电力公司 | A kind of E formatted file automatic generation methods of stability control strategy |
CN107832915B (en) * | 2017-10-12 | 2021-06-11 | 国网安徽省电力公司 | E-format file automatic generation method of stability control strategy |
CN112039074A (en) * | 2020-09-25 | 2020-12-04 | 贵州电网有限责任公司 | Online safety and stability emergency control strategy mode word generation method |
CN112039074B (en) * | 2020-09-25 | 2022-01-18 | 贵州电网有限责任公司 | Online safety and stability emergency control strategy mode word generation method |
CN114156934A (en) * | 2021-11-04 | 2022-03-08 | 云南电网有限责任公司 | Wind-water coordination active real-time control method based on online dynamic quota adjustment |
CN114156934B (en) * | 2021-11-04 | 2024-01-26 | 云南电网有限责任公司 | Wind-water coordination active real-time control method based on online dynamic quota adjustment |
Also Published As
Publication number | Publication date |
---|---|
CN102347613B (en) | 2015-05-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102347613A (en) | Method for automatically selecting on-line strategy and off-line strategy of transient security and stability emergency control of electrical power system | |
CN105656024B (en) | Electric power system operation standby margin of safety online evaluation method | |
CN101557110B (en) | On-line analysis and aid decision making method for low-frequency oscillation of electric power system | |
CN102324743B (en) | Screening method for expected fault in online transient safety and stability assessment of power system | |
CN104678264B (en) | The online Insulation monitoring of AUV DC power-supply systems and fault treating apparatus and method | |
CN102638041B (en) | Method forquickly checking safety and stability of scheduling operation of power system on line | |
CN106549425B (en) | A kind of failure isolated island fast control method containing flexible direct current | |
CN103514364B (en) | The grid equipment overload aid decision computational methods of meter and load transfer measure | |
CN103107544B (en) | On-line pre-deciding method for offshore oilfield group power grid emergency control | |
CN105207196B (en) | A kind of power grid critical circuits discrimination method based on effective power flow betweenness | |
CN106099906B (en) | A kind of power system security stablizes online integrated campaign method | |
CN104112076B (en) | Operation risk assessment method and assessment system based on fuzzy mathematics | |
CN101419267A (en) | Electric network fault on-line rapid diagnosis and analysis method | |
CN101969202A (en) | Method for recognizing transmission section power limit interval of power system transient stability | |
CN107732906B (en) | Cutter cutting control method for dynamically tracking transient power angle weak stability mode | |
JP6047425B2 (en) | Isolated operation detection device and isolated operation detection method | |
CN103577698B (en) | A kind of on-Line Voltage stabilizing determination method of alternating current-direct current combined hybrid system | |
CN102185291B (en) | Island detection method and island detection system | |
CN108599225A (en) | A kind of commutation failure forecast Control Algorithm and its device based on direct current tolerance | |
CN108037387A (en) | The equipment fault analysis method and device collected based on cluster | |
Voropai et al. | A suite of intelligent tools for early detection and prevention of blackouts in power interconnections | |
CN105139075B (en) | Consider that the power system security planned in real time stablizes prevention and control Rolling decision method | |
Zhang et al. | Detection and isolation of sensor faults of wind turbines using sliding mode observers | |
CN206673564U (en) | A kind of pump-storage generator accident standby trip protection device | |
RU2530836C2 (en) | Automated distributed control for electrical devices capable to regulate their longitudinal resistance in order to unload components of power pool system in case of their overloading |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
ASS | Succession or assignment of patent right |
Owner name: NANJING NARI CO., LTD. Free format text: FORMER OWNER: STATE GRID ELECTRIC POWER RESEARCH INSITITUTE Effective date: 20130312 Free format text: FORMER OWNER: NANJING NARI CO., LTD. Effective date: 20130312 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20130312 Address after: Nan Shui Road Gulou District of Nanjing city of Jiangsu Province, No. 8 210003 Applicant after: Nanjing Nari Co., Ltd. Address before: Nan Shui Road Gulou District of Nanjing city of Jiangsu Province, No. 8 210003 Applicant before: State Grid Electric Power Research Insititute Applicant before: Nanjing Nari Co., Ltd. |
|
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: NARI TECHNOLOGY DEVELOPMENT CO., LTD. Free format text: FORMER OWNER: NANJING NARI CO., LTD. Effective date: 20131225 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 210003 NANJING, JIANGSU PROVINCE TO: 210061 NANJING, JIANGSU PROVINCE |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20131225 Address after: 210061 D10, Nanjing high tech Industrial Development Zone, Jiangsu, China Applicant after: NARI Technology Development Co., Ltd. Address before: Nan Shui Road Gulou District of Nanjing city of Jiangsu Province, No. 8 210003 Applicant before: Nanjing Nari Co., Ltd. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |