CN102344021B - Method for manufacturing titanium sponge packing barrel body - Google Patents

Method for manufacturing titanium sponge packing barrel body Download PDF

Info

Publication number
CN102344021B
CN102344021B CN 201010240792 CN201010240792A CN102344021B CN 102344021 B CN102344021 B CN 102344021B CN 201010240792 CN201010240792 CN 201010240792 CN 201010240792 A CN201010240792 A CN 201010240792A CN 102344021 B CN102344021 B CN 102344021B
Authority
CN
China
Prior art keywords
barrel body
titanium sponge
ladle body
machine
steel plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201010240792
Other languages
Chinese (zh)
Other versions
CN102344021A (en
Inventor
欧宝成
马骀
周渤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENYANG BOYU TECHNOLOGY CO., LTD.
Original Assignee
Shenyang Aluminum and Magnesium Engineering and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Aluminum and Magnesium Engineering and Research Institute Co Ltd filed Critical Shenyang Aluminum and Magnesium Engineering and Research Institute Co Ltd
Priority to CN 201010240792 priority Critical patent/CN102344021B/en
Publication of CN102344021A publication Critical patent/CN102344021A/en
Application granted granted Critical
Publication of CN102344021B publication Critical patent/CN102344021B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Application Of Or Painting With Fluid Materials (AREA)

Abstract

The invention discloses a method for manufacturing a titanium sponge packing barrel body, and particularly relates to a method for manufacturing the titanium sponge packing barrel body during production of large-scale titanium sponge. The method comprises the following steps of: placing a steel strip coil for manufacturing a barrel on an uncoiling machine and uncoiling, leveling by a leveler, and shearing by a shearing machine to obtain a steel plate in accordance with the specification; allowing the steel plate to pass through a rolling machine and coiling the steel plate to obtain a round barrel with the specified size, and welding by using a spot welder, and a seam welder; processing the barrel body, and detecting sealing performance of the barrel body by a leakage detection machine; and allowing the barrel body which meets the requirement to pass through a degreasing and phosphorization line and a washing and drying channel to wash and dry, allowing the barrel body to pass through a barrel body paint spraying chamber to spray paint, allowing the barrel body to pass through a paint spraying drying line to dry and allowing the barrel body to pass through a cold air section to cool, and then unloading from the line to finish the process. The method can improve labor productivity by 30 percent, guarantee product quality, improve transportation efficiency between processes, save labor power, solve the problem of environment-friendliness and emission, and meet the environment-friendly requirement of a factory building area.

Description

Method for manufacturing titanium sponge packing barrel body
Technical field
The present invention relates to a kind of packing barrel ladle body method for making, relate in particular to the method for manufacturing titanium sponge packing barrel body of using in a kind of large sponge titanium production.
Background technology
Loading barrel packaging is last procedure that titanium sponge is produced, and the titanium sponge that is about to produce is packed in the special packing barrel, and seals up for safekeeping vacuumizing rear injection argon gas in the bucket.Because titanium sponge manufacturing enterprise scale was less in the past, titanium sponge is mainly supplied the home market, the main 100L titanium sponge packing barrel that adopts of its packing.Along with the production-scale continuous expansion of titanium sponge, and the needs of outlet world market, for ease of the transportation of freight container, now a lot of enterprises have all selected 200L titanium sponge packing barrel.
The manufacturing scale of titanium sponge packing barrel was unit in the past, small batch production, along with the production-scale continuous expansion of titanium sponge manufacturing enterprise, the demand of packing barrel is also in continuous expansion, packing barrel need to carry out zinc-plated processing in the past simultaneously, but pay close attention to today of environmental protection the whole people, particularly will found the factory in the very tight area of some environmental demandss, zincincation is strictly forbidden.Therefore adopt titanium sponge packing barrel manufacture craft efficient, environmental protection, the needs of producing in order to satisfy titanium sponge become a kind of inevitable trend.
Summary of the invention
The invention provides a kind of method for manufacturing titanium sponge packing barrel body in order to solve the problems of the technologies described above, purpose is: the conveying efficiency that improves inter process, save manpower, adopt simultaneously ladle body lacquer spraying technique replacement zincincation in the past, solve because environment protection emission is not up to standard the technical matters that can not found the factory in the strict area of some environmental demandss.
For reaching above-mentioned purpose method for manufacturing titanium sponge packing barrel body of the present invention, comprise the steps: first tubbing to be placed on uncoiling on the decoiling unit with steel coil strip, by the leveler leveling, cut into steel plate up to specification through shears; Then steel plate is passed through spheronizator, it is rolled into the cylinder that meets size, weld by point welder, seam welding machine again; By pulling limit rise muscle machine, undulator, folding-and-seaming press processing ladle body, and by testing leakage machine its leak tightness is tested; Next with satisfactory ladle body through the defatting-bonderizing line with clean drying tunnel and carry out cleaning, drying, and by processings of spraying paint of ladle body paint spray booth, through the drying line oven dry of spraying paint, finally by the cold wind section roll off the production line after ladle body is cooled off and finish.
Described shears cuts into steel plate buttress up to specification on sheet piler platform.
Described ladle body after cleaning drying tunnel to carry out cleaning, drying through delivering to the ladle body paint spray booth after the positioning machine upset.
Described process is sprayed paint and through the cold wind section ladle body is carried out cooling processing after drying line is dried.
The invention has the beneficial effects as follows: solved the in the past drawback of single machine production, can improve 30% labor efficiency, guaranteed product design, improved the conveying efficiency of inter process, saved manpower; Solve the environment protection emission problem, satisfy the environmental demands in the area of founding the factory.
Description of drawings
Fig. 1 is flow scheme of the present invention.
The specific embodiment
The below is described in detail by reference to the accompanying drawings to embodiments of the invention, but protection scope of the present invention is not limit by embodiment.
As shown in Figure 1,200L method for manufacturing titanium sponge packing barrel body of the present invention comprises the steps: first tubbing to be placed on uncoiling on the decoiling unit with steel coil strip, by the leveler leveling, cuts into steel plate up to specification through shears; Shears cuts into steel plate buttress up to specification on sheet piler platform, then steel plate is passed through spheronizator, and it is rolled into the cylinder that meets size, welds by point welder, seam welding machine again; By pulling limit rise muscle machine, undulator, folding-and-seaming press processing ladle body, and by testing leakage machine its leak tightness is tested; Next satisfactory ladle body is carried out cleaning, drying through defatting-bonderizing line and cleaning drying tunnel, ladle body after cleaning drying tunnel to carry out cleaning, drying through delivering to the ladle body paint spray booth after the positioning machine upset, and by the processing of spraying paint of ladle body paint spray booth, through the drying line oven dry of spraying paint, finish finally by crossing to roll off the production line after the cold wind section is cooled off ladle body.
Undulator among the present invention is W muscle machine.
Being slideway between decoiling unit of the present invention, leveler, shears, sheet piler platform, spheronizator, point welder, the seam welding machine connects; Pull the limit rise muscle machine, undulator, folding-and-seaming press, test leakage machine, defatting-bonderizing line, clean between drying tunnel, ladle body paint spray booth, the drying line that sprays paint, the cold wind section and be equipped with conveyer chain.Can adjust the speed of conveyer chain, in order to the frequency of operation of its delivery speed and unit is complementary.Select efficient spheronizator, pull limit rise muscle machine, W muscle machine, folding-and-seaming press and test leakage the equipment such as machine, to improve productive capacity, select simultaneously the ladle body spray painting equipment, to solve packing barrel corrosion problem.

Claims (2)

1. method for manufacturing titanium sponge packing barrel body is characterized in that comprising the steps: first tubbing being placed on uncoiling on the decoiling unit with steel coil strip, by the leveler leveling, cuts into steel plate up to specification through shears; Then steel plate is passed through spheronizator, it is rolled into the cylinder that meets size, weld by point welder, seam welding machine again; By pulling limit rise muscle machine, undulator, folding-and-seaming press processing ladle body, and by testing leakage machine its leak tightness is tested; Next with satisfactory ladle body through the defatting-bonderizing line with clean drying tunnel and carry out cleaning, drying, and by processings of spraying paint of ladle body paint spray booth, through the drying line oven dry of spraying paint, finally by the cold wind section roll off the production line after ladle body is cooled off and finish.
2. method for manufacturing titanium sponge packing barrel body according to claim 1 is characterized in that described shears cuts into steel plate buttress up to specification on sheet piler platform.
3. method for manufacturing titanium sponge packing barrel body according to claim 1 is characterized in that described ladle body delivers to the ladle body paint spray booth after through the positioning machine upset after cleaning drying tunnel to carry out cleaning, drying
CN 201010240792 2010-07-30 2010-07-30 Method for manufacturing titanium sponge packing barrel body Expired - Fee Related CN102344021B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010240792 CN102344021B (en) 2010-07-30 2010-07-30 Method for manufacturing titanium sponge packing barrel body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010240792 CN102344021B (en) 2010-07-30 2010-07-30 Method for manufacturing titanium sponge packing barrel body

Publications (2)

Publication Number Publication Date
CN102344021A CN102344021A (en) 2012-02-08
CN102344021B true CN102344021B (en) 2013-05-01

Family

ID=45543163

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010240792 Expired - Fee Related CN102344021B (en) 2010-07-30 2010-07-30 Method for manufacturing titanium sponge packing barrel body

Country Status (1)

Country Link
CN (1) CN102344021B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103255408A (en) * 2012-02-17 2013-08-21 浙江新安化工集团股份有限公司 Steel barrel surface zirconizing treatment process
CN104191254A (en) * 2014-05-13 2014-12-10 重庆市龙航金属制品有限公司 Semi-automatic production line of steel drum body
CN105083677A (en) * 2015-07-07 2015-11-25 句容市三圆制桶有限公司 20 L-100 L expansion rib non-corrugated type steel barrel and manufacturing process thereof
CN107971759A (en) * 2017-12-27 2018-05-01 太原融合智慧科技有限公司 A kind of method of bottomless automatic production line of steel drum and its bottomless steel drum of production
CN110666522A (en) * 2019-11-12 2020-01-10 东莞市正信激光科技有限公司 Steel band edge rolling welding flanger of duplex position production

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201280280Y (en) * 2008-06-04 2009-07-29 攀枝花钢企恒升包装制品有限公司 Steel drum for packaging titanium sponge

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS564823B2 (en) * 1973-06-12 1981-02-02

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201280280Y (en) * 2008-06-04 2009-07-29 攀枝花钢企恒升包装制品有限公司 Steel drum for packaging titanium sponge

Also Published As

Publication number Publication date
CN102344021A (en) 2012-02-08

Similar Documents

Publication Publication Date Title
CN102344021B (en) Method for manufacturing titanium sponge packing barrel body
CN101249605B (en) Method for continuous producing rust-inhibiting primer coating steel plate
CN101249606B (en) Method and equipment for hot rolled plate colored forming continuous production
CN102351062B (en) Tank body processing method
CN202825218U (en) Processing and production line of shape steel
CN103612074A (en) Method for machining aluminum alloy air tank
CN106031970A (en) Manufacturing method of container
CN101138837A (en) Cold-rolled steel strip acid-free descaling technique and special device thereof
CN101709445A (en) Method for continuously and thermally galvanizing pipe
CN209735847U (en) High efficiency epoxy powder automatic spraying equipment
CN111112026A (en) Horizontal double-electron-beam irradiation curing metal coil coating device and production line
CN105127323A (en) Manufacturing method for environmental-friendly and energy-saving color printed steel drums
CN210360266U (en) Basketball stand production line
CN101767695A (en) Manufacturing method of container
CN101705463A (en) Device for continuously hot dip galvanizing pipe
CN104307716A (en) Aluminum plate electrostatic spraying process
CN211756653U (en) Horizontal double-electron-beam irradiation curing metal coil coating device and production line
CN202047002U (en) Glassware spraying machine
CN102139252A (en) Displacement airless spraying device of low-pressure storage tank
CN106269349B (en) A kind of weld seam spray equipment
CN107538883A (en) A kind of hot equipment for coating film of sheet metal and its processing method
CN104646954A (en) Online continuous plating process
CN217832672U (en) Container top side beam and bottom side beam roller forming device and production line thereof
CN206494960U (en) A kind of hot galvanized steel pipe machining production line
CN105983525A (en) Casting painting process

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SHENYANG BOYU TECHNOLOGY CO., LTD.

Free format text: FORMER OWNER: SHENYANG ALUMINUM + MAGNESIUM ENGINEERING + RESEARCH INSTITUTE CO., LTD.

Effective date: 20141125

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 110001 SHENYANG, LIAONING PROVINCE TO: 110101 SHENYANG, LIAONING PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20141125

Address after: 110101 No. 176-1 Dingxiang street, Sujiatun District, Liaoning, Shenyang

Patentee after: SHENYANG BOYU TECHNOLOGY CO., LTD.

Address before: 110001 Heping Street, Heping District, Liaoning, Shenyang, No. 184

Patentee before: Shenyang Aluminum & Magnesium Engineering & Research Institute Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130501

Termination date: 20200730

CF01 Termination of patent right due to non-payment of annual fee