CN102323975A - Message correctness judging method of IEC61850-based model file - Google Patents
Message correctness judging method of IEC61850-based model file Download PDFInfo
- Publication number
- CN102323975A CN102323975A CN201110161336A CN201110161336A CN102323975A CN 102323975 A CN102323975 A CN 102323975A CN 201110161336 A CN201110161336 A CN 201110161336A CN 201110161336 A CN201110161336 A CN 201110161336A CN 102323975 A CN102323975 A CN 102323975A
- Authority
- CN
- China
- Prior art keywords
- message
- goose
- model file
- information
- captures
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Debugging And Monitoring (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110161336.2A CN102323975B (en) | 2011-06-16 | 2011-06-16 | Message correctness judging method of IEC61850-based model file |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110161336.2A CN102323975B (en) | 2011-06-16 | 2011-06-16 | Message correctness judging method of IEC61850-based model file |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102323975A true CN102323975A (en) | 2012-01-18 |
CN102323975B CN102323975B (en) | 2015-03-11 |
Family
ID=45451717
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110161336.2A Expired - Fee Related CN102323975B (en) | 2011-06-16 | 2011-06-16 | Message correctness judging method of IEC61850-based model file |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102323975B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102594622A (en) * | 2012-02-23 | 2012-07-18 | 河北省电力研究院 | Method for detecting GOOSE (generic object oriented substation event) messages of digital substation |
CN103096013A (en) * | 2013-01-08 | 2013-05-08 | 广东电网公司电力调度控制中心 | Method and system for joint debugging communication |
CN103856372A (en) * | 2014-03-11 | 2014-06-11 | 电信科学技术仪表研究所 | Method and device for monitoring GOOSE messages of digital substation |
WO2015176516A1 (en) * | 2014-05-21 | 2015-11-26 | 中兴通讯股份有限公司 | Method and apparatus for tracking service process |
CN114664121A (en) * | 2022-03-23 | 2022-06-24 | 合肥置顶信息技术有限公司 | Intelligent error-correcting civil aviation meteorological observation making and publishing system and method |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100820923B1 (en) * | 2007-01-30 | 2008-04-11 | 명지대학교 산학협력단 | Apparatus and method for detecting ied abnormal state on-line in substation automation system based on iec61850 |
KR20080094490A (en) * | 2007-04-20 | 2008-10-23 | 현대중공업 주식회사 | Data acquisition device |
CN101432612A (en) * | 2006-04-24 | 2009-05-13 | Abb研究有限公司 | Intelligent electronic device configuration verification |
CN101609407A (en) * | 2009-07-22 | 2009-12-23 | 天津市电力公司 | Detection method based on the full station model file coupling of publisher/subscriber's pattern |
CN101771581A (en) * | 2009-12-16 | 2010-07-07 | 广东电网公司电力科学研究院 | Server-side simulating system based on IEC61850 and method thereof |
CN102005818A (en) * | 2010-11-10 | 2011-04-06 | 国电南瑞科技股份有限公司 | Method for detecting consistency of SCD (System Configuration Document) and IED (Intelligent Electronic Device) model on line |
CN101706816B (en) * | 2009-12-22 | 2011-05-04 | 广东电网公司电力科学研究院 | Method for detecting digitized transformer station model |
CN102075378A (en) * | 2010-12-10 | 2011-05-25 | 浙江省电力试验研究院 | IEC61850 standard-based GOOSE communication simulation method |
-
2011
- 2011-06-16 CN CN201110161336.2A patent/CN102323975B/en not_active Expired - Fee Related
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101432612A (en) * | 2006-04-24 | 2009-05-13 | Abb研究有限公司 | Intelligent electronic device configuration verification |
KR100820923B1 (en) * | 2007-01-30 | 2008-04-11 | 명지대학교 산학협력단 | Apparatus and method for detecting ied abnormal state on-line in substation automation system based on iec61850 |
KR20080094490A (en) * | 2007-04-20 | 2008-10-23 | 현대중공업 주식회사 | Data acquisition device |
CN101609407A (en) * | 2009-07-22 | 2009-12-23 | 天津市电力公司 | Detection method based on the full station model file coupling of publisher/subscriber's pattern |
CN101771581A (en) * | 2009-12-16 | 2010-07-07 | 广东电网公司电力科学研究院 | Server-side simulating system based on IEC61850 and method thereof |
CN101706816B (en) * | 2009-12-22 | 2011-05-04 | 广东电网公司电力科学研究院 | Method for detecting digitized transformer station model |
CN102005818A (en) * | 2010-11-10 | 2011-04-06 | 国电南瑞科技股份有限公司 | Method for detecting consistency of SCD (System Configuration Document) and IED (Intelligent Electronic Device) model on line |
CN102075378A (en) * | 2010-12-10 | 2011-05-25 | 浙江省电力试验研究院 | IEC61850 standard-based GOOSE communication simulation method |
Non-Patent Citations (5)
Title |
---|
中华人民共和国国家发展和改革委员会: "变电站通信网络和系统第10部分:一致性测试", 《中华人民共和国电力行业标准 DL/T 860.10-2006/IEC61850-10:2005》 * |
张世强: "基于IEC 61850规约的保护装置GOOSE报文测试工具的开发", 《中国优秀硕士论文全文数据库工程科技II辑(月刊)》 * |
张帆等: "面向通用对象的变电站事件(G00SE)实时解析和预警系统", 《电力系统保护与控制》 * |
李忠明等: "IEC61850 SCD文件导入生成嵌入式远动系统装置定义的通用方法", 《电力自动化设备》 * |
李铁成等: "数字化变电站GOOSE网络故障分析及处理", 《河北电力技术》 * |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102594622A (en) * | 2012-02-23 | 2012-07-18 | 河北省电力研究院 | Method for detecting GOOSE (generic object oriented substation event) messages of digital substation |
WO2013123752A1 (en) * | 2012-02-23 | 2013-08-29 | 河北省电力研究院 | Method and system for detecting goose messages of digital substation |
CN103096013A (en) * | 2013-01-08 | 2013-05-08 | 广东电网公司电力调度控制中心 | Method and system for joint debugging communication |
CN103096013B (en) * | 2013-01-08 | 2015-08-12 | 广东电网公司电力调度控制中心 | Uniting and adjustment communication means and system |
CN103856372A (en) * | 2014-03-11 | 2014-06-11 | 电信科学技术仪表研究所 | Method and device for monitoring GOOSE messages of digital substation |
CN103856372B (en) * | 2014-03-11 | 2017-08-15 | 电信科学技术仪表研究所 | A kind of monitoring method and monitoring device of digital transformer substation GOOSE message |
WO2015176516A1 (en) * | 2014-05-21 | 2015-11-26 | 中兴通讯股份有限公司 | Method and apparatus for tracking service process |
CN114664121A (en) * | 2022-03-23 | 2022-06-24 | 合肥置顶信息技术有限公司 | Intelligent error-correcting civil aviation meteorological observation making and publishing system and method |
CN114664121B (en) * | 2022-03-23 | 2024-01-09 | 合肥置顶信息技术有限公司 | Intelligent error correction civil aviation meteorological observation making and publishing system and method |
Also Published As
Publication number | Publication date |
---|---|
CN102323975B (en) | 2015-03-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103631921B (en) | A kind of configuration information of transformer substation detection method and device | |
CN108268706B (en) | Closed loop test system and method for intelligent alarm application of integrated monitoring system | |
CN107180314B (en) | Operation and maintenance business model modeling method based on primary and secondary system incidence relation | |
CN106530121B (en) | Method and system for detecting safety protection compliance of power monitoring system | |
CN103105556A (en) | Intelligent power grid load testing and recognition method based on steady state and transient state characteristic joint matching | |
CN110855503A (en) | Fault cause determining method and system based on network protocol hierarchy dependency relationship | |
CN104155580A (en) | Voltage sag source positioning method with association analysis and electric power calculation being combined | |
CN102323975B (en) | Message correctness judging method of IEC61850-based model file | |
CN103227734A (en) | Method for detecting abnormity of OpenStack cloud platform | |
CN109767054A (en) | Efficiency cloud appraisal procedure and edge efficiency gateway based on deep neural network algorithm | |
BR112022010464A2 (en) | ANNOTATION, COLLECTION AND PROCESSING OF USER-FEEDED AI DATA ON DEMAND | |
CN104052633A (en) | Integrated testing method for intelligent station 61850 and telecontrol 104 protocol | |
CN105184886A (en) | Cloud data center intelligence inspection system and cloud data center intelligence inspection method | |
CN112785108A (en) | Power grid operation data correlation analysis method and system based on regulation cloud | |
CN102692558A (en) | Monitoring and analyzing system for electricity data and realization method thereof | |
CN113131378A (en) | Intelligent inspection system and method for secondary system of transformer substation based on image recognition | |
CN110968703B (en) | Method and system for constructing abnormal metering point knowledge base based on LSTM end-to-end extraction algorithm | |
CN103529337B (en) | The recognition methods of nonlinear correlation relation between equipment failure and electric quantity information | |
Li et al. | Identification of distribution network topology parameters based on multidimensional operation data | |
CN103235791A (en) | Optimizing positioning method for fingerprint-matching based on rank order | |
CN116881958A (en) | Power grid big data safety protection method, system, electronic equipment and storage medium | |
CN109946640B (en) | Special transformer terminal voltage and current loss judgment method based on metering automation system data | |
CN104158852A (en) | Information interaction detection system for low-voltage meter reading concentrator and local communication module | |
US20230070173A1 (en) | Cloud-end collaborative system and method for load identification | |
CN104850484A (en) | Bitmap analysis based automatic determination method for character terminal interactive state |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: STATE GRID CORPORATION OF CHINA HEBEI ELECTRIC POW Effective date: 20121219 Owner name: HEBEI ELECTRIC POWER CORPORATION ELECTRIC POWER RE Free format text: FORMER OWNER: HEBEI ELECTRIC POWER RESEARCH INSTITUTE Effective date: 20121219 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 050000 SHIJIAZHUANG, HEBEI PROVINCE TO: 050021 SHIJIAZHUANG, HEBEI PROVINCE |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20121219 Address after: 050021 No. 238 South Sports street, Yuhua Road, Hebei, Shijiazhuang Applicant after: Electric Power Research Institute of Hebei Electric Power Corporation Applicant after: State Grid Corporation of China Applicant after: Hebei Electric Power Construction & Adjustment Research Institute Address before: 050000 Hebei city of Shijiazhuang Province Sports Street No. 232 Applicant before: Hebei Electric Power Research Institute |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150311 Termination date: 20150616 |
|
EXPY | Termination of patent right or utility model |