CN102340813A - Method and device for creating test environment of base station in high-load operation state - Google Patents

Method and device for creating test environment of base station in high-load operation state Download PDF

Info

Publication number
CN102340813A
CN102340813A CN2010102349343A CN201010234934A CN102340813A CN 102340813 A CN102340813 A CN 102340813A CN 2010102349343 A CN2010102349343 A CN 2010102349343A CN 201010234934 A CN201010234934 A CN 201010234934A CN 102340813 A CN102340813 A CN 102340813A
Authority
CN
China
Prior art keywords
base station
tested base
tested
information
sub
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2010102349343A
Other languages
Chinese (zh)
Other versions
CN102340813B (en
Inventor
郭智奇
隆岗
于朝阳
朱书恬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Futian Quantum Technology Co ltd
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN201010234934.3A priority Critical patent/CN102340813B/en
Publication of CN102340813A publication Critical patent/CN102340813A/en
Application granted granted Critical
Publication of CN102340813B publication Critical patent/CN102340813B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention relates to a method and device for creating the test environment of a base station in a high-load operation state; the device comprises a man-machine interaction unit, a message processing unit and a communication unit which are sequentially connected; the method comprises the steps that: after the connection with a tested base station is established, the tested base station is controlled to establish communities on other vacant resources other than the frequency points of a service community by sending a control command to the tested base station, and resources are distributed to the user equipment (UE) which is configured for at least one user in each established community according to the test requirements; parts that the users configure according to the test requirements or the information loaded to the business data of all the UE are sent to the tested base station, and the tested base station loads and bags the specified UE according to the information; and real UE is connected into the tested base station, so as to test the performance indexes of the tested base station. The invention effectively improves the test efficiency, and keeps a high-load state more stable.

Description

Create the method and the device of the test environment of base station under the heavy-duty service state
Technical field
The present invention relates to communication field, be specifically related to a kind of method and device of creating the test environment of base station under the heavy-duty service state.
Background technology
In wireless communication system,, when beginning is arranged net, need carry out the performance test under the high-load condition of base station for guaranteeing the performance index of base station under real network high load capacity situation.Test contents comprises: a series of indexs such as the success rate of subscriber equipment under the high-load condition (User Equipment abbreviates UE as) access network, UE conversation retention time, sub-district handover success rate, base station heavy-duty service stability.The prerequisite of testing is to improve the utilization rate of base station resource, makes the utilization rate of resources such as base station carrier, code channel reach a higher degree, reaches 85% or higher like resource utilization.
For improving the base station resource utilization rate, at present modes of artificial input Run Script that adopt impel the base station to reach the state of high load capacity more.Yet this mode base station is one by one carried out the script operation, and the operating process relative complex causes the difficulty that artifical influence factor increases in the test process, the cooperation of a plurality of base station is tested to strengthen.In order better under the high load capacity situation, base station performance to be tested, how making the base station efficiently, fast, stably run on higher load condition has become problem demanding prompt solution.
Summary of the invention
The technical problem that the present invention will solve provides a kind of method and device of creating the test environment of base station under the heavy-duty service state, to solve the defective of existing scheme more complicated.
For addressing the above problem, the invention provides a kind of method of creating the test environment of base station under the heavy-duty service state, comprising:
After connecting with tested base station; Through to said tested base station transmitting control commands; Control said tested base station and on other idling-resource except that the service subdistrict frequency point, set up the sub-district, and in the sub-district that each has been set up, be at least one user configured subscriber equipment (UE) Resources allocation respectively according to test request; The user is sent to said tested base station according to the business datum load information of the part or all of UE of test request configuration, load and irritate package operation according to this information to specifying UE by said tested base station; Use true UE to insert said tested base station, the performance index of this tested base station are tested.
Further, said method also can have following characteristic:
Before the transmitting control commands of said tested base station, said method also comprises: send the sub-district and obtain request message to said tested base station; After this message is received in said tested base station, reply the frequency point information of all sub-districts of serving this base station;
Controlling said tested base station is meant on service other idling-resource the subdistrict frequency point, setting up the sub-district: the frequency point information of all sub-districts that the user serves according to the resource reservation situation and the said tested base station of the said tested base station of existing network is added to the configuration information of the sub-district of idling-resource configuration in said control command; After said configuration information is received in said tested base station, set up the sub-district according to said configuration information.
Further, said method also can have following characteristic:
Saidly in the sub-district that each has been set up, be at least a user configured UE Resources allocation respectively according to test request and be meant: the user is respectively each information sets of having set up at least one UE of cell configuration dresses up and send to said tested base station after Radio Link is set up request, tested base station is the corresponding UE Resources allocation in each sub-district according to the content of this request.
Further, said method also can have following characteristic:
Said tested base station is meant specifying UE to load and irritate package operation: said tested base station generates the business datum of corresponding UE according to certain rule, these data is sent to the relevant communication unit of inside of base station as the up-downgoing data of this UE.
Further, said method also can have following characteristic:
And interactive messages is and meets the base station communication protocol signaling between tested base station.
The present invention also provides a kind of device of creating the test environment of base station under the heavy-duty service state, comprising: the man-machine interaction unit, message processing unit and the communication unit that link to each other successively;
Said man-machine interaction unit is used for after said testing apparatus and tested base station connect; To the user interface is provided, supplies user's input to be used for controlling said tested base station is set up the relevant information of sub-district, is used to control the part or all of UE that said tested base station disposes for the information of at least one user configured subscriber equipment (UE) Resources allocation and according to test request in each sub-district of having set up respectively on other idling-resource that removes the service subdistrict frequency point business datum load information; Also be used for above-mentioned information is sent to said message processing unit respectively; Also be used to the information that shows that said message processing unit is sent;
Each information that said message processing unit will receive sends to said communication unit after being packaged into and meeting the base station communication protocol signaling; Also be used for after the message that said communication unit is sent parses the relevant information that can supply said man-machine interaction unit to show, sending to said man-machine interaction unit;
Said communication unit is used for the signaling of receiving from said message processing unit is sent to corresponding tested base station; Also be used for the message that reply said tested base station is sent to said message processing unit.
Further, said apparatus also can have following characteristic:
Said testing apparatus and tested base station connect and be meant: said communication unit and tested base station connect through the transmission network of radio network controller (RNC); Perhaps said communication unit is direct-connected to be connected to said tested base station to said tested base station or through switch.
Further, said apparatus also can have following characteristic:
The information that said man-machine interaction unit also is used to provide the interface for users input to be used to obtain said tested base station current service cell information also is used for showing the frequency point information of this tested base station current service cell that corresponding signaling that said message processing unit is replied from said tested base station parses.
Further, said apparatus also can have following characteristic:
Said message processing unit is used for that said man-machine interaction unit sends is used to control said tested base station and dresses up for the information sets of at least one user configured UE Resources allocation in each sub-district of having set up respectively and send to said communication unit after Radio Link is set up request.
Adopt the present invention can obtain following benefit:
1, can be forwarded to the base station through radio network controller (RadioNetwork Controller abbreviates RNC as) transmission network according to test site condition and environmental selection, also can be direct-connected to the base station;
2, can set up UE and carry out data load and Guan Bao through testing apparatus; Large tracts of land has been cut down the use amount of actual UE in the test, has been simplified the repetitive operation in the test process; Effectively raise testing efficiency, and can make higher load condition keep ground more stable;
3, can operate, load, irritate bag to a plurality of base stations simultaneously, coverage rate is wider when making test.
Description of drawings
Fig. 1 is a method flow diagram of creating the test environment of base station under the heavy-duty service state in the embodiment of the invention;
Fig. 2 is a composition frame diagram of creating the device of the test environment of base station under the heavy-duty service state in the embodiment of the invention.
Embodiment
As shown in Figure 1; The basic design of the method for the invention is: after connecting with tested base station; Through to tested base station transmitting control commands; Control tested base station and on other idling-resource except that the service subdistrict frequency point, set up the sub-district, and in the sub-district that each has been set up, be at least one user configured UE Resources allocation respectively according to test request; The user is sent to above-mentioned tested base station according to the business datum load information of the part or all of UE of above-mentioned test request configuration, load and irritate package operation according to this information to specifying UE by above-mentioned tested base station.At this moment, promptly accomplished the building work of test environment, after this, can use true UE to insert this tested base station, these tested base station performance index under the heavy-duty service state have been tested.
Below in conjunction with accompanying drawing and practical implementation method the present invention is done further to introduce in detail, but not as to qualification of the present invention.In order to set forth conveniently, hereinafter is that background is set forth embodiment with TD-SCDMA (Timedivision-Synchronous Code Division Multiple Access, TD SDMA) system.
Create the method for the test environment of base station under the heavy-duty service state, specifically may further comprise the steps:
One, testing apparatus and tested base station connect;
Testing apparatus can be direct-connected to tested base station, transmission network that also can be through RNC or switch etc. are connected to tested base station.When being connected to tested base station through the RNC transmission network; Testing apparatus is before sending message to tested base station; Need again this message to be sent to tested base station after this message packets of data format assembling according to the RNC transmission network earlier; And when using a testing apparatus simultaneously a plurality of tested base stations to be tested, this testing apparatus need provide a plurality of processes, and each process is safeguarded the communication link to one of them tested base station.
Two, the structure of test environment;
When the tested base station of test, testing apparatus sends the sub-district and obtains request message to tested base station; After this message is received in tested base station; Collect, organize the frequency point information of all sub-districts that this base station serves; And these information are replied to testing apparatus according to after the specified format encapsulation, wherein, this part sub-district that is obtained is the sub-district of real deployment in the network, foundation.The message that testing apparatus is replied according to tested base station shows the frequency point information of above-mentioned tested base station institute Serving cell on human-computer interaction interface.
Generally speaking, tested base station can't be on all available frequencies allocating cells all.Therefore, in making up the test environment process, after the frequency point information of having obtained tested base station current service cell; The user needs the resource reservation situation according to the tested base station of existing network; Be the idling-resource allocating cell on above-mentioned human-computer interaction interface, testing apparatus is set up message through sending the sub-district to tested base station then, and user configured cell parameter is sent to tested base station; Corresponding sub-district is set up according to above-mentioned cell parameter in tested base station, makes the cell carrier occupancy reach test request.The sub-district that testing apparatus sends sets up message and cell parameter all is as the criterion with the base station communication agreement, and whole layoutprocedure is carried out on the testing apparatus interactive interface.The tester is according to the concrete condition of tested base station, allocating cell parameter on human-computer interaction interface, and testing apparatus is packaged into the cell parameter that configures to be sent to tested base station after signaling is set up in the sub-district.
At last, after the occupancy of tested base station resource reached test request, the user had set up cell configuration at least one UE according to the communication protocol standard signaling for each through the human-computer interaction interface of testing apparatus.After accomplishing configuration; Testing apparatus is dressed up RU (Radio Link with above-mentioned user configured information sets; Radio Link) sends to tested base station after setting up request message, set up corresponding UE (be about to user configured UE and insert designated cell) according to this message by tested base station.After completion UE sets up process; Base station and UE do not have service data interaction; Therefore also need user's one or more UE issuing service data load message to appointment on testing apparatus, load, irritate bag according to the content of business datum loading messages to specifying UE by tested base station.The realization that loads, irritates bag is that tested base station is according to certain rule; Generate business datum; Then be sent to the relevant communication unit of tested base station to these data as the uplink and downlink data of UE, thereby realize that tested base station operates in the purpose of the high load condition of expection.
Three, test process
After making up the completion test environment, beginning follow-up test process.Use true terminal equipment to call out, according to exhaling understanding and considerate condition to analyze call completion ratio; Use the maintenance of conversing of true terminal, analyze conversation maintenance situation; After true terminal is inserted, when keeping conversation, carry out drive test, to analyze handover success rate.
Establishment according to the invention base station can run on the main frame at the testing apparatus of the test environment under the heavy-duty service state, is used for man-machine interaction.As shown in Figure 2, testing apparatus can be divided into message processing unit, communication unit and man-machine interaction unit three parts; Comprise Signaling Processing Unit, inside story processing unit and communication unit in the tested base station.The transmission network that testing apparatus can pass through network controller (like the radio network controller (Radio Network Controller abbreviates RNC as) of TD-SCDMA system) be connected to tested base station, also can be direct-connected or be connected to tested base station through switch.A testing apparatus can connect a plurality of tested base stations simultaneously, and a plurality of tested base stations are operated, and is as shown in Figure 1.
Each component units in the testing apparatus has following function:
Message processing unit, is resolved the tested base station message received, is carried out the flow process that corresponding logical process, control messages are handled according to message at the configuration information packaging and testing device message that is used for providing according to man-machine interaction unit.Result according to Message Processing sends a command to tested base station or notifies man-machine interaction unit to carry out update displayed.Particularly, this message processing unit is used for each information that receives is packaged into and sends to communication unit after meeting the base station communication protocol signaling; Also be used for after the message that communication unit is sent parses the relevant information that can supply man-machine interaction unit to show, sending to man-machine interaction unit;
Communication unit is used for the signaling of receiving from message processing unit is sent to corresponding tested base station; Also be used for the message that reply tested base station is sent to message processing unit.Also be responsible for the link keep-alive, keep communication link between single testing apparatus and a plurality of tested base station etc.
Man-machine interaction unit, interface each interactive interface of update notification real-time update that the relevant parameter of configuration testing device message, acceptance test personnel's operational order are controlled, sent according to message processing unit each step of test process.Concrete; After testing apparatus and tested base station connect; Be used for the interface being provided, supply user's input to be used for controlling tested base station is set up the relevant information of sub-district, is used to control the part or all of UE that tested base station disposes for the information of at least one user configured UE Resources allocation and according to test request in each sub-district of having set up respectively on other idling-resource that removes the service subdistrict frequency point business datum load information to the user; Also be used for above-mentioned information is sent to message processing unit respectively; Also be used for the information that the display message processing unit is sent.
Data by the process that testing apparatus is sent to corresponding tested base station are: on human-computer interaction interface, by the user (input that is relevant information) operated in any one or more tested base stations, operation information was consigned to message processing unit after operation was accomplished.After being encapsulated as the form of appointment to operation information by message processing unit according to the base station communication agreement, consign to communication unit.Communication unit is issued corresponding tested base station to message according to the Information Selection link corresponding of tested base station in the message, and final completion is mutual with tested base station.
Processing procedure and said process after tested base station data sent arrives at are opposite, and the communication unit interface can be judged the source of message according to the information of receiving, and informs message processing unit.Finally, message processing unit parses some necessary information and issues man-machine interaction unit from this message, be shown to the user by man-machine interaction unit.
Each component units in the tested base station has following function:
The signaling message processing unit is set up signaling message, control signaling message handling process that testing apparatus is replied in sub-district that the testing apparatus signaling describes and UE, assembling.
The inside story processing unit is used to handle test command that testing apparatus sends, behind the test command that the acceptance test device sends, and coordinates tested base station resource according to the content measurement of order request, controls tested base station software and carries out test implementation.
Communication unit, the message of being responsible for that testing apparatus is sent receive and transmit, send message and link keep-alive to testing apparatus.
One of ordinary skill in the art will appreciate that all or part of step in the said method can instruct related hardware to accomplish through program, said program can be stored in the computer-readable recording medium, like read-only memory, disk or CD etc.Alternatively, all or part of step of the foregoing description also can use one or more integrated circuits to realize.Correspondingly, each the module/unit in the foregoing description can adopt the form of hardware to realize, also can adopt the form of software function module to realize.The present invention is not restricted to the combination of the hardware and software of any particular form.

Claims (9)

1. method of creating the test environment of base station under the heavy-duty service state comprises:
After connecting with tested base station; Through to said tested base station transmitting control commands; Control said tested base station and on other idling-resource except that the service subdistrict frequency point, set up the sub-district, and in the sub-district that each has been set up, be at least one user configured subscriber equipment (UE) Resources allocation respectively according to test request; The user is sent to said tested base station according to the business datum load information of the part or all of UE of test request configuration, load and irritate package operation according to this information to specifying UE by said tested base station; Use true UE to insert said tested base station, the performance index of this tested base station are tested.
2. the method for claim 1 is characterized in that:
Before the transmitting control commands of said tested base station, said method also comprises: send the sub-district and obtain request message to said tested base station; After this message is received in said tested base station, reply the frequency point information of all sub-districts of serving this base station;
Controlling said tested base station is meant on service other idling-resource the subdistrict frequency point, setting up the sub-district: the frequency point information of all sub-districts that the user serves according to the resource reservation situation and the said tested base station of the said tested base station of existing network is added to the configuration information of the sub-district of idling-resource configuration in said control command; After said configuration information is received in said tested base station, set up the sub-district according to said configuration information.
3. method as claimed in claim 2 is characterized in that:
Saidly in the sub-district that each has been set up, be at least a user configured UE Resources allocation respectively according to test request and be meant: the user is respectively each information sets of having set up at least one UE of cell configuration dresses up and send to said tested base station after Radio Link is set up request, tested base station is the corresponding UE Resources allocation in each sub-district according to the content of this request.
4. method as claimed in claim 3 is characterized in that:
Said tested base station is meant specifying UE to load and irritate package operation: said tested base station generates the business datum of corresponding UE according to certain rule, these data is sent to the relevant communication unit of inside of base station as the up-downgoing data of this UE.
5. like any described method in the claim 1~4, it is characterized in that:
And interactive messages is and meets the base station communication protocol signaling between tested base station.
6. a device of creating the test environment of base station under the heavy-duty service state comprises: the man-machine interaction unit, message processing unit and the communication unit that link to each other successively;
Said man-machine interaction unit is used for after said testing apparatus and tested base station connect; To the user interface is provided, supplies user's input to be used for controlling said tested base station is set up the relevant information of sub-district, is used to control the part or all of UE that said tested base station disposes for the information of at least one user configured subscriber equipment (UE) Resources allocation and according to test request in each sub-district of having set up respectively on other idling-resource that removes the service subdistrict frequency point business datum load information; Also be used for above-mentioned information is sent to said message processing unit respectively; Also be used to the information that shows that said message processing unit is sent;
Each information that said message processing unit will receive sends to said communication unit after being packaged into and meeting the base station communication protocol signaling; Also be used for after the message that said communication unit is sent parses the relevant information that can supply said man-machine interaction unit to show, sending to said man-machine interaction unit;
Said communication unit is used for the signaling of receiving from said message processing unit is sent to corresponding tested base station; Also be used for the message that reply said tested base station is sent to said message processing unit.
7. like any described device in the claim 6, it is characterized in that:
Said testing apparatus and tested base station connect and be meant: said communication unit and tested base station connect through the transmission network of radio network controller (RNC); Perhaps said communication unit is direct-connected to be connected to said tested base station to said tested base station or through switch.
8. like claim 6 or 7 described devices, it is characterized in that:
The information that said man-machine interaction unit also is used to provide the interface for users input to be used to obtain said tested base station current service cell information also is used for showing the frequency point information of this tested base station current service cell that corresponding signaling that said message processing unit is replied from said tested base station parses.
9. like claim 6 or 7 described devices, it is characterized in that:
Said message processing unit is used for that said man-machine interaction unit sends is used to control said tested base station and dresses up for the information sets of at least one user configured UE Resources allocation in each sub-district of having set up respectively and send to said communication unit after Radio Link is set up request.
CN201010234934.3A 2010-07-21 2010-07-21 Method and device for creating test environment of base station in high-load operation state Expired - Fee Related CN102340813B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010234934.3A CN102340813B (en) 2010-07-21 2010-07-21 Method and device for creating test environment of base station in high-load operation state

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010234934.3A CN102340813B (en) 2010-07-21 2010-07-21 Method and device for creating test environment of base station in high-load operation state

Publications (2)

Publication Number Publication Date
CN102340813A true CN102340813A (en) 2012-02-01
CN102340813B CN102340813B (en) 2014-08-13

Family

ID=45516259

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010234934.3A Expired - Fee Related CN102340813B (en) 2010-07-21 2010-07-21 Method and device for creating test environment of base station in high-load operation state

Country Status (1)

Country Link
CN (1) CN102340813B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102651881A (en) * 2012-04-13 2012-08-29 大唐移动通信设备有限公司 Parameter modifying method and system in test of external field of wireless network
WO2017219539A1 (en) * 2016-06-22 2017-12-28 中兴通讯股份有限公司 Method, device and system for automatically adjusting downlink udp packet forwarding flow
WO2023185018A1 (en) * 2022-03-28 2023-10-05 华为技术有限公司 Communication control method, communication device and medium

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1867148A (en) * 2005-12-07 2006-11-22 华为技术有限公司 Method and system for realizing downlink artificial load in communication system
US20100075678A1 (en) * 2008-09-23 2010-03-25 Arda Akman Methods, systems, and computer readable media for stress testing mobile network equipment using a common public radio interface (cpri)
CN102075995A (en) * 2009-11-24 2011-05-25 中兴通讯股份有限公司 Method and device for simulating load of wireless communication system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1867148A (en) * 2005-12-07 2006-11-22 华为技术有限公司 Method and system for realizing downlink artificial load in communication system
US20100075678A1 (en) * 2008-09-23 2010-03-25 Arda Akman Methods, systems, and computer readable media for stress testing mobile network equipment using a common public radio interface (cpri)
CN102075995A (en) * 2009-11-24 2011-05-25 中兴通讯股份有限公司 Method and device for simulating load of wireless communication system

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102651881A (en) * 2012-04-13 2012-08-29 大唐移动通信设备有限公司 Parameter modifying method and system in test of external field of wireless network
CN102651881B (en) * 2012-04-13 2015-02-11 大唐移动通信设备有限公司 Parameter modifying method and system in test of external field of wireless network
WO2017219539A1 (en) * 2016-06-22 2017-12-28 中兴通讯股份有限公司 Method, device and system for automatically adjusting downlink udp packet forwarding flow
CN107529197A (en) * 2016-06-22 2017-12-29 中兴通讯股份有限公司 A kind of method, apparatus and system for automatically adjusting descending UDP and filling packet stream amount
CN107529197B (en) * 2016-06-22 2021-10-08 中兴通讯股份有限公司 Method, device and system for automatically adjusting downlink UDP (user Datagram protocol) packet flow
WO2023185018A1 (en) * 2022-03-28 2023-10-05 华为技术有限公司 Communication control method, communication device and medium

Also Published As

Publication number Publication date
CN102340813B (en) 2014-08-13

Similar Documents

Publication Publication Date Title
CN103200615B (en) A kind of method and device carrying out transfer of data in a communication network
CN103945443B (en) A kind of TD-LTE wireless network traffic performance test methods and system
CN101795465A (en) Method and equipment for group management of APs
CN105682146A (en) Data transmission method and device and user equipment
CN106304403A (en) A kind of multi-link method for building up and relevant device
CN110557690B (en) Radio remote hub RHUB, indoor communication system and signal transmission method
CN103828481B (en) Data transmission set, communication system and communication means
CN103763700A (en) Method for sensing off-line identity information of mobile terminal
CN110234175A (en) A kind of ad hoc network coordination approach, device, system, equipment and storage medium
CN102076044B (en) Switching method and equipment
CN103517339A (en) System for realizing data traffic shunting by WLAN, equipment and method
CN105323194A (en) Base band data exchange apparatus and method
CN102340813B (en) Method and device for creating test environment of base station in high-load operation state
CN107666688A (en) Public flow implementation method, apparatus and system
CN103686936B (en) The cut-in method of packet switching service and evolution base station
CN106028425A (en) Wireless communication connection control method and device
CN105992303B (en) A kind of access and its control method, device and user equipment of multimode UE
CN103260219B (en) A kind of mobile communication network and method
CN110392347A (en) Data transmission method and device
CN104053159A (en) Method and device for distributing frequency points to multi-carrier base station
CN102835145B (en) Electricity adjusts methods, devices and systems
CN108924941B (en) Information transmission method and base station
CN103581937B (en) Device and method for testing wireless controller
CN106162666A (en) A kind of configuring method for neighboring area and device
CN105657753A (en) Method and device for redirecting among systems

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20171017

Address after: 510000 unit 2414-2416, building, No. five, No. 371, Tianhe District, Guangdong, China

Patentee after: GUANGDONG GAOHANG INTELLECTUAL PROPERTY OPERATION Co.,Ltd.

Address before: 518057 Nanshan District Guangdong high tech Industrial Park, South Road, science and technology, ZTE building, Ministry of Justice

Patentee before: ZTE Corp.

TR01 Transfer of patent right
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Yang Yuandan

Inventor before: Guo Zhiqi

Inventor before: Long Gang

Inventor before: Yu Chaoyang

Inventor before: Zhu Shutian

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20171023

Address after: 200000 building 218, No. 1, West Tianmu Road, Shanghai, Jingan District, 21

Patentee after: SHANGHAI FUTIAN QUANTUM TECHNOLOGY Co.,Ltd.

Address before: 510000 unit 2414-2416, building, No. five, No. 371, Tianhe District, Guangdong, China

Patentee before: GUANGDONG GAOHANG INTELLECTUAL PROPERTY OPERATION Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140813